CN102767289B - 大型网格结构非对称整体提升施工方法 - Google Patents
大型网格结构非对称整体提升施工方法 Download PDFInfo
- Publication number
- CN102767289B CN102767289B CN201210242064.3A CN201210242064A CN102767289B CN 102767289 B CN102767289 B CN 102767289B CN 201210242064 A CN201210242064 A CN 201210242064A CN 102767289 B CN102767289 B CN 102767289B
- Authority
- CN
- China
- Prior art keywords
- scale network
- counterweight
- construction method
- lifting
- suspension centre
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Landscapes
- Conveying And Assembling Of Building Elements In Situ (AREA)
- Jib Cranes (AREA)
Abstract
Description
Claims (6)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201210242064.3A CN102767289B (zh) | 2012-07-12 | 2012-07-12 | 大型网格结构非对称整体提升施工方法 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201210242064.3A CN102767289B (zh) | 2012-07-12 | 2012-07-12 | 大型网格结构非对称整体提升施工方法 |
Publications (2)
Publication Number | Publication Date |
---|---|
CN102767289A CN102767289A (zh) | 2012-11-07 |
CN102767289B true CN102767289B (zh) | 2014-10-15 |
Family
ID=47094836
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201210242064.3A Active CN102767289B (zh) | 2012-07-12 | 2012-07-12 | 大型网格结构非对称整体提升施工方法 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN102767289B (zh) |
Families Citing this family (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN103276908A (zh) * | 2013-06-06 | 2013-09-04 | 四川电力建设三公司 | 一种用于组装钢网架筒壳结构干煤棚的施工方法 |
CN103967121B (zh) * | 2013-11-22 | 2016-05-25 | 广州市第二建筑工程有限公司 | 一种阳光房短柱结构及其切割方法 |
CN104060840A (zh) * | 2014-06-25 | 2014-09-24 | 广州市第三建筑工程有限公司 | 使用螺栓球桁架提升机提升大跨度穹顶网架的施工方法 |
CN112912567B (zh) * | 2019-07-03 | 2022-11-01 | 广州建筑股份有限公司 | 一种l型双向悬挑结构整体提升施工方法 |
CN112960551B (zh) * | 2021-03-26 | 2023-03-17 | 深圳市瑞鑫钢结构工程有限公司 | 一种非对称大型网格结构整体提升辅助装置 |
CN114541567A (zh) * | 2022-03-04 | 2022-05-27 | 中建八局第二建设有限公司 | 一种狭小场地不规则连体钢连廊施工方法 |
Family Cites Families (8)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP3658572B2 (ja) * | 2002-04-16 | 2005-06-08 | 株式会社富士ピー・エス | 長尺部材用荷吊り治具 |
JP2004168529A (ja) * | 2002-11-22 | 2004-06-17 | Sumitomo Forestry Co Ltd | 構造物吊り上げ作業支援システム |
JP4397716B2 (ja) * | 2004-03-25 | 2010-01-13 | 山九株式会社 | 重量物の載置方法及びそのシステム |
CN100480481C (zh) * | 2007-10-30 | 2009-04-22 | 浙江大学 | 四角锥球面网壳无脚手架施工型钢托撑式吊装机具 |
CN101451378A (zh) * | 2007-11-29 | 2009-06-10 | 上海市机械施工有限公司 | “水滴形”放射状单层钢管网壳分块及安装方法 |
CN101586400A (zh) * | 2008-05-22 | 2009-11-25 | 中国十五冶金建设有限公司 | 分块添加式提升法安装网架方法 |
CN101988308B (zh) * | 2010-09-30 | 2011-08-10 | 中国华西企业有限公司 | 大跨度空间螺栓球钢网壳穹顶无支撑安装工法 |
CN102465602A (zh) * | 2010-11-18 | 2012-05-23 | 芜湖天航科技(集团)股份有限公司 | 柱面网壳旋转提升施工方法 |
-
2012
- 2012-07-12 CN CN201210242064.3A patent/CN102767289B/zh active Active
Also Published As
Publication number | Publication date |
---|---|
CN102767289A (zh) | 2012-11-07 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN102767289B (zh) | 大型网格结构非对称整体提升施工方法 | |
CN103243654B (zh) | 斜拉桥钢锚梁的安装方法及所使用的拼装胎架和索塔安装平台 | |
CN207294093U (zh) | 一种大跨度钢桁架整体提升装置 | |
CN106812328B (zh) | 带吊挂层的张弦预应力钢结构网架整体二步提升施工方法 | |
CN102733615B (zh) | 非对称整体提升施工方法 | |
CN202248941U (zh) | 大型钢构件的整体提升就位安装装置 | |
CN203296361U (zh) | 大跨度钢结构跨外组对吊装平台 | |
CN104179121B (zh) | 一种移动模架托架四提升自拼装方法 | |
CN205474844U (zh) | 一种跨式贝雷梁支架 | |
CN107476581A (zh) | 一种钢结构双层悬挑结构吊装安装方法 | |
CN104989111B (zh) | 钢结构高层吊装施工方法 | |
CN205575428U (zh) | 一种构件吊装系统 | |
CN208151865U (zh) | 一种内倾式钢箱拱桥整体提升模拟吊装系统 | |
CN104775363B (zh) | 上塔柱钢筋节段的组拼方法 | |
CN201793330U (zh) | 龙门式吊架装置 | |
CN202369321U (zh) | 隔震支座吊装车 | |
CN110723642A (zh) | 一种封闭厂房内设备平移吊装就位装置及方法 | |
CN215164726U (zh) | 一种用于现浇梁钢管桩支架快速拆除的整体卸落结构 | |
CN205114881U (zh) | 造船用门式起重机 | |
CN201825635U (zh) | 电站锅炉吊装结构 | |
CN2402764Y (zh) | 建筑物或构筑物整体迁移装置 | |
CN211057829U (zh) | 一种配重抗扭型悬挑式减压井固定检修平台 | |
CN107355003A (zh) | 大跨度超宽超重桁架的模块化施工方法 | |
CN103711112B (zh) | 浇筑大跨度混凝土梁用组合式贝雷架承重排架 | |
CN208039333U (zh) | 一种工程桩基检测装置 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
ASS | Succession or assignment of patent right |
Owner name: GUANGZHOU SECOND CONSTRUCTION ENGINEERING CO., LTD Free format text: FORMER OWNER: GUANGZHOU SECOND CONSTRUCTION ENGINEERING CO., LTD. SHENZHEN YAXIN CONSTRUCTION STEELSTRUCTURE ENGINEERING CO., LTD. Effective date: 20130121 |
|
C41 | Transfer of patent application or patent right or utility model | ||
C53 | Correction of patent for invention or patent application | ||
CB03 | Change of inventor or designer information |
Inventor after: Wang Long Inventor after: Gao Junyue Inventor after: Yao Mingqiu Inventor after: Chen Zhenying Inventor after: Bin Jianxiong Inventor after: Feng Chen Inventor after: Wang Shigang Inventor after: Wei Wai Inventor before: Wang Long Inventor before: Gao Junyue Inventor before: Yao Mingqiu Inventor before: Chen Zhenying Inventor before: Bin Jianxiong Inventor before: Feng Chen Inventor before: Wang Shigang |
|
COR | Change of bibliographic data |
Free format text: CORRECT: INVENTOR; FROM: WANG LONG GAO JUNYUE YAO MINGQIU CHEN ZHENYING BIN JIANXIONG FENG CHEN WANG SHIGANG TO: WANG LONG GAO JUNYUE YAO MINGQIU CHEN ZHENYING BIN JIANXIONG FENG CHEN WANG SHIGANG WEI WAI |
|
TA01 | Transfer of patent application right |
Effective date of registration: 20130121 Address after: 510030 Yuexiu District, Guangdong Province, Guang Wei Road, No. 4, No. Applicant after: Guangzhou Construction Co., Ltd. Applicant after: Guangzhou Di-Er Construction & Engineering Co., Ltd. Applicant after: Shenzhen Yaxin Construction Steel Structure Engineering Co., Ltd. Applicant after: Shanghai Yesheng Electromechanical Control Technology Co., Ltd. Address before: 510030 Yuexiu District, Guangdong Province, Guang Wei Road, No. 4, No. Applicant before: Guangzhou Construction Co., Ltd. Applicant before: Guangzhou Di-Er Construction & Engineering Co., Ltd. Applicant before: Shenzhen Yaxin Construction Steel Structure Engineering Co., Ltd. |
|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
ASS | Succession or assignment of patent right |
Owner name: GUANGZHOU SECOND CONSTRUCTION ENGINEERING CO., LTD Free format text: FORMER OWNER: GUANGZHOU SECOND CONSTRUCTION ENGINEERING CO., LTD. SHENZHEN YAXIN CONSTRUCTION STEELSTRUCTURE ENGINEERING CO., LTD. SHANGHAI YESHENG Effective date: 20150217 |
|
C41 | Transfer of patent application or patent right or utility model | ||
TR01 | Transfer of patent right |
Effective date of registration: 20150217 Address after: 510030 Yuexiu District, Guangdong Province, Guang Wei Road, No. 4, No. Patentee after: Guangzhou Construction Co., Ltd. Patentee after: Guangzhou Di-Er Construction & Engineering Co., Ltd. Patentee after: Shenzhen Yaxin Construction Steel Structure Engineering Co., Ltd. Address before: 510030 Yuexiu District, Guangdong Province, Guang Wei Road, No. 4, No. Patentee before: Guangzhou Construction Co., Ltd. Patentee before: Guangzhou Di-Er Construction & Engineering Co., Ltd. Patentee before: Shenzhen Yaxin Construction Steel Structure Engineering Co., Ltd. Patentee before: Shanghai Yesheng Electromechanical Control Technology Co., Ltd. |