煤层气水平井悬挂筛管完井方法 Download PDFInfo
- Publication number
- CN102767349A CN102767349A CN201210241237XA CN201210241237A CN102767349A CN 102767349 A CN102767349 A CN 102767349A CN 201210241237X A CN201210241237X A CN 201210241237XA CN 201210241237 A CN201210241237 A CN 201210241237A CN 102767349 A CN102767349 A CN 102767349A
- Authority
- CN
- China
- Prior art keywords
- cave
- coal bed
- screen casing
- bed gas
- well
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
- 239000003245 coal Substances 0.000 title claims abstract description 39
- 238000000034 method Methods 0.000 title claims abstract description 17
- 239000000725 suspension Substances 0.000 claims description 13
- 239000004576 sand Substances 0.000 abstract description 8
- 238000004519 manufacturing process Methods 0.000 abstract description 6
- 239000003818 cinder Substances 0.000 abstract description 4
- 230000000694 effects Effects 0.000 abstract description 3
- 239000002245 particle Substances 0.000 abstract description 2
- 238000005553 drilling Methods 0.000 abstract 2
- 238000010276 construction Methods 0.000 description 2
- 230000009286 beneficial effect Effects 0.000 description 1
- 239000002817 coal dust Substances 0.000 description 1
- 238000005516 engineering process Methods 0.000 description 1
- 239000006260 foam Substances 0.000 description 1
- 238000007689 inspection Methods 0.000 description 1
- 238000012423 maintenance Methods 0.000 description 1
- 230000035699 permeability Effects 0.000 description 1
- 238000005086 pumping Methods 0.000 description 1
- 210000000664 rectum Anatomy 0.000 description 1
- XLYOFNOQVPJJNP-UHFFFAOYSA-N water Substances O XLYOFNOQVPJJNP-UHFFFAOYSA-N 0.000 description 1
Images
Landscapes
- Devices Affording Protection Of Roads Or Walls For Sound Insulation (AREA)
- Investigation Of Foundation Soil And Reinforcement Of Foundation Soil By Compacting Or Drainage (AREA)
Abstract
煤层气水平井悬挂筛管完井方法,应用于煤层气开采中。特征:钻一口煤层气直井,下入生外层套管,并实施固井,然后利用机械造穴工具在煤层段造出洞穴,洞穴直径为500~700mm,再钻一口多分支羽状水平井,水平段与洞穴连通。其次,在外层套管内下入内层管柱;液压尾管悬挂器下至洞穴上部40~60m处,液压尾管悬挂器座封在外层套管的内壁上;液压尾管悬挂器的下端连接4~6根内层套管,内层套管的下端连接筛管,筛管的位置在洞穴处,筛管的长度大于洞穴的高度,筛管的下端连接套管鞋。效果是:有效防止大粒径煤块掉落堵塞井筒,有力保证井筒通畅,使捞砂作业和起下采气管柱作业能够顺利进行。
Description
技术领域
本发明涉及煤层气井完井工艺技术领域,特别涉及一种一种煤层气水平井悬挂筛管完井方法,是对洞穴完井的补充。
背景技术
目前,煤层气井完井施工中,洞穴完井一种特殊的裸眼完井方法。在裸眼孔段,通过煤层自然压力、人工压力诱导、水力切割扩孔等方法引发煤层向井筒内崩落,然后用压缩空气或泡沫将煤粉清除,最终造成一个能够使应力场重新分布的大洞穴,长度为4~5m,提高煤储层裂隙中的有效渗透率和气井产量。大洞穴一般直径为500~700mm。此方法的优点是能减少煤层损伤,提高储层导流能力:缺点是作业风险大,井筒维护困难。国内煤层气水平井都是通过洞穴完井工艺进行完井,部分井存在洞穴段煤层垮塌严重,大块煤堵塞井筒的问题,使得井筒情况变得复杂化,严重影响捞砂管柱和采气管柱的顺利起下。
由于煤层气水平井洞穴完井后部分井存在洞穴段大煤块垮塌堵塞井筒的问题,使得井筒情况复杂化,给捞砂作业及起下采气管柱带来很大的困难。
发明内容
本发明的目的是:提供一种煤层气水平井悬挂筛管完井方法,在不影响该井正常排水采气的同时,保证井筒的完整性,使捞砂作业和起下采气管柱作业能够顺利进行。
本发明采用的技术方案是:
首先,钻一口煤层气直井,下入生外层套管1,并实施固井,然后利用机械造穴工具在煤层段造出洞穴6,洞穴6直径为500~700mm,再钻一口多分支羽状水平井,水平段7与洞穴6连通。其次,在外层套管1内下入内层管柱,内层管柱包括液压尾管悬挂器3、内层套管2、筛管4和套管鞋5;液压尾管悬挂器3下至洞穴6上部40~60m处,液压尾管悬挂器3座封(悬挂)在外层套管1的内壁上;液压尾管悬挂器3的下端连接4~6根内层套管2。4~5根内层套管2作为加重管,保证液压尾管悬挂器3平稳的挂在外层套管1壁上。内层套管2的下端连接筛管4,筛管4的位置在洞穴6处,筛管4的长度大于洞穴6的高度,筛管4的作用是挡煤块。筛管4的下端连接套管鞋5。套管鞋5的作用是确保大煤块不进入井筒,起下管柱不磕碰。
所述的筛管4的孔眼密度为10孔/m,孔眼直径为60mm。
实施套管固井施工、在煤层段造出洞穴和液压尾管悬挂器3座封(悬挂)在外层套管1的内壁上施工,不属于本发明的创造,本领域技术人员能完成。
本发明的有益效果:本发明煤层气水平井悬挂筛管完井方法,可以有效防止大粒径煤块掉落堵塞井筒,有力保证井筒通畅,使捞砂作业和起下采气管柱作业能够顺利进行,使后期检泵、修井、捞砂作业更加安全可靠。
附图说明
图1是煤层气水平井悬挂筛管完井方法纵剖面图示意图。
图中,1-7〞外层套管,2-5〞内层套管,3-7〞×5〞液压尾管悬挂器,4-5〞筛管,5-5〞套管鞋,6-洞穴,7-水平段。
具体实施方式
实施例1:以某区块1#井试验的煤层气水平井悬挂筛管完井方法为例,对本发明作进一步详细说明。实施下入内层管柱前,井筒最小通径106mm,洞穴6直径500mm,水平段7高度为152mm。1#井完井下泵时因洞穴段煤层垮塌严重,井筒捞砂处理难度非常大,在捞砂处理过程中常发生煤块卡管柱的事故,该井捞砂作业进行了将近一个月时间后还不断有煤层坍塌的现场发生。
参阅图1。本发明煤层气水平井悬挂筛管完井方法,首先,钻一口煤层气直井,下入生外层套管1,并实施固井,然后利用机械造穴工具在煤层段造出洞穴6,洞穴6直径为650mm,再钻一口多分支羽状水平井,水平段7与洞穴6连通。
其次,在外层套管1内下入内层管柱,内层管柱包括液压尾管悬挂器3、内层套管2、筛管4和套管鞋5;7〞×5〞的液压尾管悬挂器3下至洞穴上部50m处,7〞×5〞的液压尾管悬挂器3座封(悬挂)在外层7〞套管1的内壁上。7〞×5〞的液压尾管悬挂器3的下端连接5根内层套管2。内层套管2采用的规格是5〞。内层套管2的下端在水平井洞穴6的顶部。内层套管2的下端连接5〞规格的筛管4,筛管4的位置在洞穴6处,筛管4的长度为10m,筛管4的孔眼密度为10孔/m,孔眼直径为60mm;5〞筛管4的下端连接套管鞋5,套管鞋5的规格是5〞,长度为200mm。
Claims (2)
1.一种煤层气水平井悬挂筛管完井方法,其特征在于:首先,钻一口煤层气直井,下入生外层套管1,并实施固井,然后利用机械造穴工具在煤层段造出洞穴6,洞穴6直径为500~700mm,再钻一口多分支羽状水平井,水平段7与洞穴6连通。其次,在外层套管1内下入内层管柱,内层管柱包括液压尾管悬挂器3、内层套管2、筛管4和套管鞋5;液压尾管悬挂器3下至洞穴6上部40~60m处,液压尾管悬挂器3座封(悬挂)在外层套管1的内壁上;液压尾管悬挂器3的下端连接4~6根内层套管2,内层套管2的下端连接筛管4,筛管4的位置在洞穴6处,筛管4的长度大于洞穴6的高度,筛管4的下端连接套管鞋5。
2.根据权利要求1中所述的煤层气水平井悬挂筛管完井方法,其特征在于:所述的筛管4的孔眼密度为10孔/m,孔眼直径为60mm。
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201210241237.XA CN102767349B (zh) | 2012-07-12 | 2012-07-12 | 煤层气水平井悬挂筛管完井方法 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201210241237.XA CN102767349B (zh) | 2012-07-12 | 2012-07-12 | 煤层气水平井悬挂筛管完井方法 |
Publications (2)
Publication Number | Publication Date |
---|---|
CN102767349A true CN102767349A (zh) | 2012-11-07 |
CN102767349B CN102767349B (zh) | 2015-05-27 |
Family
ID=47094892
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201210241237.XA Active CN102767349B (zh) | 2012-07-12 | 2012-07-12 | 煤层气水平井悬挂筛管完井方法 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN102767349B (zh) |
Cited By (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN103527148A (zh) * | 2013-09-26 | 2014-01-22 | 中煤科工集团西安研究院有限公司 | 一种双套管单泵分层控压合层排采技术及装置 |
CN104481468B (zh) * | 2014-09-28 | 2017-02-22 | 山西蓝焰煤层气集团有限责任公司 | 一种煤层气井裸眼井完井工艺 |
CN108590597A (zh) * | 2018-04-18 | 2018-09-28 | 中联煤层气有限责任公司 | 一种井眼防护装置及方法 |
CN109798078A (zh) * | 2019-03-06 | 2019-05-24 | 中联煤层气有限责任公司 | 煤层气水平井洞穴砂埋修井工艺 |
CN115059434A (zh) * | 2022-05-31 | 2022-09-16 | 中国石油大学(北京) | 煤层气水平井组开发方法 |
CN117514115A (zh) * | 2023-12-18 | 2024-02-06 | 河南省地质研究院 | 基于高煤阶煤层气压裂水平井的完井装置及方法 |
Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US20040244988A1 (en) * | 2003-06-05 | 2004-12-09 | Preston Yale Matthew | Baffle system for two-phase annular flow |
RU2006124027A (ru) * | 2006-07-04 | 2008-01-20 | Открытое Акционерное Общество "Татнефть" им. В.Д.Шашина (RU) | Способ добычи из подземной залежи тяжелых и/или высоковязких углеводородов |
CN201756917U (zh) * | 2010-08-09 | 2011-03-09 | 北京奥瑞安能源技术开发有限公司 | 一种煤层气排采管 |
CN201826821U (zh) * | 2010-11-03 | 2011-05-11 | 郭志艳 | 用于油气开采的两级防砂筛管 |
CN102425397A (zh) * | 2011-12-29 | 2012-04-25 | 郑州大学 | 双井筒水平羽状井水力冲刷钻进卸压开采煤层气方法 |
-
2012
- 2012-07-12 CN CN201210241237.XA patent/CN102767349B/zh active Active
Patent Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US20040244988A1 (en) * | 2003-06-05 | 2004-12-09 | Preston Yale Matthew | Baffle system for two-phase annular flow |
RU2006124027A (ru) * | 2006-07-04 | 2008-01-20 | Открытое Акционерное Общество "Татнефть" им. В.Д.Шашина (RU) | Способ добычи из подземной залежи тяжелых и/или высоковязких углеводородов |
CN201756917U (zh) * | 2010-08-09 | 2011-03-09 | 北京奥瑞安能源技术开发有限公司 | 一种煤层气排采管 |
CN201826821U (zh) * | 2010-11-03 | 2011-05-11 | 郭志艳 | 用于油气开采的两级防砂筛管 |
CN102425397A (zh) * | 2011-12-29 | 2012-04-25 | 郑州大学 | 双井筒水平羽状井水力冲刷钻进卸压开采煤层气方法 |
Cited By (9)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN103527148A (zh) * | 2013-09-26 | 2014-01-22 | 中煤科工集团西安研究院有限公司 | 一种双套管单泵分层控压合层排采技术及装置 |
CN104481468B (zh) * | 2014-09-28 | 2017-02-22 | 山西蓝焰煤层气集团有限责任公司 | 一种煤层气井裸眼井完井工艺 |
CN108590597A (zh) * | 2018-04-18 | 2018-09-28 | 中联煤层气有限责任公司 | 一种井眼防护装置及方法 |
CN109798078A (zh) * | 2019-03-06 | 2019-05-24 | 中联煤层气有限责任公司 | 煤层气水平井洞穴砂埋修井工艺 |
CN109798078B (zh) * | 2019-03-06 | 2020-08-11 | 中联煤层气有限责任公司 | 煤层气水平井洞穴砂埋修井工艺 |
CN115059434A (zh) * | 2022-05-31 | 2022-09-16 | 中国石油大学(北京) | 煤层气水平井组开发方法 |
CN115059434B (zh) * | 2022-05-31 | 2023-12-08 | 中国石油大学(北京) | 煤层气水平井组开发方法 |
CN117514115A (zh) * | 2023-12-18 | 2024-02-06 | 河南省地质研究院 | 基于高煤阶煤层气压裂水平井的完井装置及方法 |
CN117514115B (zh) * | 2023-12-18 | 2024-05-10 | 河南省地质研究院 | 基于高煤阶煤层气压裂水平井的完井装置及方法 |
Also Published As
Publication number | Publication date |
---|---|
CN102767349B (zh) | 2015-05-27 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN103015955B (zh) | 裸眼水平井多簇滑套分段压裂方法 | |
CN102767349B (zh) | 煤层气水平井悬挂筛管完井方法 | |
CN103061684B (zh) | 裸眼水平井分段多簇均匀酸化管柱及其酸化方法 | |
CN105201458B (zh) | 一种煤层气水平井玻璃钢筛管完井方法 | |
CN107401393A (zh) | 排水采气一体化采空区瓦斯抽采井井身结构及其施工方法 | |
CN201705219U (zh) | 侧钻井砾石充填完井管柱 | |
CN106014346A (zh) | 一种速度管柱配套柱塞气举排水采气方法及装置 | |
CN104481489B (zh) | 一种气井直井用连续油管压裂与完井一体化工艺方法 | |
CN103603625A (zh) | 一种套管取心钻具及套管取心钻进方法 | |
CN108533200A (zh) | 一种膨胀管悬插修复工具及修复方法 | |
CN109267983B (zh) | 基于裸眼预置管柱完井的水平井重复压裂装置及方法 | |
CN102852490A (zh) | 复杂结构井抽放高瓦斯气工艺方法 | |
CN105443099A (zh) | 一种裸眼预置管柱完井水平井上返压裂方法 | |
CN104343424B (zh) | 一种煤层气水平井pe筛管完井应用工艺方法 | |
CN107152261A (zh) | 煤层气抽采系统及建造方法 | |
CN204126624U (zh) | 裸眼水平井不动管柱水力喷射分段完井压裂管柱 | |
CN106930733A (zh) | 煤层气群井抽采系统及建造方法 | |
CN103089193A (zh) | 一种筛管顶部膨胀套管封堵的尾管完井的方法 | |
CN112282718B (zh) | 一种侧钻井和小井眼井用组合管串及使用方法 | |
WO2021249499A1 (zh) | 井筒分段作业方法和用于该方法的胶塞 | |
CN204283371U (zh) | 完井管柱 | |
CN214576923U (zh) | 煤层气水平井系统 | |
CN112267866B (zh) | 侧钻井和小井眼井用小直径管分段压裂生产管柱及方法 | |
CN112431579B (zh) | 侧钻井和小井眼井用预置小直径管管内压裂装置及方法 | |
CN108240193B (zh) | 一种煤层气水平井解卡管柱及方法 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
C14 | Grant of patent or utility model | ||
GR01 | Patent grant |