CN102747732A - 海上蓄潮封底混凝土施工方法 - Google Patents

海上蓄潮封底混凝土施工方法 Download PDF

Info

Publication number
CN102747732A
CN102747732A CN2012102171354A CN201210217135A CN102747732A CN 102747732 A CN102747732 A CN 102747732A CN 2012102171354 A CN2012102171354 A CN 2012102171354A CN 201210217135 A CN201210217135 A CN 201210217135A CN 102747732 A CN102747732 A CN 102747732A
Authority
CN
China
Prior art keywords
concrete
water surface
bottom concrete
construction
pouring
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN2012102171354A
Other languages
English (en)
Other versions
CN102747732B (zh
Inventor
孙鹏
李新形
文德安
赵军科
田新平
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
CCCC Second Highway Engineering Co Ltd
CCCC Highway Long Bridge Construction National Engineering Research Center Co Ltd
CCCC SHB First Engineering Co Ltd
Original Assignee
CCCC SHB First Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by CCCC SHB First Engineering Co Ltd filed Critical CCCC SHB First Engineering Co Ltd
Priority to CN201210217135.4A priority Critical patent/CN102747732B/zh
Publication of CN102747732A publication Critical patent/CN102747732A/zh
Application granted granted Critical
Publication of CN102747732B publication Critical patent/CN102747732B/zh
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Revetment (AREA)

Abstract

本发明公开了一种海上蓄潮封底混凝土施工方法,具体为:在涨潮时,即承台封底混凝土标高高于水面时,将承台封底混凝土分两层浇筑:承台封底混凝土的标高低于水面的浇筑层,采用导管浇筑水下混凝土施工工艺;待标高低于水面的浇筑层的混凝土的强度达到要求后,潮水退后,对承台封底混凝土的标高高于水面的浇筑层,采用干浇筑施工工艺。本发明根据潮汐的实际情况,通过水下蓄潮及干施工结合分层浇筑封底混凝土的施工工艺,有效解决了潮汐影响区海上封底混凝土施工技术难题,且施工简便、安全,工期短,效果好,有效地保证了封底混凝土的施工质量,为承台干施工创造了有利的条件,并具有广泛的应用前景,对类似工程具有很好的参考价值。

Description

海上蓄潮封底混凝土施工方法
技术领域
本发明涉及桥梁施工技术领域,具体地指一种海上蓄潮封底混凝土施工方法。
背景技术
目前,当海上承台封底混凝土标高在水面以下时,采用水下浇筑混凝土施工工艺。但在实际中,受海上潮水的涨落的影响,水面的高度具有一定的波动,使承台封底混凝土标高相对于水面也产生一定的波动,当承台封底混凝标高处于潮水涨落范围内时,使用封底混凝土施工时,胶凝材料容易在潮水涨落过程中,随海水流失,严重影响封底混凝土内部质量。
发明内容
本发明的目的就是要解决上述背景技术的不足,提供一种海上蓄潮封底混凝土施工方法。
本发明的技术方案为:一种海上蓄潮封底混凝土施工方法,在涨潮时,即承台封底混凝土标高高于水面时,将承台封底混凝土分两层浇筑:承台封底混凝土的标高低于水面的浇筑层,采用导管浇筑水下混凝土施工工艺;待标高低于水面的浇筑层的混凝土的强度达到要求后,潮水退后,对承台封底混凝土的标高高于水面的浇筑层,采用干浇筑施工工艺。
在上述方案中:
所述的承台封底混凝土的标高低于水面的浇筑层分为多个浇筑区,在每个浇筑区侧面设置有用于保证混凝土浇筑时不流到其他浇筑区内的刚性挡板。
在所述的刚性挡板上设置有连通孔,用于保持各个分区内以及整个套筒内外水位保持一致。
对承台封底混凝土的标高低于水面的浇筑层中的各个浇筑区,采取由边角到中心的原则进行浇筑,可优先保证边角混凝土的填充。
对承台封底混凝土的标高高于水面的浇筑层,采用干浇筑施工工艺一次性浇筑前,在此层混凝土内设置钢筋网,在混凝土中的护筒周边设置有钢筋环,用以增强封底混凝土与护筒间的握裹力,满足承台混凝土浇筑时的抗下滑要求。
本发明根据潮汐的实际情况,通过水下蓄潮及干施工结合分层浇筑封底混凝土的施工工艺,有效解决了潮汐影响区海上封底混凝土施工技术难题,且施工简便、安全,工期短,效果好,有效地保证了封底混凝土的施工质量,为承台干施工创造了有利的条件,并具有广泛的应用前景,对类似工程具有很好的参考价值。
附图说明
图1为本发明中承台封底混凝土的标高低于水面的平面布置示意图。
图2为本发明中在承台封底混凝土的标高低于水面的浇筑时示意图。
图3为本发明中在承台封底混凝土的标高高于水面的浇筑时示意图。
图4为本发明中护筒和钢筋环的布置示意图。
具体实施方式
下面结合附图和具体实施例对本发明作进一步的详细说明,便于清楚地了解本发明,但它们不对本发明构成限定。
图中所示一种海上蓄潮封底混凝土施工方法,在涨潮时,即承台封底混凝土标高高于水面时,将承台封底混凝土分两层浇筑:承台封底混凝土的标高低于水面的浇筑层1,采用如图1、图2所示的导管浇筑水下混凝土施工工艺;待标高低于水面的浇筑层的混凝土的强度达到要求后,潮水退后,对承台封底混凝土的标高高于水面的浇筑层2,采用如图3所示的干浇筑施工工艺。
如图1、图2所示,此时承台封底混凝土的标高低于水面约2m,将浇筑层分为9个浇筑区,即1.1区、1.2区、1.3区、1.4区、1.5区、1.6区、1.7区、1.8区、1.9区,在每个浇筑区内的混凝土中都设有护筒3,在每个浇筑区侧面设置有用于保证混凝土浇筑时不流到其他浇筑区内的刚性挡板4,在刚性挡板4上设有用于保持各个分区内以及整个套筒内外水位保持一致的连通孔。对各个浇筑区采取由边角到中心的原则进行浇筑,可优先保证边角混凝土的填充。在对承台封底混凝土的标高低于水面的浇筑层浇筑时,连通孔根据混凝土浇筑的高度需及时封堵。
如图3、图4所示,待标高低于水面的浇筑层1的混凝土的强度达到要求后,潮水退后,把连通孔全部封堵,对承台封底混凝土的标高高于水面约1m的浇筑层2使用混凝土浇筑前,在浇筑层2内设置两层钢筋网5,在混凝土中的护筒3周边设置有两层钢筋环6,用以增强封底混凝土与护筒间的握裹力,满足承台混凝土浇筑时的抗下滑要求,此时可采用干浇筑施工工艺对承台封底混凝土的标高高于水面的浇筑层2进行浇筑。
本发明根据潮汐的实际情况,通过水下蓄潮及干施工结合分层浇筑封底混凝土的施工工艺,有效解决了潮汐影响区海上封底混凝土施工技术难题,且施工简便、安全,工期短,效果好,有效地保证了封底混凝土的施工质量,为承台干施工创造了有利的条件,并具有广泛的应用前景,对类似工程具有很好的参考价值。

Claims (5)

1.一种海上蓄潮封底混凝土施工方法,其特征在于:在涨潮时,即承台封底混凝土标高高于水面时,将承台封底混凝土分两层浇筑:承台封底混凝土的标高低于水面的浇筑层,采用导管浇筑水下混凝土施工工艺;待标高低于水面的浇筑层的混凝土的强度达到要求后,潮水退后,对承台封底混凝土的标高高于水面的浇筑层,采用干浇筑施工工艺。
2.根据权利要求1所述的海上蓄潮封底混凝土施工方法,其特征在于:承台封底混凝土的标高低于水面的浇筑层分为多个浇筑区,在每个浇筑区侧面设置有用于保证混凝土浇筑时不流到其他浇筑区内的刚性挡板。
3.根据权利要求2所述的海上蓄潮封底混凝土施工方法,其特征在于:在所述的刚性挡板上设置有连通孔。
4.根据权利要求2所述的海上蓄潮封底混凝土施工方法,其特征在于:对承台封底混凝土的标高低于水面的浇筑层中的各个浇筑区,采取由边角到中心的原则进行浇筑。
5.根据权利要求1所述的海上蓄潮封底混凝土施工方法,其特征在于:对承台封底混凝土的标高高于水面的浇筑层,采用干浇筑施工工艺一次性浇筑前,在此层混凝土内设置钢筋网,在混凝土中的护筒周边设置有钢筋环。
CN201210217135.4A 2012-06-28 2012-06-28 海上蓄潮封底混凝土施工方法 Active CN102747732B (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201210217135.4A CN102747732B (zh) 2012-06-28 2012-06-28 海上蓄潮封底混凝土施工方法

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201210217135.4A CN102747732B (zh) 2012-06-28 2012-06-28 海上蓄潮封底混凝土施工方法

Publications (2)

Publication Number Publication Date
CN102747732A true CN102747732A (zh) 2012-10-24
CN102747732B CN102747732B (zh) 2015-01-21

Family

ID=47028197

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201210217135.4A Active CN102747732B (zh) 2012-06-28 2012-06-28 海上蓄潮封底混凝土施工方法

Country Status (1)

Country Link
CN (1) CN102747732B (zh)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107558479A (zh) * 2017-08-08 2018-01-09 中铁四局集团第二工程有限公司 深水基础钢护筒整体定位安装方法

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109183827A (zh) * 2018-09-18 2019-01-11 何文峰 水下钢筋混凝土基础施工作业工法

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS6233930A (ja) * 1985-08-07 1987-02-13 Ohbayashigumi Ltd 水中コンクリ−トの打設方法
CN102080380A (zh) * 2009-11-26 2011-06-01 袁建华 水下混凝土工程的浇筑和凝固方法
CN102134852A (zh) * 2010-01-25 2011-07-27 宏利国际投资有限公司 混凝土灌注设备及方法
CN102168427A (zh) * 2010-11-12 2011-08-31 张永忠 袋装砼隔离体

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS6233930A (ja) * 1985-08-07 1987-02-13 Ohbayashigumi Ltd 水中コンクリ−トの打設方法
CN102080380A (zh) * 2009-11-26 2011-06-01 袁建华 水下混凝土工程的浇筑和凝固方法
CN102134852A (zh) * 2010-01-25 2011-07-27 宏利国际投资有限公司 混凝土灌注设备及方法
CN102168427A (zh) * 2010-11-12 2011-08-31 张永忠 袋装砼隔离体

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
刘彦山等: "水下混凝土群管施工", 《黑龙江水利科技》 *

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107558479A (zh) * 2017-08-08 2018-01-09 中铁四局集团第二工程有限公司 深水基础钢护筒整体定位安装方法

Also Published As

Publication number Publication date
CN102747732B (zh) 2015-01-21

Similar Documents

Publication Publication Date Title
Slocum et al. Ocean renewable energy storage (ORES) system: Analysis of an undersea energy storage concept
CN104389318B (zh) 用于海上风电的钢砼‑钢构混合重力式基础及其施工方法
CN209397587U (zh) 一种单桩防冲刷护底
CN106245671B (zh) 一种组合式海上风电基础及其施工方法
CN104210627A (zh) 用于自升式平台平地建造下水的装置及方法
CN102392411A (zh) 海工混凝土墩体的钢筋防侵蚀方法及装置
CN204608815U (zh) 筏板重力式海上风机基础
CN104294749A (zh) 一种圆筒基础栈桥结构的安装方法
CN104179156A (zh) 箱筒型基础水闸结构及围埝合拢口的施工方法
CN102747732B (zh) 海上蓄潮封底混凝土施工方法
CN201685997U (zh) 利用浮船坞造船的工装
CN202730783U (zh) 一种钢围堰与混凝土间的止水装置
CN102730163B (zh) 海上浮岛以及制造该海上浮岛工艺流程
CN106049520A (zh) 海上支撑结构的混凝土基底和钢管桩之间的结合方法
KR20150026428A (ko) 석션 파일을 활용한 압축공기 저장구조물의 시공방법
CN104264646A (zh) 混凝土海上核电平台
CN109080782B (zh) 一种海上的大型浮岛
CN217267678U (zh) 一种防止海水腐蚀的保护机构
CN102518214A (zh) 一种应用于混凝土耐压容器的防渗结构
US10450714B2 (en) Device for protecting against the scouring of granular fillings submerged in gravity structures
CN203924089U (zh) 用于海上风电设施的桩基
CN203238636U (zh) 一种海上基础支撑结构
CN204608816U (zh) 海上风电机组沉箱基础结构
CN203096753U (zh) 一种海底储油系统
CN202175936U (zh) 一种堆石混凝土坝

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
TR01 Transfer of patent right
TR01 Transfer of patent right

Effective date of registration: 20210914

Address after: 430056 rooms 1-9, 22 / F, building B, science and technology complex building, 145 Hong Kong Road, Jiang'an District, Wuhan City, Hubei Province

Patentee after: CCCC-SHB FIRST ENGINEERING Co.,Ltd.

Patentee after: CCCC SECOND HIGHWAY ENGINEERING Co.,Ltd.

Patentee after: CCCC HIGHWAY BRIDGES NATIONAL ENGINEERING RESEARCH CENTER Co.,Ltd.

Address before: 430019 22F, Yuanyang building, No. 1, middle section of Hong Kong Road, Hankou, Wuhan, Hubei Province

Patentee before: CCCC-SHB FIRST ENGINEERING Co.,Ltd.