CN102758437A - Circular foundation pit construction method for pouring ultra-large volume concrete radially from center to edge - Google Patents

Circular foundation pit construction method for pouring ultra-large volume concrete radially from center to edge Download PDF

Info

Publication number
CN102758437A
CN102758437A CN2012102651192A CN201210265119A CN102758437A CN 102758437 A CN102758437 A CN 102758437A CN 2012102651192 A CN2012102651192 A CN 2012102651192A CN 201210265119 A CN201210265119 A CN 201210265119A CN 102758437 A CN102758437 A CN 102758437A
Authority
CN
China
Prior art keywords
pouring
concrete
large volume
construction method
ultra
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN2012102651192A
Other languages
Chinese (zh)
Inventor
龚剑
朱毅敏
周虹
吴德龙
黄玉林
华关昌
陈康
陈建大
陈俊春
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shanghai Construction Group Co Ltd
Shanghai Construction No 1 Group Co Ltd
Shanghai Jiangong Construction Material Co Ltd
Original Assignee
Shanghai Construction Group Co Ltd
Shanghai Construction No 1 Group Co Ltd
Shanghai Jiangong Construction Material Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shanghai Construction Group Co Ltd, Shanghai Construction No 1 Group Co Ltd, Shanghai Jiangong Construction Material Co Ltd filed Critical Shanghai Construction Group Co Ltd
Priority to CN2012102651192A priority Critical patent/CN102758437A/en
Publication of CN102758437A publication Critical patent/CN102758437A/en
Pending legal-status Critical Current

Links

Images

Landscapes

  • On-Site Construction Work That Accompanies The Preparation And Application Of Concrete (AREA)

Abstract

The invention discloses a circular foundation pit construction method for pouring ultra-large volume concrete radially from center to edge, wherein automobile pumps and fixed pumps are arranged on an annular construction road of a foundation pit at intervals; a pouring operation is carried out by adopting a method for pouring in the pouring direction radially from center to edge; and a pouring principle comprises the rules of fixing points sectionally, forming one slope, carrying out thin-layer pouring, proceeding gradually, and pouring to the top in one step. By the adoption of the method for radially pouring from the center of the foundation pit to the edge thereof, the site condition advantages are sufficiently exerted, and a plurality of the automobile pumps are arranged as more as possible along the perimeter of the foundation pit for pumping the concrete. According to the method disclosed by the invention, the pouring path is shortened by a half, and the time of pouring the concrete is shortened; and the pipe explosion risks and quality hidden troubles caused by pump pipe blockage are reduced, the labor intensity of workers is lowered, and the homogeneity and compactness of the concrete are guaranteed simultaneously.

Description

Radial pouring construction method around the mind-set in the circular foundation ditch ultra-large volume concrete
Technical field
The invention belongs to the underground building technical field of construction, relate to the ultra mass concrete casting method of a kind of super large, radial pouring construction method around the mind-set in particularly a kind of circular foundation ditch ultra-large volume concrete.
Background technology
Along with the increase of project scale, the casting of concrete in mass scale of construction is increasing, and satisfy requirement of engineering has supporting technical method and measure.For preventing the generation of the cold seam of concrete, must strictness carry out management and control to the time of building.What the pouring construction of prior art mass concrete engineering generally adopted at present is to utilize fixed pump to carry out the unidirectional mode continuous placing construction of watering of moving back, and the method mainly contains following some factor affecting and builds efficient:
1. fixed pump waters that to smash speed low, and the time of building is long.
2. fixed pump waters the arrangement of smashing the monolateral cloth pump of common employing, causes the layout quantity of fixed pump few, and the utilization of area rate is low.
3. adopt fixed pump to move back frequent the installation and the dismounting pump line in the process of smashing, the amount of labour increases, and the concrete clogging takes place easily.
The amount of labour that is produced in the whole process is excessive, simultaneously following uncertain potential safety hazard.
Summary of the invention
Technical problem to be solved by this invention provides and a kind ofly can shorten the concreting time; Reduce labor strength and degree of fatigue; And can guarantee in the homogeneous circular foundation ditch ultra-large volume concrete of concrete radial pouring construction method around the mind-set, to overcome the above-mentioned defective that prior art exists.
The technical scheme of technical solution problem of the present invention is following:
Radial pouring construction method around the mind-set in a kind of circular foundation ditch ultra-large volume concrete; It is characterized in that; With automotive pump and fixed pump separation on the annular pioneer road on foundation ditch limit; Build direction serve as reasons in around the mind-set radial method of building water and smash, water and smash principle and be segmentation fixed point, the gradient, a thin concrete lift, advance, once arrive the top in proper order.
Can know that by above disclosed technical scheme the present invention gives full play to the site condition advantage through adopting from foundation ditch radial casting method around the mind-set,, arrange that as far as possible many automotive pump carry out concrete pumping along the foundation ditch periphery.Shorten the half the path of building, reduced concrete watering the time of smashing; Reduce pump line and stopped up booster risk and the hidden danger of quality that brings, alleviated the intensity of workman's work, guaranteed concrete homogeneous density simultaneously.
Description of drawings
Fig. 1 ~ Fig. 3 flows to procedure chart for foundation ditch concrete in mass of the present invention waters to smash;
Reference numeral is following:
1, automotive pump 2, fixed pump 3, receive a maintenance zone
The specific embodiment
Below in conjunction with accompanying drawing and embodiment the present invention is made further detailed description.
Specific embodiment: the total side of the thick 6m of certain long 121m of construction works main building sole plate amount 6 ten thousand steres, underplate concrete all adopts commercial concrete.
Radial pouring construction method around the mind-set in the circular foundation ditch ultra-large volume concrete of employing the present invention; With automotive pump and fixed pump separation on the annular pioneer road on foundation ditch limit; Build direction serve as reasons in around the mind-set radial method of building water and smash, water and smash principle and be segmentation fixed point, the gradient, a thin concrete lift, advance, once arrive the top in proper order.
Like Fig. 1 ~ shown in Figure 3; Adopt 12 automotive pump (4 56m and 8 48m) and 6 fixed pump separation on the annular pioneer road on foundation ditch limit; Wherein fetch earth and arrange 4 56m automotive pump on the trestle platform; All the other 8 48m automotive pump and 6 fixed pump separation are built in circular foundation ditch limit simultaneously, build direction and move back around the mind-set in serving as reasons and smash.
Employing is watered by radial method of building around the middle mind-set and is smash, and the gradient is controlled between the 30-45 degree, and about 10m to be 1 extension, height 1m segmentation is built.Concrete supply speed guarantees that greater than initial set speed concrete cold seam do not occur at the place, inclined-plane; A direction principle of receiving underplate concrete adopts and progressively advances from east to west, and the most western trestle place receipts head waters to be smash.
Through adopting the present invention to realize accomplishing the task of building in 60 hours, greatly reduce labor strength and degree of fatigue.
The above is merely preferred embodiments of the present invention, is not to be used for limiting protection scope of the present invention, and every equal conversion of doing according to claim of the present invention is all within protection scope of the present invention.

Claims (5)

1. radial pouring construction method around the mind-set in the circular foundation ditch ultra-large volume concrete; It is characterized in that; With automotive pump and fixed pump separation on the annular pioneer road on foundation ditch limit; Build direction serve as reasons in around the mind-set radial method of building water and smash, water and smash principle and be segmentation fixed point, the gradient, a thin concrete lift, advance, once arrive the top in proper order.
2. radial pouring construction method around the mind-set is characterized in that in the circular foundation ditch ultra-large volume concrete according to claim 1, and the gradient is controlled between 30 degree-45 degree.
3. radial pouring construction method around the mind-set is characterized in that in the circular foundation ditch ultra-large volume concrete according to claim 1, and about 10m to be 1 extension, height 1m segmentation is built.
4. radial pouring construction method around the mind-set is characterized in that in the circular foundation ditch ultra-large volume concrete according to claim 1, and underplate concrete is received a direction principle employing and progressively advanced from east to west, and the most western trestle place receipts head waters to be smash.
5. radial pouring construction method around the mind-set is characterized in that concrete supply speed guarantees that greater than initial set speed concrete cold seam do not occur at the place, inclined-plane in the circular foundation ditch ultra-large volume concrete according to claim 1.
CN2012102651192A 2012-07-27 2012-07-27 Circular foundation pit construction method for pouring ultra-large volume concrete radially from center to edge Pending CN102758437A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2012102651192A CN102758437A (en) 2012-07-27 2012-07-27 Circular foundation pit construction method for pouring ultra-large volume concrete radially from center to edge

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2012102651192A CN102758437A (en) 2012-07-27 2012-07-27 Circular foundation pit construction method for pouring ultra-large volume concrete radially from center to edge

Publications (1)

Publication Number Publication Date
CN102758437A true CN102758437A (en) 2012-10-31

Family

ID=47053070

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2012102651192A Pending CN102758437A (en) 2012-07-27 2012-07-27 Circular foundation pit construction method for pouring ultra-large volume concrete radially from center to edge

Country Status (1)

Country Link
CN (1) CN102758437A (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112031423A (en) * 2020-08-12 2020-12-04 河南高建工程管理有限公司 Construction quality control method for ultra-large-volume concrete

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1515764A (en) * 2003-01-06 2004-07-28 中国建筑第八工程局中南公司 Ultra-thin superlength reinforced concrete structure seamless construction method
EP2072706A1 (en) * 2007-12-20 2009-06-24 Kp1 Floor comprising girders and structural floor units as well as a seamless cast slab on these girders and structural floor units
CN101638940A (en) * 2009-05-26 2010-02-03 中冶集团华冶资源开发有限责任公司 Large plate mass concrete seamless construction method
CN102251674A (en) * 2011-06-05 2011-11-23 山东宁建建设集团有限公司 Bunker-skipping type seamless construction method of ultra-long concrete structure

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1515764A (en) * 2003-01-06 2004-07-28 中国建筑第八工程局中南公司 Ultra-thin superlength reinforced concrete structure seamless construction method
EP2072706A1 (en) * 2007-12-20 2009-06-24 Kp1 Floor comprising girders and structural floor units as well as a seamless cast slab on these girders and structural floor units
CN101638940A (en) * 2009-05-26 2010-02-03 中冶集团华冶资源开发有限责任公司 Large plate mass concrete seamless construction method
CN102251674A (en) * 2011-06-05 2011-11-23 山东宁建建设集团有限公司 Bunker-skipping type seamless construction method of ultra-long concrete structure

Non-Patent Citations (4)

* Cited by examiner, † Cited by third party
Title
朱毅敏、龚剑: "宁波环球航运广场主楼基础底板大体积混凝土施工技术", 《建筑施工》 *
王念念: "基础底板大体积混凝土分层浇筑施工技术", 《建筑技术》 *
陈建大等: "超大体积超厚C50混凝土的配置技术与质量组织六步法管理机制的实践", 《全国混凝土新技术、新标准及工程应用学术交流会》 *
龚剑等: "上海环球金融中心主楼深基础混凝土大底板施工研究", 《建筑施工》 *

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112031423A (en) * 2020-08-12 2020-12-04 河南高建工程管理有限公司 Construction quality control method for ultra-large-volume concrete

Similar Documents

Publication Publication Date Title
CN107806205B (en) Mounting structure and mounting method of lining-free steel dome
CN105239775B (en) A kind of reinforcement installation penetration quality dynamic control method for silo slip form construction
CN206438500U (en) A kind of bridge pile foundation steel reinforcement cage space positioning system
CN103939110A (en) Strengthening system for slight cracking of existing tunnel arch portion lining
CN203547753U (en) Profile steel concrete shaft wall base
CN103451338B (en) Method for installing ascending tubes and five-way balls of blast furnace gas systems
CN207498832U (en) Hydraulic climbing die block system climbing device
CN205532623U (en) Be applicable to special ground shield tunnel segment ring
CN104314081A (en) Deep foundation pit driftway-free basement concrete pumping construction device
CN202866304U (en) Reverse-building-method steel pipe column bottom locating device
CN102758437A (en) Circular foundation pit construction method for pouring ultra-large volume concrete radially from center to edge
CN202644495U (en) Porous vertical shaft slide mold construction device in complicated structure
CN104153451A (en) Construction method for installing concrete pipeline through prefabricated supporting block
CN204163120U (en) Excavation of foundation pit space enclosing structure top deformation monitoring device
CN104900132A (en) Simulated test device of shield method construction inclined well tube sheet filling behind lining
CN202788126U (en) Anchor bolt type column foot herringbone framework
CN201554033U (en) Tower crane foundation for deep foundation ditch
CN202064330U (en) Pressure steel pipe inspection access channel structure for high-head hydropower plant
CN204783059U (en) Poling combination bow member of tunnel work face of processing landslide
CN108071097A (en) A kind of turbine chamber integral replacing method
CN206625850U (en) Tunnel concrete liner Simple steel scaffold
CN202520315U (en) Tunnel ventilation shaft wall lining-supporting system
CN103541574B (en) Steel-making diffusing tower installation construction in narrow regions
CN108868787B (en) Shield starting construction method for river-crossing tunnel
CN105317054A (en) Draught fan foundation structure with single pile of transition sections and construction method

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C05 Deemed withdrawal (patent law before 1993)
WD01 Invention patent application deemed withdrawn after publication

Application publication date: 20121031