CN102733380A - Lag pile and construction method thereof - Google Patents

Lag pile and construction method thereof Download PDF

Info

Publication number
CN102733380A
CN102733380A CN2012101985158A CN201210198515A CN102733380A CN 102733380 A CN102733380 A CN 102733380A CN 2012101985158 A CN2012101985158 A CN 2012101985158A CN 201210198515 A CN201210198515 A CN 201210198515A CN 102733380 A CN102733380 A CN 102733380A
Authority
CN
China
Prior art keywords
pile
stake
thick
thin
hole
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN2012101985158A
Other languages
Chinese (zh)
Inventor
张永忠
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN2012101985158A priority Critical patent/CN102733380A/en
Publication of CN102733380A publication Critical patent/CN102733380A/en
Pending legal-status Critical Current

Links

Images

Landscapes

  • Piles And Underground Anchors (AREA)

Abstract

The invention relates to a lag pile for civil engineering foundations and a construction method for the lag pile. The middle of a thick pile is provided with a through hole; a thin pile is arranged in the through hole; the lower end of the thin pile is provided with a pile head; the pile head is a cone; and the diameter of the bottom face of the cone is greater than that of the through hole of the thick pile. When the lag pile works, firstly, the thick pile and the thin pile in the thick pile are sunk underground together; then, a steel tube is put at the upper end of the thin pile; a steel tube cap at the upper end of the steel tube is hammered to sink the thin pile; when the top end of the thin pile is in the thick pile for certain depth, i.e. when the thick pile and the thin pile are lapped for certain length, the steel tube is lifted, and a certain amount of concrete is filled in the through hole of the thick pile to perform fixation. According to the lag pile and the construction method thereof, a pile body can be sunk section by section, and when each section of sunk pile body is sunk, only the resistance between the pile body and a soil body needs to be overcome, and thus, pile sinking is easier.

Description

Lag pile and job practices thereof
One, technical field
The present invention relates to a kind of lag pile and job practices thereof, the lag pile and the job practices thereof of particularly a kind of civil engineering basis usefulness.
Two, background technology:
During hammer piling, the frictional resistance of the pile body and the soil body increases along with the increase of the degree of depth, can't sink to owing to its huge frictional resistance makes stake during to a certain degree of depth.
Three, summary of the invention:
The invention provides a kind of lag pile and job practices thereof, the pile body segmentation is sunk to.
The present invention realizes through following technical scheme:
A kind of lag pile and job practices thereof are provided with a through hole in the middle of the thick stake, hole built-in one thin stake; Thin stake lower end is provided with a pile crown, and pile crown is a cone, and the diameter of cone bottom surface is greater than the diameter in thick stake hole; When the present invention works, at first will thick stake and thick stake in thin stake sink to undergroundly together, then steel pipe is inserted the upper end of thin stake; The steel pipe cap of hammering steel pipe upper end sinks to thin stake, thin stake top certain depth in thick stake; When promptly thick stake and thin stake overlap joint certain-length, propose steel pipe, a certain amount of concrete is fixing to get final product with pouring in the thick stake hole.
The present invention has following characteristics:
This lag pile and job practices thereof can make the pile body segmentation sink to, and every section pile body that sinks to only overcomes the frictional resistance of this section pile body and the soil body when sinking to, and pile sinking is easier to.
Four, description of drawings:
Below in conjunction with accompanying drawing the present invention is further described:
Accompanying drawing 1 is the structural representation of the thin stake of the present invention in thick stake.
Accompanying drawing 2 has gone out the structural representation of thick stake for the thin stake of the present invention.
Among the figure: 1, steel pipe cap, 2, steel pipe, 3, thick stake, 4, thin stake, 5, pile crown.
Five, the specific embodiment:
Accompanying drawing is a kind of specific embodiment of the present invention, is provided with a through hole in the middle of the thick stake 3 of this embodiment, hole built-in one thin stake 4, and thin stake 4 lower ends are provided with a pile crown 5; Pile crown 5 is a cone, and the diameter of cone bottom surface is greater than the diameter in thick stake hole, when the present invention works; At first will thick stake and thick stake in thin stake sink to undergroundly together, then steel pipe 2 is inserted the upper end of thin stake, the steel pipe cap 1 of hammering steel pipe upper end; Because this moment, thick stake was very little with the frictional resistance of thin stake, can very easily thin stake be sunk to thin stake top certain depth in thick stake; When promptly thick stake and thin stake overlap joint certain-length, propose steel pipe, a certain amount of concrete is fixing to get final product with pouring in the thick stake hole.

Claims (1)

1. lag pile and job practices thereof is characterized in that: be provided with a through hole in the middle of the thick stake (3), hole built-in one thin stake (4); Thin stake (4) lower end is provided with a pile crown (5), and pile crown (5) is a cone, and the diameter of cone bottom surface is greater than the diameter in thick stake hole; When the present invention works, at first will thick stake and thick stake in thin stake sink to undergroundly together, then steel pipe (2) is inserted the upper end of thin stake; The steel pipe cap (1) of hammering steel pipe upper end sinks to thin stake, thin stake top certain depth in thick stake; When promptly thick stake and thin stake overlap joint certain-length, propose steel pipe, a certain amount of concrete is fixing to get final product with pouring in the thick stake hole.
CN2012101985158A 2012-06-17 2012-06-17 Lag pile and construction method thereof Pending CN102733380A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2012101985158A CN102733380A (en) 2012-06-17 2012-06-17 Lag pile and construction method thereof

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2012101985158A CN102733380A (en) 2012-06-17 2012-06-17 Lag pile and construction method thereof

Publications (1)

Publication Number Publication Date
CN102733380A true CN102733380A (en) 2012-10-17

Family

ID=46989637

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2012101985158A Pending CN102733380A (en) 2012-06-17 2012-06-17 Lag pile and construction method thereof

Country Status (1)

Country Link
CN (1) CN102733380A (en)

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103790173A (en) * 2014-03-12 2014-05-14 中铁第五勘察设计院集团有限公司 Lime-soil compaction pile and CFG rigid pile combined device and method for disposing collapsible loess
CN104612413A (en) * 2015-01-30 2015-05-13 中冶建工集团有限公司 Static pressure pipe pile hole protecting device
CN105649076A (en) * 2014-11-11 2016-06-08 五冶集团上海有限公司 Outer pile inner hole soil retaining flapper-type pile tip used for prestressed concrete pipe (PHC) pile sleeving construction
CN109056747A (en) * 2018-10-17 2018-12-21 石磊 A kind of efficient mini steel-pipe pile constructing structure, method
CN114775588A (en) * 2021-12-13 2022-07-22 大建建筑集团有限公司 Sectional type foundation pile and construction method thereof

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN87105352A (en) * 1987-08-07 1988-01-20 中国建筑科学研究院地基基础研究所 Special-shaped castinplace pile and pile-forming equipment thereof
JP2002115249A (en) * 2000-10-12 2002-04-19 Geotop Corp Device and method for treating pile head
CN1414186A (en) * 2002-05-10 2003-04-30 贾燎 Sleeve pile and designing method
CN101191330A (en) * 2006-12-02 2008-06-04 吕怀民 Construction method for large bearing capacity pile and pile foundation and inner hole deposition device
CN102345288A (en) * 2010-07-29 2012-02-08 律凤梅 Method for solving problem of upward floating of hollow pile

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN87105352A (en) * 1987-08-07 1988-01-20 中国建筑科学研究院地基基础研究所 Special-shaped castinplace pile and pile-forming equipment thereof
JP2002115249A (en) * 2000-10-12 2002-04-19 Geotop Corp Device and method for treating pile head
CN1414186A (en) * 2002-05-10 2003-04-30 贾燎 Sleeve pile and designing method
CN101191330A (en) * 2006-12-02 2008-06-04 吕怀民 Construction method for large bearing capacity pile and pile foundation and inner hole deposition device
CN102345288A (en) * 2010-07-29 2012-02-08 律凤梅 Method for solving problem of upward floating of hollow pile

Cited By (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103790173A (en) * 2014-03-12 2014-05-14 中铁第五勘察设计院集团有限公司 Lime-soil compaction pile and CFG rigid pile combined device and method for disposing collapsible loess
CN103790173B (en) * 2014-03-12 2015-12-09 中铁第五勘察设计院集团有限公司 The device and method of lime-soil compaction pile and CFG rigid pile Combined Treatment collapsible loess
CN105649076A (en) * 2014-11-11 2016-06-08 五冶集团上海有限公司 Outer pile inner hole soil retaining flapper-type pile tip used for prestressed concrete pipe (PHC) pile sleeving construction
CN105649076B (en) * 2014-11-11 2019-03-15 五冶集团上海有限公司 A kind of stud inner hole earth-retaining flapper-type pile top for the dress construction of PHC pile protection
CN104612413A (en) * 2015-01-30 2015-05-13 中冶建工集团有限公司 Static pressure pipe pile hole protecting device
CN109056747A (en) * 2018-10-17 2018-12-21 石磊 A kind of efficient mini steel-pipe pile constructing structure, method
CN114775588A (en) * 2021-12-13 2022-07-22 大建建筑集团有限公司 Sectional type foundation pile and construction method thereof
CN114775588B (en) * 2021-12-13 2023-08-18 大建建筑集团有限公司 Sectional foundation pile and construction method thereof

Similar Documents

Publication Publication Date Title
CN104018512B (en) The caisson sinking construction method dynamic to environment micro-turbulence
CN102733380A (en) Lag pile and construction method thereof
CN206204978U (en) For the miniature grouting steel pipe pile multi-column pier foundation structure of Selection of Urban Pedestrian Overpass
CN102535452A (en) Novel engineering pile
CN103898918A (en) Combined supporting structure and construction method
CN102691295A (en) Spike tooth concrete tubular pile and construction method thereof
CN203583501U (en) Deep-layer shear resistant device capable of preventing rock sliding
CN203904972U (en) Anti-soil leaking combined support pile
CN204080797U (en) The composite pile of a kind of PHC stake and YTSC stake
CN202090360U (en) Dentiform pile capable of resisting earthquake, tornado and strong storm
CN204491614U (en) A kind of anti-pile tube skew Pile feeder
CN201087402Y (en) High bearing ability filling pile
CN204212173U (en) Miniature pile foundation for power transmission tower
CN204530700U (en) A kind of civil engineering roofbolt construction arrangement
CN203256736U (en) Composite pile with strongly-stirred soil implanted with rigid body and embedded with hard bearing layer
CN203559415U (en) Cone driven cast-in-situ pile filled with nanometer magnesia concrete
KR20130073052A (en) Method of bundled pile footing
CN203361132U (en) Auxiliary device for increasing precast pile bearing capacity
CN103046550A (en) Pile extractor with vibrating lantern ring and application method thereof
CN204418176U (en) A kind of fixed structure based on steel pipe pile
CN202090334U (en) Capped two-way-perforated PTC tubular pile composite foundation
CN205742239U (en) A kind of rockbolt static pressure steel pipe pile structure
CN106988331A (en) A kind of piling strtucture and pile base construction method suitable for soft soil foundation
CN207193954U (en) A kind of novel prefabricated concrete pile tube
CN205115995U (en) Be used for road and bridge to build tubular column

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C02 Deemed withdrawal of patent application after publication (patent law 2001)
WD01 Invention patent application deemed withdrawn after publication

Application publication date: 20121017