CN102720200A - Riprap elephant trunk retraction system for immersed tube foundation construction - Google Patents

Riprap elephant trunk retraction system for immersed tube foundation construction Download PDF

Info

Publication number
CN102720200A
CN102720200A CN2012101812680A CN201210181268A CN102720200A CN 102720200 A CN102720200 A CN 102720200A CN 2012101812680 A CN2012101812680 A CN 2012101812680A CN 201210181268 A CN201210181268 A CN 201210181268A CN 102720200 A CN102720200 A CN 102720200A
Authority
CN
China
Prior art keywords
elephant trunk
jackstone
trunk
lephant
retraction system
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN2012101812680A
Other languages
Chinese (zh)
Inventor
刘宝河
孟凡利
孔令磊
丰贯凌
张怡戈
沈家海
张宝奇
刘昊摈
靳胜
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
TIANJIN GANGHANG INSTALLATION ENGINEERING Co Ltd
No 1 Engineering Co Ltd of CCCC First Harbor Engineering Co Ltd
Original Assignee
TIANJIN GANGHANG INSTALLATION ENGINEERING Co Ltd
No 1 Engineering Co Ltd of CCCC First Harbor Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by TIANJIN GANGHANG INSTALLATION ENGINEERING Co Ltd, No 1 Engineering Co Ltd of CCCC First Harbor Engineering Co Ltd filed Critical TIANJIN GANGHANG INSTALLATION ENGINEERING Co Ltd
Priority to CN2012101812680A priority Critical patent/CN102720200A/en
Publication of CN102720200A publication Critical patent/CN102720200A/en
Pending legal-status Critical Current

Links

Images

Landscapes

  • Revetment (AREA)

Abstract

A rip-rap lephant trunk retraction system for immersed tube foundation construction is characterized in that the retraction system comprises a rip-rap lephant trunk and a retraction pulling cable, wherein the upper end of the rip-rap lephant trunk is arranged in a pivotally connected manner, the lower end of the rip-rap lephant trunk and the retraction pulling cable are arranged in a traction manner, and the lower end of the rip-rap lephant trunk is arranged in a rotating manner around the pivoted part between the vertical direction and the horizontal direction of the lephant trunk. The rip-rap lephant trunk retraction system for immersed tube foundation construction is simple and fast to operate, can effectively achieve lephant trunk retraction, is reasonable in design, occupies a small area, meanwhile can achieve the retraction operation of the lephant trunk on water in virtue of the driving force of a lephant trunk trolley, and can be operated repeatedly. The manufacturing manner of the retraction system is simple, the normal use of the rip-rap lephant trunk cannot be impacted, and also the security under a non-riprap state can be ensured.

Description

The jackstone elephant trunk extension and retraction system of immersed tube foundation construction
Technical field
The invention belongs to the jackstone device of immersed tube foundation construction in the waters, concrete relate to a kind of jackstone elephant trunk extension and retraction system that can carry out the immersed tube foundation construction of folding and unfolding the jackstone device.
Background technology
Along with domestic and international coastal development upsurge, corresponding coastal engineering construction increases, and need carry out the construction of island, cofferdam when carrying out the tunnel construction of island, cofferdam in the marine site; Adopt steel pipe pile to make up island, cofferdam wall; Carry out the jackstone operation of rockfilling then, ram flatly again, form firm island wall cofferdam structure.Because construction at sea; Corresponding immersed tube operation, jackstone are filled out the sea and rammed flat operation all needs plurality of devices to cooperate; If adopt a plurality of ships to carry out the operation of difference in functionality, then the operation place is difficult to satisfy the demand and also has simultaneously complex operation, shipping traffic and positioning security problem.In addition, jackstone is filled out extra large operation needs a large amount of cubic meters of stone, not only will satisfy delivery and require also will accomplish that the jackstone operation in accurate place, existing equipment can't satisfy efficient and construction period.This case inventor has invented the technology that the elephant trunk that adopts tubulose carries out jackstone, and it adopts the metal tub pipe that satisfies the jackstone diameter guiding device as the fixed point jackstone, and the metal tub pipe extends to underwater dumped rockfill basis district, carries out the jackstone operation then.Because the length of this metal tub pipe is bigger, when barge carries out non-jackstone operation its deeply under water part can have potential safety hazard.
Summary of the invention
The invention provides a kind of jackstone elephant trunk extension and retraction system of simple and efficient to handle, the immersed tube foundation construction that can effectively realize the elephant trunk folding and unfolding; It is reasonable in design; It is little to take up room, and can realize the folding and unfolding operation of elephant trunk on the water surface simultaneously by the driving force that Liu manages dolly, but and repeatable operation.The production method of this extension and retraction system is simple, does not influence the normal use of jackstone elephant trunk, can guarantee the safety under the non-jackstone state again.
The technical scheme that the present invention adopted is following:
A kind of jackstone elephant trunk extension and retraction system of immersed tube foundation construction; It is characterized in that said extension and retraction system comprises jackstone elephant trunk and folding and unfolding drag cable; The upper end of said jackstone elephant trunk articulates and is provided with; Its lower end and the traction of said folding and unfolding drag cable are provided with, and this jackstone elephant trunk its lower end under the traction of said folding and unfolding drag cable articulates the position rotary setting in the vertical direction and the horizontal direction spaced winding of elephant trunk.
In the specific embodiment, the upper end of said jackstone elephant trunk is provided with otic placode, and said jackstone elephant trunk articulates through otic placode and is provided with; The lower end of said jackstone elephant trunk also is provided with otic placode, and said otic placode is provided with by the folding and unfolding drag cable traction of oblique setting.
In one embodiment, said jackstone elephant trunk is the more piece tube-shaped tube that movable set is provided with, and settings dock in the upper end of inboard tube-shaped tube with the lower port of jackstone funnel, and this is the top and the elephant trunk dolly pivot joint setting of the tube-shaped tube of inboard.
In another embodiment, the lower end of said outermost tube-shaped tube is provided with otic placode, and said otic placode is provided with by the traction of folding and unfolding drag cable.
In one embodiment, said jackstone elephant trunk is arranged on the elephant trunk dolly, and the assembling of this elephant trunk dolly and a track is provided with, and is arranged at intervals with a pulley in a side of elephant trunk dolly, and the other end of said folding and unfolding drag cable is provided with by haulage gear traction behind this pulley.
In the embodiment, the distance of said elephant trunk dolly and pulley spare is more than or equal to the length of said elephant trunk again.
The lower end that the jackstone elephant trunk extension and retraction system of this immersed tube foundation construction is utilized in the jackstone elephant trunk is provided with the folding and unfolding drag cable.Affect the lower end of jackstone elephant trunk to realize rotation through this folding and unfolding drag cable, thereby realize the folding and unfolding operation of jackstone elephant trunk around the articulated section of jackstone elephant trunk upper end.The jackstone elephant trunk can realize around the pivot joint position of its upper end level to traction, when non-jackstone operation, stretch into existing potential safety hazard and course obstruction under water thereby eliminate the jackstone elephant trunk.The tube-shaped tube that the jackstone elephant trunk can adopt the more piece suit to be provided with can extend to darker foundation bottom under water when carrying out jackstone.When carrying out the folding and unfolding operation; Can be earlier the tube-shaped tube of suit be shunk; Then with the lower end of jackstone elephant trunk through the folding and unfolding drag cable to the skew back tractive that makes progress; The jackstone elephant trunk is under the draw of this folding and unfolding drag cable, and whole elephant trunk is rotated around the articulated section of its upper end, draws to the appropriate location until the folding and unfolding drag cable.The oblique traction of folding and unfolding drag cable can be passed through the pulley setting, and pulley plays the effect that changes folding and unfolding drag cable direction, makes the pulling equipment that is positioned at jackstone elephant trunk dolly opposite side to connect driving to this folding and unfolding drag cable.
Beneficial effect of the present invention is; The jackstone elephant trunk extension and retraction system of this immersed tube foundation construction is simple and efficient to handle, can effectively realize the elephant trunk folding and unfolding, and it is reasonable in design, and it is little to take up room; Can realize the folding and unfolding operation of elephant trunk on the water surface simultaneously by the driving force that Liu manages dolly, but and repeatable operation.The production method of this extension and retraction system is simple, does not influence the normal use of jackstone elephant trunk, can guarantee the safety under the non-jackstone state again.
Below in conjunction with the accompanying drawing and the specific embodiment the present invention is done further elaboration.
Description of drawings
Fig. 1 is a status architecture sketch map of the specific embodiment of the invention;
Fig. 2 is another status architecture sketch map of the specific embodiment of the invention.
The specific embodiment
As depicted in figs. 1 and 2, the jackstone elephant trunk extension and retraction system of this immersed tube foundation construction can be arranged on the immersed tube foundation construction barge 20, and it mainly contains jackstone elephant trunk 10 and forms with folding and unfolding drag cable 17.Jackstone elephant trunk 10 is the more piece tube-shaped tube that movable set is provided with, and settings dock in the upper end of inboard tube-shaped tube with the lower port of jackstone funnel 14, and this is the top and the elephant trunk dolly pivot joint setting of the tube-shaped tube of inboard.The top of the most inboard tube-shaped tube of jackstone elephant trunk is articulated on the elephant trunk dolly through otic placode 12; The lower end of the outermost tube-shaped tube of jackstone elephant trunk is provided with otic placode 11, and otic placode 11 is provided with by folding and unfolding drag cable 17 tractions of oblique setting.The jackstone elephant trunk is arranged on the elephant trunk dolly 13, and the assembling of this elephant trunk dolly 13 and a track is provided with, and is arranged at intervals with a pulley 15 in a side of elephant trunk dolly, the other end of said folding and unfolding drag cable 15 through this pulley 15 after by a haulage gear 16 traction settings.The distance of elephant trunk dolly and pulley room is more than or equal to the length of elephant trunk.As shown in Figure 2, this jackstone elephant trunk lower end articulates the position rotary setting in the vertical direction and the horizontal direction spaced winding of elephant trunk under the traction of folding and unfolding drag cable.

Claims (6)

1. the jackstone elephant trunk extension and retraction system of an immersed tube foundation construction; It is characterized in that said extension and retraction system comprises jackstone elephant trunk and folding and unfolding drag cable; The upper end of said jackstone elephant trunk articulates and is provided with; Its lower end and the traction of said folding and unfolding drag cable are provided with, and this jackstone elephant trunk its lower end under the traction of said folding and unfolding drag cable articulates the position rotary setting in the vertical direction and the horizontal direction spaced winding of elephant trunk.
2. the jackstone elephant trunk extension and retraction system of immersed tube foundation construction according to claim 1 is characterized in that the upper end of said jackstone elephant trunk is provided with otic placode, and said jackstone elephant trunk articulates through otic placode and is provided with; The lower end of said jackstone elephant trunk also is provided with otic placode, and said otic placode is provided with by the folding and unfolding drag cable traction of oblique setting.
3. the jackstone elephant trunk extension and retraction system of immersed tube foundation construction according to claim 1; It is characterized in that said jackstone elephant trunk is the more piece tube-shaped tube that movable set is provided with; Setting is docked in the upper end of inboard tube-shaped tube with the lower port of jackstone funnel, and the top of the tube-shaped tube that this is the most inboard articulates setting with the elephant trunk dolly.
4. the jackstone elephant trunk extension and retraction system of immersed tube foundation construction according to claim 3 is characterized in that the lower end of said outermost tube-shaped tube is provided with otic placode, and said otic placode is provided with by the traction of folding and unfolding drag cable.
5. the jackstone elephant trunk extension and retraction system of immersed tube foundation construction according to claim 1; It is characterized in that said jackstone elephant trunk is arranged on the elephant trunk dolly; This elephant trunk dolly and track assembling are provided with; Side at the elephant trunk dolly is arranged at intervals with a pulley, and the other end of said folding and unfolding drag cable is provided with by haulage gear traction behind this pulley.
6. the jackstone elephant trunk extension and retraction system of immersed tube foundation construction according to claim 5 is characterized in that the length of the distance of said elephant trunk dolly and pulley spare more than or equal to said elephant trunk.
CN2012101812680A 2012-06-05 2012-06-05 Riprap elephant trunk retraction system for immersed tube foundation construction Pending CN102720200A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2012101812680A CN102720200A (en) 2012-06-05 2012-06-05 Riprap elephant trunk retraction system for immersed tube foundation construction

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2012101812680A CN102720200A (en) 2012-06-05 2012-06-05 Riprap elephant trunk retraction system for immersed tube foundation construction

Publications (1)

Publication Number Publication Date
CN102720200A true CN102720200A (en) 2012-10-10

Family

ID=46946055

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2012101812680A Pending CN102720200A (en) 2012-06-05 2012-06-05 Riprap elephant trunk retraction system for immersed tube foundation construction

Country Status (1)

Country Link
CN (1) CN102720200A (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103911999A (en) * 2013-01-08 2014-07-09 中交第一航务工程局有限公司 Material backfilling system
CN104652442A (en) * 2015-02-16 2015-05-27 中交一航局第二工程有限公司 Positioning system for deep water backfilling operation
CN110790205A (en) * 2019-10-28 2020-02-14 中交第三航务工程局有限公司 Method for driving oblique chute barrel to move in three dimensions and driving system based on method
CN112344096A (en) * 2020-11-13 2021-02-09 中船华南船舶机械有限公司 Construction method for leveling, laying, locking and burying equipment of submarine pipeline

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103911999A (en) * 2013-01-08 2014-07-09 中交第一航务工程局有限公司 Material backfilling system
CN103911999B (en) * 2013-01-08 2016-02-03 中交第一航务工程局有限公司 Material backfill system
CN104652442A (en) * 2015-02-16 2015-05-27 中交一航局第二工程有限公司 Positioning system for deep water backfilling operation
CN110790205A (en) * 2019-10-28 2020-02-14 中交第三航务工程局有限公司 Method for driving oblique chute barrel to move in three dimensions and driving system based on method
CN112344096A (en) * 2020-11-13 2021-02-09 中船华南船舶机械有限公司 Construction method for leveling, laying, locking and burying equipment of submarine pipeline
CN112344096B (en) * 2020-11-13 2022-07-29 中船华南船舶机械有限公司 Construction method of submarine pipeline leveling, laying, locking and burying equipment

Similar Documents

Publication Publication Date Title
CN105604079B (en) A kind of tunnel immersed tube tube coupling being applied under big flow conditions undocks construction method
CN204940392U (en) One can sink and emerge type water energy powered desilting device automatically
CN102720200A (en) Riprap elephant trunk retraction system for immersed tube foundation construction
CN106522211B (en) A kind of bridge pier tubular pole pile foundation constructing device and its construction method
KR20110092257A (en) Barge device for installation of tidal power structure
CN106677257B (en) A kind of mounting process of power plant sea taking and discharging immersed tube
CN102758439A (en) Foundation construction barge for immersed tube
CN202828007U (en) Installation equipment for suction anchor in deep water
CN102837804A (en) Installation equipment and installation method for suction anchor in deep water
CN204456115U (en) A kind of crane barge pile driving barge with leading truck
CN104002936B (en) A kind of shoal, strand drilling platform
CN106088155A (en) Box hat immersed tube tunnel tube coupling prefabricated transportation by driving fitting-out technique
CN203960942U (en) Water intake pumping station
CN202730772U (en) Riprapping articulated chute retractile system for pipeline sinking basic construction
CN103774672A (en) Method for shipping caissons through ramp
CN202090262U (en) Bearing buoyancy tank for construction in mudflat and swamp areas
CN101922145A (en) Method for arresting entermorpha with air bag type arresting barrier
CN101701471B (en) Silt operation device of large-caliber sewage conduit desilting system
CN103215980A (en) Air-lift slurry discharge subsea pipeline on-line trenching equipment
CN206438538U (en) Immersed tube tunnel construction system
CN205369182U (en) A fill water energy absorber that is used for geomembrane storehouse basin prevention of seepage system
CN202595751U (en) Elephant trunk riprapping vehicle for immersed tube foundation construction
CN203996791U (en) The self-service ferry-boat of a kind of wire rope traction
CN208966209U (en) Coastal waters prevents guard aperture casing to be displaced arragement construction when drilling
CN209082432U (en) A kind of efficient wave absorption structure applied in navigable tunnel

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
WD01 Invention patent application deemed withdrawn after publication

Application publication date: 20121010

WD01 Invention patent application deemed withdrawn after publication