CN102841943B CN201210303206.2A CN201210303206A CN102841943B CN 102841943 B CN102841943 B CN 102841943B CN 201210303206 A CN201210303206 A CN 201210303206A CN 102841943 B CN102841943 B CN 102841943B
Authority
CN
China
Prior art keywords
data
backup
early warning
safety supervision
module
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201210303206.2A
Other languages
Chinese (zh)
Other versions
CN102841943A (en
Inventor
陈继杰
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shanghai Taiyu information technology Limited by Share Ltd
Original Assignee
Huzhou Taiyu Computer Co Ltd
SHANGHAI TAIYU INFORMATION TECHNOLOGY Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Huzhou Taiyu Computer Co Ltd, SHANGHAI TAIYU INFORMATION TECHNOLOGY Co Ltd filed Critical Huzhou Taiyu Computer Co Ltd
Priority to CN201210303206.2A priority Critical patent/CN102841943B/en
Publication of CN102841943A publication Critical patent/CN102841943A/en
Priority to PCT/CN2013/082022 priority patent/WO2014029343A1/en
Application granted granted Critical
Publication of CN102841943B publication Critical patent/CN102841943B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06FELECTRIC DIGITAL DATA PROCESSING
    • G06F11/00Error detection; Error correction; Monitoring
    • G06F11/07Responding to the occurrence of a fault, e.g. fault tolerance
    • G06F11/14Error detection or correction of the data by redundancy in operation
    • G06F11/1402Saving, restoring, recovering or retrying
    • G06F11/1446Point-in-time backing up or restoration of persistent data
    • G06F11/1458Management of the backup or restore process

Landscapes

  • Engineering & Computer Science (AREA)
  • Theoretical Computer Science (AREA)
  • Quality & Reliability (AREA)
  • Physics & Mathematics (AREA)
  • General Engineering & Computer Science (AREA)
  • General Physics & Mathematics (AREA)
  • Information Retrieval, Db Structures And Fs Structures Therefor (AREA)

Abstract

The invention discloses a data safety supervision early warning and backup strategy system and a method, and belongs to the technical field of data backup in computer application. The data safety supervision early warning and backup strategy system comprises a data safety supervision and early warning platform, a data backup strategy platform and a triangle backup area, wherein the two platforms achieve safety supervision of backup data through information interaction with the triangle backup area to promote safe, normalized and standardized management of the backup data. Based on the system, the invention further discloses a safety supervision early warning and backup strategy method which combines safety supervision and register backup of the backup data closely, ensures safety of the backup data, and avoids occurrence of various hidden dangers.

Description

Data safety supervision early warning and backup policy system and method
Technical field
The present invention relates to technology of data copy in computer application field, particularly a kind of data safety supervision early warning and backup policy system and method.
Background technology
The information-based paces in the whole world are more and more faster, and the growth rapidly of data total amount, so the security that data store becomes more and more important.Informationization brings service efficiently and while managing easily, also bring the risk that numerical information is lost, the critical role of therefore data backup highlights all the more.
Application number be 03113490.4 Chinese invention patent application disclose a kind of database backup method, comprise the following steps: 1. arrange monitoring and backup information; 2. pair DB Backup content is resolved; 3. connection data storehouse; 4., when backing up beginning, carry out backup content search; 5. pair Query Result carries out back-up storage.Adopt this method, custom system can to accomplish in unattended situation as required the key business information in backup database at any time.This method provide the model customization mode of flexibility and changeability, the partial information of submeter can back up in the middle part of database, instead of whole storehouse or the backup of whole table, and for backup content, user can select random combination.But system data has only done and once backed up, when Backup Data breaks down, security, the integrality of data will can not be guaranteed.
Summary of the invention
An object of the present invention is to solve the problems of the technologies described above, and provides a unification, real-time, intelligent data safety supervision early warning and standby system, realizes the security control of data and dual backup.
Above-mentioned technical purpose of the present invention is achieved by the following technical programs:
A kind of data safety supervision early warning and backup policy system, is characterized in that, comprising: data safety supervision and early warning platform, data backup policy platform and triangle backup area, wherein:
Data safety supervision and early warning platform, comprise core data acquisition module, scan module, data check module, data management module and alarm module; Core data acquisition module is used for image data, carries out data acquisition configuration; Scan module is used for periodic scanning data; Data check module and scan module operate simultaneously, carry out data check and generate verification report; Data management module represents and data maintenance in real time for data area monitoring, data analysis, data; Alarm module sends alerting signal by alarm mechanism;
Data backup policy platform, comprises policy module, backup module and SMS module; Wherein, policy module is used for arranging timed task, generates backup policy; Backup module is used for intellectual analysis verification report, the corresponding Backup Data of automated back-up; SMS module sends SMS notification relevant people automatically after Backup end;
Triangle backup area, comprises backup center data field, again Backup Data district and interim backup area map section.
Backup center data field store backup data; Backup Data district stores Backup Data more again, raw data and Backup Data and Backup Data is completely the same again; Interim backup area map section is an interim backup area, and true address is positioned at data backup policy platform.Backup center data field, again Backup Data district and interim backup area map section composition triangle dynamic backup mechanism, when Backup Data or Backup Data breaks down again time, the Backup Data again in corresponding region or Backup Data meeting automated back-up, to interim backup area map section, can ensure two parts of secure datas so all the time.
As preferably, described triangle backup area is also provided with agency, and described data safety supervision and the agency by arranging in triangle backup area between early warning platform and data backup policy platform carry out information interaction.
As preferably, the data of the backup center data field of described triangle backup area are Backup Data; The data in Backup Data district are again Backup Data again; Backup Data and again Backup Data are by registration Backup Data carrier bag composition.
When the backup center data field of triangle backup area Backup Data or again the Backup Data again in Backup Data district and the data of initialization result inconsistent time, as long as the registration Backup Data carrier bag of appropriate section is carried out backing up, do not need all data all to back up.
As preferably, described data acquisition configuration refers to according to index allocation manual configuration relevant information, described index allocation comprise whether enable, index name, corresponding device, command name, command parameter, frequency acquisition, retry interval, time cycle information.
Another object of the present invention provides a kind of above-mentioned data safety supervision early warning and standby system of utilizing to realize the security control of data and the data safety supervision early warning of dual backup and backup method.
A kind of data safety supervision early warning and backup policy method, relate to data safety supervision and early warning platform, data backup policy platform and triangle backup area, the method comprises:
First a, data safety supervision and early warning platform carry out data acquisition configuration, generate configuration information;
B, data safety supervision and early warning platform carry out information interaction by agency with triangle backup area, the data in backup center data field, again Backup Data district are configured according to the form of configuration information;
C, data safety supervision and early warning platform send scan instruction to agency, act on behalf of and carry out initialization scan according to scan instruction to raw data, generate initialization result, record each data primary data summary info;
D, data safety supervision and early warning platform start scan module and send real time scan instruction to agency;
E, data safety supervision and early warning platform start data check module and send checking command to agency;
F, act on behalf of, according to real time scan instruction, real time scan is carried out to data, generate real time scan result, record data scanning summary info;
G, act on behalf of according to checking command check analysis initialization result and real time scan result, generate check results, and check results is returned to data safety supervision and early warning platform;
H, data safety supervision and early warning platform carry out analysis management to the check results returned, find scanning summary info and primary data summary info inconsistent, start alarm module and send warning message, and send enabled instruction to data backup policy platform;
I, data backup policy platform receive enabled instruction first trigger policy module and backup module, and policy module arranges timed task, generate backup policy and send policy instructions; Backup module generates backup instruction according to backup policy;
Policy instructions and backup instruction are sent to agency by j, data backup policy platform;
K, act on behalf of the inconsistent data division of strategically instruction and backup instruction automated back-up initialization result and real time scan result;
L, Backup end, data backup policy platform starts SMS module and sends note.
As preferably, described check analysis initialization result and real time scan result refer to respectively by the real time scan result Inspection of initialization result and backup center data field and verification of the real time scan result in initialization result and Backup Data district again being compared.
As preferably, the described automated back-up initialization result data division inconsistent with real time scan result refers to and will occur that interim backup area map section that the Backup Data carrier bag in the district of Backup Data again that the inconsistent Backup Data carrier bag of initialization result and the real time scan result data of backup center data field is corresponding backups to described triangle backup area maybe will occur that the Backup Data carrier bag of the backup center data field that the initialization result Backup Data carrier bag inconsistent with the real time scan result data in Backup Data district is again corresponding backups to the interim backup area map section of described triangle backup area.
As preferably, described data safety supervision and early warning platform also comprise and carry out data analysis management to raw data, carry out query composition, printing reports to data; Described data safety supervision and early warning platform also comprise and carry out data to raw data with overview diagram, pie chart multi-dimensional fashion and represent in real time; Described data safety supervision and early warning platform also comprise system maintenance, carry out log management and personal management.
In sum, the security control of data and registration backup are combined closely by the present invention, data safety supervision and early warning platform and data backup policy platform realize the security control of Backup Data by the information interaction of triangle backup area, promote the management of Backup Data safe, regulation and standardization, ensure that the safety of Backup Data, thus avoid the generation of various hidden danger.
Accompanying drawing explanation
Fig. 1 is the structural representation that the present invention realizes data safety supervision early warning and backup policy embodiment.
Fig. 2 is the structural representation in three districts of triangle backup area of the present invention.
Fig. 3 is the schematic diagram that three district's data of triangle backup area of the present invention carry out backup procedure when breaking down.
Embodiment
Below in conjunction with accompanying drawing, the present invention is described in further detail.
As shown in Figure 1, a kind of data safety supervision early warning and backup policy system, is characterized in that, comprising: data safety supervision and early warning platform, data backup policy platform and triangle backup area, wherein:
Data safety supervision and early warning platform, comprise core data acquisition module, scan module, data check module, data management module and alarm module; Core data acquisition module is used for image data, carries out data acquisition configuration; Scan module is used for periodic scanning data; Data check module and scan module operate simultaneously, carry out data check and generate verification report; Data management module represents and data maintenance in real time for data area monitoring, data analysis, data; Alarm module sends alerting signal by alarm mechanism;
Data backup policy platform, comprises policy module, backup module and SMS module; Wherein, policy module is used for arranging timed task, generates backup policy; Backup module is used for intellectual analysis verification report, the corresponding Backup Data of automated back-up; SMS module sends SMS notification automatically after Backup end.
Triangle backup area, comprises backup center data field (backup A district), again Backup Data district (backup B district) and interim backup area map section (backup C district).
Backup center data field (backup A district) store backup data; Again Backup Data district (backup B district) store Backup Data again, raw data and Backup Data and Backup Data is completely the same again; Interim backup area map section (backup C district) is an interim backup area, and true address is positioned at data backup policy platform.
Triangle backup area is also provided with agency, and described data safety supervision and the agency by arranging in triangle backup area between early warning platform and data backup policy platform carry out information interaction.
The Backup Data of described triangle backup area and again Backup Data are by registration Backup Data carrier bag composition.
As shown in Figure 2, Backup Data and again Backup Data are by three registration Backup Data carrier bag compositions, and Backup Data is registered Backup Data carrier bag by X, Y, Z tri-and formed; Backup Data is made up of X1, Y1, Z1 tri-registration Backup Data carrier bag again.
As shown in Figure 3, three composition triangle dynamic backup mechanisms of district, when the data that backup center data field (backup A district) X registers Backup Data carrier bag go wrong, the X1 in the corresponding district of Backup Data again (backup B district) registers Backup Data carrier bag meeting automated back-up to interim backup area map section (backup C district), can ensure two parts of secure datas all the time like this.
Data acquisition configuration refer to according to index allocation manual configuration relevant information, described index allocation comprise whether enable, index name, corresponding device, command name, command parameter, frequency acquisition, retry interval, time cycle information.
A kind of data safety supervision early warning and backup policy method, relate to data safety supervision and early warning platform, data backup policy platform, triangle backup area, the method comprises:
First a, data safety supervision and early warning platform carry out data acquisition configuration, generate configuration information;
B, data safety supervision and early warning platform carry out information interaction by agency with triangle backup area, the data in backup center data field, again Backup Data district are configured according to the form of configuration information;
C, data safety supervision and early warning platform send scan instruction to agency, act on behalf of and carry out initialization scan according to scan instruction to raw data, generate initialization result, record each data primary data summary info;
D, data safety supervision and early warning platform start scan module and send real time scan instruction to agency;
E, data safety supervision and early warning platform start data check module and send checking command to agency;
F, act on behalf of, according to real time scan instruction, real time scan is carried out to data, generate real time scan result, record data scanning summary info;
G, act on behalf of according to checking command check analysis initialization result and real time scan result, generate check results, and check results is returned to data safety supervision and early warning platform;
Check analysis initialization result and real time scan result refer to respectively by the real time scan result Inspection in initialization result and backup center data field (backup A district) and verification of the real time scan result of initialization result and Backup Data district (backing up B district) again being compared;
H, data safety supervision and early warning platform carry out analysis management to the check results returned, find scanning summary info and primary data summary info inconsistent, start alarm module and send warning message, and send enabled instruction to data backup policy platform;
I, data backup policy platform receive enabled instruction first trigger policy module and backup module, and policy module arranges timed task, generate backup policy and send policy instructions; Backup module generates backup instruction according to backup policy;
Policy instructions and backup instruction are sent to agency by j, data backup policy platform;
K, act on behalf of the inconsistent data division of strategically instruction and backup instruction automated back-up initialization result and real time scan result;
The automated back-up initialization result data division inconsistent with real time scan result refers to and will occur that interim backup area map section (backup C district) that the Backup Data carrier bag in the district of Backup Data again (backup B district) that the initialization result Backup Data carrier bag inconsistent with the real time scan result data in backup center data field (backup A district) is corresponding backups to described triangle backup area maybe will occur that the Backup Data carrier bag of the backup center data field (backing up A district) that the inconsistent Backup Data carrier bag of the real time scan result data in initialization result and Backup Data district (backup B district) is again corresponding backups to the interim backup area map section (backing up C district) of described triangle backup area;
L, Backup end, data backup policy platform starts SMS module and sends note.
Data safety supervision and early warning platform also comprise and carry out data analysis management to raw data, carry out query composition, printing reports to data; Described data safety supervision and early warning platform also comprise and carry out data to raw data with overview diagram, pie chart multi-dimensional fashion and represent in real time; Described data safety supervision and early warning platform also comprise system maintenance, carry out log management and personal management.

Claims (8)

1. data safety supervision early warning and a backup policy system, is characterized in that, comprising: data safety supervision and early warning platform, data backup policy platform, triangle backup area, wherein:
Data safety supervision and early warning platform, comprise core data acquisition module, scan module, data check module, data management module and alarm module; Core data acquisition module is used for image data, carries out data acquisition configuration; Scan module is used for periodic scanning data; Data check module and scan module operate simultaneously, carry out data check and generate verification report; Data management module represents and data maintenance in real time for data area monitoring, data analysis, data; Alarm module sends alerting signal by alarm mechanism;
Data backup policy platform, comprises policy module, backup module and SMS module; Wherein, policy module is used for arranging timed task, generates backup policy; Backup module is used for intellectual analysis verification report, the corresponding Backup Data of automated back-up; SMS module sends SMS notification relevant people automatically after Backup end;
Triangle backup area, comprises backup center data field, again Backup Data district and interim backup area map section.
2. data safety supervision early warning according to claim 1 and backup policy system, it is characterized in that: described triangle backup area is also provided with agency, described data safety supervision and the agency by arranging in triangle backup area between early warning platform and data backup policy platform carry out information interaction.
3. data safety supervision early warning according to claim 2 and backup policy system, is characterized in that: the data of the backup center data field of described triangle backup area are Backup Data; The data in Backup Data district are again Backup Data again; Backup Data and again Backup Data are by registration Backup Data carrier bag composition.
4. the data safety supervision early warning according to claim 1 or 2 or 3 and backup policy system, it is characterized in that: described data acquisition configuration refers to according to index allocation manual configuration relevant information, described index allocation comprise whether enable, index name, corresponding device, command name, command parameter, frequency acquisition, retry interval, time cycle information.
5. data safety supervision early warning and a backup policy method, relate to data safety supervision and early warning platform, data backup policy platform, triangle backup area, the method comprises:
First a, data safety supervision and early warning platform carry out data acquisition configuration, generate configuration information;
B, data safety supervision and early warning platform carry out information interaction by agency with triangle backup area, the data in backup center data field, again Backup Data district are configured according to the form of configuration information;
C, data safety supervision and early warning platform send scan instruction to agency, act on behalf of and carry out initialization scan according to scan instruction to raw data, generate initialization result, record the primary data summary info of each data;
D, data safety supervision and early warning platform start scan module and send real time scan instruction to agency;
E, data safety supervision and early warning platform start data check module and send checking command to agency;
F, act on behalf of, according to real time scan instruction, real time scan is carried out to data, generate real time scan result, the scanning summary info of record data;
G, act on behalf of according to checking command check analysis initialization result and real time scan result, generate check results, and check results is returned to data safety supervision and early warning platform;
H, data safety supervision and early warning platform carry out analysis management to the check results returned, find scanning summary info and primary data summary info inconsistent, start alarm module and send warning message, and send enabled instruction to data backup policy platform;
I, data backup policy platform receive enabled instruction first trigger policy module and backup module, and policy module arranges timed task, generate backup policy and send policy instructions; Backup module generates backup instruction according to backup policy;
Policy instructions and backup instruction are sent to agency by j, data backup policy platform;
K, act on behalf of the inconsistent data division of strategically instruction and backup instruction automated back-up initialization result and real time scan result;
L, Backup end, data backup policy platform starts SMS module and sends note.
6. data safety supervision early warning according to claim 5 and backup policy method, is characterized in that: described check analysis initialization result and real time scan result refer to respectively by the real time scan result Inspection of initialization result and backup center data field and verification of the real time scan result in initialization result and Backup Data district again being compared.
7. data safety supervision early warning according to claim 5 and backup policy method, it is characterized in that: the described automated back-up initialization result data division inconsistent with real time scan result refers to and will occur that the Backup Data carrier bag in the district of Backup Data again that the inconsistent Backup Data carrier bag of initialization result and the real time scan result data of backup center data field is corresponding backups to the interim backup area map section of described triangle backup area, maybe will occur that the Backup Data carrier bag of the backup center data field that the initialization result Backup Data carrier bag inconsistent with the real time scan result data in Backup Data district is again corresponding backups to the interim backup area map section of described triangle backup area.
8. the data safety supervision early warning according to claim 6 or 7 and backup policy method, is characterized in that: described data safety supervision and early warning platform also comprise and carry out data analysis management to raw data, carry out query composition, printing reports to data; Described data safety supervision and early warning platform also comprise and carry out data to raw data with overview diagram, pie chart multi-dimensional fashion and represent in real time; Described data safety supervision and early warning platform also comprise system maintenance, carry out log management and personal management.
CN201210303206.2A 2012-08-24 2012-08-24 Data safety supervision early warning and backup strategy system and method Active CN102841943B (en)

Priority Applications (2)

Application Number Priority Date Filing Date Title
CN201210303206.2A CN102841943B (en) 2012-08-24 2012-08-24 Data safety supervision early warning and backup strategy system and method
PCT/CN2013/082022 WO2014029343A1 (en) 2012-08-24 2013-08-22 System and method for data safety monitoring, warning and backup strategy

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201210303206.2A CN102841943B (en) 2012-08-24 2012-08-24 Data safety supervision early warning and backup strategy system and method

Publications (2)

Publication Number Publication Date
CN102841943A CN102841943A (en) 2012-12-26
CN102841943B true CN102841943B (en) 2015-07-08

Family

ID=47369306

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201210303206.2A Active CN102841943B (en) 2012-08-24 2012-08-24 Data safety supervision early warning and backup strategy system and method

Country Status (2)

Country Link
CN (1) CN102841943B (en)
WO (1) WO2014029343A1 (en)

Families Citing this family (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102841943B (en) * 2012-08-24 2015-07-08 上海泰宇信息技术有限公司 Data safety supervision early warning and backup strategy system and method
CN103678042B (en) * 2013-12-25 2017-01-04 上海爱数信息技术股份有限公司 A kind of backup policy information generating method based on data analysis
CN104112014A (en) * 2014-07-18 2014-10-22 国家电网公司 Method for realizing automatic check of index data based on task scheduling
CN107193691A (en) * 2017-05-15 2017-09-22 深圳市奇摩计算机有限公司 Directly from the method for storage device Backup Data and its realize system and alternate device
CN110018993B (en) * 2017-12-29 2021-03-23 中移动信息技术有限公司 Data analysis system, method and monitoring analysis system
CN110287241B (en) * 2019-06-27 2023-09-08 深圳前海微众银行股份有限公司 Method and device for generating alarm data report

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101170454A (en) * 2006-10-27 2008-04-30 亿阳信通股份有限公司 A method and system for monitoring data collection and summary status
CN101370305A (en) * 2008-09-23 2009-02-18 中兴通讯股份有限公司 Method and system for protecting data traffic security
CN102457518A (en) * 2011-10-17 2012-05-16 长沙迪麓数字技术有限公司 Multimedia data safety monitoring device, receiving terminal, authentication method and system thereof

Family Cites Families (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
TWI377469B (en) * 2008-11-13 2012-11-21 Transcend Information Inc Storage apparatus and on-line client service system, soft and method thereof
CN201937606U (en) * 2011-02-28 2011-08-17 苏州市职业大学 Network data safety supervision system
CN102609371B (en) * 2012-02-16 2014-12-03 武汉噢易科技有限公司 System protecting method based on data security
CN102841943B (en) * 2012-08-24 2015-07-08 上海泰宇信息技术有限公司 Data safety supervision early warning and backup strategy system and method

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101170454A (en) * 2006-10-27 2008-04-30 亿阳信通股份有限公司 A method and system for monitoring data collection and summary status
CN101370305A (en) * 2008-09-23 2009-02-18 中兴通讯股份有限公司 Method and system for protecting data traffic security
CN102457518A (en) * 2011-10-17 2012-05-16 长沙迪麓数字技术有限公司 Multimedia data safety monitoring device, receiving terminal, authentication method and system thereof

Also Published As

Publication number Publication date
CN102841943A (en) 2012-12-26
WO2014029343A1 (en) 2014-02-27

Similar Documents

Publication Publication Date Title
CN102841943B (en) Data safety supervision early warning and backup strategy system and method
CN103529707B (en) The method for designing of full Object-oriented Intelligent alarm model in a kind of subway comprehensive monitoring system
CN105260841B (en) A kind of distribution network failure repairing receipt auditing system
CN203225787U (en) A synchronizer spanning a safe area in power scheduling
CN104700191A (en) Intelligent mobile terminal based agricultural product quality and safety geographic information supervision and management method and system
CN107256429A (en) A kind of vehicle maintenance method and device
CN101968858A (en) Software configuration management auxiliary system
CN111047143A (en) Power grid OMS-based regional and county team index management system
CN109656914A (en) On-line off-line mixed air control modeling training and production dissemination method and system
CN111737364B (en) Safe multi-party data fusion and federal sharing method, device, equipment and medium
CN103870921A (en) Operation maintenance management system
KR101600257B1 (en) Nuclear power plants configuration management apparatus
CN104077668A (en) Emergency meeting rescue and security basic information management system
CN202306631U (en) Visual management system for biopharmaceutical factory equipment
CN104077403A (en) Alcedo database scheduled task processing method and processing device
CN207882734U (en) A kind of intelligence prize-mounted refueling device
KR101508068B1 (en) Apparatus and method for data de-duplication
CN205091787U (en) Cigarette market supervision work systems
Turluev et al. Artificial Intelligence in Corporate Governance Systems
CN105894142A (en) Electronic process based filing and modeling method
CN107622381A (en) Record workpoints account checking method and device
CN203520104U (en) Device for controlling production according to standards
CN112256489A (en) Data acquisition method and device of cloud development platform and data storage architecture
CN112446619A (en) Power distribution network emergency repair processing method and device
CN110136405A (en) A kind of upper track operation safety protection system and method

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
ASS Succession or assignment of patent right

Owner name: HUZHOU TAIYU COMPUTER CO., LTD.

Effective date: 20130407

C41 Transfer of patent application or patent right or utility model
TA01 Transfer of patent application right

Effective date of registration: 20130407

Address after: 201100, room 1, building 6, building 4299, 125 Jin Du Road, Shanghai, Minhang District

Applicant after: Shanghai Taiyu Information Technology Co., Ltd.

Applicant after: Huzhou Taiyu Computer Co., Ltd.

Address before: 201100, room 1, building 6, building 4299, 125 Jin Du Road, Shanghai, Minhang District

Applicant before: Shanghai Taiyu Information Technology Co., Ltd.

C14 Grant of patent or utility model
GR01 Patent grant
C41 Transfer of patent application or patent right or utility model
TR01 Transfer of patent right

Effective date of registration: 20151201

Address after: 201100, room 1, building 6, building 4299, 125 Jin Du Road, Shanghai, Minhang District

Patentee after: Shanghai Taiyu information technology Limited by Share Ltd

Address before: 201100, room 1, building 6, building 4299, 125 Jin Du Road, Shanghai, Minhang District

Patentee before: Shanghai Taiyu Information Technology Co., Ltd.

Patentee before: Huzhou Taiyu Computer Co., Ltd.

PE01 Entry into force of the registration of the contract for pledge of patent right
PE01 Entry into force of the registration of the contract for pledge of patent right

Denomination of invention: Data security supervision early warning and backup strategy system and method

Effective date of registration: 20210730

Granted publication date: 20150708

Pledgee: Changhe Branch of Hangzhou United Rural Commercial Bank Co.,Ltd.

Pledgor: SHANGHAI TAIYU INFORMATION TECHNOLOGY Co.,Ltd.

Registration number: Y2021330001045