CN102420402A - New Technology of Live Fastening Drainage Wire Clamp - Google Patents
New Technology of Live Fastening Drainage Wire Clamp Download PDFInfo
- Publication number
- CN102420402A CN102420402A CN2011104066451A CN201110406645A CN102420402A CN 102420402 A CN102420402 A CN 102420402A CN 2011104066451 A CN2011104066451 A CN 2011104066451A CN 201110406645 A CN201110406645 A CN 201110406645A CN 102420402 A CN102420402 A CN 102420402A
- Authority
- CN
- China
- Prior art keywords
- ground
- ground potential
- wrench
- fastening
- live
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Landscapes
- Electric Cable Installation (AREA)
Abstract
Description
技术领域: Technical field:
本发明涉及一种带电紧固引流线夹方法,特别涉及一种带电紧固引流线夹新工艺。 The invention relates to a method for fastening a drain wire clip with electricity, in particular to a new process for fastening a drain wire clip with electricity.
背景技术: Background technique:
目前,现有技术中,带电引流线夹不具有可以事先与引流线连接在一起的装置,使用时,必须二人同时上杆操作,一人先后甲两个引流线夹先将引流线的一端与输电线卡紧,同时另一人用绑线器将其紧固,然后再共同做引流线的另一端,费时、费力,而且危险性大;目前,将带电紧固引流线夹松动螺栓需要等电位操作63分钟左右。停电紧固降低线路供电可靠性、等电位带电紧固操作工艺复杂、人员劳动强度大、操作用时长的问题 At present, in the prior art, the live drain wire clamp does not have a device that can be connected with the drain wire in advance. When using it, two people must operate on the pole at the same time. The transmission line is clamped tightly, and another person uses a wire tie to fasten it at the same time, and then jointly make the other end of the drain line, which is time-consuming, laborious, and dangerous; The operation takes about 63 minutes. Power failure fastening reduces the reliability of line power supply, the operation process of equipotential live fastening is complicated, the labor intensity of personnel is high, and the operation takes a long time
发明内容: Invention content:
本发明的目的就是针对现有技术存在的上述缺陷,提供一种带电紧固引流线夹新工艺,解决停电紧固降低线路供电可靠性、等电位带电紧固操作工艺复杂、人员劳动强度大、操作用时长的问题。 The purpose of the present invention is to address the above-mentioned defects in the prior art, to provide a new process for fastening the drain wire clamp with electricity, which solves the problem of power failure fastening, which reduces the reliability of line power supply, the operation process of equipotential live fastening is complicated, and the labor intensity of personnel is high. The problem of operating time.
其技术方案是由以下操作步骤实现: Its technical scheme is realized by following operation steps:
(a)做好带电作业工器具的地面准备工作; (a) Do a good job of ground preparation for live working tools;
(b)地电位作业人员带传递绳上电线杆,地面作业人员将调整好开口大小的带电操作扳手固定在绝缘操作杆上并传递给地电位作业人员; (b) The ground potential operator takes the transmission rope to the pole, and the ground operator fixes the live operation wrench with the adjusted opening size on the insulating operating rod and passes it to the ground potential operator;
(c)地面工作人员使用监控装置指挥地电位作业人员利用绝缘操作杆将带电操作扳手卡在引流线夹松动螺母处,地电位作业人员利用绝缘操作杆紧固好引流线夹螺栓; (c) The ground staff use the monitoring device to instruct the ground potential operator to use the insulating operating rod to clamp the live operation wrench on the loose nut of the drain clamp, and the ground potential operator uses the insulating operating rod to fasten the drain clamp bolt;
(d)地电位工作人员与地面工作人员配合将绝缘操作杆传递至地面; (d) The ground potential staff cooperates with the ground staff to transfer the insulating operating rod to the ground;
(e)地电位作业人员撤离电线杆上,地面人员整理绝缘工器具,紧固引流线夹工作结束。 (e) The ground potential workers are evacuated from the utility poles, the ground personnel arrange the insulation tools, and the work of fastening the drainage clamps is completed.
上述的监控装置采用望远镜或监控摄像头。 The above-mentioned monitoring device adopts a telescope or a monitoring camera.
上述的带电操作扳手主要由把手、连接杆、固定扳手、活动扳手组成,连接杆的两端分别连接固定扳手和活动扳手,连接杆的中部连接把手。 The above-mentioned live operation wrench is mainly composed of a handle, a connecting rod, a fixed wrench, and an adjustable wrench. The two ends of the connecting rod are respectively connected to the fixed wrench and the adjustable wrench, and the middle part of the connecting rod is connected to the handle.
本发明的有益效果是:大大降低了杆上作业人员的劳动强度、提高了作业人员的劳动效率,最重要的是大大提高了带电紧固引流线夹松动螺栓的工作的安全性;解决停电紧固降低线路供电可靠性、等电位带电紧固操作工艺复杂、人员劳动强度大、操作用时长的问题。 The beneficial effects of the present invention are: greatly reducing the labor intensity of the operators on the pole, improving the labor efficiency of the operators, and most importantly, greatly improving the safety of the work of live fastening and loosening bolts of the drain wire clip; Solidly reduce the reliability of line power supply, the operation process of equipotential live fastening is complicated, the labor intensity of personnel is high, and the operation takes a long time.
附图说明: Description of drawings:
附图1是本发明的结构示意图; Accompanying drawing 1 is a structural representation of the present invention;
附图2是本发明的带电操作扳手的结构图; Accompanying drawing 2 is the structural diagram of live operation wrench of the present invention;
上图中:地电位作业人员1、绝缘操作杆2、带电操作扳手3、电线杆4、引流线夹螺栓5;把手3.1、连接杆3.2、固定扳手3.3、活动扳手3.4。 In the above figure: ground potential operator 1, insulating operating rod 2, live operation wrench 3, utility pole 4, drain clamp bolt 5; handle 3.1, connecting rod 3.2, fixed wrench 3.3, adjustable wrench 3.4.
具体实施方式: Detailed ways:
结合附图1-2,对本发明作进一步的描述: In conjunction with accompanying drawings 1-2, the present invention is further described:
本发明带电紧固引流线夹新工艺由以下操作步骤实现: The new process of live fastening and drainage wire clamp of the present invention is realized by the following operation steps:
(a)做好带电作业工器具的地面准备工作; (a) Do a good job of ground preparation for live working tools;
(b)地电位作业人员1带传递绳上电线杆4,地面作业人员将调整好开口大小的带电操作扳手3固定在绝缘操作杆2上并传递给地电位作业人员; (b) The ground potential operator 1 carries the transfer rope to the pole 4, and the ground operator fixes the live operation wrench 3 with the adjusted opening size on the insulating operating rod 2 and passes it to the ground potential operator;
(c)地面工作人员1使用监控装置指挥地电位作业人员利用绝缘操作杆2将带电操作扳手3卡在引流线夹松动螺母处,地电位作业人员1利用绝缘操作杆2紧固好引流线夹螺栓5; (c) The ground worker 1 uses the monitoring device to direct the ground potential operator to use the insulating operating rod 2 to clamp the live operation wrench 3 on the loose nut of the drain clamp, and the ground potential worker 1 uses the insulating operating rod 2 to fasten the drain clamp Bolt 5;
(d)地电位工作人员与地面工作人员配合将绝缘操作杆2传递至地面; (d) The ground potential staff cooperates with the ground staff to transfer the insulating operating rod 2 to the ground;
(e)地电位作业人员撤离电线杆上,地面人员整理绝缘工器具,紧固引流线夹工作结束。 (e) The ground potential workers are evacuated from the utility poles, the ground personnel arrange the insulation tools, and the work of fastening the drainage clamps is completed.
其中,监控装置采用望远镜或监控摄像头。 Wherein, the monitoring device adopts a telescope or a monitoring camera.
另外,带电操作扳手3主要由把手3.1、连接杆3.2、固定扳手3.3、活动扳手3.4组成,连接杆3.2的两端分别连接固定扳手3.3和活动扳手3.4,连接杆3.2的中部连接把手3.1。 In addition, the live operation wrench 3 is mainly composed of a handle 3.1, a connecting rod 3.2, a fixed wrench 3.3, and an adjustable wrench 3.4. The two ends of the connecting rod 3.2 are respectively connected to the fixed wrench 3.3 and the adjustable wrench 3.4, and the middle part of the connecting rod 3.2 is connected to the handle 3.1.
本发明大大降低了杆上作业人员的劳动强度、提高了作业人员的劳动效率,最重要的是大大提高了带电紧固引流线夹松动螺栓的工作的安全性;解决停电紧固降低线路供电可靠性、等电位带电紧固操作工艺复杂、人员劳动强度大、操作用时长的问题。 The present invention greatly reduces the labor intensity of the operators on the pole, improves the labor efficiency of the operators, and most importantly, greatly improves the safety of the live fastening and loosening bolts of the drainage wire clamp; solves the problem of power failure and fastening reduces the reliability of line power supply Sexuality, equipotential live fastening operation process is complicated, labor intensity is high, and operation time is long.
Claims (3)
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN2011104066451A CN102420402A (en) | 2011-12-09 | 2011-12-09 | New Technology of Live Fastening Drainage Wire Clamp |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN2011104066451A CN102420402A (en) | 2011-12-09 | 2011-12-09 | New Technology of Live Fastening Drainage Wire Clamp |
Publications (1)
| Publication Number | Publication Date |
|---|---|
| CN102420402A true CN102420402A (en) | 2012-04-18 |
Family
ID=45944688
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| CN2011104066451A Pending CN102420402A (en) | 2011-12-09 | 2011-12-09 | New Technology of Live Fastening Drainage Wire Clamp |
Country Status (1)
| Country | Link |
|---|---|
| CN (1) | CN102420402A (en) |
Cited By (3)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN103683104A (en) * | 2013-12-11 | 2014-03-26 | 云南电网公司昆明供电局 | A ratchet combination tool for live fastening and draining clip |
| CN104377589A (en) * | 2014-11-14 | 2015-02-25 | 国家电网公司 | Fitting bolt ground potential assembling and disassembling method |
| CN110320454A (en) * | 2019-07-19 | 2019-10-11 | 云南电网有限责任公司昆明供电局 | It is a kind of to be mounted on the insulation measuring apparatus penetrated in gun-type operating stick |
Citations (2)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN201266806Y (en) * | 2008-09-02 | 2009-07-01 | 沧州供电公司 | Tool for fastening 220kv strain clamp bolt |
| CN201931392U (en) * | 2010-12-20 | 2011-08-17 | 南通市电站阀门有限公司 | Combined wrench |
-
2011
- 2011-12-09 CN CN2011104066451A patent/CN102420402A/en active Pending
Patent Citations (2)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN201266806Y (en) * | 2008-09-02 | 2009-07-01 | 沧州供电公司 | Tool for fastening 220kv strain clamp bolt |
| CN201931392U (en) * | 2010-12-20 | 2011-08-17 | 南通市电站阀门有限公司 | Combined wrench |
Non-Patent Citations (2)
| Title |
|---|
| 孙兵等: "《110kV线路双回路耐张铁塔等电位处理引流缺陷》", 《电力技术》 * |
| 陈家斌等: "《电力架空线路运行维护与带电作业》", 31 January 2006, 中国水利水电出版社 * |
Cited By (4)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN103683104A (en) * | 2013-12-11 | 2014-03-26 | 云南电网公司昆明供电局 | A ratchet combination tool for live fastening and draining clip |
| CN104377589A (en) * | 2014-11-14 | 2015-02-25 | 国家电网公司 | Fitting bolt ground potential assembling and disassembling method |
| CN104377589B (en) * | 2014-11-14 | 2017-06-20 | 国家电网公司 | A kind of metal bolt ground potential handling method |
| CN110320454A (en) * | 2019-07-19 | 2019-10-11 | 云南电网有限责任公司昆明供电局 | It is a kind of to be mounted on the insulation measuring apparatus penetrated in gun-type operating stick |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| CN104505766B (en) | The instrument and method of a kind of charged for replacement transformer station 500kV strain insulator strings | |
| CN105914646B (en) | Working method for replacing 35kV tension insulator strings with power on | |
| CN203522074U (en) | Bundling fixing device for tail wire and main wire of stay wire of power transmission line poles | |
| CN206516767U (en) | A kind of multipurpose ground connection pincers | |
| CN102185267B (en) | 66KV ground potential hot-line make-and-break bypassing method | |
| CN102420402A (en) | New Technology of Live Fastening Drainage Wire Clamp | |
| CN202534977U (en) | V-shaped clamping apparatus for transposing double insulator strings of power transmission line | |
| CN103500961B (en) | A special tool for live replacement of tension insulator strings | |
| CN104348122B (en) | Ground potential mounting type shunt wire clamp device and mounting method thereof | |
| CN201868784U (en) | Lifter for 220KV earth wire of power transmission line | |
| CN205583533U (en) | Right insulator specialized tool with electricity | |
| CN203707670U (en) | Tool for lively processing bolt of by-pass jumper clamp | |
| CN101364716A (en) | Clamp type hot-line work fastener and using method | |
| CN204089047U (en) | A kind of fixing-line device and pull bar combination tool | |
| CN203278084U (en) | Special tool for fixing mesophase drainage wire in 10KV live working | |
| CN201868786U (en) | Special repairing lifter for 220KV lightning wire of power transmission line | |
| CN201478734U (en) | Insulator string remover | |
| CN103532040A (en) | Special tool and method for fixing middle-phase bypass jumper during 10kV hot-line working | |
| CN104466820A (en) | House-service gathering wire clamp | |
| CN203839879U (en) | Multifunction lead clamping device with die | |
| CN202026035U (en) | Wire fixing device for live line work of overhead line | |
| CN204143774U (en) | Electric power steel pipe tower signboard fixing device | |
| CN104318859B (en) | A kind of electric power steel pipe tower signboard fixing device and method | |
| CN202353101U (en) | Post insulator live tightening device | |
| CN210957558U (en) | Lifting assistor tool for insulated operating rod |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| C06 | Publication | ||
| PB01 | Publication | ||
| C10 | Entry into substantive examination | ||
| SE01 | Entry into force of request for substantive examination | ||
| ASS | Succession or assignment of patent right |
Owner name: SHANDONG ELECTRIC POWER GROUP CORPORATION DONGYING Effective date: 20121221 Owner name: STATE GRID CORPORATION OF CHINA Free format text: FORMER OWNER: SHANDONG ELECTRIC POWER GROUP CORPORATION DONGYING POWER SUPPLY COMPANY Effective date: 20121221 |
|
| C41 | Transfer of patent application or patent right or utility model | ||
| COR | Change of bibliographic data |
Free format text: CORRECT: ADDRESS; FROM: 257091 DONGYING, SHANDONG PROVINCE TO: 100031 DONGCHENG, BEIJING |
|
| TA01 | Transfer of patent application right |
Effective date of registration: 20121221 Address after: 100031 West Chang'an Avenue, Beijing, No. 86 Applicant after: State Grid Corporation of China Applicant after: Dongying Power Supply Branch of Shandong Electric Power Corporation Address before: 257091 South Road, Dongying District, Shandong, No. 357, No. Applicant before: Dongying Power Supply Branch of Shandong Electric Power Corporation |
|
| C02 | Deemed withdrawal of patent application after publication (patent law 2001) | ||
| WD01 | Invention patent application deemed withdrawn after publication |
Application publication date: 20120418 |