CN102251674A - Bunker-skipping type seamless construction method of ultra-long concrete structure - Google Patents
Bunker-skipping type seamless construction method of ultra-long concrete structure Download PDFInfo
- Publication number
- CN102251674A CN102251674A CN 201110149353 CN201110149353A CN102251674A CN 102251674 A CN102251674 A CN 102251674A CN 201110149353 CN201110149353 CN 201110149353 CN 201110149353 A CN201110149353 A CN 201110149353A CN 102251674 A CN102251674 A CN 102251674A
- Authority
- CN
- China
- Prior art keywords
- concrete
- pouring
- construction
- seamless
- expansive
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Images
Landscapes
- On-Site Construction Work That Accompanies The Preparation And Application Of Concrete (AREA)
Abstract
The invention relates to a bunker-skipping type seamless construction method of an ultra-long concrete structure, the pouring of concrete adopts the continuous construction way for construction, and the continuous pouring method of adopting one gradient, performing thin-layer pouring, progressively advancing and pouring to the top once is adopted along the longitudinal direction for enabling concrete to flow naturally for forming a slope, thereby ensuring timely jointing and avoiding the occurrence of cold joints. Four concrete pumps are divided into two groups for proceeding in opposite directions, during the whole pouring process, in each group, withdrawal of one pump is ensured for continuously pouring small expansive concrete of an ultra-long seamless raft, and the other pump is flexibly matched with a skip of a tower crane for pouring the concrete of an expansive reinforcing band and a wall body. When the expansive reinforcing band is poured, the expansive concrete is adopted for construction, when the other side is poured, the small expansive concrete is used for pouring, and the operation is performed in a circulating manner till the completion of the continuous pouring, thereby realizing the seamless construction. When in concrete pouring, the concrete at other parts are strictly prevented from entering into an expanded post-pouring band, thereby avoiding affecting the setting effects.The bunker-skipping type seamless construction is performed, thereby fully applying chemical reaction of cement as well as reducing and avoiding cracking of the concrete.
Description
Technical field
The present invention relates to the method for building operations, relate in particular to Overlong Concrete Structure and jump storehouse formula seamless construction method.
Background technology
In overlength, super wide treatment tank structure of reinforced concrete, for accelerating construction progress, guarantee the concrete total quality, establish expansion reinforcing band one every 30~40m.Should produce the cold seam of construction if adopt conventional method to build successively, cause pond body seepage.Its reason is, the variation of concrete shrinkage and environment temperature can cause the contraction tensile stress in the concrete structure, and concrete tensile strength has only about 10 of compressive strength, if continuous length is too big, in use tensile stress reaches tensile strength and produces structural cracks, and influence is used and be attractive in appearance.
Summary of the invention
The objective of the invention is to, overcome the deficiencies in the prior art part, provide a kind of Overlong Concrete Structure to jump storehouse formula seamless construction method, by jumping storehouse formula jointless construction, fully use the chemical reaction of cement, cause and offset the tensile stress that the drying shrinkage that produces in the course of hardening and heat of hydration shrinkage occur, thereby reduce and avoid concrete cracking to occur.
Overlong Concrete Structure of the present invention is jumped storehouse formula seamless construction method, concrete building adopted continuous form of construction work construction, longitudinally adopt the continuous placing method of " gradient; thin concrete lift; advance in proper order, once arrive the top ", concrete is trickled naturally form the slope, guarantee timely seam, avoid cold seam to occur.Four concrete pumps divide two groups of subtends to carry out, and build in the whole process, guarantee that a pump moves back the little expansive concrete of the seamless raft plate of pump continuous placing overlength in every group, and the other then motor-driven cooperation tower crane of a pump suspension bucket carries out expansion reinforcing band and walls concrete is built.Adopt the expansive concrete construction when being poured into expansion reinforcing band, using little expansive concrete again instead when building to opposite side and build, so circulation finishes until continuous placing, realizes jointless construction.During concreting, be strictly on guard against that other position concrete enters in the expansion ater-casting, in order to avoid influence is provided with effect.When concreting is near expansion reinforcing band, vibrating head is inserted smash a little and close order fast easy-to-closing net is kept at a distance and is not less than 30 ㎝, and must not be crossed and shake.Overlength seamless raft board concrete in expansion reinforcing band place waters and is filled in-after finishing, side concreting carries out, and the pool wall concrete is treated to build before the final set after the initial set of the seamless raft board concrete of this position overlength.Build when turning over pool wall, it is flat to be poured into going up of raft plate earlier, after the raft board concrete reaches initial set, turns over 600 ㎜ pool wall concrete in the cast again, with the vibrating head pool wall bottom of vibrating gently.
Overlong Concrete Structure of the present invention is jumped storehouse formula seamless construction method, adopt the mode of continuous placing construction to carry out the concreting operation, by jumping storehouse formula jointless construction, fully use the chemical reaction of cement, can so that offset the tensile stress that the drying shrinkage that produces in the course of hardening and heat of hydration shrinkage occur, thereby reduce and avoid concrete cracking to occur.
Description of drawings
The specific embodiment
Referring now to accompanying drawing 1, be described as follows in conjunction with the embodiments: Overlong Concrete Structure of the present invention is jumped storehouse formula seamless construction method, concrete building adopted continuous form of construction work construction, longitudinally adopt the continuous placing method of " gradient, thin concrete lift advance; once arrive the top in proper order ", concrete is trickled naturally form the slope, guarantee timely seam, avoid cold seam to occur.Four concrete pumps divide two groups of subtends to carry out, and build in the whole process, guarantee that a pump moves back the seamless raft plate 2 little expansive concretes of pump continuous placing overlength in every group, and the other then motor-driven cooperation tower crane of a pump suspension bucket carries out expansion reinforcing band 3 and walls concrete is built.Adopt the expansive concrete construction when being poured into expansion reinforcing band 3, using little expansive concrete again instead when building to opposite side and build, so circulation finishes until continuous placing, realizes jointless construction.During concreting, be strictly on guard against that other position concrete enters in the expansion ater-casting, in order to avoid influence is provided with effect.When concreting is near expansion reinforcing band 3, vibrating head is inserted smash a little and close order fast easy-to-closing net is kept at a distance and is not less than 30 ㎝, and must not be crossed and shake.Expansion reinforcing band 3 place's overlength are seamless, and raft plate 2 concrete castings are filled in-after finishing, side concreting carries out, and pool wall 1 concrete is treated to build before the final set behind seamless raft plate 2 concrete initial sets of this position overlength.Build when turning over pool wall 1, it is flat to be poured into going up of raft plate 2 earlier, after raft plate 2 concrete reach initial set, turns over 600 ㎜ pool walls, 1 concrete in the cast again, with vibrating head pool wall 1 bottom of vibrating gently.Overlong Concrete Structure of the present invention is jumped storehouse formula seamless construction method, adopt the mode of continuous placing construction to carry out the concreting operation, by jumping storehouse formula jointless construction, fully use the chemical reaction of cement, can so that offset the tensile stress that the drying shrinkage that produces in the course of hardening and heat of hydration shrinkage occur, thereby reduce and avoid concrete cracking to occur.
Claims (1)
1. Overlong Concrete Structure is jumped storehouse formula seamless construction method, it is characterized in that the concrete continuous form of construction work construction of employing of building, longitudinally adopt the continuous placing method of " gradient; thin concrete lift; advance in proper order, once arrive the top ", concrete is trickled naturally form the slope, guarantee timely seam, avoid cold seam to occur; Four concrete pumps divide two groups of subtends to carry out, build in the whole process, guarantee in every group that a pump moves back the little expansive concrete of the seamless raft plate of pump continuous placing overlength (2), the other then motor-driven cooperation tower crane of a pump suspension bucket carries out expansion reinforcing band (3) and walls concrete is built; Adopt the expansive concrete construction when being poured into expansion reinforcing band (3), using little expansive concrete again instead when building to opposite side and build, so circulation finishes until continuous placing, realizes jointless construction; During concreting, be strictly on guard against that other position concrete enters in the expansion ater-casting, in order to avoid influence is provided with effect; When concreting is near expansion reinforcing band (3), vibrating head is inserted smash a little and close order fast easy-to-closing net is kept at a distance and is not less than 30 ㎝, and must not be crossed and shake; Expansion reinforcing band (3) locates the seamless raft plate of overlength (2) concrete casting and is filled in-after finishing, side concreting carries out, and pool wall (1) concrete is treated to build before the final set behind the seamless raft plate of this position overlength (2) concrete initial set; Build when turning over pool wall (1), it is flat to be poured into going up of raft plate (2) earlier, after raft plate (2) concrete reaches initial set, turns over 600 ㎜ pool wall (1) concrete in the cast again, with vibrating head pool wall (1) bottom of vibrating gently.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN 201110149353 CN102251674A (en) | 2011-06-05 | 2011-06-05 | Bunker-skipping type seamless construction method of ultra-long concrete structure |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN 201110149353 CN102251674A (en) | 2011-06-05 | 2011-06-05 | Bunker-skipping type seamless construction method of ultra-long concrete structure |
Publications (1)
Publication Number | Publication Date |
---|---|
CN102251674A true CN102251674A (en) | 2011-11-23 |
Family
ID=44979214
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN 201110149353 Pending CN102251674A (en) | 2011-06-05 | 2011-06-05 | Bunker-skipping type seamless construction method of ultra-long concrete structure |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN102251674A (en) |
Cited By (11)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102758437A (en) * | 2012-07-27 | 2012-10-31 | 上海建工集团股份有限公司 | Circular foundation pit construction method for pouring ultra-large volume concrete radially from center to edge |
CN103669868A (en) * | 2013-12-30 | 2014-03-26 | 中国建筑第八工程局有限公司 | Recursive flow process construction method for ultra-long concrete floor structure |
CN105569339A (en) * | 2015-12-31 | 2016-05-11 | 青建集团股份公司 | Super-long structure seamless construction method combining sequence with skip and combining intermittence with reinforcement |
CN106639321A (en) * | 2017-01-03 | 2017-05-10 | 中冶建筑研究总院有限公司 | Method and structure for controlling shrinkage cracks of ultra-long concrete structure |
CN109306714A (en) * | 2018-08-13 | 2019-02-05 | 中国建筑第四工程局有限公司 | Jump the control distress in concrete construction method that storehouse method is combined with expansion reinforcing band |
CN109594683A (en) * | 2019-01-18 | 2019-04-09 | 深圳市天健坪山建设工程有限公司 | A kind of construction method and structure of ultra-long concrete wall |
CN110284717A (en) * | 2019-04-24 | 2019-09-27 | 中国一冶集团有限公司 | Super-long-and-Large-area is seamless concrete construction method |
CN110821023A (en) * | 2019-11-28 | 2020-02-21 | 中国一冶集团有限公司 | Villa flat tile large-gradient inclined roof construction method |
CN111396077A (en) * | 2020-03-10 | 2020-07-10 | 北京市政建设集团有限责任公司 | Tunnel air duct secondary lining construction method |
CN112709261A (en) * | 2020-12-22 | 2021-04-27 | 碧源建工有限公司 | Construction method based on skip method and intermittent expansion reinforcing belt |
CN114215363A (en) * | 2021-12-20 | 2022-03-22 | 浙江银晨建设有限公司 | Large-area concrete ground seamless construction equipment and construction method thereof |
Citations (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
RU2137730C1 (en) * | 1998-09-16 | 1999-09-20 | Государственный научно-исследовательский, проектно-конструкторский и технологический институт бетона и железобетона (НИИЖБ) | Seamless poured-in-place concrete floor |
CN1369603A (en) * | 2001-09-19 | 2002-09-18 | 刘志刚 | Method for constructing stressed seamless rectangular water pool without adhesion |
CN1515764A (en) * | 2003-01-06 | 2004-07-28 | 中国建筑第八工程局中南公司 | Ultra-thin superlength reinforced concrete structure seamless construction method |
UA8692U (en) * | 2005-02-08 | 2005-08-15 | Ltd Liability Company Res And | Seamless pouring floor |
CN1978803A (en) * | 2005-12-06 | 2007-06-13 | 杨中源 | Super-length saddle prestressed ring beam seamless construction method |
EP2072706A1 (en) * | 2007-12-20 | 2009-06-24 | Kp1 | Floor comprising girders and structural floor units as well as a seamless cast slab on these girders and structural floor units |
CN101638940A (en) * | 2009-05-26 | 2010-02-03 | 中冶集团华冶资源开发有限责任公司 | Large plate mass concrete seamless construction method |
-
2011
- 2011-06-05 CN CN 201110149353 patent/CN102251674A/en active Pending
Patent Citations (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
RU2137730C1 (en) * | 1998-09-16 | 1999-09-20 | Государственный научно-исследовательский, проектно-конструкторский и технологический институт бетона и железобетона (НИИЖБ) | Seamless poured-in-place concrete floor |
CN1369603A (en) * | 2001-09-19 | 2002-09-18 | 刘志刚 | Method for constructing stressed seamless rectangular water pool without adhesion |
CN1515764A (en) * | 2003-01-06 | 2004-07-28 | 中国建筑第八工程局中南公司 | Ultra-thin superlength reinforced concrete structure seamless construction method |
UA8692U (en) * | 2005-02-08 | 2005-08-15 | Ltd Liability Company Res And | Seamless pouring floor |
CN1978803A (en) * | 2005-12-06 | 2007-06-13 | 杨中源 | Super-length saddle prestressed ring beam seamless construction method |
EP2072706A1 (en) * | 2007-12-20 | 2009-06-24 | Kp1 | Floor comprising girders and structural floor units as well as a seamless cast slab on these girders and structural floor units |
CN101638940A (en) * | 2009-05-26 | 2010-02-03 | 中冶集团华冶资源开发有限责任公司 | Large plate mass concrete seamless construction method |
Non-Patent Citations (5)
Title |
---|
《四川建筑》 20030831 杜峰,胡宝明 超长地下室混凝土结构无缝施工技术 第23卷, 第4期 * |
《山西建筑》 20070930 池启贵;刘春秀 超长混凝土结构无缝施工技术 第33卷, 第25期 * |
《河北建筑工程学院学报》 20080331 柳明华;唐龙;赵颖霞 超长钢筋混凝土结构无缝施工 第26卷, 第1期 * |
《膨胀剂与膨胀混凝土》 20080430 江守恒,朱卫中 超长大体积混凝土水池无缝施工应用技术 , 第2期 * |
《膨胀剂与膨胀混凝土》 20101231 单连梅,刘兴军,张英群 浅谈大体积混凝土超长无缝冬期施工 , 第4期 * |
Cited By (13)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102758437A (en) * | 2012-07-27 | 2012-10-31 | 上海建工集团股份有限公司 | Circular foundation pit construction method for pouring ultra-large volume concrete radially from center to edge |
CN103669868A (en) * | 2013-12-30 | 2014-03-26 | 中国建筑第八工程局有限公司 | Recursive flow process construction method for ultra-long concrete floor structure |
CN103669868B (en) * | 2013-12-30 | 2015-09-09 | 中国建筑第八工程局有限公司 | The recursion cross construction method of ultra-long concrete floor structure |
CN105569339A (en) * | 2015-12-31 | 2016-05-11 | 青建集团股份公司 | Super-long structure seamless construction method combining sequence with skip and combining intermittence with reinforcement |
CN106639321A (en) * | 2017-01-03 | 2017-05-10 | 中冶建筑研究总院有限公司 | Method and structure for controlling shrinkage cracks of ultra-long concrete structure |
CN109306714A (en) * | 2018-08-13 | 2019-02-05 | 中国建筑第四工程局有限公司 | Jump the control distress in concrete construction method that storehouse method is combined with expansion reinforcing band |
CN109594683A (en) * | 2019-01-18 | 2019-04-09 | 深圳市天健坪山建设工程有限公司 | A kind of construction method and structure of ultra-long concrete wall |
CN109594683B (en) * | 2019-01-18 | 2024-04-02 | 深圳市天健坪山建设工程有限公司 | Construction method and structure of ultra-long concrete wall |
CN110284717A (en) * | 2019-04-24 | 2019-09-27 | 中国一冶集团有限公司 | Super-long-and-Large-area is seamless concrete construction method |
CN110821023A (en) * | 2019-11-28 | 2020-02-21 | 中国一冶集团有限公司 | Villa flat tile large-gradient inclined roof construction method |
CN111396077A (en) * | 2020-03-10 | 2020-07-10 | 北京市政建设集团有限责任公司 | Tunnel air duct secondary lining construction method |
CN112709261A (en) * | 2020-12-22 | 2021-04-27 | 碧源建工有限公司 | Construction method based on skip method and intermittent expansion reinforcing belt |
CN114215363A (en) * | 2021-12-20 | 2022-03-22 | 浙江银晨建设有限公司 | Large-area concrete ground seamless construction equipment and construction method thereof |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN102251674A (en) | Bunker-skipping type seamless construction method of ultra-long concrete structure | |
CN103015719B (en) | Preliminary work for spudding steel concrete wastewater disposal basin monobloc cast technique | |
CN101418571B (en) | Middle plate construction method of wide pit top-down construction | |
CN107447646B (en) | Preparation method of steel-continuous fiber composite bar ECC-concrete composite column/pier | |
CN101696580A (en) | Outboard template construction method of post-pouring belt of outer wall of underground structure | |
CN206956565U (en) | A kind of steel box girder bridge hogging moment area pre-stress system | |
CN103572784A (en) | Supporting system and construction method of post-cast strip template of super-thick raft | |
CN104929278A (en) | Assembly type dense column hollow shear wall structure | |
CN102535746A (en) | Concrete-filled steel tube column and casting method thereof | |
CN102071953A (en) | Method for casting surrounding concrete of lined steel pipe of shield tunnel | |
CN104790436A (en) | High-rise building basement roof settlement post-pouring joint advanced water stop construction method | |
CN202610694U (en) | Steel fiber light concrete and high-strength concrete overlaid pouring composite beam | |
CN103938649B (en) | A kind of construction method on high-rise building cavity basis | |
CN106638486B (en) | High-tech zones cut-pff wall and gallery stage construction method | |
CN103321412A (en) | Hollow floor air bag and construction method of cast-in-place hollow floors | |
CN207047911U (en) | A kind of poured band of outer wall of basement template | |
CN205476487U (en) | Dismantled cyclic utilization device of centre form come -up is packed to control light block | |
CN202401668U (en) | Concrete column structure of steel pipe | |
CN105926656B (en) | The construction method of volume of concrete foundation | |
CN209243778U (en) | Expansion reinforcing band structure for the control distress in concrete construction in conjunction with jump storehouse method | |
CN104372894B (en) | A kind of construction method of clear-water concrete FRP Columns | |
CN207919747U (en) | A kind of high-strength high concrete assembled frame structure system of ductility | |
CN209703720U (en) | Pool wall construction joint multiple waterproof structure | |
CN107815976B (en) | A kind of construction method of multi-joint continuous beam or multi-joint rigid structure beam end bay straight line beam section | |
CN202830782U (en) | Formwork for improving pier durability in freezing-thawing or chlorine salt erosion environment |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
C02 | Deemed withdrawal of patent application after publication (patent law 2001) | ||
WD01 | Invention patent application deemed withdrawn after publication |
Application publication date: 20111123 |