CN102842868B - The method of Electrified fastening hammer for preventing conductor from vibration bolt - Google Patents

The method of Electrified fastening hammer for preventing conductor from vibration bolt Download PDF

Info

Publication number
CN102842868B
CN102842868B CN201210327525.7A CN201210327525A CN102842868B CN 102842868 B CN102842868 B CN 102842868B CN 201210327525 A CN201210327525 A CN 201210327525A CN 102842868 B CN102842868 B CN 102842868B
Authority
CN
China
Prior art keywords
bolt
slide block
ratchet
handle
stockbridge damper
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201210327525.7A
Other languages
Chinese (zh)
Other versions
CN102842868A (en
Inventor
屈以军
后承康
陈自立
牛永志
王龙全
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
State Grid Corp of China SGCC
Chuzhou Power Supply Co of State Grid Anhui Electric Power Co Ltd
Original Assignee
State Grid Corp of China SGCC
Chuzhou Power Supply Co of State Grid Anhui Electric Power Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by State Grid Corp of China SGCC, Chuzhou Power Supply Co of State Grid Anhui Electric Power Co Ltd filed Critical State Grid Corp of China SGCC
Priority to CN201210327525.7A priority Critical patent/CN102842868B/en
Publication of CN102842868A publication Critical patent/CN102842868A/en
Application granted granted Critical
Publication of CN102842868B publication Critical patent/CN102842868B/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Electric Cable Installation (AREA)

Abstract

The invention discloses a kind of method of Electrified fastening hammer for preventing conductor from vibration bolt, bolt tightener is adopted to carry out fastening to described wire stockbridge damper bolt, described fastener comprises: front end is provided with the ratchet spanner of ratchet carriage, and the handle of described ratchet spanner is provided with strip groove along its length; The slide block that can slide along the groove on described handle, described slide block is provided with locking member can by described slider locking on handle, and the end of described locking member connects with action bars.On bar, operating personnel carry out fastening by action bars rotating ratchet spanner to stockbridge damper bolt, the present invention can improve processing safety, increases work efficiency, by indirect live working method (earth potential working), carry out fastening by operating personnel on shaft tower with insulating bar formula fastener to stockbridge damper set bolt.<!--1-->

Description

The method of Electrified fastening hammer for preventing conductor from vibration bolt
Technical field:
The present invention relates to a kind of method of Electrified fastening hammer for preventing conductor from vibration bolt.
Background technology:
Hammer for preventing conductor from vibration is one of important protective hardware of transmission line, and main effect avoids wire not to be subject to vibrating by wind the damage caused in running.Require to install according to defined after the installation of hammer for preventing conductor from vibration is all through calculating, its antihunt action is not just had once stockbridge damper generation slip positioning, the vibration of wire is made constantly to be sent to hitch point i.e. the suspension clamp place of wire, finally cause wire to produce metal fatigue, and wire strand breakage line-outage contingency occurs.
Continue to prevent hammer for preventing conductor from vibration slip positioning occurs, first to reset to the stockbridge damper of positioning in maintenance process, then will tighten up the stockbridge damper of non-positioning, be all generally that combined circuit power failure chance establishment officer carries out surprise and tightens up.But it is the low-down work of a large operating efficiency of labour intensity that stockbridge damper tightens up in circuit service work, to hang on after operating personnel's rod-rising tower and hang up properly rope ladder or vertical ladder, then on wire under, wire hangs up properly coaster again, to coaster, slide into stockbridge damper place, side under personnel carries out fastening, carries out fastening under then returning upper conductor to opposite side.Be with the many inefficiencys of Work tool four people group within one day, to complete at most the fastening work of 3-4 base.
Summary of the invention:
For overcoming the defect of prior art, the object of the present invention is to provide a kind of method of Electrified fastening hammer for preventing conductor from vibration bolt, to improve processing safety, increase work efficiency, by indirect live working method (earth potential working), to carry out fastening with insulating bar, fastener to stockbridge damper set bolt by operating personnel on shaft tower.
Technical solution problem of the present invention adopts following technical scheme:
The method of Electrified fastening hammer for preventing conductor from vibration bolt, adopt bolt tightener to carry out fastening to described wire stockbridge damper bolt, described fastener comprises:
Front end is provided with the ratchet spanner of ratchet carriage, and the handle of described ratchet spanner is provided with strip groove along its length;
The slide block that can slide along the groove on described handle, described slide block is provided with locking member can by described slider locking on handle, and the end of described locking member connects with action bars; Described locking member comprises: the boring nut being fixed on described slide block lower end, the fastening bolt coordinated with described snail box thread, the upper end of described fastening bolt extend into described slide block inner chamber can with the wall contacts of described handle, the lower end of fastening bolt is provided with cross clamping groove and connects with action bars;
Described slide block is socketed on the handle of described ratchet spanner with the inner chamber of its hollow, and slide block is provided with the caging bolt passed in described groove;
The fastening of hammer for preventing conductor from vibration bolt is carried out according to the following steps:
1) on bar, operating personnel carries bolt tightener and enters cross-arm position, by Ground Operation personnel with insulation transmit rope action bars passed to be in cross-arm position bar on operating personnel, on bar, fastener and action bars are carried out positive connection by operating personnel, determine that the direction adjusting knob on ratchet carriage is in tram;
2) on bar, square slider is drawn the position near ratchet carriage by operating personnel, tightens fixing square slider, delivers to stockbridge damper bolt position by action bars, ratchet carriage is inserted in stockbridge damper nut by fastening bolt;
3) slide block is moved to the groove afterbody of ratchet spanner by rotating operation bar screwed tightening fixing bolt, then promotes action bars back and forth along line direction and ratchet spanner is swung, and ratchet carriage and stockbridge damper bolt link and rotate, and realize the object of stockbridge damper bolted.
Compared with the prior art, beneficial effect of the present invention is embodied in:
1, whether fastening work is not subject to the time and has a power failure to affect.
2, single, double time circuit homework of 110 kilovolt of-220 KV transmission line is applicable to.
3, reduce operating personnel's labour intensity, reduce human users's fault rate, improve the fail safe of operating personnel and equipment.After operating personnel's rod-rising tower is in place, carry out fastening work with regard to ratchet wheel tensioner on available action bar.
4, Work tool reduces, without lower wire operation, and several times of can increasing work efficiency.
Accompanying drawing illustrates:
Fig. 1,2 is front view, the vertical view of ratchet spanner of the present invention; Fig. 3 is that in the present invention, slide block and locking member thereof are socketed on the front view on pinch bar, and Fig. 4 is the right view of slide block and locking member thereof in Fig. 3; Fig. 5 is the process chart that action bars coordinates with fastener.
Number in the figure: 1 ratchet carriage, 2 grooves, 3 slide blocks, 4 fastening bolts, 5 caging bolts, 6 boring nuts, 7 action bars.
Below by way of embodiment, and the invention will be further described by reference to the accompanying drawings.
Embodiment:
Embodiment: composition graphs 1-5, stockbridge damper bolt tightener, it comprises:
Ratchet spanner, its front end is provided with ratchet carriage 1, the handle of ratchet spanner is provided with strip groove 2 along its length, slide block 3 is socketed on the handle of ratchet spanner by the inner chamber of its hollow and also can slides on handle, in order to carry out spacing to the sliding stroke of slide block, anti-limited slip block comes off from handle, and slide block 3 is provided with the caging bolt 5 passed in groove 2.
In order to slide block being locked on the handle of ratchet spanner, boring nut 6 is fixedly connected with in the lower end of slide block 3, fastening bolt 4 coordinates with snail box thread, the upper end of fastening bolt extend into slide block 3 inner chamber can with the wall contacts of handle, the lower end of fastening bolt is provided with cross clamping groove and connects with action bars 7.
The object that slide block can slide on the handle of ratchet spanner is, in fastener cycle, the handle of ratchet spanner is more long more laborsaving, but to be fixed on action bars unstable again for ratchet spanner handle rear end after reaching certain length, operating personnel is difficult to be entangled by stockbridge damper nut with the ratchet carriage of front end, therefore a strip groove to be outputed on the handle of ratchet spanner, before ratchet carriage is inserted in stockbridge damper nut, the position of slide block is comparatively near ratchet carriage one end, after being inserted in, can by skid to the end of ratchet spanner handle, to increase moment during rotation.
The fastening of hammer for preventing conductor from vibration bolt is carried out according to the following steps:
Preparation under shaft tower: check waistband, step on bar instrument, personal protection apparatus is well complete, correctly wear; Check that shaft tower root is firm.
1) on bar, operating personnel carries bolt tightener, bar is stepped in transmission rope (be made up of becket bridle, single-sheaved block, band clasp insulation ropes, insulation ropes penetrates single-sheaved block), enters cross-arm position; Enter cross-arm position, by Ground Operation personnel with insulation transmit rope action bars passed to be in cross-arm position bar on operating personnel, on bar, fastener and action bars are carried out positive connection by operating personnel, determine that the direction adjusting knob on ratchet carriage 1 is in tram;
2) on bar, operating personnel, by the position of square slider 3 strokes to close ratchet carriage 1, tightens fixing square slider 3 by fastening bolt 4, delivers to stockbridge damper bolt position by action bars 7, ratchet carriage 1 is inserted in stockbridge damper nut;
3) slide block 3 is moved to the groove afterbody of ratchet spanner by rotating operation bar screwed tightening fixing bolt 4, then promotes action bars back and forth along line direction and ratchet spanner is swung, and ratchet carriage 1 and stockbridge damper bolt link and rotate, and realize the object of stockbridge damper bolted.
To be tightened completely after, ratchet carriage 1 is withdrawn from stockbridge damper nut, personnel's lower beam; Under the commander and monitoring of work director, operating personnel's finishing tool material, cleaning work is on-the-spot, safe escape working site, end-of-job.

Claims (1)

1. the method for Electrified fastening hammer for preventing conductor from vibration bolt, is characterized in that, adopt bolt tightener to carry out fastening to described wire stockbridge damper bolt, described fastener comprises:
Front end is provided with the ratchet spanner of ratchet carriage (1), the handle of described ratchet spanner is provided with along its length strip groove (2);
The slide block (3) that can slide along the groove (2) on described handle, described slide block (3) is provided with locking member can by described slider locking on handle, and the end of described locking member connects with action bars; Described locking member comprises: the boring nut (6) being fixed on described slide block (3) lower end, the fastening bolt (4) coordinated with described snail box thread, the upper end of described fastening bolt extend into described slide block inner chamber can with the wall contacts of described handle, the lower end of fastening bolt is provided with cross clamping groove and connects with action bars;
Described slide block (3) is socketed on the inner chamber of its hollow on the handle of described ratchet spanner, and slide block (3) is provided with the caging bolt (5) passed in described groove (2);
The fastening of hammer for preventing conductor from vibration bolt is carried out according to the following steps:
1) on bar, operating personnel carries bolt tightener and enters cross-arm position, by Ground Operation personnel with insulation transmit rope action bars passed to be in cross-arm position bar on operating personnel, on bar, fastener and action bars are carried out positive connection by operating personnel, determine that the direction adjusting knob on ratchet carriage (1) is in tram;
2) on bar, square slider (3) is drawn the position near ratchet carriage (1) by operating personnel, fixing square slider (3) is tightened by fastening bolt (4), deliver to stockbridge damper bolt position by action bars, ratchet carriage (1) is inserted in stockbridge damper nut;
3) slide block (3) is moved to the groove afterbody of ratchet spanner by rotating operation bar screwed tightening fixing bolt (4), then promoting action bars back and forth along line direction makes ratchet spanner swing, ratchet carriage (1) and stockbridge damper bolt link and rotate, and realize the object of stockbridge damper bolted;
4) to be tightened completely after, ratchet carriage 1 is withdrawn from stockbridge damper nut, personnel's lower beam; Under the commander and monitoring of work director, operating personnel's finishing tool material, cleaning work is on-the-spot, safe escape working site, end-of-job.
CN201210327525.7A 2012-09-06 2012-09-06 The method of Electrified fastening hammer for preventing conductor from vibration bolt Expired - Fee Related CN102842868B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201210327525.7A CN102842868B (en) 2012-09-06 2012-09-06 The method of Electrified fastening hammer for preventing conductor from vibration bolt

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201210327525.7A CN102842868B (en) 2012-09-06 2012-09-06 The method of Electrified fastening hammer for preventing conductor from vibration bolt

Publications (2)

Publication Number Publication Date
CN102842868A CN102842868A (en) 2012-12-26
CN102842868B true CN102842868B (en) 2016-01-27

Family

ID=47370012

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201210327525.7A Expired - Fee Related CN102842868B (en) 2012-09-06 2012-09-06 The method of Electrified fastening hammer for preventing conductor from vibration bolt

Country Status (1)

Country Link
CN (1) CN102842868B (en)

Families Citing this family (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104552175B (en) * 2013-10-12 2017-04-26 国家电网公司 Multifunctional overhaul tool
CN103683104A (en) * 2013-12-11 2014-03-26 云南电网公司昆明供电局 Ratchet wheel type combined tool for fastening jumper conductor clamp in charged mode
CN106451230A (en) * 2016-09-05 2017-02-22 国家电网公司 Vibration-proofing hammer electric installation tool
CN108988208A (en) * 2018-08-02 2018-12-11 刘少广 A kind of earth potential live benefit dress power line conductive line side bolt and nut operational instrument
CN113852015B (en) * 2021-09-24 2023-04-07 广东电网有限责任公司 Wire stripper
CN113889918B (en) * 2021-10-21 2023-04-18 国家电网有限公司 Electrified repacking system of transmission line bolt cotter pin
CN114799846B (en) * 2022-05-13 2023-06-13 安徽博晟亿电力科技有限公司 High-strength bolt fastening device for damper and method thereof

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH08196010A (en) * 1995-01-11 1996-07-30 Nishi Nippon Densen Kk Connecting clamp
CN201256263Y (en) * 2008-10-06 2009-06-10 江西景德镇供电公司 Live fastener for manufacturing metal bolt
CN201300393Y (en) * 2008-11-20 2009-09-02 许延龙 Spanner

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH08196010A (en) * 1995-01-11 1996-07-30 Nishi Nippon Densen Kk Connecting clamp
CN201256263Y (en) * 2008-10-06 2009-06-10 江西景德镇供电公司 Live fastener for manufacturing metal bolt
CN201300393Y (en) * 2008-11-20 2009-09-02 许延龙 Spanner

Also Published As

Publication number Publication date
CN102842868A (en) 2012-12-26

Similar Documents

Publication Publication Date Title
CN102842868B (en) The method of Electrified fastening hammer for preventing conductor from vibration bolt
CN102623926B (en) Distant equipotential tackle and method for realizing charged equipotential access by using same
CN103683104A (en) Ratchet wheel type combined tool for fastening jumper conductor clamp in charged mode
CN105305317A (en) Tool of suspending insulated flexible ladder on live wires
CN107528257B (en) Power transmission line damper position adjusting device
CN104638563A (en) High-voltage transmission line conveying device
CN102801116B (en) Operating rod type stockbridge damper bolt tightener
CN202023497U (en) Special rope ladder between tower and lead
CN104158112A (en) Multi-purpose pedaled flying vehicle
CN202602223U (en) Operating rod type antivibration hammer bolt fastener
CN104836149A (en) Tool for removing foreign matter from bundled conductor of high-voltage line in live working manner and method for removing foreign matter
CN206250670U (en) It is a kind of to be easy to operation and safe replacing device for insulator
CN110707599A (en) Special tool for electrified adjustment of 220kv vertically-arranged double-bundle conductor sag
CN101366994A (en) Falling-proof equipment for human on electrical pole with rope sleeve regulating lever
CN205141535U (en) Live conductor hangs instrument of insulating rope ladder
CN203859438U (en) Multipurpose pedaling type overhead carriage
CN206022675U (en) Universal shaped cable clamp earth lead
CN106229881B (en) Into the method and rope ladder head used of 500/220 kilovolt of multiple-loop line transmission line of electricity electric field
CN210779813U (en) Special tool for adjusting sag of 220kV vertically-arranged double-bundle conductor in electrified manner
CN202978127U (en) Wire barrow with brake apparatus
CN206471748U (en) Universal 500kV straight lines wineglass tower line maintenance cross-arm hanging point device
CN204835355U (en) Electrified foreign matter instrument of demolising of high voltage transmission lines split conductor
CN204651778U (en) A kind of servicing unit changing electric transmission line isolator
CN102420402A (en) New technology for electrified fastening drainage wire clamp
CN205092508U (en) Special use of suspension type composite insulator is rolled off production line and is hung ladder

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
ASS Succession or assignment of patent right

Owner name: STATE GRID CORPORATION OF CHINA

Effective date: 20121204

C41 Transfer of patent application or patent right or utility model
TA01 Transfer of patent application right

Effective date of registration: 20121204

Address after: 239000 No. 510 Fenghuang Road, Anhui, Chuzhou

Applicant after: Chuzhou Power Supply Company of Anhui Electric Power Co.,Ltd.

Applicant after: State Grid Corporation of China

Address before: 239000 No. 510 Fenghuang Road, Anhui, Chuzhou

Applicant before: Chuzhou Power Supply Company of Anhui Electric Power Co.,Ltd.

C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20160127

CF01 Termination of patent right due to non-payment of annual fee