CN102841538B - 用于控制分批过程的方法和系统 - Google Patents
用于控制分批过程的方法和系统 Download PDFInfo
- Publication number
- CN102841538B CN102841538B CN201210297341.0A CN201210297341A CN102841538B CN 102841538 B CN102841538 B CN 102841538B CN 201210297341 A CN201210297341 A CN 201210297341A CN 102841538 B CN102841538 B CN 102841538B
- Authority
- CN
- China
- Prior art keywords
- control
- model
- batch process
- batch
- control routine
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Classifications
-
- G—PHYSICS
- G05—CONTROLLING; REGULATING
- G05B—CONTROL OR REGULATING SYSTEMS IN GENERAL; FUNCTIONAL ELEMENTS OF SUCH SYSTEMS; MONITORING OR TESTING ARRANGEMENTS FOR SUCH SYSTEMS OR ELEMENTS
- G05B13/00—Adaptive control systems, i.e. systems automatically adjusting themselves to have a performance which is optimum according to some preassigned criterion
- G05B13/02—Adaptive control systems, i.e. systems automatically adjusting themselves to have a performance which is optimum according to some preassigned criterion electric
- G05B13/04—Adaptive control systems, i.e. systems automatically adjusting themselves to have a performance which is optimum according to some preassigned criterion electric involving the use of models or simulators
- G05B13/041—Adaptive control systems, i.e. systems automatically adjusting themselves to have a performance which is optimum according to some preassigned criterion electric involving the use of models or simulators in which a variable is automatically adjusted to optimise the performance
-
- G—PHYSICS
- G05—CONTROLLING; REGULATING
- G05B—CONTROL OR REGULATING SYSTEMS IN GENERAL; FUNCTIONAL ELEMENTS OF SUCH SYSTEMS; MONITORING OR TESTING ARRANGEMENTS FOR SUCH SYSTEMS OR ELEMENTS
- G05B13/00—Adaptive control systems, i.e. systems automatically adjusting themselves to have a performance which is optimum according to some preassigned criterion
- G05B13/02—Adaptive control systems, i.e. systems automatically adjusting themselves to have a performance which is optimum according to some preassigned criterion electric
- G05B13/04—Adaptive control systems, i.e. systems automatically adjusting themselves to have a performance which is optimum according to some preassigned criterion electric involving the use of models or simulators
-
- G—PHYSICS
- G05—CONTROLLING; REGULATING
- G05B—CONTROL OR REGULATING SYSTEMS IN GENERAL; FUNCTIONAL ELEMENTS OF SUCH SYSTEMS; MONITORING OR TESTING ARRANGEMENTS FOR SUCH SYSTEMS OR ELEMENTS
- G05B13/00—Adaptive control systems, i.e. systems automatically adjusting themselves to have a performance which is optimum according to some preassigned criterion
- G05B13/02—Adaptive control systems, i.e. systems automatically adjusting themselves to have a performance which is optimum according to some preassigned criterion electric
- G05B13/04—Adaptive control systems, i.e. systems automatically adjusting themselves to have a performance which is optimum according to some preassigned criterion electric involving the use of models or simulators
- G05B13/048—Adaptive control systems, i.e. systems automatically adjusting themselves to have a performance which is optimum according to some preassigned criterion electric involving the use of models or simulators using a predictor
-
- G—PHYSICS
- G05—CONTROLLING; REGULATING
- G05B—CONTROL OR REGULATING SYSTEMS IN GENERAL; FUNCTIONAL ELEMENTS OF SUCH SYSTEMS; MONITORING OR TESTING ARRANGEMENTS FOR SUCH SYSTEMS OR ELEMENTS
- G05B17/00—Systems involving the use of models or simulators of said systems
- G05B17/02—Systems involving the use of models or simulators of said systems electric
Landscapes
- Engineering & Computer Science (AREA)
- Physics & Mathematics (AREA)
- General Physics & Mathematics (AREA)
- Automation & Control Theory (AREA)
- Computer Vision & Pattern Recognition (AREA)
- Artificial Intelligence (AREA)
- Health & Medical Sciences (AREA)
- Evolutionary Computation (AREA)
- Medical Informatics (AREA)
- Software Systems (AREA)
- Feedback Control In General (AREA)
- Management, Administration, Business Operations System, And Electronic Commerce (AREA)
- Testing And Monitoring For Control Systems (AREA)
- Programmable Controllers (AREA)
Applications Claiming Priority (3)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| US11/241,157 US7877154B2 (en) | 2005-09-30 | 2005-09-30 | Method and system for controlling a batch process |
| US11/241,157 | 2005-09-30 | ||
| CN2006101317512A CN1940781B (zh) | 2005-09-30 | 2006-09-30 | 用于控制分批过程的方法和系统 |
Related Parent Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| CN2006101317512A Division CN1940781B (zh) | 2005-09-30 | 2006-09-30 | 用于控制分批过程的方法和系统 |
Publications (2)
| Publication Number | Publication Date |
|---|---|
| CN102841538A CN102841538A (zh) | 2012-12-26 |
| CN102841538B true CN102841538B (zh) | 2015-09-23 |
Family
ID=37421252
Family Applications (2)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| CN201210297341.0A Expired - Fee Related CN102841538B (zh) | 2005-09-30 | 2006-09-30 | 用于控制分批过程的方法和系统 |
| CN2006101317512A Active CN1940781B (zh) | 2005-09-30 | 2006-09-30 | 用于控制分批过程的方法和系统 |
Family Applications After (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| CN2006101317512A Active CN1940781B (zh) | 2005-09-30 | 2006-09-30 | 用于控制分批过程的方法和系统 |
Country Status (5)
| Country | Link |
|---|---|
| US (1) | US7877154B2 (https=) |
| JP (2) | JP5331301B2 (https=) |
| CN (2) | CN102841538B (https=) |
| DE (1) | DE102006045428B4 (https=) |
| GB (3) | GB2467683B (https=) |
Families Citing this family (60)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| US7689296B2 (en) * | 2006-04-28 | 2010-03-30 | Honeywell Asca Inc. | Apparatus and method for controlling a paper machine or other machine using measurement predictions based on asynchronous sensor information |
| US7747416B2 (en) * | 2006-06-06 | 2010-06-29 | Siemens Industry, Inc. | System and method for batch process control with diverse distributed control system protocols |
| US8527252B2 (en) * | 2006-07-28 | 2013-09-03 | Emerson Process Management Power & Water Solutions, Inc. | Real-time synchronized control and simulation within a process plant |
| US7949417B2 (en) | 2006-09-22 | 2011-05-24 | Exxonmobil Research And Engineering Company | Model predictive controller solution analysis process |
| US8571690B2 (en) * | 2006-10-31 | 2013-10-29 | Rockwell Automation Technologies, Inc. | Nonlinear model predictive control of a biofuel fermentation process |
| US8521310B2 (en) * | 2006-10-31 | 2013-08-27 | Rockwell Automation Technologies, Inc. | Integrated model predictive control of distillation and dehydration sub-processes in a biofuel production process |
| US7831318B2 (en) * | 2006-10-31 | 2010-11-09 | Rockwell Automation Technologies, Inc. | Model predictive control of fermentation temperature in biofuel production |
| US8634940B2 (en) * | 2006-10-31 | 2014-01-21 | Rockwell Automation Technologies, Inc. | Model predictive control of a fermentation feed in biofuel production |
| US7933849B2 (en) * | 2006-10-31 | 2011-04-26 | Rockwell Automation Technologies, Inc. | Integrated model predictive control of batch and continuous processes in a biofuel production process |
| US20080103747A1 (en) * | 2006-10-31 | 2008-05-01 | Macharia Maina A | Model predictive control of a stillage sub-process in a biofuel production process |
| US7844350B2 (en) * | 2006-11-22 | 2010-11-30 | Honeywell International Inc. | Testing of control strategies in a control system controlling a process control plant |
| US9298174B2 (en) * | 2008-03-20 | 2016-03-29 | Rockwell Automation Technologies, Inc. | Determining total inventory of batch and continuous inventories in a biofuel production process |
| US7840363B2 (en) * | 2008-03-20 | 2010-11-23 | Rockwell Automation Technologies, Inc. | Determining total mill flow in a biofuel production process |
| US8755939B2 (en) * | 2008-06-30 | 2014-06-17 | Rockwell Automation Technologies, Inc. | Throughput/yield optimized model predictive control |
| US20100063786A1 (en) * | 2008-09-11 | 2010-03-11 | Harke Michael C | Co-Simulation Process |
| US9014858B2 (en) * | 2008-09-30 | 2015-04-21 | Rockwell Automation Technologies, Inc. | Energy optimizer for dehydrating biofuels through distillation towers and molecular sieves |
| US9098093B2 (en) * | 2008-09-30 | 2015-08-04 | Rockwell Automation Technologies, Inc. | Model predictive control of biofuel denaturant blending |
| US9037298B2 (en) * | 2008-09-30 | 2015-05-19 | Rockwell Automation Technologies, Inc. | Cook flash temperature optimization |
| US8103385B2 (en) * | 2008-09-30 | 2012-01-24 | Rockwell Automation Technologies, Inc. | Optimizing product drying through parallel lines of centrifuges and dryer process units |
| US20100123618A1 (en) * | 2008-11-19 | 2010-05-20 | Harris Corporation | Closed loop phase control between distant points |
| US7969358B2 (en) * | 2008-11-19 | 2011-06-28 | Harris Corporation | Compensation of beamforming errors in a communications system having widely spaced antenna elements |
| US8170088B2 (en) * | 2008-11-19 | 2012-05-01 | Harris Corporation | Methods for determining a reference signal at any location along a transmission media |
| US20100124263A1 (en) * | 2008-11-19 | 2010-05-20 | Harris Corporation | Systems for determining a reference signal at any location along a transmission media |
| US20100125347A1 (en) * | 2008-11-19 | 2010-05-20 | Harris Corporation | Model-based system calibration for control systems |
| US7970365B2 (en) * | 2008-11-19 | 2011-06-28 | Harris Corporation | Systems and methods for compensating for transmission phasing errors in a communications system using a receive signal |
| US7855681B2 (en) * | 2008-11-19 | 2010-12-21 | Harris Corporation | Systems and methods for determining element phase center locations for an array of antenna elements |
| CN102741430B (zh) * | 2009-12-01 | 2016-07-13 | 牛津楠路珀尔科技有限公司 | 生化分析仪器、用于进行生化分析的第一模块以及相关方法 |
| US8756039B2 (en) * | 2010-03-02 | 2014-06-17 | Fisher-Rosemount Systems, Inc. | Rapid process model identification and generation |
| WO2011146914A2 (en) | 2010-05-21 | 2011-11-24 | Fisher-Rosemount Systems, Inc. | Multi-stage process modeling method |
| US9182752B2 (en) | 2010-05-21 | 2015-11-10 | Fisher-Rosemount Systems, Inc. | Method and system for multi-zone modeling to determine material properties in storage tanks |
| US9335042B2 (en) | 2010-08-16 | 2016-05-10 | Emerson Process Management Power & Water Solutions, Inc. | Steam temperature control using dynamic matrix control |
| US9447963B2 (en) | 2010-08-16 | 2016-09-20 | Emerson Process Management Power & Water Solutions, Inc. | Dynamic tuning of dynamic matrix control of steam temperature |
| US9217565B2 (en) | 2010-08-16 | 2015-12-22 | Emerson Process Management Power & Water Solutions, Inc. | Dynamic matrix control of steam temperature with prevention of saturated steam entry into superheater |
| AU2012215135B9 (en) | 2011-02-11 | 2017-03-09 | Oxford Nanopore Technologies Limited | Mutant pores |
| US8788239B2 (en) * | 2011-02-11 | 2014-07-22 | Fisher-Rosemount Systems, Inc. | Methods, apparatus and articles of manufacture to test batch configurations |
| US9163828B2 (en) | 2011-10-31 | 2015-10-20 | Emerson Process Management Power & Water Solutions, Inc. | Model-based load demand control |
| WO2013087973A1 (en) * | 2011-12-16 | 2013-06-20 | Metso Automation Oy | Method of tuning a process controller |
| JP6271505B2 (ja) | 2012-04-10 | 2018-01-31 | オックスフォード ナノポール テクノロジーズ リミテッド | 変異体ライセニンポア |
| JP5969919B2 (ja) * | 2012-12-28 | 2016-08-17 | アズビル株式会社 | 最適化装置および方法ならびに制御装置および方法 |
| GB201313477D0 (en) | 2013-07-29 | 2013-09-11 | Univ Leuven Kath | Nanopore biosensors for detection of proteins and nucleic acids |
| CN103268069B (zh) * | 2013-05-22 | 2015-10-28 | 常州大学 | 基于Hammerstein模型的自适应预测控制方法 |
| US10018997B2 (en) * | 2013-06-28 | 2018-07-10 | Fisher-Rosemount Systems, Inc. | Non-intrusive data analytics in a process control system |
| DE102013108478A1 (de) * | 2013-08-06 | 2015-02-12 | Endress+Hauser Process Solutions Ag | Verfahren zur Erweiterung einer eingebetteten Softwarekomponente eines Feldgerätes |
| US10443097B2 (en) | 2014-05-02 | 2019-10-15 | Oxford Nanopore Technologies Ltd. | Method of improving the movement of a target polynucleotide with respect to a transmembrane pore |
| JP7086600B2 (ja) * | 2014-08-13 | 2022-06-20 | フィッシャー-ローズマウント システムズ,インコーポレイテッド | プロセス制御器、プロセス制御方法、プロセス制御デバイス、及び多重速度制御器 |
| US10400014B2 (en) | 2014-09-01 | 2019-09-03 | Oxford Nanopore Technologies Ltd. | Mutant CsgG pores |
| US10266885B2 (en) | 2014-10-07 | 2019-04-23 | Oxford Nanopore Technologies Ltd. | Mutant pores |
| US10394973B2 (en) | 2015-12-18 | 2019-08-27 | Fisher-Rosemount Systems, Inc. | Methods and apparatus for using analytical/statistical modeling for continued process verification (CPV) |
| US10809702B2 (en) * | 2016-10-17 | 2020-10-20 | Fisher-Rosemount Systems, Inc. | Mobile devices for remote access of process control data |
| US10656635B2 (en) * | 2016-12-02 | 2020-05-19 | Honeywell International Inc. | Apparatus and method for performing process simulations for embedded multivariable predictive controllers in industrial process control and automation systems |
| CN109600245B (zh) * | 2017-09-30 | 2021-11-19 | 北京国双科技有限公司 | 服务器自动配置方法及装置 |
| CN107991886B (zh) * | 2017-12-28 | 2020-08-28 | 杭州电子科技大学 | 一种废塑料气化炼油炉膛压力的预测优化控制方法 |
| JP7036128B2 (ja) * | 2018-01-16 | 2022-03-15 | 日本電気株式会社 | 制御装置、制御方法およびプログラム |
| EP3671373A1 (de) | 2018-12-19 | 2020-06-24 | Bystronic Laser AG | Prognoseverfahren zur prognose eines bearbeitungsergebnisses für ein laserbearbeitungsverfahren |
| CN109981467B (zh) * | 2019-03-29 | 2022-02-11 | 中国人民银行清算总中心 | 静态路由更新方法和路由集中管理分发方法 |
| US11899417B2 (en) * | 2019-05-02 | 2024-02-13 | Fisher-Rosemount Systems, Inc. | Methods and apparatus to implement predictive analytics for continuous control system processes |
| US11604459B2 (en) | 2019-07-12 | 2023-03-14 | Emerson Process Management Power & Water Solutions, Inc. | Real-time control using directed predictive simulation within a control system of a process plant |
| US12050448B2 (en) * | 2021-01-29 | 2024-07-30 | Tata Consultancy Services Limited | Method and system to control a continuous bioprocessing |
| US20220308978A1 (en) * | 2021-03-24 | 2022-09-29 | International Business Machines Corporation | Task simulation using revised goals |
| US12530018B2 (en) * | 2023-02-28 | 2026-01-20 | Fisher-Rosemount Systems, Inc. | Model predictive control systems for process automation plants |
Citations (5)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN1197946A (zh) * | 1997-04-29 | 1998-11-04 | 鲜京建设株式会社 | 混合预测器和混合预测方法及用其控制进程的系统和方法 |
| CN1416540A (zh) * | 2000-03-10 | 2003-05-07 | 博里利斯技术公司 | 过程控制系统 |
| CN1598720A (zh) * | 2003-06-05 | 2005-03-23 | 费舍-柔斯芒特系统股份有限公司 | 具有非线性预测性能的多输入/多输出控制块 |
| EP1311913B1 (en) * | 2000-04-06 | 2005-06-01 | ABB Automation Inc. | System and methodology for adaptive, linear model predictive control based on rigorous, nonlinear process model |
| EP1577721A2 (en) * | 2004-03-16 | 2005-09-21 | United Technologies Corporation | Model predictive controller with life extending control |
Family Cites Families (16)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| US7149590B2 (en) | 1996-05-06 | 2006-12-12 | Pavilion Technologies, Inc. | Kiln control and upset recovery using a model predictive control in series with forward chaining |
| US6445963B1 (en) | 1999-10-04 | 2002-09-03 | Fisher Rosemount Systems, Inc. | Integrated advanced control blocks in process control systems |
| JP2001106703A (ja) * | 1999-10-06 | 2001-04-17 | Mitsubishi Rayon Co Ltd | 品質予測反応制御システム |
| US6654649B2 (en) | 1999-12-22 | 2003-11-25 | Aspen Technology, Inc. | Computer method and apparatus for optimized controller in a non-linear process |
| JP2001249705A (ja) * | 2000-03-03 | 2001-09-14 | Toshiba Corp | プロセスシミュレータ応用非線形制御装置およびその方法 |
| US6760716B1 (en) * | 2000-06-08 | 2004-07-06 | Fisher-Rosemount Systems, Inc. | Adaptive predictive model in a process control system |
| US6721609B1 (en) | 2000-06-14 | 2004-04-13 | Fisher-Rosemount Systems, Inc. | Integrated optimal model predictive control in a process control system |
| WO2002005042A2 (en) * | 2000-07-12 | 2002-01-17 | Aspen Technology, Inc. | Automated closed loop step testing of process units |
| JP2002041108A (ja) * | 2000-07-25 | 2002-02-08 | Yokogawa Electric Corp | プロセス制御方法及びこれを用いたプロセス制御装置 |
| US6819963B2 (en) | 2000-12-06 | 2004-11-16 | Advanced Micro Devices, Inc. | Run-to-run control method for proportional-integral-derivative (PID) controller tuning for rapid thermal processing (RTP) |
| JP3864781B2 (ja) * | 2001-12-28 | 2007-01-10 | オムロン株式会社 | 温度調節器 |
| US6901308B1 (en) | 2002-07-09 | 2005-05-31 | The Regents Of The University Of California | System level analysis and control of manufacturing process variation |
| US7376472B2 (en) | 2002-09-11 | 2008-05-20 | Fisher-Rosemount Systems, Inc. | Integrated model predictive control and optimization within a process control system |
| US7242989B2 (en) | 2003-05-30 | 2007-07-10 | Fisher-Rosemount Systems, Inc. | Apparatus and method for batch property estimation |
| US20050193739A1 (en) * | 2004-03-02 | 2005-09-08 | General Electric Company | Model-based control systems and methods for gas turbine engines |
| US7117046B2 (en) * | 2004-08-27 | 2006-10-03 | Alstom Technology Ltd. | Cascaded control of an average value of a process parameter to a desired value |
-
2005
- 2005-09-30 US US11/241,157 patent/US7877154B2/en active Active
-
2006
- 2006-09-20 GB GB1008266A patent/GB2467683B/en not_active Expired - Fee Related
- 2006-09-20 GB GB0618442A patent/GB2430763B/en not_active Expired - Fee Related
- 2006-09-20 GB GB1003382A patent/GB2465513B/en not_active Expired - Fee Related
- 2006-09-26 DE DE102006045428.6A patent/DE102006045428B4/de active Active
- 2006-09-30 CN CN201210297341.0A patent/CN102841538B/zh not_active Expired - Fee Related
- 2006-09-30 CN CN2006101317512A patent/CN1940781B/zh active Active
- 2006-10-02 JP JP2006270333A patent/JP5331301B2/ja active Active
-
2011
- 2011-12-22 JP JP2011281104A patent/JP5479443B2/ja active Active
Patent Citations (5)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN1197946A (zh) * | 1997-04-29 | 1998-11-04 | 鲜京建设株式会社 | 混合预测器和混合预测方法及用其控制进程的系统和方法 |
| CN1416540A (zh) * | 2000-03-10 | 2003-05-07 | 博里利斯技术公司 | 过程控制系统 |
| EP1311913B1 (en) * | 2000-04-06 | 2005-06-01 | ABB Automation Inc. | System and methodology for adaptive, linear model predictive control based on rigorous, nonlinear process model |
| CN1598720A (zh) * | 2003-06-05 | 2005-03-23 | 费舍-柔斯芒特系统股份有限公司 | 具有非线性预测性能的多输入/多输出控制块 |
| EP1577721A2 (en) * | 2004-03-16 | 2005-09-21 | United Technologies Corporation | Model predictive controller with life extending control |
Also Published As
| Publication number | Publication date |
|---|---|
| DE102006045428B4 (de) | 2022-12-08 |
| GB201003382D0 (en) | 2010-04-14 |
| GB201008266D0 (en) | 2010-06-30 |
| JP2007188473A (ja) | 2007-07-26 |
| JP5331301B2 (ja) | 2013-10-30 |
| CN1940781A (zh) | 2007-04-04 |
| DE102006045428A1 (de) | 2007-04-26 |
| JP2012064245A (ja) | 2012-03-29 |
| GB2430763B (en) | 2010-07-14 |
| GB2465513A (en) | 2010-05-26 |
| GB2467683B (en) | 2010-10-13 |
| GB2430763A (en) | 2007-04-04 |
| HK1144715A1 (en) | 2011-03-04 |
| CN1940781B (zh) | 2012-09-26 |
| HK1098835A1 (zh) | 2007-07-27 |
| US7877154B2 (en) | 2011-01-25 |
| US20070078530A1 (en) | 2007-04-05 |
| GB0618442D0 (en) | 2006-11-01 |
| GB2467683A (en) | 2010-08-11 |
| HK1148083A1 (en) | 2011-08-26 |
| CN102841538A (zh) | 2012-12-26 |
| GB2465513B (en) | 2010-07-14 |
| JP5479443B2 (ja) | 2014-04-23 |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| CN102841538B (zh) | 用于控制分批过程的方法和系统 | |
| JP2007188473A5 (https=) | ||
| JP7162075B2 (ja) | バッチプロセスのモデル化、監視及び制御におけるバッチデータの自動アライメントのためのコンピュータシステム、方法およびコンピュータプログラムプロダクト | |
| US7272454B2 (en) | Multiple-input/multiple-output control blocks with non-linear predictive capabilities | |
| US20250068794A1 (en) | Method for Predicting Outcome of an Modelling of a Process in a Bioreactor | |
| CN106575104B (zh) | 使用无线过程信号的模型预测控制 | |
| US20250068152A1 (en) | Method for Operating a Process Plant, Soft Sensor and Digital Process Twin System | |
| CN1490690A (zh) | 在过程控制系统中的集成模型预测控制和最佳化 | |
| CN1490691A (zh) | 集成模型预测控制和优化器功能块的配置和观察显示器 | |
| CZ20023362A3 (cs) | Způsob a řídící zařízení pro řízení procesu | |
| CN106094568A (zh) | 多阶段过程建模方法 | |
| JP2003295907A (ja) | 変動性プロセス遅延に対する高度プロセス制御ブロックの適応 | |
| EP4036672B1 (en) | Method to control a continuous bioprocessing | |
| JP2012138118A (ja) | バッチ特性推定のための装置及び方法 | |
| Ding et al. | Towards digital twin for biopharmaceutical processes: concept and progress | |
| Zhu | System identification for process control: recent experience and outlook | |
| CN121028728B (zh) | 基于数字孪生的炉渣金属回收过程优化方法 | |
| WO2024029063A1 (ja) | 支援方法、支援装置、及び支援プログラム | |
| Zhu | System identification for process control: Recent experience and outlook | |
| Vu et al. | The use of the pilot plant facility in teaching process control engineering at Murdoch University | |
| Christensen et al. | Comparing Model-based Control Strategies for a Quadruple Tank System: Decentralized PID, LMPC, and NMPC | |
| CN117193014A (zh) | 一种基于qp-dmc的快速重介选煤密度控制系统 | |
| Horst | Digital Twin based feedback control of biomass specific rates in a Fab-fragment producing E. coli Fed-batch process | |
| Joelianto et al. | Industrial Control Quality Improvement using Statistical Process Control: Tennessee Eastman Process Simulation Case | |
| Moreira | Process instrumentation and control |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| C06 | Publication | ||
| PB01 | Publication | ||
| C10 | Entry into substantive examination | ||
| SE01 | Entry into force of request for substantive examination | ||
| C14 | Grant of patent or utility model | ||
| GR01 | Patent grant | ||
| CF01 | Termination of patent right due to non-payment of annual fee | ||
| CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20150923 |