CN1978803A - Super-length saddle prestressed ring beam seamless construction method - Google Patents

Super-length saddle prestressed ring beam seamless construction method Download PDF

Info

Publication number
CN1978803A
CN1978803A CN 200510122874 CN200510122874A CN1978803A CN 1978803 A CN1978803 A CN 1978803A CN 200510122874 CN200510122874 CN 200510122874 CN 200510122874 A CN200510122874 A CN 200510122874A CN 1978803 A CN1978803 A CN 1978803A
Authority
CN
China
Prior art keywords
ring beam
construction
stretch
draw
sections
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN 200510122874
Other languages
Chinese (zh)
Inventor
杨中源
全有维
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Construction Eighth Engineering Bureau Third Construction Co.
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN 200510122874 priority Critical patent/CN1978803A/en
Publication of CN1978803A publication Critical patent/CN1978803A/en
Pending legal-status Critical Current

Links

Landscapes

  • Rod-Shaped Construction Members (AREA)

Abstract

The invention discloses super long pre-stress ring beam seamless construction method. It adopts section construction and section stretching construction according to the different plan position and space condition of the ring beam position. The ring beam doesn't set deformation joint, adds JM-III(A) high enhancement type crack resistance additive with 7% cement content to increase stretching front concrete crack resistance. The installing of the conjoin part steel casting of the mast top and the ring beam adopts 1:1 simulated test to set out mast top bearing steel plate one by one, finally confirm angle change and installing position. Precision drill one embedded parts anchor plate can ensure pre-stress sinew and bearing steel bar installing position. The method of the invention can make the super long saddle type pre-stress ring beam seamless construction reach the quality demand. And it can be suited for various high space super long saddle type pre-stress ring beam seamless construction.

Description

Super-length saddle prestressed ring beam seamless construction method
Technical field
The invention belongs to technical field of building construction, especially belong to the super-length saddle prestressed ring beam seamless construction method field.
Background technology
Super-length saddle prestressed ring beam has more in the architectural design of present large-scale public stadiums, this super-length saddle prestressed ring beam brings many difficult problems to our construction, mainly contain a following difficult problem: A, ring beam deformation joint is not set, how to prevent that the temperature shrinkage crack from being a difficult point; B, ring beam shape are changeable, are the shape of a saddle, and difficulty of construction is big; Arrangement of reinforcement is intensive in C, the ring beam, except that being furnished with the structure stress reinforcing bar, also is furnished with steel hinge line, and the installation in position of ring beam reinforcing bar and steel hinge line is very difficult; The steel-casting position of D, ring beam and capital contact surface is x, y, z three dimensions changes, and the installation in position of steel-casting is very difficult.So the jointless construction of super-length saddle prestressed ring beam also has a series of technical problem to need to solve.
Summary of the invention
At a difficult problem of the prior art, the purpose of this invention is to provide a kind of seamless construction method of super-length saddle prestressed ring beam, it can guarantee the construction quality of super-length saddle prestressed ring beam, guarantees that construction quality reaches designing requirement.
The object of the present invention is achieved like this: the seamless construction method of super-length saddle prestressed ring beam comprises the following aspects:
Section construction, subsection tension job practices are taked in A, super-length prestressed construction, and promptly according to plan-position, the ring beam place characteristics different with steric requirements, equitable subsection construction, presstressed reinforcing steel segmentation are arranged, implement subsection tension; The construction of ring beam must be carried out synchronously with the construction of each floor of agent structure.Concrete scheme following (1), the concrete section construction of ring beam, the segmentation arrangement a of presstressed reinforcing steel, ring beam concrete section construction scheme: ring beam respectively is divided into 5 sections constructions at low, the absolute altitude vary within wide limits of absolute altitude of south, North Area with south, North Area; East, Westbound ring beam absolute altitude height, absolute altitude amplitude of variation are little, respectively are divided into 3 sections constructions.More than four districts be divided into 16 construction sections altogether, water after adding stride four sections be divided into into 20 sections respectively the construction.B, ring beam presstressed reinforcing steel segmental installation constructure scheme: presstressed reinforcing steel in the ring beam is carried out segmentation arrange, promptly bury presstressed reinforcing steel underground 2 periods of 3 periods of north and south district each minutes, thing district each minutes.Water the presstressed reinforcing steel of striding after 4, include 4 sections of adjacent East, West, South, North respectively in and bury layout underground.(2), tensioning construction a, stretching plan: adopt segmentation, beam splitting, carry out the two ends stretching construction by root.B, stretch-draw end are arranged: the indwelling requirement of ring beam 12 bundle tension of prestressed tendon ends is: 4 bundles of right (3) side are in the left side, and 4 bundles an of left side (1) side are stayed the right side.2 bundles of ring beam upper surface are stayed 2 sides, above 2 bundles of soffit are stayed.To be that 4 requirements of restrainting are arranged by same cross section simultaneously.So 12 the bundle presstressed reinforcing steels divide 3 different cross sections to be arranged in 3 different spans, that is: up and down 4 the bundle 1 stride between; In 2 of 2 bundles on right side and left side restrainted between 1 is striden; In addition 2 bundles in right side and left side between 1 is striden in.C, symmetrical stretch-draw: the stretch-draw end is 4 bundles totally 28 steel strand in each cross section.Must adopt left and right symmetry during every bundle tension of prestressed tendon, the method for upper and lower symmetrical stretch-draw is carried out.D, by root stretch-draw.(3) contract value in 2mm in stretching construction key Quality Control a, the control tension of prestressed tendon; The difference of b, control actual stretch value and theoretic elongation is in ± 6%; C, adopt two times tensioning or super stretch-draw to return loose technology to solve the stress relaxation loss as above-mentioned situation occurring.D, guarantee the foundation of working control stress value by " witness stretch-draw ".
B, after template, reinforcement installation acceptance(check), carry out concreting.Sequence of construction is from low to high, promptly construct earlier south, North Area, and thing district again constructs.Adopt the segmentation concreting, adopt the commercial concrete pumping construction.Construct toward other end placement layer by layer from an end of segmentation, ring beam is not provided with deformation joint, in order to improve the cracking resistance of ring beam before prestressed reinforcement stretch-draw, the high enhancement mode cracking resistance of admixture cement consumption 7%JM-III (A) Admixture in concrete.Building finishes in time carries out covering curing;
The mounting method of C, capital and ring beam contact site steel-casting, promptly before the construction, adopt wooden model to make the full size full-page proof of column cap and ring beam junction, to the setting-out one by one of absolute altitude variation portion capital supporting steel plate, the angle of determining its position changes, then ring beam prestressing force and structure stress reinforcing bar need be passed the position of anchor slab, accurately perforate on anchor slab in advance can be passed through when guaranteeing prestressed and structure stress reinforcing bar smoothly.
Description of drawings
Accompanying drawing 1 is that schematic diagram is arranged in the section construction of ring beam concrete, presstressed reinforcing steel segmentation
Accompanying drawing 2 is capital steel-casting anchor slab preformed hole position views
Accompanying drawing acceptance of the bid keep the score state as follows: 1----ring beam concrete is distinguished each minute 5 sections constructions code name for 1. 2. 3. in south (north); 2----ring beam prestressing force is distinguished each minute three sections layouts in south (north), and code name is a, b; Water behind the 3----and stride; 4---ring beam presstressed reinforcing steel is distinguished each minute two sections constructions in east (west), and code name is c; 5---ring beam concrete is in east (west) each minute 3 sections constructions, and code name is for 4. 5.; The 6---pre-embedded steel slab; 7----steel anchor slab; The 8---steel strand; The 9---reinforcing bar.
The specific embodiment
Below in conjunction with accompanying drawing and embodiment the specific embodiment of inventing is described in further detail.Main stadium, the Olympic Sports Center, Nanjing roofing ring beam is along steel structural roof bearing place arranged around, and sectional dimension is 1500 * 1200mm (wide * height), has 52 reinforced concrete posts under the Zhou Changyue 810m, ring beam, constitute that span varies in size 52 stride between.Wherein maximum span reaches 22m.Ring beam end face absolute altitude is not waited to 44.28m by 16.6m.Ring beam always reaches 810m, and at an overlength ring beam concrete construction difficult problem, ring beam respectively is divided into 5 sections constructions at low, the absolute altitude vary within wide limits of absolute altitude of south, North Area with south, North Area; East, Westbound ring beam absolute altitude height, absolute altitude amplitude of variation are little, respectively are divided into 3 sections constructions.More than four districts be divided into 16 construction sections altogether, water after adding stride be divided into into 20 sections respectively the construction.Sequence of construction is from low to high, i.e. construction earlier north and south district, and thing district again constructs.Adopt the pumping commercial concrete to construct toward other end placement layer by layer from an end of segmentation, in order to improve the cracking resistance (east, Westbound concrete section construction length reach 90m) of ring beam before prestressed reinforcement stretch-draw, the high enhancement mode cracking resistance of admixture cement consumption 7%JM-III (A) Admixture in C40 level concrete.Building finishes in time carries out covering curing.At segmentation layout, the subsection tension difficult problem of presstressed reinforcing steel, 12 bundle presstressed reinforcing steels in the ring beam have been carried out rational segmentation arranged.Promptly in south, three periods of North Area each minutes bury presstressed reinforcing steel underground, two periods of east, Westbound each minutes are buried presstressed reinforcing steel underground, the ring beam of total length 812m is divided into into 10 sections and buries presstressed reinforcing steel underground.Designing requirement can not surpass 4 bundles at the prestressed stretch-draw anchor end in same cross section, and promptly every section 12 bundle presstressed reinforcing steel will divide three diverse locations to make the stretch-draw anchor end.The presstressed reinforcing steel that whole ring beam is 10 sections will be arranged 12 bundle presstressed reinforcing steels at 30 diverse locations respectively, and requires all to adopt two ends stretch-draw, so when the ring beam concrete construction, must accurately keep somewhere 60 prestressed stretch-draw end positions.Stretch-draw is taked: segmentation, beam splitting, carry out the two ends stretching construction by root; The stretch-draw end is 4 bundles totally 28 steel strand in each cross section.Must adopt left and right symmetry during every bundle tension of prestressed tendon, the method for upper and lower symmetry is carried out; By root stretch-draw.At a steel-casting difficult problem in place, before the construction, adopt wooden model to make the full size full-page proof of column cap and ring beam junction, to the setting-out one by one of absolute altitude variation portion capital supporting steel plate, the angle of determining its position changes, then ring beam prestressing force and non-prestressing tendon need be passed the position of steel anchor slab, accurately boring on anchor slab in advance can be passed through when guaranteeing prestressed and nonprestressed reinforcement smoothly.

Claims (3)

1, super-length saddle prestressed ring beam seamless construction method is characterized in that: described job practices is divided into the following aspects:
Section construction, subsection tension job practices are taked in A, super-length prestressed construction, and promptly according to plan-position, the ring beam place characteristics different with steric requirements, equitable subsection construction, presstressed reinforcing steel segmentation are arranged, implement subsection tension; The construction of ring beam must be carried out synchronously with the construction of each floor of agent structure.
B, after template, reinforcement installation acceptance(check), carry out concreting.Sequence of construction is from low to high, promptly construct earlier south, North Area, and thing district again constructs.Adopt the segmentation concreting, adopt the commercial concrete pumping construction.Construct toward other end placement layer by layer from an end of segmentation, ring beam is not provided with deformation joint, in order to improve the cracking resistance of ring beam before tension of prestressed tendon admixture cement consumption 7%JM-III (A) enhancement mode cracking resistance Admixture in concrete.Building finishes in time carries out covering curing;
The mounting method of C, capital and ring beam contact site steel-casting, promptly before the construction, adopt wooden model to make the full size full-page proof of column cap and ring beam junction, to the setting-out one by one of absolute altitude variation portion capital supporting steel plate, the angle of determining its position changes, then ring beam prestressing force and structure stress reinforcing bar need be passed the position of anchor slab, accurately perforate on anchor slab in advance can be passed through when guaranteeing prestressed and nonprestressed reinforcement smoothly.
2, method according to claim 1 is characterized in that:
The segmentation arrangement of A, the concrete section construction of ring beam, presstressed reinforcing steel
(1) ring beam concrete section construction scheme: ring beam respectively is divided into 5 sections constructions at low, the absolute altitude vary within wide limits of absolute altitude of south, North Area with south, North Area; East, Westbound ring beam absolute altitude height, absolute altitude amplitude of variation are little, respectively are divided into 3 sections constructions.More than four districts be divided into 16 construction sections altogether, water after adding stride four sections be divided into into 20 sections respectively the construction
(2) ring beam presstressed reinforcing steel segmental installation constructure scheme: presstressed reinforcing steel in the ring beam is carried out segmentation arrange, promptly bury presstressed reinforcing steel underground 2 periods of 3 periods of north and south district each minutes, thing district each minutes.Water the presstressed reinforcing steel of striding after 4, include 4 sections of adjacent East, West, South, North respectively in and bury layout underground.
B, tensioning construction
(1) stretching plan: adopt segmentation, beam splitting, carry out the two ends stretching construction by root.
(2) the stretch-draw end is arranged: the indwelling requirement of every section ring beam 12 bundle tension of prestressed tendon ends is: 4 bundles of right (3) side are in the left side, and 4 bundles an of left side (1) side are stayed the right side.2 bundles of ring beam upper surface are stayed 2 sides, above 2 bundles of bottom surface are stayed.To be that 4 requirements of restrainting are arranged by same cross section simultaneously.So 12 the bundle presstressed reinforcing steels divide 3 different cross sections to be arranged in 3 different spans, that is: up and down 4 the bundle 1 stride between; In 2 of 2 bundles on right side and left side restrainted between 1 is striden; In addition 2 bundles in right side and left side between 1 is striden in.
(3) symmetrical stretch-draw: the stretch-draw end is 4 bundles totally 28 steel strand in each cross section.Must adopt left and right symmetry during every bundle tension of prestressed tendon, the method for upper and lower symmetrical stretch-draw is carried out.
(4) by root stretch-draw.
3, method according to claim 1 and 2 is characterized in that: the stretching construction key Quality Control is
(1) contracts value in 2mm in the control tension of prestressed tendon;
(2) difference of control actual stretch value and theoretic elongation is in ± 6%;
(3) adopt two times tensioning or super stretch-draw to return the loss of loose technology solution stress relaxation as above-mentioned situation occurring;
(4) guarantee the foundation of working control stress value by " witness stretch-draw ".
CN 200510122874 2005-12-06 2005-12-06 Super-length saddle prestressed ring beam seamless construction method Pending CN1978803A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN 200510122874 CN1978803A (en) 2005-12-06 2005-12-06 Super-length saddle prestressed ring beam seamless construction method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN 200510122874 CN1978803A (en) 2005-12-06 2005-12-06 Super-length saddle prestressed ring beam seamless construction method

Publications (1)

Publication Number Publication Date
CN1978803A true CN1978803A (en) 2007-06-13

Family

ID=38130091

Family Applications (1)

Application Number Title Priority Date Filing Date
CN 200510122874 Pending CN1978803A (en) 2005-12-06 2005-12-06 Super-length saddle prestressed ring beam seamless construction method

Country Status (1)

Country Link
CN (1) CN1978803A (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102251674A (en) * 2011-06-05 2011-11-23 山东宁建建设集团有限公司 Bunker-skipping type seamless construction method of ultra-long concrete structure
CN102619338A (en) * 2011-03-09 2012-08-01 青光绪 Construction method for pre-stressed tendon of ultra-long ring beam
CN107419849A (en) * 2017-04-18 2017-12-01 清华大学建筑设计研究院有限公司 A kind of space prestressed ring beam of the shape of a saddle
CN111101533A (en) * 2020-01-14 2020-05-05 中国中材国际工程股份有限公司 Eccentric annular foundation of clinker silo and construction method thereof

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102619338A (en) * 2011-03-09 2012-08-01 青光绪 Construction method for pre-stressed tendon of ultra-long ring beam
CN102619338B (en) * 2011-03-09 2015-07-15 青光绪 Construction method for pre-stressed tendon of ultra-long ring beam
CN102251674A (en) * 2011-06-05 2011-11-23 山东宁建建设集团有限公司 Bunker-skipping type seamless construction method of ultra-long concrete structure
CN107419849A (en) * 2017-04-18 2017-12-01 清华大学建筑设计研究院有限公司 A kind of space prestressed ring beam of the shape of a saddle
CN107419849B (en) * 2017-04-18 2019-06-14 清华大学建筑设计研究院有限公司 A kind of space prestressed ring beam of the shape of a saddle
CN111101533A (en) * 2020-01-14 2020-05-05 中国中材国际工程股份有限公司 Eccentric annular foundation of clinker silo and construction method thereof

Similar Documents

Publication Publication Date Title
CN107165272B (en) Prestressed assembled concrete frame node connecting structure and construction method thereof
CN110512647B (en) Partial assembly type subway station structure design and construction method
CN100554588C (en) A kind of vertical rotation steel-concrete combination arch bridge
CN204185755U (en) A kind of Wavelike steel webplate post-stressed concrete T beam
CN106013432B (en) A kind of high ductility prefabricated integral frame interior joint connection structure and construction method
CN105926440A (en) Steel-concrete combined continuous beam bridge deck as well as manufacturing method and application thereof
CN111364681B (en) Staggered tensioning anchoring structure for prestressed tendons of end column-beam joints and construction method
CN103046463B (en) Assembly type saddle-shell-shaped bottom plate continuous box girder bridge and construction method thereof
CN102418425B (en) Prefabrication integral casting building structure system with cast-in-site haunched beams, and construction method for prefabrication integral casting building structure system
CN110924287A (en) Semi-fabricated large-span combined box girder and construction method thereof
CN103966953B (en) Based on the post-tensioned prestressed large-span concrete beam construction method of non-bending steel cable
CN201794161U (en) Prefabricated integrally cast building structure system with cast-in-place haunched beam
CN109098201A (en) A kind of super plane area portions prestressed concrete well foundation and its construction method
CN1978803A (en) Super-length saddle prestressed ring beam seamless construction method
CN113638304B (en) Concrete beam type bridge hidden cover beam structure system and construction method thereof
CN108316150B (en) Construction system and construction method for main tower and steel anchor beam of cable-stayed bridge
CN113699876A (en) Pier is assembled in prefabricated of segment of vertical continuous band tenon fourth of twelve earthly branches structure
CN103147438A (en) Cast-in-place post-tensioning method-based I-shaped support pile and manufacturing method of support pile
CN110409282B (en) Non-web-rib prestressed self-maintenance composite beam based on permanent post-tensioned prestressed UHPC (ultra high performance concrete) nested template and construction method
CN201785867U (en) Novel reinforced-concrete prefabricated and integral-cast building structure system
CN208668249U (en) A kind of connecting structure of prefabricated bent cap and Precast Pier Columns
CN105951984A (en) High-ductility assembled integral type frame exterior joint connection structure and construction method thereof
CN107142830B (en) Steel pipe web prestress steel-concrete combined girder structure and construction method
CN215563714U (en) Prefabricated assembly type prestressed steel reinforced concrete multi-web hollow composite floor slab
CN102418400A (en) Pretensioning prestressed reinforced concrete precast beam

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
ASS Succession or assignment of patent right

Owner name: NO.3 BUILDING CO., LTD., CHINA NO.8 BUILDING ENGI

Free format text: FORMER OWNER: YANG ZHONGYUAN; APPLICANT

Effective date: 20070706

C10 Entry into substantive examination
C41 Transfer of patent application or patent right or utility model
SE01 Entry into force of request for substantive examination
TA01 Transfer of patent application right

Effective date of registration: 20070706

Address after: 210046 No. 100 Yao Jian village, Yao Cheng Gate, Nanjing, Jiangsu

Applicant after: China Construction Eighth Engineering Bureau Third Construction Co.

Address before: 210046 No. 100 Yao Jian village, Yao Cheng Gate, Nanjing, Jiangsu

Applicant before: Yang Zhongyuan

Co-applicant before: Quan Youwei

C02 Deemed withdrawal of patent application after publication (patent law 2001)