CN206503157U - The embedding rock mixing pile foundation of offshore wind farm - Google Patents

The embedding rock mixing pile foundation of offshore wind farm Download PDF

Info

Publication number
CN206503157U
CN206503157U CN201720188630.5U CN201720188630U CN206503157U CN 206503157 U CN206503157 U CN 206503157U CN 201720188630 U CN201720188630 U CN 201720188630U CN 206503157 U CN206503157 U CN 206503157U
Authority
CN
China
Prior art keywords
pile
concrete
linkage section
wind farm
offshore wind
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201720188630.5U
Other languages
Chinese (zh)
Inventor
贺广零
田景奎
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
North China Power Engineering Co Ltd of China Power Engineering Consulting Group
North China Power Engineering Beijing Co Ltd
Original Assignee
North China Power Engineering Co Ltd of China Power Engineering Consulting Group
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by North China Power Engineering Co Ltd of China Power Engineering Consulting Group filed Critical North China Power Engineering Co Ltd of China Power Engineering Consulting Group
Priority to CN201720188630.5U priority Critical patent/CN206503157U/en
Application granted granted Critical
Publication of CN206503157U publication Critical patent/CN206503157U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Piles And Underground Anchors (AREA)

Abstract

The utility model is a kind of embedding rock mixing pile foundation of offshore wind farm, it is single-pile foundation, it includes top steel-pipe pile and bottom bored concrete pile, the two is connected by concrete linkage section, concrete linkage section stretches into not less than 2 times stake footpaths of distance of steel-pipe pile bottom, pile top thickened area is also included in the bottom of concrete linkage section, the steel reinforcement cage of bored concrete pile is stretched into from armored concrete linkage section bottom up, bored concrete pile is poured together with armored concrete linkage section, steel-pipe pile is placed on bedrock surface during installation, bored concrete pile is cast-in-situ bored pile, it is placed under bedrock surface, not less than 1.5 times stake footpaths of depth of cast-in-situ bored pile insertion bedrock surface, it is C40 armored concrete in armored concrete, the utility model is suitable for the offshore wind farm pile foundation compared with shallow overburden, reasonable stress is reliable, resistance to plucking, anti- Its ultimate bearing capacity is strong etc., each marine wind electric field can be promoted the use of.

Description

The embedding rock mixing pile foundation of offshore wind farm
Technical field
The utility model is related to wind power generation field, particularly a kind of offshore wind farm pile foundation being applied to compared with shallow overburden Plinth.
Background technology
At sea in wind field design, offshore wind turbine foundation design is key problem.In ocean engineering, applied to improve Work efficiency rate, reduces cost, uses steel-pipe pile more.In some marine sites(Such as the Bohai and Yellow Seas marine site of China), engineering geological condition ratio More special, coating buried depth is shallower, is basement rock under coating, because traditional steel-pipe pile can not embedding rock, it is difficult to meet resistance to plucking, anti- Horizontal bearing capacity requirement.
Utility model content
The technical problem that the utility model is solved is providing a kind of embedding rock of offshore wind farm being applied to compared with shallow overburden Mix pile foundation.
The technological means that the utility model is used is as follows.
A kind of embedding rock mixing pile foundation of offshore wind farm, it is single-pile foundation, and it includes top steel-pipe pile and bottom bored concrete pile, The two is connected by armored concrete linkage section.
The armored concrete linkage section stretches into not less than 2 times stake footpaths of distance of the bottom of steel-pipe pile 1.
The steel reinforcement cage of the bored concrete pile is stretched into from armored concrete linkage section bottom up, the bored concrete pile and reinforced concrete Native linkage section is poured together.
The steel-pipe pile is placed on bedrock surface, and bored concrete pile is cast-in-situ bored pile, is placed under bedrock surface.
Not less than 1.5 times stake footpaths of depth of the cast-in-situ bored pile insertion bedrock surface.
It is C40 armored concrete in the steel concrete linkage section.
Pile top thickened area is also included in the bottom of armored concrete linkage section.
Having the beneficial effect that produced by the utility model.
1st, the embedding rock mixing pile foundation of offshore wind farm of the present utility model is combined by top steel-pipe pile and bottom bored concrete pile, Top steel-pipe pile has the advantage that offshore construction is convenient, cost is relatively low, and bottom bored concrete pile can preferably solve the problems, such as embedding rock.
2nd, bored concrete pile and armored concrete linkage section pour mode and the interspersed mode of steel reinforcement cage, it can be ensured that steel-pipe pile with The validity that both bored concrete piles are connected.
3rd, suitable for the offshore wind farm pile foundation form compared with shallow overburden, reasonable stress is reliable, resistance to plucking, anti-horizontal bearing energy Power is strong etc., can promote the use of each marine wind electric field.
Brief description of the drawings
Fig. 1 is the structural representation that the embedding rock of offshore wind farm of the present utility model mixes pile foundation.
Fig. 2 is the structural representation of reinforced concrete linkage section in the utility model.
Embodiment
The utility model protects a kind of reasonable stress reliable, and the strong embedding rock of offshore wind farm of resistance to plucking, anti-Its ultimate bearing capacity is mixed Close pile foundation.
Structure as shown in Figure 1, the bored concrete pile 2 of steel-pipe pile 1 and bottom of the pile foundation comprising top passes through in the middle of the two Armored concrete linkage section 3 is connected.The stake footpath of steel-pipe pile 1 is D.
The top of the armored concrete linkage section 3 is stretched into the bottom of steel-pipe pile 2, and what it was stretched into is not less than 2 times apart from H1 Stake footpath D.Pile top thickened area 31 is also included in the bottom of concrete linkage section 3.
The bottom of armored concrete linkage section 3 is poured together with the bored concrete pile 2 of lower section, structure as shown in Figure 2, bored concrete pile 2 Steel reinforcement cage 21 stretched into from the bottom up of armored concrete linkage section 3.
The construction process of the embedding rock mixing pile foundation of offshore wind farm of the present utility model is as follows:Upper steel is carried out by pile driving barge Pile tube pile sinking, sets up Pile platform, determines embedding rock initial surface, using mud gas-lift reverses circulation, and pore-forming, which reaches, to be set Borehole cleaning is carried out after meter depth, makes and steel reinforcement cage is installed, in secondary clear qualified rear concrete perfusion, if pile measurement is qualified, i.e., Complete work progress.
Following parameter is by taking certain marine wind electric field single-pile foundation as an example, more than bedrock surface, and steel-pipe pile stake footpath D is 6.5m, greatly Part wall thickness is 65mm, and only in the range of pile top 2m, wall thickness increases to 70mm.Meanwhile, steel-pipe pile is in pile top 13m(I.e. 2 times stakes Footpath)In the range of be embedding rock linkage section, be C40 armored concrete in linkage section.Below bedrock surface, single-pile foundation is drill-pouring Stake, stake footpath is 5m, and cast-in-situ bored pile insertion basement rock is not less than 7.5m(I.e. 1.5 times stake footpaths), specific embedding rock length is according to resistance to plucking, anti- Horizontal bearing capacity computation is determined.

Claims (7)

1. a kind of embedding rock mixing pile foundation of offshore wind farm, it is characterised in that it is single-pile foundation, and it includes top steel-pipe pile(1) With bottom bored concrete pile(2), the two passes through armored concrete linkage section(3)It is connected.
2. the embedding rock mixing pile foundation of offshore wind farm as claimed in claim 1, it is characterised in that the armored concrete linkage section (3)Stretch into the distance of the bottom of steel-pipe pile 1(H1)Not less than 2 times stake footpaths(D).
3. the embedding rock mixing pile foundation of offshore wind farm as claimed in claim 1, it is characterised in that the bored concrete pile(2)Reinforcing bar Cage(21)From armored concrete linkage section(3)Bottom up is stretched into, the bored concrete pile(2)With armored concrete linkage section(3)One Rise and pour.
4. the embedding rock mixing pile foundation of offshore wind farm as claimed in claim 1, it is characterised in that the steel-pipe pile(1)It is placed in base On scar, bored concrete pile(2)For cast-in-situ bored pile, it is placed under bedrock surface.
5. the embedding rock mixing pile foundation of offshore wind farm as claimed in claim 4, it is characterised in that the cast-in-situ bored pile is embedded in base The depth of scar(H2)Not less than 1.5 times stake footpaths(D).
6. the embedding rock mixing pile foundation of offshore wind farm as claimed in claim 1, it is characterised in that in the steel concrete linkage section For C40 armored concrete.
7. the embedding rock mixing pile foundation of offshore wind farm as described in claim 1 to 6 is any, it is characterised in that in armored concrete Linkage section(3)Bottom also include pile top thickened area(31).
CN201720188630.5U 2017-02-28 2017-02-28 The embedding rock mixing pile foundation of offshore wind farm Active CN206503157U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201720188630.5U CN206503157U (en) 2017-02-28 2017-02-28 The embedding rock mixing pile foundation of offshore wind farm

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201720188630.5U CN206503157U (en) 2017-02-28 2017-02-28 The embedding rock mixing pile foundation of offshore wind farm

Publications (1)

Publication Number Publication Date
CN206503157U true CN206503157U (en) 2017-09-19

Family

ID=59841677

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201720188630.5U Active CN206503157U (en) 2017-02-28 2017-02-28 The embedding rock mixing pile foundation of offshore wind farm

Country Status (1)

Country Link
CN (1) CN206503157U (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108411907A (en) * 2018-05-18 2018-08-17 上海勘测设计研究院有限公司 The self-balance test embedded rock pile and its construction method and test method of arrangement two-stage load box
CN108505531A (en) * 2017-02-28 2018-09-07 中国电力工程顾问集团华北电力设计院有限公司 The embedding rock of offshore wind farm mixes pile foundation
CN109930624A (en) * 2019-04-08 2019-06-25 龙源(北京)风电工程设计咨询有限公司 A kind of embedding petrographic province blower foundation of offshore wind farm and construction method

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108505531A (en) * 2017-02-28 2018-09-07 中国电力工程顾问集团华北电力设计院有限公司 The embedding rock of offshore wind farm mixes pile foundation
CN108411907A (en) * 2018-05-18 2018-08-17 上海勘测设计研究院有限公司 The self-balance test embedded rock pile and its construction method and test method of arrangement two-stage load box
CN108411907B (en) * 2018-05-18 2024-07-30 上海勘测设计研究院有限公司 Self-balancing method test rock-socketed pile for arranging two-stage load boxes, construction method and test method thereof
CN109930624A (en) * 2019-04-08 2019-06-25 龙源(北京)风电工程设计咨询有限公司 A kind of embedding petrographic province blower foundation of offshore wind farm and construction method

Similar Documents

Publication Publication Date Title
CN104389318B (en) Reinforced concrete-steel structure hybrid gravity foundation for offshore wind power and construction method thereof
CN204370469U (en) A kind of drilled pile long leg jacket offshore wind turbine foundation
CN101408023A (en) Method for supporting and protecting row pile pit
CN102704505A (en) Onshore wind generating set foundation
CN102162256A (en) Maritime foundation base
CN201390974Y (en) Foundation structure of wind-driven generator for coastal intertidal zones
CN206503157U (en) The embedding rock mixing pile foundation of offshore wind farm
CN105780806A (en) Offshore wind turbine foundation for long-leg jacket of drilling piles and construction method of offshore wind turbine foundation
CN203361150U (en) Composite anti-floating anchor pile
CN100371537C (en) Novel method for reinforcing deep soft foundition-cencrete core sand stone pile compound foundition method
CN102808407B (en) Construction method of soft-foundation reinforced concrete cast-in-place pile
CN110439022A (en) Marine single-pile foundation with compacting grouting and reinforcing ground
CN108505531A (en) The embedding rock of offshore wind farm mixes pile foundation
CN105862908A (en) Offshore wind power bottle-shaped gravity foundation
CN105862906A (en) Offshore wind power plant draught fan single pile foundation and construction method
CN102733407A (en) Two-ring grouted single pile foundation
CN210797617U (en) A pile-tube composite truss type offshore wind turbine foundation
CN208763050U (en) Offshore wind turbine gravity caisson basis
CN211621665U (en) Composite foundation with externally arranged piles and offshore wind power foundation
CN207211167U (en) Latch steel pipe and reinforced concrete combination pile cofferdam
CN114855867A (en) Raft gravity type jacket offshore wind turbine foundation and construction method thereof
CN211257042U (en) Pile foundation structure for improving bearing capacity of jacket foundation of deep and offshore soft soil foundation
CN203977417U (en) Ribs built-in steel casing for a kind of pile of deep water pile foundation
CN110847217A (en) Composite foundation with piles distributed in cylinder-cylinder offshore wind power foundation and construction method
CN206204981U (en) Huge water inlet rock foundation

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant