CN203960942U - Water intake pumping station - Google Patents

Water intake pumping station Download PDF

Info

Publication number
CN203960942U
CN203960942U CN201420169556.9U CN201420169556U CN203960942U CN 203960942 U CN203960942 U CN 203960942U CN 201420169556 U CN201420169556 U CN 201420169556U CN 203960942 U CN203960942 U CN 203960942U
Authority
CN
China
Prior art keywords
water
water intaking
pumping station
intaking platform
pile
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
CN201420169556.9U
Other languages
Chinese (zh)
Inventor
李辉
彭旭军
苟宏伦
李龙华
郭晓川
王菁菁
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Sichuan Electric Power Design and Consulting Co Ltd
Original Assignee
Sichuan Electric Power Design and Consulting Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Sichuan Electric Power Design and Consulting Co Ltd filed Critical Sichuan Electric Power Design and Consulting Co Ltd
Priority to CN201420169556.9U priority Critical patent/CN203960942U/en
Application granted granted Critical
Publication of CN203960942U publication Critical patent/CN203960942U/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Landscapes

  • Foundations (AREA)

Abstract

The utility model relates to a kind of water intake pumping station.This water intake pumping station, comprises water intaking platform, pile foundation and water pump, and described water intaking platform is arranged in pile foundation, and described water pump is arranged on water intaking platform.This water intake pumping station need not arrange underground type pump house, can directly pump be directly installed on water intaking platform, integrated engineering amount is little, and there is no subaqueous construction engineering quantity, invest low, easy construction, duration short, be particularly useful for the water head site that riverbank geological conditions is poor, mud is thicker and current delay.

Description

Water intake pumping station
Technical field
The utility model relates to surface water intake strucure, especially a kind of water intake pumping station.
Background technology
Intake strucure refers to the general name of the various structure of getting the former water of collection and arrange.Intake strucure pattern is varied, and the classification pattern of using at present morely has: shore type water intaking, river channel water intaking and portable water intaking.Intake strucure pattern need be made a concrete analysis of to select according to the natural conditions of water source type, water withdrawal size, execution conditions and water head site.
The shore type intake strucure channel thread offshore of being everlasting, stabilization of river bed, silt, floating thing, the more serious section of ice slush adopt.It is convenient that this water-supply method has bookkeeping, fetches water safe and reliable, little on the impact of river hydraulics, the advantage such as be not subject to that shipping affects.But shore type intake strucure is higher to water head site landform, geologic requirements, the enough depth of water of General Requirements water head site, slope of river bank are steep and geological conditions is good.
River channel intake strucure is everlasting that stabilization of river bed, riverbank are smooth, dry season main flow offshore can not meet compared with far away, the bank depth of water that water intaking requires or bank water quality is poor and korneforos have the enough depth of water or better the section of water quality water intaking condition adopt.This water-supply method gos deep into korneforos by water-fetching head exactly, by aqueduct, former water is introduced between the water inlet on bank.Because landform, geology and range of stage etc. are little to its scope of application restriction, therefore the water-supply method of this form is widely adopted.But river channel water intaking need be built underground type pump house, and its engineering quantity is large, invests high, long in time limit.
Portable water intaking has cable car type and floating vessel type.It is little that portable water intaking is mainly applicable to water withdrawal, and water intaking section range of stage is large, and flow velocity is little, and fluctuation in stage speed is unhappy, and there is certain depth of water on bank, stream bank stability, and engineering geological conditions is better, the situation that floating thing is few.Some mountain stream ranges of stage are larger, and construction stationary water intaking structure engineering quantity is large, and is not suitable with fluctuation in stage, can consider to adopt portable water intaking structure.But portable water intaking mode needs suitable bank slope and good riverbank geological conditions, and its stability is also relatively poor.
Utility model content
Technical problem to be solved in the utility model is to provide a kind of water intake pumping station, and this water intake pumping station requires low to water head site geology landform, and its engineering quantity is little, investment is lower.
The disclosed water intake pumping station of the utility model, comprises water intaking platform, pile foundation and water pump, and described water intaking platform is arranged in pile foundation, and described water pump is arranged on water intaking platform.
Preferably, described water intaking platform is fabricated construction, and water intaking platform comprises linking beam and landing slab, and described pile foundation top is provided with cushion cap, and described linking beam is fixedly connected with cushion cap, and described landing slab is layed on linking beam.
Preferably, described pile foundation adopts prestressed high strength concrete pile tube.
Preferably, described linking beam is H section steel beam.
Preferably, the concreting bed die of described landing slab is profiled sheet.
Preferably, described pile foundation comprises Vertical Pile and taper pile, and described Vertical Pile is arranged at water intaking platform below, and below, described water intaking platform two ends is provided with cross one another taper pile, the top of described taper pile is connected with the end angle of water intaking platform, and the bottom of taper pile is towards water intaking platform outer incline.
Preferably, this water intake pumping station is also provided with and connects aisle, and described connection aisle is connected with water intaking platform.
Preferably, described water pump is borehole shaft driven(centrifugal)pump, and described water intaking platform below is provided with protection cylinder, and the pump housing of described water pump is arranged in protection cylinder.
Preferably, the below of described water intaking platform is provided with garbage barrier net, and described garbage barrier net is positioned at the water inlet front of water pump.
Preferably, in the pile foundation in the water inlet front of described water pump, be provided with anchor ear, described garbage barrier net dual-side is provided with guide groove, garbage barrier net bottom is provided with kerve, described guide groove and kerve are all fixed in pile foundation by anchor ear, on described water intaking platform, offer strip opening, and described strip opening part is provided with support member, described garbage barrier net is connected with support member by steel strand, on described strip opening, is stamped cover plate.
Disclosed water intake pumping station of the present utility model need not arrange underground type pump house, can directly pump be directly installed on water intaking platform, integrated engineering amount is little, and there is no subaqueous construction engineering quantity, invest low, easy construction, duration short, be particularly useful for the water head site that riverbank geological conditions is poor, mud is thicker and current delay.
Brief description of the drawings
Fig. 1 is schematic diagram of the present utility model;
Fig. 2 is the partial schematic diagram of platform of fetching water in the utility model;
Fig. 3 is the aerial prospective figure of the heavy pile foundation of the utility model and water intaking platform;
Fig. 4 is top view of the present utility model;
Fig. 5 is the utility model water pump and the schematic diagram of protecting cylinder;
Fig. 6 is the schematic diagram of garbage barrier net in the utility model;
Fig. 7 is the top view of the utility model garbage barrier net.
Mark in figure: the 1-platform of fetching water, 101-linking beam, 102-landing slab, 103-strip opening, 104-cover plate, 2-pile foundation, 201-cushion cap, 202-Vertical Pile, the 203-platform of fetching water, 3-water pump, the 301-pump housing, 4-connects aisle, 5-sleeve pipe, 6-garbage barrier net, 601-anchor ear, 602-guide groove, 603-kerve, 604-steel strand, 605-support member, the thin garbage barrier net of 7-, 8-connecting rod, 9-water-supply-pipe.
Detailed description of the invention
Below in conjunction with accompanying drawing, the utility model is further illustrated.
As shown in Figure 1, the utility model discloses fetch water platform 1, pile foundation 2 and the water pump 3 of comprising of water intake pumping station, and described water intaking platform 1 is arranged in pile foundation 2, and described water pump 3 is arranged on water intaking platform 1.In the time building this water intake pumping station, generally water intaking platform 1 is built and had enough depth of water position, and pile foundation 2 is goed deep into riverbed to ensure the stability of total, water pump 3 is directly arranged on water intaking platform 1 and extracts former water.The subaqueous construction of traditional shore type and river channel water intaking is converted into over-water construction by this programme, will install under water and be converted into installation waterborne, saves subaqueous construction engineering quantity, greatly reduce expenses, and with respect to portable water intaking, its stability is higher.
Because more than the construction of water intaking platform 1 is positioned at the water surface, for avoiding underwater operation, on the basis of such scheme, as optimal way, as shown in Figure 2, described water intaking platform 1 is fabricated construction, water intaking platform 1 comprises linking beam 101 and landing slab 102, described pile foundation 2 tops are provided with cushion cap 201, and described linking beam 101 is fixedly connected with cushion cap 201, and described landing slab 102 is layed on linking beam 101.Conventionally, on cushion cap 201, be provided with embedded part, linking beam 101 is fixedly connected with cushion cap 201 by embedded part, and the load on water intaking platform 1 is delivered in pile foundation 2 by cushion cap 201.Adopt this scheme can greatly shorten the over-water construction time of water intaking platform 1, reduce difficulty of construction, accelerate construction progress.
In such scheme, the selection of pile foundation 2 is various, and as optimal way, described pile foundation 2 adopts prestressed high strength concrete pile tube.Prestressed high strength concrete pile tube, is called for short PHC pile tube, is to adopt pre-tensioned prestressing centrifugal molding process, and through the stream curing of 10 atmospheric pressure, 1800 DEG C of left and right, makes that a kind of hollow cylinder shape is mixed doubts native prefabricated units.Its bearing capacity of single pile is very high, because PHC tubular pile body concrete strength is high, can squeeze into closely knit layer of sand, and due to squeezing action, the comparable original state soil property of bearing capacity of pile tip improves 70%~80%, and pile side friction improves 20%~40%.
Equally, linking beam can adopt the material such as steel, concrete, and as optimal way, described linking beam 101 is H section steel beam.H shaped steel is that a kind of section area distributes more reasonably economic section high efficiency section bar of optimization, the ratio of strength to weight more.Owing to arranging in the Jun Yi right angle, each position of H shaped steel, therefore H shaped steel all has simple, the cost-saving and lightweight construction of very strong bending resistance, its construction in all directions, is conducive to increase water intaking platform intensity, alleviates its weight.
In routine techniques, when casting platform plate 102, generally need build operation at sea platform, and for reducing engineering quantity, avoid setting up operation at sea platform, as optimal way, the concreting bed die of described landing slab 102 is profiled sheet.Profiled sheet has light unit weight, intensity is high, anti-seismic performance good, the advantage such as quick of constructing, and sets it as the bed die of concreting, and interim vertical supporting can be no longer set under it, avoids setting up operation at sea platform.
In the time building water intaking platform structure, the set-up mode of pile foundation 2 can directly have influence on the stability of total, as optimal way, as shown in Figure 1, Figure 3, described pile foundation 2 comprises Vertical Pile 202 and taper pile 203, and described Vertical Pile 202 is arranged at water intaking platform 1 below, and described water intaking platform 1 below, two ends is provided with cross one another taper pile 203, the top of described taper pile 203 is connected with the end angle of water intaking platform 1, and 1 inclination outside water intaking platform of the bottom of taper pile 203.General even water intaking platform 1 below that is arranged at of Vertical Pile 202, taper pile 203 can be converted into part of horizontal active force an axial compression, can make system stressed more even and two cross one another taper piles 203 are respectively set below water intaking platform 1 two ends.Be provided with and intersect taper pile with that relative storey displacement angle under the various operating modes of water intaking platform of taper pile 203 is not set is as shown in the table:
Because most water head sites are in open location, wind-force is larger, therefore roof system and enclosure wall are no longer set on water intaking platform, wind load does not play control action to structure, therefore do not list wind load operating mode.As can be seen from the above table, the water intake pumping station that is provided with intersection taper pile has strong rigidity, and its stability is higher.In the time that taper pile 203 is set, also must note not being in contact with one another between cross one another taper pile 203, and should keep certain distance, prevent that slight displacement from making to intersect taper pile and mutually push and cause damage.
As mentioned before, water intaking platform 1 is generally built in the position that has the enough depth of water, manages and safeguards for convenience of staff, as optimal way, as shown in Figure 4, described water intake pumping station is also provided with and connects aisle 4, and described connection aisle 4 is connected with water intaking platform 1.Wherein, connect 4 one end, aisle and be connected on water intaking platform 1, the other end is connected with riverbank, facilitates the movement of persons.Connecting aisle 4 is also generally to support by pile foundation 2, and former water water-supply-pipe 6 also can be arranged along connecting aisle 4 simultaneously.
In such scheme; the mobile meeting of river causes certain influence to the work of water pump; for addressing this problem; as optimal way; as shown in Figure 5; described water pump 3 is borehole shaft driven(centrifugal)pump, and described water intaking platform 1 below is provided with protection cylinder 5, and the pump housing 301 of described water pump 3 is arranged in protection cylinder 5.Common centrifugal pump is inhaled journey and is generally only had 7 meters of left and right, possibly cannot extract former water, and borehole shaft driven(centrifugal)pump is because its pump housing 301 is arranged in the liquid that will extract, so there will not be this problem in dry season; For avoiding underwater mud impact; protection cylinder 5 bottoms need apart from river bed certain distance, if adopt diving deep well pump to need in addition it to be fixed, borehole shaft driven(centrifugal)pump is more convenient for installing; its motor part is arranged on water intaking platform, and pump housing part stretches into protection cylinder bottom.The general high-quality steel that adopt of protection cylinder 5 are made, and have stronger impact resistance, can make the pump housing 301 wherein work in relatively stable, avoid it to be subject to the impact of current.
While using above-mentioned water intake pumping station to fetch water in river, in water, rubbish, foreign material may impact water intaking work, for addressing this problem, as optimal way, the below of described water intaking platform 1 is provided with garbage barrier net 6, and described garbage barrier net 6 is positioned at water inlet 302 fronts of water pump 3.Water inlet 302 fronts of water pump 3 described here determine with water (flow) direction, namely refer to that garbage barrier net 6 is positioned at the upstream position of water inlet 302 of water pump 3 and corresponding with water inlet 302 positions.Arrange garbage barrier net 6 just to a certain extent in anti-sealing dirt water intaking work is exerted an influence, on the position of best described water inlet 302, also set up the thin garbage barrier net 7 of one deck simultaneously, block so dirty effect better.Also should be noted that, if be provided with protection cylinder 5, so above-mentioned water inlet 302 just should refer to the bottom port of protection cylinder 5.
In such scheme, the concrete set-up mode of garbage barrier net 6 has a variety of, but, as optimal way, in the pile foundation 2 in water inlet 302 fronts of described water pump 3, be provided with anchor ear 601, described garbage barrier net 6 dual-sides are provided with guide groove 602, garbage barrier net 6 bottoms are provided with kerve 603, described guide groove 602 and kerve 603 are all fixed in pile foundation 2 by anchor ear 601, on described water intaking platform 1, offer strip opening 103, described strip opening 103 places are provided with support member 605, described garbage barrier net 6 is connected with support member 605 by steel strand 604, on described strip opening 103, be stamped cover plate 104.So, the cleaning of garbage barrier net 6 has all become for convenience with replacing.Wherein, the Main Function of anchor ear 601 is that guide groove 602 and kerve 603 are fixed in pile foundation 2, and anchor ear 601 is preferably with bolts with guide groove 602, avoids Underwater Welding.When cleaning garbage barrier net 6, first go up drawing steel stranded wire 604, make garbage barrier net 6 upwards shift out the water surface along guide groove 602, just can clear up it by strip opening 103.Because interception has dirt can increase the current obstruction area of total later on garbage barrier net 6, so garbage barrier net 6 is not the bigger the better, the size of garbage barrier net 6 only need guarantee to prevent that dirt from entering water inlet 302, the garbage barrier net 6 of size appropriateness must be placed on rational position and could play a role best, and kerve 603 not only has the effect of supporting garbage barrier net 6, and can be in the time transferring garbage barrier net 6, help to determine whether garbage barrier net 6 transfers to tram.

Claims (9)

1. water intake pumping station; it is characterized in that: comprise water intaking platform (1), pile foundation (2) and water pump (3); described water intaking platform (1) is arranged in pile foundation (2); described water pump (3) is arranged on water intaking platform (1); described water pump (3) is borehole shaft driven(centrifugal)pump; described water intaking platform (1) below is provided with protection cylinder (5), and the pump housing (301) of described water pump (3) is arranged in protection cylinder (5).
2. water intake pumping station as claimed in claim 1, it is characterized in that: described water intaking platform (1) is fabricated construction, water intaking platform (1) comprises linking beam (101) and landing slab (102), described pile foundation (2) top is provided with cushion cap (201), described linking beam (101) is fixedly connected with cushion cap (201), and described landing slab (102) is layed on linking beam (101).
3. water intake pumping station as claimed in claim 1, is characterized in that: described pile foundation (2) adopts prestressed high strength concrete pile tube.
4. water intake pumping station as claimed in claim 2, is characterized in that: described linking beam (101) is H section steel beam.
5. water intake pumping station as claimed in claim 2, is characterized in that: the concreting bed die of described landing slab (102) is profiled sheet.
6. the water intake pumping station as described in arbitrary claim in claim 1 to 5, it is characterized in that: described pile foundation (2) comprises Vertical Pile (202) and taper pile (203), described Vertical Pile (202) is arranged at water intaking platform (1) below, below, described water intaking platform (1) two ends is provided with cross one another taper pile (203), the top of described taper pile (203) is connected with the end angle of water intaking platform (1), and the bottom of taper pile (203) is towards water intaking platform (1) outer incline.
7. water intake pumping station as claimed in claim 6, is characterized in that: be also provided with and connect aisle (4), described connection aisle (4) is connected with water intaking platform (1).
8. water intake pumping station as claimed in claim 1, it is characterized in that: the below of described water intaking platform (1) is provided with garbage barrier net (6), described garbage barrier net (6) is positioned at water inlet (302) front of water pump (3).
9. water intake pumping station as claimed in claim 8, it is characterized in that: in the pile foundation (2) in water inlet (302) front of described water pump (3), be provided with anchor ear (601), described garbage barrier net (6) dual-side is provided with guide groove (602), garbage barrier net (6) bottom is provided with kerve (603), described guide groove (602) and kerve (603) are all fixed in pile foundation (2) by anchor ear (601), on described water intaking platform (1), offer strip opening (103), described strip opening (103) locates to be provided with support member (605), described garbage barrier net (6) is connected with support member (605) by steel strand (604), on described strip opening (103), be stamped cover plate (104).
CN201420169556.9U 2014-04-09 2014-04-09 Water intake pumping station Expired - Lifetime CN203960942U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201420169556.9U CN203960942U (en) 2014-04-09 2014-04-09 Water intake pumping station

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201420169556.9U CN203960942U (en) 2014-04-09 2014-04-09 Water intake pumping station

Publications (1)

Publication Number Publication Date
CN203960942U true CN203960942U (en) 2014-11-26

Family

ID=51921543

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201420169556.9U Expired - Lifetime CN203960942U (en) 2014-04-09 2014-04-09 Water intake pumping station

Country Status (1)

Country Link
CN (1) CN203960942U (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103866817A (en) * 2014-04-09 2014-06-18 四川电力设计咨询有限责任公司 Water intake pumping station
CN105350606A (en) * 2015-11-06 2016-02-24 孙旭东 Speed controllable pumping station water drawing pipe device having port protection function
CN105350605A (en) * 2015-11-06 2016-02-24 范含波 Pumping station water drawing pipe protective device for hydraulic engineering
CN108331078A (en) * 2018-02-09 2018-07-27 王国裕 A kind of Novel pollution-free energy-saving material manufacturing technology equipment

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103866817A (en) * 2014-04-09 2014-06-18 四川电力设计咨询有限责任公司 Water intake pumping station
CN105350606A (en) * 2015-11-06 2016-02-24 孙旭东 Speed controllable pumping station water drawing pipe device having port protection function
CN105350605A (en) * 2015-11-06 2016-02-24 范含波 Pumping station water drawing pipe protective device for hydraulic engineering
CN108331078A (en) * 2018-02-09 2018-07-27 王国裕 A kind of Novel pollution-free energy-saving material manufacturing technology equipment
CN108331078B (en) * 2018-02-09 2019-03-12 陈广枭 A kind of waters intake equipment

Similar Documents

Publication Publication Date Title
CN103866817B (en) Water intake pumping station
CN110374131A (en) A kind of cylinder composite truss formula offshore wind turbine foundation and its construction technology
CN103225304B (en) A kind of marine foundation supporting structure and construction method thereof
CN203960942U (en) Water intake pumping station
CN105350531B (en) The pile tube anchor pole composite foundation and construction technology of tension compression bidirectional load can be born
CN107653895A (en) Six floating drum buoyancy tank foundation structures and its construction method on a kind of combined type sea
CN107806108A (en) Three floating drum buoyancy tank foundation structures and its construction method on a kind of combined type sea
CN105862907A (en) Annular combination type super-large diameter offshore wind power single pile foundation and construction technology thereof
CN107630461A (en) Four floating drum buoyancy tank foundation structures and its construction method on a kind of combined type sea
CN204825949U (en) Marine fan basis connection structure of pipe posture of driving piles in advance
CN201980397U (en) Underwater slipway for ship berth
CN201713827U (en) Fan base structure of offshore wind power station
CN103243678A (en) Breakwater
CN202187340U (en) Socketed pile with concrete-filled steel tube core column
CN207987950U (en) Four floating drum buoyancy tank foundation structures on a kind of combined type sea
CN206503157U (en) The embedding rock mixing pile foundation of offshore wind farm
CN211898498U (en) Deepwater foundation structure of tree-shaped multi-section pile bearing platform for strait bridge
CN202247719U (en) Corresponding corrugated pre-stressed anti-sedimentation culvert pipe for bridge
CN202170512U (en) Underwater combined base for open caisson and steel pipe piles
CN201502065U (en) Anchor rod joint excavation compound basis
CN115622483A (en) Device for bearing negative wind lift force of large-span flexible photovoltaic support by means of water body dead weight
CN110492832A (en) A kind of photovoltaic power generation structure applied to breakwater
CN202969405U (en) Cup-shaped concrete foundation of wind power generation tower
CN102146669B (en) Movable/fixed man-made island cylindrical foundation
CN102286971A (en) Concrete-filled steel tube core column socketed pile

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CX01 Expiry of patent term
CX01 Expiry of patent term

Granted publication date: 20141126