CN114775588B - Sectional foundation pile and construction method thereof - Google Patents

Sectional foundation pile and construction method thereof Download PDF

Info

Publication number
CN114775588B
CN114775588B CN202210489680.2A CN202210489680A CN114775588B CN 114775588 B CN114775588 B CN 114775588B CN 202210489680 A CN202210489680 A CN 202210489680A CN 114775588 B CN114775588 B CN 114775588B
Authority
CN
China
Prior art keywords
pile pipe
pile
pipe
separated
tip
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202210489680.2A
Other languages
Chinese (zh)
Other versions
CN114775588A (en
Inventor
叶剑波
彭健锋
梁灼添
梁坤胜
陈沛棋
黄景伦
孔健敏
林明新
陈子良
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Dajian Construction Group Co ltd
Original Assignee
Dajian Construction Group Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Dajian Construction Group Co ltd filed Critical Dajian Construction Group Co ltd
Publication of CN114775588A publication Critical patent/CN114775588A/en
Application granted granted Critical
Publication of CN114775588B publication Critical patent/CN114775588B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D5/00Bulkheads, piles, or other structural elements specially adapted to foundation engineering
    • E02D5/22Piles
    • E02D5/52Piles composed of separable parts, e.g. telescopic tubes ; Piles composed of segments
    • E02D5/523Piles composed of separable parts, e.g. telescopic tubes ; Piles composed of segments composed of segments
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D7/00Methods or apparatus for placing sheet pile bulkheads, piles, mouldpipes, or other moulds
    • E02D7/20Placing by pressure or pulling power

Landscapes

  • Engineering & Computer Science (AREA)
  • Structural Engineering (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Mining & Mineral Resources (AREA)
  • Paleontology (AREA)
  • Civil Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Piles And Underground Anchors (AREA)

Abstract

The application provides a sectional foundation pile which comprises an upper section pile pipe, a lower section pile pipe and a separated pile tip. The separated pile tip comprises a main body part and a split part; the lower end of the lower pile pipe is abutted against the main body part of the separated pile tip; the split part is annular and sleeved outside the lower pile pipe; the lower end of the upper section pile pipe is sleeved outside the upper end of the lower section pile pipe, and the lower end of the upper section pile pipe is propped against the split part of the split pile tip. The upper end of the upper section pile pipe is filled with an upper concrete body for blocking the upper end of the upper section pile pipe; the lower end of the upper section pile pipe is filled with a middle concrete body for plugging the lower end of the upper section pile pipe and cementing the lower end of the upper section pile pipe and the upper end of the lower section pile pipe together; the lower end of the lower section pile pipe is filled with a lower concrete body for blocking the lower end of the lower section pile pipe. The application also provides a construction method of the sectional foundation pile, which obviously reduces construction difficulty by sectional piling and is not easy to cause conditions of deflection, pile breakage and the like.

Description

Sectional foundation pile and construction method thereof
Technical Field
The application relates to the field of building construction, in particular to a sectional foundation pile and a construction method thereof.
Background
An unstable soil layer exists under a building, a plurality of foundation piles are needed to be embedded in the construction ground during construction, the foundation piles penetrate through the soft high-compressibility soil layer or water, and the born load is transferred to a harder, denser or less-compressibility foundation bearing layer, so that stable bearing capacity is provided.
However, the existing foundation pile is in a long cylindrical shape, the construction difficulty of embedding the whole pile into a soil layer is high, and the time consumption is long. And the foundation pile is overlong in the piling process, so that the pile breaking, the skew and the like are easy to occur.
Disclosure of Invention
The application aims to provide a sectional foundation pile which comprises an upper section pile pipe, a lower section pile pipe and a separated pile tip, wherein the upper section pile pipe and the lower section pile pipe are hollow pipes.
The separated pile tip comprises a main body part and a split part; the lower end of the lower pile pipe is abutted against the main body part of the separated pile tip; the split part is annular and sleeved outside the lower pile pipe; the lower end of the upper section pile pipe is sleeved outside the upper end of the lower section pile pipe, and the lower end of the upper section pile pipe is propped against the split part of the split pile tip.
The upper end of the upper section pile pipe is filled with an upper concrete body for blocking the upper end of the upper section pile pipe; the lower end of the upper section pile pipe is filled with a middle concrete body for plugging the lower end of the upper section pile pipe and cementing the lower end of the upper section pile pipe and the upper end of the lower section pile pipe together; the lower end of the lower section pile pipe is filled with a lower concrete body for blocking the lower end of the lower section pile pipe.
The application further provides a construction method of the sectional foundation pile, which comprises the following steps:
providing an upper pile pipe, a lower pile pipe and a separated pile tip, wherein the upper pile pipe and the lower pile pipe are hollow pipes, the separated pile tip comprises a main body part and a separated part, a bearing part for bearing the separated part is arranged on the main body part of the separated pile tip, and the separated part of the separated pile tip is abutted against the bearing part so that the separated part is borne by the main body part;
mounting the separated pile tip at the lower end of the upper pile pipe, wherein the lower end of the upper pile pipe is propped against the split part of the separated pile tip;
pressing the upper pile pipe to press the upper pile pipe, the split part of the split pile tip and the main body part into the ground with the first depth;
placing the lower section pile pipe into the upper section pile pipe, wherein the lower end of the lower section pile pipe is propped against the main body part of the separated pile tip;
the lower pile pipe is pressed to press the lower pile pipe and the main body part of the separated pile tip into the ground at a second depth together, wherein the second depth is larger than the first depth.
Thereby to achieve segmented piling.
The sectional foundation pile comprises an upper section pile pipe and a lower section pile pipe, wherein the upper section pile pipe is pressed into the ground with a first depth during construction, and then the lower section pile pipe is placed into the upper section pile pipe and pressed into the ground with a second depth; the construction difficulty is remarkably reduced by sectional piling. And the upper section pile pipe is sleeved outside the lower section pile pipe, and when the lower section pile pipe is constructed, the lower section pile pipe is pressed into the ground by the pipe body of the upper section pile pipe in a guiding way, so that the conditions of deflection, pile breakage and the like are not easy to occur.
The pile tip of the technical scheme is a separated pile tip, and when the upper section pile pipe is constructed, the separated pile tip is taken as the pile tip of the upper section pile pipe and is pressed into the ground together with the upper section pile pipe; when the lower pile pipe is constructed, the main body part of the separated pile tip is separated from the separated part, and the pile tip serving as the lower pile pipe is pressed into the ground together with the lower pile pipe. The separated pile tip of the technical scheme is recycled in the segmented pile driving process, so that the penetrating capacity of the pile pipe at the upper section and the pile pipe at the lower section on a soil layer is improved when the pile pipe at the upper section and the pile pipe at the lower section are pressed, and the pile breaking prevention effect is realized.
The upper section pile pipe and the lower section pile pipe of the technical scheme are hollow pipes, and the upper end of the upper section pile pipe is plugged by filling an upper concrete body; plugging the lower end of the upper section pile pipe by filling the middle concrete body and cementing the lower end of the upper section pile pipe and the upper end of the lower section pile pipe together; and the lower end of the lower section pile pipe is blocked by filling the lower concrete body. The loading requirements of the foundation pile are met without filling the whole upper section pile pipe and the whole lower section pile pipe, and the cost is saved.
Drawings
Fig. 1 is a schematic structural view of a sectional foundation pile according to the present application.
Fig. 2-6 are schematic structural diagrams of the construction process of the sectional foundation pile of the present application.
Detailed Description
The scheme of the application is further described with reference to the accompanying drawings:
referring to fig. 1-6, a sectional foundation pile comprises an upper section pile pipe 1, a lower section pile pipe 2 and a separated pile tip 3, wherein the upper section pile pipe 1 and the lower section pile pipe 2 are hollow pipes.
The split pile tip 3 includes a main body 31 and a split 32. The lower end of the lower pile pipe 2 abuts against the main body 31 of the split pile toe 3. The split part 32 is annular and sleeved outside the lower pile pipe 2; the lower end of the upper pile pipe 1 is sleeved outside the upper end of the lower pile pipe 2, and the lower end of the upper pile pipe 1 is abutted against the split part 32 of the split pile tip 3.
The sectional foundation pile comprises an upper section pile pipe 1 and a lower section pile pipe 2, wherein the upper section pile pipe 1 is pressed into the ground with a first depth during construction, and then the lower section pile pipe 2 is placed into the upper section pile pipe 1 and pressed into the ground with a second depth; the construction difficulty is remarkably reduced by sectional piling. And the upper pile pipe 1 is sleeved outside the lower pile pipe 2, so that when the lower pile pipe 2 is constructed, the lower pile pipe 2 is pressed into the ground by the pipe body of the upper pile pipe 1 in a guiding way, and the conditions of deflection, pile breakage and the like are not easy to occur.
The main body 31 of the separable pile tip 3 is provided with a bearing portion 311 for bearing the separable part 32. In the technical scheme, the bearing part 311 is arranged so that when the upper pile pipe 1 drives the split part 32 of the split pile tip 3 into the ground, the split part 32 of the split pile tip 3 is contacted with the bearing part 311 for transmission to drive the main body part 31 into the ground.
The pile tip of the technical scheme is a separated pile tip 3, and when the upper section pile pipe 1 is constructed, the separated pile tip 3 is taken as the pile tip of the upper section pile pipe 1 and is pressed into the ground together with the upper section pile pipe 1; when the lower pile pipe 2 is constructed, the body 31 of the separable pile tip 3 is separated from the split part 32, and the pile tip serving as the lower pile pipe 2 is pushed into the ground together with the lower pile pipe 2. According to the technical scheme, the separated pile tip 3 is recycled in the segmented pile driving process, the penetrating capacity of the upper pile pipe 1 and the lower pile pipe 2 on a soil layer is increased when pressure is applied, and the pile breaking prevention effect is achieved.
The upper end of the upper pile pipe 1 is filled with an upper concrete body 4 for blocking the upper end of the upper pile pipe 1. The lower end of the upper pile pipe 1 is filled with a middle concrete body 5 for sealing the lower end of the upper pile pipe 1 and cementing the lower end of the upper pile pipe 1 and the upper end of the lower pile pipe 2 together. The lower end of the lower pile pipe 2 is filled with a lower concrete body 6 for blocking the lower end of the lower pile pipe 2.
According to the technical scheme, the upper section pile pipe 1 and the lower section pile pipe 2 are hollow pipes, and the upper end of the upper section pile pipe 1 is blocked by filling an upper concrete body 4; the lower end of the upper section pile pipe 1 is blocked by filling the middle concrete body 5, and the lower end of the upper section pile pipe 1 and the upper end of the lower section pile pipe 2 are glued together; the lower end of the lower pile pipe 2 is blocked by filling the lower concrete body 6. The loading requirements of the foundation pile are met without filling the whole upper-section pile pipe 1 and the whole lower-section pile pipe 2, and the cost is saved.
The main body 31 of the separated pile tip 3 seals the lower end of the lower pile pipe 2, and the main body 31 of the separated pile tip 3 is provided with a connecting part 312 inserted into the lower end of the lower pile pipe 2; the lower concrete body 6 is also used for cementing the lower end of the lower pile pipe 2 and the connecting part 312 of the main body part 31 of the separated pile tip 3 together; the diameter of the lower pile pipe 2 is smaller than that of the upper pile pipe 1.
According to the technical scheme, the main body 31 of the separated pile tip 3 is fixed through the lower concrete body 6 of the lower end of the plugging lower-section pile pipe 2, secondary construction fixation is not needed, and the efficiency is high and the cost is low.
The upper end of the lower pile pipe 2 is opened to form an upper end pipe orifice of the lower pile pipe 2, and a sealing cover plate 21 for sealing the upper end pipe orifice of the lower pile pipe 2 is arranged on the upper end cover of the lower pile pipe 2; the middle concrete body 5 covers the sealing cover plate 21.
The middle concrete body 5 of the technical scheme is covered on the sealing cover plate 21, so that the upper end of the lower pile pipe 2 is sealed.
In this embodiment, the sealing cover plate 21 is fixed on the upper pipe orifice of the lower pile pipe 2 in advance before construction.
The upper end of the upper pile pipe 1 is provided with a supporting plate 42 for supporting the upper concrete body 4. The upper concrete body 4 is a reinforced concrete structure body and comprises an upper reinforced concrete structure body 41 and an upper concrete structure body 43; the lower end of the upper steel bar structure 41 is welded with the supporting plate 42, so that the upper steel bar structure 41 and the supporting plate 42 are integrated into a whole to play a role of reinforcement; the upper end of the upper reinforcing bar structure 41 is penetrated out of the upper end of the upper pile pipe 1 for connection with other building elements.
In this embodiment, before the upper concrete structure 43 is poured, the upper steel bar structure 41 and the supporting plate 42 welded into a whole are placed into the upper end of the upper pile pipe 1, then the upper steel bar structure 41 is fixed by the upper end of the steel bar structure penetrating out of the upper end of the upper pile pipe 1, and finally the upper concrete structure 43 is poured.
The diameter of the supporting plate 42 is equal to the inner diameter of the upper pile pipe 1, so that the periphery of the supporting plate 42 is tightly attached to the inner wall of the upper pile pipe 1, and the phenomenon that the concrete falls to the lower end of the upper pile pipe 1 when the upper concrete structure 43 is poured is avoided.
The central concrete body 5 is also a reinforced concrete structure and comprises a central reinforcing structure 51 and a central concrete structure 52, the central reinforcing structure 51 falling above the sealing cover 21. The middle concrete body 52 is filled above the sealing cover plate 21 from the gap between the lower end of the upper pile pipe 1 and the upper end of the lower pile pipe 2, and completely covers the middle reinforcement body 51.
In this embodiment, the middle reinforcement structure 51 is placed on the sealing cover 21 before the middle concrete structure 52 is poured.
A construction method of a sectional foundation pile comprises the following steps:
an upper pile pipe 1, a lower pile pipe 2 and a split pile tip 3 are provided, the upper pile pipe 1 and the lower pile pipe 2 are hollow pipes, the split pile tip 3 comprises a main body part 31 and a split part 32, a bearing part 311 for bearing the split part 32 is arranged on the main body part 31 of the split pile tip 3, and the split part 32 of the split pile tip 3 is abutted against the bearing part 311, so that the split part 32 is borne by the main body part 31.
As shown in fig. 2, the split pile tip 3 is mounted at the lower end of the upper pile pipe 1, and the lower end of the upper pile pipe 1 is abutted against the split part 32 of the split pile tip 3; the upper pile pipe 1 is pressed so that the upper pile pipe 1, the split portion 32 of the split pile tip 3, and the main body portion 31 are pressed together into the ground at the first depth L1.
As shown in fig. 3, the lower pile pipe 2 is put into the upper pile pipe 1, and the lower end of the lower pile pipe 2 abuts against the main body 31 of the split pile tip 3.
Concrete is poured at the lower end of the lower pile pipe 2 to form a lower concrete body 6. Wherein the main body 31 of the split pile tip 3 seals the lower end of the lower pile pipe 2, and the main body 31 of the split pile tip 3 has a connecting portion 312 inserted into the lower end of the lower pile pipe 2; the lower concrete body 6 is also used for cementing the lower end of the lower pile tube 2 with the connecting portion 312 of the main body portion 31 of the split pile toe 3.
The upper end of the lower pile pipe 2 is opened to form an upper pipe orifice of the lower pile pipe 2; a sealing cover plate 21 is provided, and the sealing cover plate 21 is overlapped on the upper end of the lower-section pile pipe 2 to seal the upper end pipe orifice of the lower-section pile pipe 2.
As shown in fig. 4, the lower pile pipe 2 is pressed to press the lower pile pipe 2 and the main body 31 of the split pile tip 3 together into the ground at a second depth L2, wherein the second depth L2 is greater than the first depth L1, and the second depth L2 is only different from the first depth L1 by less than the length of the lower pile pipe 2.
As shown in fig. 5, concrete is poured into the lower end of the upper pile pipe 1 to form a middle concrete body 5.
Wherein, the middle concrete body 5 covers the sealing cover plate 21, and the middle concrete body 5 seals the lower end of the upper section pile pipe 1 and bonds the lower end of the upper section pile pipe 1 and the upper end of the lower section pile pipe 2 together.
The middle concrete body 5 is a reinforced concrete structure body and includes a middle reinforced concrete body 51 and a middle concrete body 52, and the middle reinforced concrete body 51 falls above the sealing cover plate 21. The middle concrete body 52 is filled above the sealing cover plate 21 from the gap between the lower end of the upper pile pipe 1 and the upper end of the lower pile pipe 2, and completely covers the middle reinforcement body 51.
In this embodiment, the middle reinforcement structure 51 is placed on the sealing cover 21 before the middle concrete structure 52 is poured.
As shown in fig. 6, after the middle concrete body 5 is formed, concrete is poured to the upper end of the upper-stage pile pipe 1 to form an upper concrete body 4 for blocking the upper end of the upper-stage pile pipe 1;
wherein, the upper end of the upper pile pipe 1 is provided with a supporting plate 42 for supporting the upper concrete body 4;
the upper concrete body 4 is a reinforced concrete structure body and comprises an upper reinforced concrete structure body 41 and an upper concrete structure body 43;
the lower end of the upper steel bar structure 41 is welded with the supporting plate 42, so that the upper steel bar structure 41 and the supporting plate 42 are integrated into a whole to play a role of reinforcement;
the upper end of the upper reinforcing bar structure 41 penetrates out of the upper end of the upper pile pipe 1 for connecting other building components;
in this embodiment, before the upper concrete structure 43 is poured, the upper steel bar structure 41 and the supporting plate 42 welded into a whole are placed into the upper end of the upper pile pipe 1, then the upper steel bar structure 41 is fixed by the upper end of the steel bar structure penetrating out of the upper end of the upper pile pipe 1, and finally the upper concrete structure 43 is poured.
The diameter of the supporting plate 42 is equal to the inner diameter of the upper pile pipe 1, so that the periphery of the supporting plate 42 is tightly attached to the inner wall of the upper pile pipe 1, and the phenomenon that the concrete falls to the lower end of the upper pile pipe 1 when the upper concrete structure 43 is poured is avoided.
The above-mentioned preferred embodiments should be regarded as illustrative examples of embodiments of the present application, and all such technical deductions, substitutions, improvements made on the basis of the same, similar or similar embodiments of the present application should be regarded as the protection scope of the present patent.

Claims (7)

1. A segmented foundation pile, characterized by: the pile comprises an upper section pile pipe, a lower section pile pipe and a separated pile tip, wherein the upper section pile pipe and the lower section pile pipe are hollow pipes;
the separated pile tip comprises a main body part and a split part;
the lower end of the lower pile pipe is abutted against the main body part of the separated pile tip;
the split part is annular and sleeved outside the lower pile pipe;
the lower end of the upper section pile pipe is sleeved outside the upper end of the lower section pile pipe, and the lower end of the upper section pile pipe is propped against the split part of the split pile tip;
the main body part of the separated pile tip is provided with a bearing part for bearing the split part;
the upper end of the upper section pile pipe is filled with an upper concrete body for blocking the upper end of the upper section pile pipe;
the lower end of the upper section pile pipe is filled with a middle concrete body for plugging the lower end of the upper section pile pipe and cementing the lower end of the upper section pile pipe and the upper end of the lower section pile pipe together;
the lower end of the lower section pile pipe is filled with a lower concrete body for blocking the lower end of the lower section pile pipe;
the main body part of the separated pile tip seals the lower end of the lower section pile pipe, and the main body part of the separated pile tip is provided with a connecting part inserted into the lower end of the lower section pile pipe; the lower concrete body is also used for cementing the lower end of the lower pile pipe and the connecting part of the main body part of the separated pile tip together;
the diameter of the lower section pile pipe is smaller than that of the upper section pile pipe;
the upper end of the lower section pile pipe is opened to form an upper end pipe orifice of the lower section pile pipe, and a sealing cover plate for sealing the upper end pipe orifice of the lower section pile pipe is arranged on the upper end cover of the lower section pile pipe; the middle concrete body covers the sealing cover plate.
2. The segmented foundation pile of claim 1, wherein,
the upper end of the upper pile pipe is provided with a supporting plate for supporting the upper concrete body;
the upper concrete body is a reinforced concrete structure body and comprises an upper reinforced concrete structure body and an upper concrete structure body;
the lower end of the upper steel bar structure body is welded with the supporting plate;
the upper end of the upper reinforcing steel bar structure body penetrates out of the upper end of the upper pile pipe;
the diameter of the supporting plate is equal to the inner diameter of the upper section pile pipe.
3. The segmented foundation pile of claim 1, wherein,
the middle concrete body is also a reinforced concrete structure body and comprises a middle reinforced structure body which falls above the sealing cover plate.
4. The construction method of the sectional foundation pile is characterized by comprising the following steps of:
providing an upper pile pipe, a lower pile pipe and a separated pile tip, wherein the upper pile pipe and the lower pile pipe are hollow pipes, the separated pile tip comprises a main body part and a separated part, a bearing part for bearing the separated part is arranged on the main body part of the separated pile tip, and the separated part of the separated pile tip is abutted against the bearing part so that the separated part is borne by the main body part;
mounting the separated pile tip at the lower end of the upper pile pipe, wherein the lower end of the upper pile pipe is propped against the split part of the separated pile tip;
pressing the upper pile pipe to press the upper pile pipe, the split part of the split pile tip and the main body part into the ground with the first depth;
placing the lower section pile pipe into the upper section pile pipe, wherein the lower end of the lower section pile pipe is propped against the main body part of the separated pile tip;
the lower pile pipe is pressed to press the lower pile pipe and the main body part of the separated pile tip into the ground at a second depth together, wherein the second depth is larger than the first depth.
5. The construction method according to claim 4, wherein:
before the lower pile pipe is pressurized, concrete is poured at the lower end of the lower pile pipe to form a lower concrete body;
the main body part of the separated pile tip is provided with a connecting part inserted into the lower end of the lower pile pipe; the lower concrete body is also used for cementing the lower end of the lower pile pipe and the connecting part of the main body part of the separated pile tip together.
6. The construction method according to claim 5, wherein:
the upper end of the lower pile pipe is opened to form an upper pipe orifice of the lower pile pipe;
providing a sealing cover plate, and stacking the sealing cover plate on the upper end of the lower-section pile pipe to seal the pipe orifice at the upper end of the lower-section pile pipe before pressing the lower-section pile pipe;
pouring concrete at the lower end of the upper section pile pipe to form a middle concrete body;
the middle concrete body covers the sealing cover plate, and seals the lower end of the upper section pile pipe and bonds the lower end of the upper section pile pipe and the upper end of the lower section pile pipe together.
7. The construction method according to claim 6, wherein:
after the middle concrete body is formed, pouring concrete to the upper end of the upper section pile pipe to form an upper concrete body for blocking the upper end of the upper section pile pipe;
the upper end of the upper pile pipe is provided with a supporting plate for supporting the upper concrete body;
the upper concrete body is a reinforced concrete structure body and comprises an upper reinforced concrete structure body and an upper concrete structure body;
the lower end of the upper steel bar structure body is welded with the supporting plate;
the upper end of the upper reinforcing steel bar structure body penetrates out of the upper end of the upper pile pipe;
the diameter of the supporting plate is equal to the inner diameter of the upper section pile pipe.
CN202210489680.2A 2021-12-13 2022-05-07 Sectional foundation pile and construction method thereof Active CN114775588B (en)

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
CN2021115177930 2021-12-13
CN202111517793.0A CN113969578A (en) 2021-12-13 2021-12-13 Sectional type foundation pile and construction method thereof

Publications (2)

Publication Number Publication Date
CN114775588A CN114775588A (en) 2022-07-22
CN114775588B true CN114775588B (en) 2023-08-18

Family

ID=79590618

Family Applications (2)

Application Number Title Priority Date Filing Date
CN202111517793.0A Pending CN113969578A (en) 2021-12-13 2021-12-13 Sectional type foundation pile and construction method thereof
CN202210489680.2A Active CN114775588B (en) 2021-12-13 2022-05-07 Sectional foundation pile and construction method thereof

Family Applications Before (1)

Application Number Title Priority Date Filing Date
CN202111517793.0A Pending CN113969578A (en) 2021-12-13 2021-12-13 Sectional type foundation pile and construction method thereof

Country Status (1)

Country Link
CN (2) CN113969578A (en)

Citations (14)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
FR1292226A (en) * 1961-01-30 1962-05-04 Plug, which can be broken down into recoverable elements, for the execution of so-called driven tube foundation piles
GB9508233D0 (en) * 1995-04-24 1995-06-14 Chan Yat S Piling
DE4439115A1 (en) * 1994-08-24 1996-02-29 Jossif Dr Ing Ladyshenskij Foundation pile with reinforcing tube
JP2000073365A (en) * 1998-08-27 2000-03-07 Nkk Corp Screwed type steel pipe pile and its execution method
WO2000036226A2 (en) * 1998-12-14 2000-06-22 Rautaruukki Oyj A tubular pile encased in concrete and a method for driving the tubular pile into the soil and encasing it in concrete
JP2003227134A (en) * 2002-02-04 2003-08-15 Shoowa Kensho:Kk Intermediate point struck-type pile and method for installing the same
JP2005282185A (en) * 2004-03-30 2005-10-13 Daiwa House Ind Co Ltd Expansion pile, pile driving structure and driving method using this expansion pile
JP2007077803A (en) * 2006-12-26 2007-03-29 Jfe Steel Kk Screwing-in type steel pipe pile
CN102733380A (en) * 2012-06-17 2012-10-17 张永忠 Lag pile and construction method thereof
CN204000847U (en) * 2014-08-02 2014-12-10 柴子栋 A kind of building foundation pile element
JP2015055106A (en) * 2013-09-12 2015-03-23 株式会社大林組 Underground structure, and method of reconstructing building structure with underground skeleton
JP2015175193A (en) * 2014-03-17 2015-10-05 新日鐵住金株式会社 Both-end tapered pile, connected tapered pile, construction method of connection tapered pile and liquefaction countermeasure structure
CN205077480U (en) * 2015-07-31 2016-03-09 中国建筑第八工程局有限公司 Double cannula bored concrete pile structure
CN111350181A (en) * 2020-03-26 2020-06-30 上海杰地建筑设计有限公司 Precast concrete tubular pile only bearing anti-pulling effect

Patent Citations (14)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
FR1292226A (en) * 1961-01-30 1962-05-04 Plug, which can be broken down into recoverable elements, for the execution of so-called driven tube foundation piles
DE4439115A1 (en) * 1994-08-24 1996-02-29 Jossif Dr Ing Ladyshenskij Foundation pile with reinforcing tube
GB9508233D0 (en) * 1995-04-24 1995-06-14 Chan Yat S Piling
JP2000073365A (en) * 1998-08-27 2000-03-07 Nkk Corp Screwed type steel pipe pile and its execution method
WO2000036226A2 (en) * 1998-12-14 2000-06-22 Rautaruukki Oyj A tubular pile encased in concrete and a method for driving the tubular pile into the soil and encasing it in concrete
JP2003227134A (en) * 2002-02-04 2003-08-15 Shoowa Kensho:Kk Intermediate point struck-type pile and method for installing the same
JP2005282185A (en) * 2004-03-30 2005-10-13 Daiwa House Ind Co Ltd Expansion pile, pile driving structure and driving method using this expansion pile
JP2007077803A (en) * 2006-12-26 2007-03-29 Jfe Steel Kk Screwing-in type steel pipe pile
CN102733380A (en) * 2012-06-17 2012-10-17 张永忠 Lag pile and construction method thereof
JP2015055106A (en) * 2013-09-12 2015-03-23 株式会社大林組 Underground structure, and method of reconstructing building structure with underground skeleton
JP2015175193A (en) * 2014-03-17 2015-10-05 新日鐵住金株式会社 Both-end tapered pile, connected tapered pile, construction method of connection tapered pile and liquefaction countermeasure structure
CN204000847U (en) * 2014-08-02 2014-12-10 柴子栋 A kind of building foundation pile element
CN205077480U (en) * 2015-07-31 2016-03-09 中国建筑第八工程局有限公司 Double cannula bored concrete pile structure
CN111350181A (en) * 2020-03-26 2020-06-30 上海杰地建筑设计有限公司 Precast concrete tubular pile only bearing anti-pulling effect

Also Published As

Publication number Publication date
CN114775588A (en) 2022-07-22
CN113969578A (en) 2022-01-25

Similar Documents

Publication Publication Date Title
CN100577923C (en) Prestressed concrete steel pipe congruent pile and its manufacture and construction method
CN1896383B (en) Steel-pipe concrete assembled pile of predrilled hole rock-embedded and its construction
CN100567659C (en) The base configuration of iron tower
CN104234055B (en) A kind of prefabricated pile post-grouting device and technique thereof
CN105201514B (en) A kind of water-bearing stratum shaft wall structure and construction method
CN114775588B (en) Sectional foundation pile and construction method thereof
CN110593247A (en) Electroosmotic gravel grouting pile and construction method thereof
KR101236765B1 (en) Method for placing adhesive filling into the expanded drill hole to increase bearing capacity of piles and tention members and apparatus therefor
CN112301995A (en) Prefabricated composite reinforcement structure serving as precipitation grouting channel and construction method
CN210315518U (en) Steel pipe micro pile
CN216640565U (en) Sectional type foundation pile
CN212772306U (en) Device for improving vertical compression-resistant bearing capacity of steel pipe anchor rod static pressure pile
CN206800379U (en) Grouting behind shaft or drift lining pre-stress hollow square pile
JP2001098542A (en) Soil cement composite taper pile
CN212001300U (en) Anti-floating anchor rod for basement
KR100400853B1 (en) Removable soil nailing method and its nail assembly
CN110453690B (en) Recyclable foundation pit pile anchor supporting structure and construction method
CN211036960U (en) Electroosmosis gravel grouting pile
CN114525781A (en) Prestressed rod core bag grouting combined anti-floating component and construction method
CN202124857U (en) Splitting pile
CN206591513U (en) Slip casting cylinder for PHC pile tubes
CN213805307U (en) Prefabricated composite reinforcement body structure used as precipitation grouting channel
CN116657675B (en) Construction method for anti-floating reinforcement of thin bottom plate of subway station foundation pit in high water level area
CN210031826U (en) Foundation ditch excavation pressure-bearing water roof reinforcing apparatus
JP2884273B2 (en) Construction method for high strength cast-in-place concrete piles

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant