CN202788126U - Anchor bolt type column foot herringbone framework - Google Patents

Anchor bolt type column foot herringbone framework Download PDF

Info

Publication number
CN202788126U
CN202788126U CN 201220134026 CN201220134026U CN202788126U CN 202788126 U CN202788126 U CN 202788126U CN 201220134026 CN201220134026 CN 201220134026 CN 201220134026 U CN201220134026 U CN 201220134026U CN 202788126 U CN202788126 U CN 202788126U
Authority
CN
China
Prior art keywords
column foot
anchor
herringbone
type column
bolt type
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
CN 201220134026
Other languages
Chinese (zh)
Inventor
鲁晓秋
璩啸
陈建民
钱土根
乐群
周奕枫
朱建生
龚泉
徐坤
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
SHANGHAI TRANSMISSION AND DISTRIBUTION ENGINEERING CO LTD
Shanghai Electric Power Corp
Original Assignee
SHANGHAI TRANSMISSION AND DISTRIBUTION ENGINEERING CO LTD
Shanghai Electric Power Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by SHANGHAI TRANSMISSION AND DISTRIBUTION ENGINEERING CO LTD, Shanghai Electric Power Corp filed Critical SHANGHAI TRANSMISSION AND DISTRIBUTION ENGINEERING CO LTD
Priority to CN 201220134026 priority Critical patent/CN202788126U/en
Application granted granted Critical
Publication of CN202788126U publication Critical patent/CN202788126U/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Images

Landscapes

  • Foundations (AREA)

Abstract

本实用新型涉及一种锚栓式柱脚人字形构架,支撑顶部水平横梁,该构架包括:2-3根支柱构成人字形结构,设置在支柱底部的柱脚,柱脚上设置有端板,内嵌有锚栓的承台基础,锚栓与端板固定连接。与现有技术相比,本实用新型完全可以解决土建基础施工和构架吊装施工无法连续进行的问题,在构架安装完毕后可以直接进行软母线的安装,从而使目前在运行站内的常规构架和跨线施工需要对对应区域的电网需停电2次变为停电1次,给运行部门在调度和运行上提供方便,不影响电网运行的可靠性,降低电网运行成本。使电网更可靠更安全。

The utility model relates to a herringbone frame of an anchor-type column foot, which supports a horizontal beam at the top. The framework includes: 2-3 pillars forming a herringbone structure, and the column foot is arranged at the bottom of the pillar, and an end plate is arranged on the column foot. Embedded with anchor bolts, the anchor bolts are fixedly connected to the end plates. Compared with the prior art, the utility model can completely solve the problem that the civil foundation construction and frame hoisting construction cannot be carried out continuously. After the frame is installed, the soft busbar can be directly installed, so that the conventional The line construction needs to change the power outage of the power grid in the corresponding area from 2 times to 1 power outage, which provides convenience for the operation department in scheduling and operation, does not affect the reliability of the power grid operation, and reduces the operation cost of the power grid. Make the grid more reliable and safer.

Description

A kind of anchor bolt type suspension column herringbone framework
Technical field
The utility model relates to a kind of framework, especially relates to a kind of anchor bolt type suspension column herringbone framework.
Background technology
The at present conventional framework in the operation station and cross-line construction need to 2 times (framework lifts and need stop 1 time to the grid power blackout of corresponding region, the concrete maintaining of framework basis rim of a cup back-grouting needed 30 days and the cross-line construction in later stage can't be carried out continuously, so the cross-line construction need stop 1 time again), the method of such conventional construction causes great inconvenience to operation department in scheduling and operation, and has affected the reliability of operation of power networks.Therefore impel us must study a kind of new process and reduce frequency of power cut, guarantee the reliability of electrical network, reduce the operation of power networks cost.
The herringbone column of conventional 220kV outlet structure often adopts the foot joint form of flush type, namely stays a rim of a cup at basic top, and the herringbone steel pipe column is inserted in the rim of a cup, and the recycling pea gravel concreten is filled the gap between basic rim of a cup wall and the post.When adopting this kind foot joint, just can carry out follow-up wire after the concrete formation intensity that needs the wait secondary to fill and hang up work.For reconstruction and extension project, the vertical and follow-up wire of the mast-up of framework is hanged up and is all needed uncharged safe construction environment, thus, can cause successively twice power failure process.As everyone knows, power failure can cause huge economic loss and great social influence, therefore, should make every effort to change conventional way, with the number of times that needs in the minimizing reorganization and expansion process to have a power failure.
The utility model content
The purpose of this utility model is exactly to provide a kind of minimizing power cut construction number of times for the defective that overcomes above-mentioned prior art existence, improves the operation of power networks reliability, reduces the anchor bolt type suspension column herringbone framework of operation of power networks cost.
The purpose of this utility model can be achieved through the following technical solutions:
A kind of anchor bolt type suspension column herringbone framework, the support, top horizontal gird, this framework comprises:
Pillar: every 2-3 root pillar consists of herringbone structure;
Suspension column: be arranged on the bottom of pillar, be provided with end plate on the suspension column;
Cushion cap foundation: be embedded with crab-bolt, this crab-bolt is fixedly connected with end plate.
Described pillar arranges 4 groups at least according to the length of crossbeam.
Described end plate is circular configuration, offers anchor hole on the excircle of end plate.
Described crab-bolt bottom is embedded in cushion cap foundation, and top is fastened in the anchor hole.
Compared with prior art, the utility model can solve the problem that foundation of civil work is constructed and the framework lifting construction can't carry out continuously fully, after installing, framework can directly carry out the installation of soft bus, thereby the conventional framework in the operation station and cross-line construction need to need be had a power failure to the electrical network of corresponding region become power failure 1 time for 2 times, provide convenience for operation department in scheduling and operation, do not affect the reliability of operation of power networks, reduce the operation of power networks cost.Make electrical network more reliable safer.
Description of drawings
Fig. 1 is structural representation of the present utility model;
Fig. 2 is the structural representation of pillar;
Fig. 3 is the structure for amplifying schematic diagram at A place among Fig. 2.
1 is that crossbeam, 2 is that pillar, 3 is that cushion cap foundation, 4 is that end plate, 5 is crab-bolt among the figure.
The specific embodiment
Below in conjunction with the drawings and specific embodiments the utility model is elaborated.
Embodiment
A kind of anchor bolt type suspension column herringbone framework, its structure are used for the horizontal gird 1 of support, top as shown in Figure 1, and this framework comprises pillar 2 and cushion cap foundation 3.Every 2-3 root pillar 2 consists of herringbone structure, bottom at pillar 2 is provided with suspension column, be provided with end plate 4 on the suspension column, its structure is shown in Fig. 2-3, and wherein, end plate 4 is circular configuration, offer anchor hole on the excircle of end plate 4, cushion cap foundation 3 is embedded with crab-bolt 5, and the top of crab-bolt 5 is fastened in the anchor hole of offering on the end plate 4, and realization pillar 2 is fixedly connected with cushion cap foundation 3.Pillar 2 arranges 4 groups at least according to the length of crossbeam 1.
The utility model has solved the problem that foundation of civil work is constructed and the framework lifting construction can't carry out continuously, after installing, framework can directly carry out the installation of soft bus, thereby the conventional framework in the operation station and cross-line construction need to need be had a power failure to the electrical network of corresponding region become power failure 1 time for 2 times, provide convenience for operation department in scheduling and operation, do not affect the reliability of operation of power networks.

Claims (4)

1.一种锚栓式柱脚人字形构架,支撑顶部水平横梁,其特征在于,该构架包括:1. An anchor bolt type column foot herringbone frame supports the top horizontal beam, it is characterized in that the frame includes: 支柱:每2-3根支柱构成人字形结构;Pillars: Every 2-3 pillars form a herringbone structure; 柱脚:设置在支柱的底部,柱脚上设置有端板;Column foot: set at the bottom of the pillar, and an end plate is arranged on the column foot; 承台基础:内嵌有锚栓,该锚栓与端板固定连接。Cap foundation: Embedded with anchor bolts, the anchor bolts are fixedly connected with the end plates. 2.根据权利要求1所述的一种锚栓式柱脚人字形构架,其特征在于,所述的支柱根据横梁的长度至少设置4组。2. An anchor-bolt type column foot herringbone frame according to claim 1, characterized in that, said pillars are arranged in at least 4 groups according to the length of the beam. 3.根据权利要求1所述的一种锚栓式柱脚人字形构架,其特征在于,所述的端板为圆形结构,端板的外圆周上开设有锚固孔。3 . The anchor-bolt type column foot herringbone frame according to claim 1 , wherein the end plate is a circular structure, and an anchor hole is opened on the outer circumference of the end plate. 4 . 4.根据权利要求3所述的一种锚栓式柱脚人字形构架,其特征在于,所述的锚栓下部嵌设在承台基础内,上部卡设在锚固孔内。4 . The anchor-bolt type column foot herringbone frame according to claim 3 , wherein the lower part of the anchor bolt is embedded in the cap foundation, and the upper part is clamped in the anchor hole. 5 .
CN 201220134026 2012-03-31 2012-03-31 Anchor bolt type column foot herringbone framework Expired - Lifetime CN202788126U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN 201220134026 CN202788126U (en) 2012-03-31 2012-03-31 Anchor bolt type column foot herringbone framework

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN 201220134026 CN202788126U (en) 2012-03-31 2012-03-31 Anchor bolt type column foot herringbone framework

Publications (1)

Publication Number Publication Date
CN202788126U true CN202788126U (en) 2013-03-13

Family

ID=47815403

Family Applications (1)

Application Number Title Priority Date Filing Date
CN 201220134026 Expired - Lifetime CN202788126U (en) 2012-03-31 2012-03-31 Anchor bolt type column foot herringbone framework

Country Status (1)

Country Link
CN (1) CN202788126U (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103669957A (en) * 2013-12-10 2014-03-26 国家电网公司 V-shaped framework hoisting construction method
CN104074390A (en) * 2014-07-08 2014-10-01 甘肃省电力设计院 750kV transformer substation steel pipe concrete framework
CN106760873A (en) * 2017-02-22 2017-05-31 成都聚立汇信科技有限公司 A kind of electric pole
CN112144660A (en) * 2020-10-15 2020-12-29 中国建筑第八工程局有限公司 Herringbone stiff column base structure and construction method thereof

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103669957A (en) * 2013-12-10 2014-03-26 国家电网公司 V-shaped framework hoisting construction method
CN104074390A (en) * 2014-07-08 2014-10-01 甘肃省电力设计院 750kV transformer substation steel pipe concrete framework
CN106760873A (en) * 2017-02-22 2017-05-31 成都聚立汇信科技有限公司 A kind of electric pole
CN112144660A (en) * 2020-10-15 2020-12-29 中国建筑第八工程局有限公司 Herringbone stiff column base structure and construction method thereof

Similar Documents

Publication Publication Date Title
CN105780925B (en) Truss-hanging combined system installation construction method
CN104929148B (en) The upside-down mounting hardened system of generation power foundation of wind power ring group plinth and reinforcement means thereof
CN109184189B (en) Construction method for conical shell silo top structure of large-diameter silo
CN201554034U (en) Horizontal embedding support structure for post-pouring belt of top-down construction
CN206233656U (en) Steel frame mill building structure
CN205841102U (en) Steel reinforced concrete combination type tower
CN103628408B (en) The construction method of bridge cast in place concrete form Eight characters bracing frame
CN203160142U (en) Jacking bridge steel hoop support system
CN205369277U (en) Support whole system of transferring in cofferdam
CN108035380B (en) Support and hanger embedded assembly and embedded installation construction method thereof
CN107558487A (en) A kind of goaf transmission line foundation bracing means and reinforcement means
CN206109965U (en) Steel plank road in water and electricity building site
CN202925975U (en) Steel funnel for coal blending bunker
CN106438216A (en) Pre-stressed concrete fan tower provided with segmented straight tower cylinder and installation method of pre-stressed concrete fan tower
CN201554033U (en) Tower crane foundation for deep foundation ditch
CN204435421U (en) A kind of assembling manhole
CN204590410U (en) A kind of outdoor power transformation framework cantilever steel girder
CN203904838U (en) Novel bracket structure for construction of box girders of soft soil foundation sites of high speed rail
CN204385762U (en) A kind of Rock Bolt Foundation structure
CN103231993A (en) Indoor GIS (Gas Insulated Switchgear) transporting and locating device and use method
CN204097883U (en) Auxiliary stand installed by steel bridge
CN203782716U (en) Unilateral template support structure of circuit purlin in cast-in-place pile support
CN203878563U (en) Suspended single-row scaffold
CN108060820B (en) A kind of wind power tower prestress wire supporting installation device and its construction method
CN204825952U (en) Tower machine steel platform basis fixed leg

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CX01 Expiry of patent term
CX01 Expiry of patent term

Granted publication date: 20130313