CN201980397U - Underwater slipway for ship berth - Google Patents

Underwater slipway for ship berth Download PDF

Info

Publication number
CN201980397U
CN201980397U CN201120039673XU CN201120039673U CN201980397U CN 201980397 U CN201980397 U CN 201980397U CN 201120039673X U CN201120039673X U CN 201120039673XU CN 201120039673 U CN201120039673 U CN 201120039673U CN 201980397 U CN201980397 U CN 201980397U
Authority
CN
China
Prior art keywords
pile
slipway
under water
underwater
contact
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201120039673XU
Other languages
Chinese (zh)
Inventor
殷良君
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
CCCC SHEC Fourth Engineering Co Ltd
Original Assignee
CCCC SHEC Fourth Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by CCCC SHEC Fourth Engineering Co Ltd filed Critical CCCC SHEC Fourth Engineering Co Ltd
Priority to CN201120039673XU priority Critical patent/CN201980397U/en
Application granted granted Critical
Publication of CN201980397U publication Critical patent/CN201980397U/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Landscapes

  • Foundations (AREA)
  • Piles And Underground Anchors (AREA)

Abstract

The utility model discloses an underwater slipway for a ship berth. The underwater slipway comprises a plurality of slipway beams, underwater pile foundations arranged at intervals for supporting the slipway beams, and a connection plate at the joint of every two slipway beams; each underwater pile foundation comprises a PHC (Prestress High Concrete) tubular pile, a pile cap, a pipe connecting point below the pile cap and a beam connecting point above the pile cap; the pile caps are positioned at the top ends of the PHC tubular piles; and the pile connecting points extend into the PHC tubular piles. Through the structure, the underwater slipway for the ship berth can adapt to various strata and geologies, the manufacturing cost is reduced, and the construction period is shortened.

Description

A kind of building berth is slideway under water
Technical field
The utility model relates to building berth that shipbuilding yard boats and ships use slideway under water.
Background technology
Building berth slideway under water comprises the spaced apart pile foundation under water of a plurality of slipway beams, supporting skid rail beam and the connecting panel of slipway beam junction in twos, at present pile foundation adopts steel pipe pile pile foundation and major part stake under water pile foundation under water, steel pipe pile pile foundation under water is adapted to all kinds of stratum geology, but the steel pipe pile cost is too high, the underwater construction work capacity is big, and the construction period is long.Major part stake pile foundation under water can't be used for the supporting pile that underlying stratum is the lithostratigraphy, is only applicable to the friction pile of grittiness, viscosity great soil group stratum geology, and actual stake position testing amount under water is big, and the construction period is long.
The utility model content
Technical problem to be solved in the utility model is: a kind of building berth slideway under water is provided, and this kind building berth slideway under water can not only be adapted to all kinds of stratum geology, and can reduce cost, shortens the construction period.
Solve this technical problem, the technical solution of the utility model is: a kind of building berth is slideway under water, comprise the spaced apart pile foundation under water of a plurality of slipway beams, supporting skid rail beam and the connecting panel of slipway beam junction in twos, described pile foundation under water is made up of the stake contact of PHC pile tube, pile cover, pile cover below and the beam contact of pile cover top, described pile cover is positioned at the top of PHC pile tube, and described stake contact stretches in the PHC pile tube.
Described pile cover, stake contact and beam contact are reinforced concrete structure.
Described pile cover be shaped as cuboid.
Described beam contact be shaped as cylinder.
The utility model building berth slideway under water adopts such structure, can not only be adapted to all kinds of stratum geology, and can reduce cost, shortens the construction period.
Description of drawings
Below in conjunction with accompanying drawing to the utility model building berth under water slideway do explanation in further detail;
Fig. 1 is the utility model building berth scheme drawing of slideway under water;
In Fig. 1,1, the PHC pile tube; 2, stake contact; 3, pile cover; 4, beam contact; 5, connecting panel; 6, slipway beam; 7, water surface curve.
The specific embodiment
As shown in Figure 1, building berth slideway under water comprises a plurality of slipway beams 6, the spaced apart pile foundation under water of supporting skid rail beam 6 and the connecting panel 5 of slipway beam junction in twos, slipway beam 6, connecting panel 5 and under water pile foundation be positioned at water surface curve 7 times, pile foundation is by PHC pile tube 1 under water, pile cover 3, the stake contact 2 of pile cover 3 belows and the beam contact of pile cover 3 tops 4 are formed, pile cover 3 is positioned at the top of PHC pile tube 1, stake contact 2 stretches in the PHC pile tube 1, the PHC pile tube is a prestressed high-strength concrete pile, all kinds of engineerings have been widely used in, pile cover, stake contact and beam contact are reinforced concrete structure, pile cover be shaped as cuboid, the beam contact be shaped as cylinder.The utility model building berth slideway under water adopts such structure, and pile foundation is made up of PHC pile tube, pile cover, stake contact beam contact under water, is convenient to construction, improves work efficiency, shortens the construction period, can be adapted to all kinds of stratum geology, has reduced cost.

Claims (4)

1. building berth slideway under water, comprise the spaced apart pile foundation under water of a plurality of slipway beams, supporting skid rail beam and the connecting panel of slipway beam junction in twos, it is characterized in that: described pile foundation under water is made up of the stake contact (2) of PHC pile tube (1), pile cover (3), pile cover (3) below and the beam contact (4) of pile cover (3) top, described pile cover (3) is positioned at the top of PHC pile tube (1), and described stake contact (2) stretches in the PHC pile tube (1).
2. a kind of building berth according to claim 1 is slideway under water, it is characterized in that: described pile cover (3), stake contact (2) and beam contact (4) are reinforced concrete structure.
3. a kind of building berth according to claim 2 is slideway under water, it is characterized in that: described pile cover (3) be shaped as cuboid.
4. a kind of building berth according to claim 3 is slideway under water, it is characterized in that: described beam contact (4) be shaped as cylinder.
CN201120039673XU 2011-02-16 2011-02-16 Underwater slipway for ship berth Expired - Fee Related CN201980397U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201120039673XU CN201980397U (en) 2011-02-16 2011-02-16 Underwater slipway for ship berth

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201120039673XU CN201980397U (en) 2011-02-16 2011-02-16 Underwater slipway for ship berth

Publications (1)

Publication Number Publication Date
CN201980397U true CN201980397U (en) 2011-09-21

Family

ID=44607861

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201120039673XU Expired - Fee Related CN201980397U (en) 2011-02-16 2011-02-16 Underwater slipway for ship berth

Country Status (1)

Country Link
CN (1) CN201980397U (en)

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103241350A (en) * 2013-05-07 2013-08-14 大连中交理工交通技术研究院有限公司 Self-sliding dropping type flexible slideway of ocean platform
CN103482042A (en) * 2013-09-22 2014-01-01 中交第二航务工程局有限公司 Mounting and constructing method for deepwater comb-shaped slide cross beam
CN103482040A (en) * 2013-09-22 2014-01-01 中交第二航务工程局有限公司 Integrated device for underwater mounting and automatic transposition of well-shaped slipway beam
RU2524740C1 (en) * 2013-06-25 2014-08-10 Общество с ограниченной ответственностью "ООО" "Научный и проектный центр "БЕРЕГОЗАЩИТА" Ship-raising cast-in-place and precast construction for small-size ships and method of its erection
CN108909975A (en) * 2018-07-19 2018-11-30 芜湖籁余新能源科技有限公司 A kind of spitkit is lauched the safeguard structure of ramp
CN112502179A (en) * 2020-12-18 2021-03-16 中铁大桥局集团第四工程有限公司 Slide system suitable for large-tonnage steel open caisson launching construction

Cited By (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103241350A (en) * 2013-05-07 2013-08-14 大连中交理工交通技术研究院有限公司 Self-sliding dropping type flexible slideway of ocean platform
CN103241350B (en) * 2013-05-07 2015-09-02 大连中交理工交通技术研究院有限公司 Platform is from sliding drop type Flexible slideway
RU2524740C1 (en) * 2013-06-25 2014-08-10 Общество с ограниченной ответственностью "ООО" "Научный и проектный центр "БЕРЕГОЗАЩИТА" Ship-raising cast-in-place and precast construction for small-size ships and method of its erection
CN103482042A (en) * 2013-09-22 2014-01-01 中交第二航务工程局有限公司 Mounting and constructing method for deepwater comb-shaped slide cross beam
CN103482040A (en) * 2013-09-22 2014-01-01 中交第二航务工程局有限公司 Integrated device for underwater mounting and automatic transposition of well-shaped slipway beam
CN103482042B (en) * 2013-09-22 2015-09-02 中交第二航务工程局有限公司 A kind of deep water comb shape slideway cross beam construction method of installation
CN103482040B (en) * 2013-09-22 2016-03-30 中交第二航务工程局有限公司 Slideway cross beam is installed and automatic positoning integrated apparatus under water
CN108909975A (en) * 2018-07-19 2018-11-30 芜湖籁余新能源科技有限公司 A kind of spitkit is lauched the safeguard structure of ramp
CN108909975B (en) * 2018-07-19 2020-08-07 温州鑫筑建材有限公司 Protective structure of small ship launching ramp
CN112502179A (en) * 2020-12-18 2021-03-16 中铁大桥局集团第四工程有限公司 Slide system suitable for large-tonnage steel open caisson launching construction

Similar Documents

Publication Publication Date Title
CN201980397U (en) Underwater slipway for ship berth
CN101736754B (en) Offshore wind power unit foundation adopting prestressed concrete cylindrical structure
CN201850498U (en) Steel trestle in water
CN205399220U (en) Whole system of erectting of large -scale arched bridge over strait
CN103225304B (en) A kind of marine foundation supporting structure and construction method thereof
CN103866817B (en) Water intake pumping station
CN101761090A (en) Space truss multi-barrel base of offshore wind power unit
CN207749529U (en) A kind of offshore wind farm combined type single-pile foundation
CN202247928U (en) Multi-pile gantry type marine wind turbine generator system base structure
CN202227360U (en) Wide-span prestressed concrete pile beam plate structure used for grounds of buildings, workshops, etc.
CN203782670U (en) Floating box platform for over-water construction
CN201794087U (en) Cylindrical foundation component
CN101929149A (en) Shallow sea pile foundation concrete oil drilling and producing platform
CN203960942U (en) Water intake pumping station
CN103485356B (en) Overwater laying frame and method for filling sand pockets with same
CN202170512U (en) Underwater combined base for open caisson and steel pipe piles
CN202787247U (en) PHC (prestressed high-strength concrete) pile and steel pipe pile composited pile for long piled wharfs
CN201756699U (en) Hoop type steel sheet pile cofferdam platform
CN202064291U (en) Traveling construction supporting pier with floating and sinking functions
CN201195820Y (en) Barrel type foundation offshore trestle structural member
CN216515566U (en) Tension type single-point mooring combined anchorage structure based on spiral anchor
CN102839660A (en) Composite pile of long piled wharf PHC (prestressed high-strength concrete) pile and steel pipe pile
CN202969405U (en) Cup-shaped concrete foundation of wind power generation tower
CN203420268U (en) Precast prestressed concrete hollow square pile with side length being 700mm
CN205804315U (en) A kind of soft soil foundation structure of anti-Earth cave

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20110921

Termination date: 20160216