CN102709955B - 一种基于多断面潮流控制的方法 - Google Patents

一种基于多断面潮流控制的方法 Download PDF

Info

Publication number
CN102709955B
CN102709955B CN201210174254.6A CN201210174254A CN102709955B CN 102709955 B CN102709955 B CN 102709955B CN 201210174254 A CN201210174254 A CN 201210174254A CN 102709955 B CN102709955 B CN 102709955B
Authority
CN
China
Prior art keywords
partiald
delta
centerdot
section
power
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201210174254.6A
Other languages
English (en)
Other versions
CN102709955A (zh
Inventor
邱健
吴淘
丁平
王天琪
陆俊
刘宇星
牛玲玲
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
State Grid Corp of China SGCC
China Electric Power Research Institute Co Ltd CEPRI
State Grid Liaoning Electric Power Co Ltd
Original Assignee
State Grid Corp of China SGCC
China Electric Power Research Institute Co Ltd CEPRI
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by State Grid Corp of China SGCC, China Electric Power Research Institute Co Ltd CEPRI filed Critical State Grid Corp of China SGCC
Priority to CN201210174254.6A priority Critical patent/CN102709955B/zh
Publication of CN102709955A publication Critical patent/CN102709955A/zh
Application granted granted Critical
Publication of CN102709955B publication Critical patent/CN102709955B/zh
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Supply And Distribution Of Alternating Current (AREA)

Abstract

本发明提供了一种基于多断面潮流控制的方法,包括以下步骤:(1).输入原始数据,并对电压进行初始化;(2).形成导纳矩阵;(3).设定各点电压的初值(4).将各点电压初值带入到注入功率和节点电压平方的不平衡式中,求出不平衡量;(5).形成雅可比矩阵并求出各个元素;(6).求解修正方程;(7).得到所要点解断面功率到目标值的发电机量的改变量。本发明提供的基于多断面潮流控制的方法,计算精度高,缩短了智能优化算法计算时间,适于在大规模电网应用,节省计算资源;而且在断面功率变化较大时能够保证收敛措施。

Description

一种基于多断面潮流控制的方法
技术领域
本发明属电力系统仿真与计算分析领域,具体讲涉及一种基于多断面潮流控制的方法。
背景技术
流计算一直都是电力系统所关心的问题。一个准确的网络潮流计算结果可以反映出电网在一个时刻断面的整体情况。这不仅为以后的暂态计算,小干扰计算留下好的计算基础,更能反映出电网在扰动情况下的稳定裕度。随着大电网互联的趋势下,电力系统在可预见的未来将会变得更加庞大和复杂,电网规模的增大也将会导致电网事故的严重化。这些事故大多是因为预警和监控的不及时所造成的。目前智能电网的建设,对电力系统潮流计算也提出的更高的要求。
目前已近用于多个省市的在线动态安全评估和预警系统。该系统以E格式语言作为载体,该系统用来计算的数据源分为在线数据和离线数据。离线数据模型对电力系统规划,历史故障及暂态稳定分析的建立参数较为详细。参数不仅包括稳态参数,还包括较详细的零序参数及发电机和负荷的详细模型,但由于模型建立在离线的基础上,所以无实时的开关、刀闸模型数据。在线数据是调度自动化部门对电力系统进行实时状况分析的依据,主要应用于SCADA及PAS的高级应用。在线数据建立一般仅包含辖区内高压主网,包括详细的低压部分模型。此外,在线数据仅包含稳态参数,来源于实时采集的SCADA,它支持拓扑功能并有开关及刀闸模型数据信息。但因为在线数据无暂态参数,无法对全网进行暂态性分析。
基于在线数据和离线数据的特点,要算出准确的潮流就需要将区域内部的在线运行数据和离线分析计算数据进行整合处理。将外网的潮流与内网的潮流进行匹配。最后可以对在线暂态稳定、电压稳定、小干扰稳定等多种稳定进行分析。
目前由于进行潮流断面调整的方法有:
1)预分配功率法。该方法是基本潮流算法功能的扩展。做法是先不考虑断面约束计算潮流,潮流收敛后,检查断面功率和目标值的差,若大于预先设定值,则将该差值分配到指定的机组中去,重新计算潮流,直至所有断面功率和目标值的偏差小于允许误差。该方法原理清晰、容易实现。缺点是计算精度不能保证,断面功率与目标值偏差比较大时难收敛。
2)最优潮流法。最优潮流是指当系统的结构参数及负荷情况给定时,通过控制变量的优选,所找到的能满足所有指定的约束条件,并使系统的某一个性能指标或目标函数达到最优时的潮流分布。最优潮流算法按照所采用的优化方法的不同大致可分为经典优化法和智能优化法。经典优化法主要指传统的运筹学优化方法,这类算法的特点是以一阶或二阶梯度作为寻找最优解的主要信息。其缺点是:对目标函数和约束条件有一定的限制,如连续、可微等;很多情况下会陷入局部最小解或接近最优解时难以收敛;对离散控制变量的处理不理想。智能优化法基于各种人工智能方法,而不是精确的数学模型,通过对人类智能的模拟、延伸和扩展实现功能。最优潮流中常用的智能方法为启发式搜索。从处理断面功率约束的角度看,智能优化算法计算时间较长,在大规模电网应用较困难,而且其特长是寻优,对于确定的约束并没有特别对策。当断面功率和目标值偏差较大时,若没有理想的方法使潮流收敛,后继的遗传操作、退火过程、演化计算等都无法进行。
3)网络拆分法。该方法为一种系统扰动后维持联络线功率为设定值的方法。将电网拆分成送端和受端两个子网,先在送端将联络线当作负荷解潮流,再推算出受端电网联络线端点的电压,最后解受端系统潮流。该算法需要在受端系统联络线端点进行功率补偿,而且没有提出联络线功率设定值改变后的算法。分布式潮流计算中使用的支路分割法,可以实现断面功率约束下的潮流计算,但该方法没有提及断面功率变化较大时保证收敛的措施。所有基于网络拆分的方法,在电网规模不是太大的情况下,会浪费计算资源。
综上所述,目前缺乏一种有效的潮流算法控制多断面功率至目标值,而给出一套使各断面功率符合给定目标的潮流对分析电网有重大意义。
发明内容
为克服上述缺陷,本发明提供了一种基于多断面潮流控制的方法,简称之为多断面控制法,该方法在基本潮流方程中增加断面功率偏差方程,并在承担控制或平衡任务的发电机功率方程中增加功率变化附加项建立控制多断面潮流的模型;本方法利用发电机实现控制,在某些情况下可推广为用负荷实现控制,或发电机与负荷的混合控制。
为实现上述目的,本发明提供一种基于多断面潮流控制的方法,其改进之处在于,所述方法包括以下步骤:
(1).输入原始数据,并对电压进行初始化;
(2).形成导纳矩阵;
(3).设定各节点的初值
(4).将各点电压初值带入到注入功率和节点电压平方的不平衡式中,求出不平衡量;
(5).形成雅可比矩阵并求出各个元素;
(6).求解修正方程;
(7).得到所要点解断面功率到目标值的发电机量的改变量;
其中,各节点的初值包括各节点电压和相角。
本发明提供的优选技术方案中,在所述步骤1中,所述输入的原始数据和电压初始化包括节点参数和支路参数。
本发明提供的第二优选技术方案中,支路参数包括:输电线路的电阻、电抗和对地导纳,以及变压器支路的电阻、电抗和变比;节点参数包括:节点类型、节点电压以及功率数据。
本发明提供的第三优选技术方案中,在所述步骤2中,导纳矩阵(Y)为:
Y = Y 11 Y 12 Y 13 . . . Y 1 n Y 21 Y 22 Y 23 . . . Y 2 n Y 31 Y 32 Y 33 . . . Y 3 n . . . . . . . . . . . . . . . Y n 1 Y n 2 Y n 3 . . . Y nn
其中,n表示电力网络的节点数,导纳矩阵反映的是节点之间的电气连接关系,若两个节点之间没有直接相连,则互导纳为0。
本发明提供的第四优选技术方案中,在所述步骤3中,所述各节点的初值是指PV节点和平衡节点的电压幅值取给定值,PQ节点的电压取1.0;各个电压的相角都取0.0。
本发明提供的第五优选技术方案中,在所述步骤4中,注入功率和节点电压平方的注入功率和节点电压平方的不平衡方程为:
Δ P c ( m ) = Σ k = 1 N m P line ( k ) - P des ( m ) = 0
Δ Q c ( m ) = Σ k = 1 N m Q line ( k ) - Q des ( m ) = 0
其中,ΔPc(m)和ΔQc(m)分别表示m断面的有功功率偏差和无功功率偏差;分别表示m断面的有功功率和无功功率,是构成该断面的Nm条线路功率之和;Pdes(m)和Qdes(m)分别表示m断面有功功率目标值和无功功率目标值。
本发明提供的第六优选技术方案中,所述步骤4中的所述功率偏差方程中,每一组机群控制一个断面,即承担断面功率变化和该机群所在电网区域系统损耗变化;发电机的调控作用通过附加功率项体现;第i台机控制第m个断面时i机的有功功率方程Pg(i)和无功功率方程Qg(i)分别为:
P g ( i ) = e i ( G ii e i - B ii f i ) + f i ( G ii f i + B ii e i ) + Σ j = 1 j ≠ i j = n [ e i ( G ij e j - B ij f j ) + f i ( G ij f j + B ij e j ) ] + α ( m ) · Δ P c ( m ) · Δ P vail ( i )
Q g ( i ) = f i ( G ii e i - B ii f i ) - e i ( G ii f i + B ii e i ) + Σ j = 1 j ≠ i j = n [ f i ( G ij e j - B ij f i ) - e i ( G ij f j + B ij e j ) ] + β ( m ) · Δ Q c ( m ) · Δ Q vail ( i )
其中,为传统牛顿法的潮流不平衡方程,α(m)、β(m)为与m断面相关的有功和无功功率控制因子;ΔPvail(i)为带权重的发电机有功可调出力,根据对机群功率增减的预测,可为:
ΔPvail(i)=Wp(i)·(Pmax(i)-Pg0(i))或者Δpvail(i)=Wp(i)·(Pg0(i)-Pmin(i))
其中,Pmax(i)、Pmin(i)、Pg0(i)分别表示发电机i的有功出力上限、有功出力下限和调整前的有功发电;Wp(i)为发电机i的有功调节权重。
ΔQvail(i)为带权重的发电机无功可调出力,同理可取为:
ΔQvail(i)=Wq(i)·(Qmax(i)-Qg0(i))或者ΔQvail(i)=Wq(i)·(Qg0(i)-Qmin(i))
其中,Qmax(i)、Qmin(i)、Qg0(i)分别表示发电机i的无功出力上限、无功出力下限和调整前的无功发电,Wq(i)为发电机i的无功调节权重;
本发明提供的第七优选技术方案中,在所述步骤5中,雅可比矩阵为:
其中与断面功率方程无关的雅可比矩阵中的元素含义为:
H ij = ∂ P i ∂ f j ; N ij = ∂ P i ∂ e j
J ij = ∂ Q i ∂ f j ; L ij = ∂ Q i ∂ e j
R ij = ∂ U i 2 ∂ f j ; S ij = ∂ U i 2 ∂ e j
其中,对每个断面,式1中的B分块矩阵中非0元素是该断面有无功功率方程对组成该断面所有线路端节点电压实部和虚部的导数;下两方程表示m断面雅可比矩阵行中与k线路对应的元素,即该断面功率方程对组成该断面的k线路I侧和J侧电压实部和虚部的导数;组成m断面的其余Nm-1条线路可依此类推。
. . . ∂ Δ P c ∂ V Irk ∂ Δ P c ( m ) ∂ V Iik . . . ∂ Δ P c ( m ) ∂ V Jrk ∂ Δ P c ( m ) ∂ V Jik . . .
. . . ∂ Δ Q c ( m ) ∂ V Irk ∂ Δ Q c ( m ) ∂ V Iik . . . ∂ Δ Q c ( m ) ∂ V Jrk ∂ Δ Q c ( m ) ∂ V Jik . . . - - - ( 2 )
其中上两式中元素详细表达式如下,VIrk表示k线路I侧电压的实部,VIik其表示k线路I侧电压虚部,VJrk表示k线路J侧电压实部,VJik表示k线路J侧电压虚部,Rk表示k线路的电阻,Xk表示k线路的电抗,Bk表示k线路为线路电容。
k线路的结构如图3所示;其中,Re表示实部,Im表示虚部,为线路I侧电压复相量,为I侧电压共轭相量。R为线路电阻,X为线路电抗,B为线路电容,其它符号类推。公式(2)的推导展开如下:
∂ Δ P c ( m ) ∂ V Irk = R k · ( 2 V Irk - V Jrk ) - X k · V Jik R k 2 + X k 2
∂ Δ P c ( m ) ∂ V Iik = R k · ( 2 V Irk - V Jrk ) + X k · V Jik R k 2 + X k 2
∂ Δ P c ( m ) ∂ V Jrk = - R k · 2 V Irk + X k · V Iik R k 2 + X k 2
∂ Δ P c ( m ) ∂ V Jik = - R k · 2 V Irk - X k · V Ik R k 2 + X k 2
∂ Δ Q c ( m ) ∂ V Irk = R k · V Jik + X k · ( 2 V Irk - V Jrk R k 2 + X k 2 - 2 V Irk · B k
∂ Δ Q c ( m ) ∂ V Iik = - R k · V Jrk + X k · ( 2 V Iik - V Jik R k 2 + X k 2 - 2 V Iik · B k
∂ Δ Q c ( m ) ∂ V Jrk = - R k · V Iik - X k · V Irk R k 2 + X k 2
∂ Δ Q c ( m ) ∂ V Jik = R k · V Irk - X k · V Iik R k 2 + X k 2
本发明提供的第八优选技术方案中,在雅可比矩阵中,若有一个断面有两条组成线路的端点相同,则在雅可比矩阵中将断面在这两条线路中对该节点电压的导数相加,作为断面对该节点电压的雅可比元素;
若第i台机控制m断面功率,雅可比矩阵与该发电机对应的两行分别增加与联络线端节点相对应的元素和与控制因子α(m)、β(m)相对应的元素。下两式表示i台机控制的m断面包含k线路时对雅可比矩阵进行的相应修改;所述雅可比矩阵A,C矩阵块中的元素为:
. . . ∂ P g ( i ) ∂ V Irk ∂ P g ( i ) ∂ V Iik . . . ∂ P g ( i ) ∂ V Jrk ∂ P g ( i ) ∂ V Jik . . . ∂ P g ( i ) ∂ α ( m )
. . . ∂ Q g ( i ) ∂ V Irk ∂ Q g ( i ) ∂ V Iik . . . ∂ Q g ( i ) ∂ V Jrk ∂ Q g ( i ) ∂ V Jik . . . ∂ Q g ( i ) ∂ β ( m )
其中,各元素表达式如下:
∂ P g ( i ) ∂ V Irk = ∂ Δ P c ( m ) ∂ V Irk · α ( m ) · Δ P vail ( i )
∂ P g ( i ) ∂ V Iik = ∂ Δ P c ( m ) ∂ V Iik · α ( m ) · Δ P vail ( i )
∂ P g ( i ) ∂ V Jr k = ∂ Δ P c ( m ) ∂ V Jrk · α ( m ) · Δ P Vail ( i )
∂ P g ( i ) ∂ V Jik = ∂ Δ P c ( m ) ∂ V Jik · α ( m ) · Δ P vail ( i )
∂ P g ( i ) ∂ α ( m ) = Δ P c ( m ) · Δ P vail ( i )
∂ Q g ( i ) ∂ V Irk = ∂ Δ Q c ( m ) ∂ V Irk · β ( m ) · Δ Q vail ( i )
∂ Q g ( i ) ∂ V Iik = ∂ Δ Q c ( m ) ∂ V Iik · β ( m ) · Δ Q vail ( i )
∂ Q g ( i ) ∂ V Jrk = ∂ Δ Q c ( j ) ∂ V Jrk · β ( m ) · Δ Q vail ( i )
∂ Q g ( i ) ∂ V Jik = ∂ Δ Q c ( j ) ∂ V Jik · β ( m ) · Δ Q vail ( i )
∂ Q g ( i ) ∂ β ( m ) = Δ Q c ( m ) · Δ Q vail ( i )
本发明提供的第九优选技术方案中,在所述步骤6中,所述求解修正方程,将节点电压的变化量求出,进行迭代,直到得到符合约束条件的结果。
本发明提供的第十优选技术方案中,在所述步骤7中,所述得到所要点解断面功率到目标值的发电机量的改变量是ΔPc(m)和ΔQc(m)。
与现有技术比,本发明提供的一种基于多断面潮流控制的方法,计算精度高,缩短了智能优化算法计算时间,适于在大规模电网应用,节省计算资源;而且在断面功率变化较大时能够保证收敛措施;可以有效的利用潮流算法控制多断面功率至目标值;再者,本方法在基本潮流方程中增加断面功率偏差方程,并在承担控制或平衡任务的发电机功率方程中增加功率变化附加项建立控制多断面潮流的模型。
附图说明
图1为基于多断面潮流控制的方法的流程图。
图2为实施例中WEPRI-36节点系统的放射型断面图。
图3为k线路的结构示意图。
具体实施方式
在WEPRI-36节点系统进行试验。系统接线如图2所示,用发电机控制指定断面有无功功率以验证本算法的有效性,各发电机初始功率及类型如表1所示,初始电压幅值和相角如表2所示。以下描述中将发电机所在母线编号作为发电机编号,相角的单位为度,系统功率基准为10MVA,其它数据均采用标幺单位。为方便起见,取每台机有功上限为8,下限为-0.01,无功上限为6,下限0;各台机带权重的可调出力取为(9)和(11)式,权重均为1。
表1:发电机初始功率和类型
  发电机母线名   BUS1   BUS 2   BUS 3   BUS 4   BUS 5   BUS 6   BUS 7   BUS 8
  初始有功   6.2271   6.0000   3.1000   1.6000   4.3000   -0.0100   2.2500   3.0600
  初始无功   2.0743   3.6000   2.7495   0.7000   3.3400   0.9739   0.2339   0.3183
  初始类型   Slack   PQ   PV   PQ   PQ   PV   PV   PV
表2:各母线初始电压和相角
  母线名称   母线电压幅值   母线电压相角   母线名称   母线电压幅值   母线电压相角
  BUS1   1.0000   0.0000   BUS19   0.9945   -28.8754
  BUS2   0.9903   -11.9921   BUS20   1.0026   -37.9659
  BUS3   1.0000   -27.8000   BUS21   0.9988   -31.5197
  BUS4   1.0094   -22.8737   BUS22   1.0392   -30.0790
  BUS5   1.0333   -31.8242   BUS23   0.9777   -20.1593
  BUS6   1.0000   -41.2368   BUS24   1.0463   -5.5066
  BUS7   1.0000   -10.7673   BUS25   1.0196   -23.8103
  BUS8   1.0000   -10.6603   BUS26   1.0118   -31.1464
  BUS9   0.9899   -20.2014   BUS27   1.0117   -31.1951
  BUS10   0.9895   -19.7508   BUS28   1.0011   -38.2493
  BUS11   1.0196   -23.7891   BUS29   0.9914   -41.5284
  BUS12   1.0117   -31.1677   BUS30   1.0195   -16.4535
  BUS13   1.0010   -38.2770   BUS31   1.0195   -16.4519
  BUS14   0.9885   -30.1359   BUS33   1.0195   -16.4671
  BUS15   0.9887   -30.0071   BUS34   0.9914   -41.5130
  BUS16   0.9915   -41.5135   BUS50   0.9948   -41.5325
  BUS17   0.9672   -41.2169   BUS51   0.9895   -19.7508
  BUS18   0.9948   -41.5325   BUS52   0.9887   -30.0071
断面组成如表3所示,两断面将电网分割成三部分,如图2所示,将电网分为左边、中部和右下三个部分。根据本算法,取发电机1、2、3构成一控制机群,发电机7、8构成另一控制机群,发电机4、5、6构成平衡机群。对断面功率进行两次调节,各断面初始功率和调节目标如表4所示,断面一功率方向为左边区域到中部区域,断面二功率方向为右下区域到中部区域。两次调整断面有功和无功功率均正确地收敛到目标值。两次调节后发电机功率对初始功率的变化列入表5,其中平衡机群不统计无功变化率;电压的幅值和相角列入表6。
表3:放射型断面组成
表4:两断面初始功率和调节目标
表5:两次调节发电机功率变化
  发电机母线名   BUS1   BUS 2   BUS 3   BUS 4   BUS 5   BUS 6   BUS 7   BUS 8
  有功可调出力   1.7729   2.0000   4.9000   6.4000   3.7000   8.0100   5.7500   4.9400
  首调后有功   6.3078   6.0910   3.3229   1.6287   4.3166   0.0260   1.9746   2.8234
  再调后有功   5.1626   4.7992   0.1579   3.0572   5.1425   1.8138   2.8063   3.5379
  首调有功变化率   0.0455   0.0455   0.0455   0.0045   0.0045   0.0045   -0.0479   -0.0479
  再调有功变化率   -0.6004   -0.6004   -0.6004   0.2277   0.2277   0.2277   0.0967   0.0967
  无功可调出力   3.9257   2.4000   3.2505   5.7661   5.6817
  首调后无功   2.0220   3.5680   2.7062   0.5622   3.2521   0.8105   0.3136   0.3968
  再调后无功   1.7658   3.4114   2.4940   0.8913   3.3591   0.6818   0.2523   0.3363
  首调无功变化率   -0.0133   -0.0133   -0.0133   0.0138   0.0138
  再调无功变化率   -0.0786   -0.0786   -0.0786   0.0032   0.0032
表6:两次调节各节点母线电压变化
  母线名称   首调后幅值   首调后相角   再调后幅值   再调后相角
  BUS1   0.9917   24.3154   1.0370   3.3569
  BUS2   0.9856   11.9202   1.0287   -5.6701
  BUS3   1.0018   -3.9393   0.9910   -21.3490
  BUS4   1.0094   0.0000   1.0094   0.0000
  BUS5   1.0333   -8.6039   1.0333   -9.7282
  BUS6   1.0000   -17.9932   1.0000   -19.0355
  BUS7   1.0322   8.7830   0.9827   12.4387
  BUS8   1.0310   9.1236   0.9836   12.0234
  BUS9   0.9857   3.5097   1.0342   -11.7104
  BUS10   0.9850   3.9853   1.0344   -11.5454
  BUS11   1.0178   -0.2677   1.0592   -13.0320
  BUS12   1.0158   -8.0054   1.0356   -15.7032
  BUS13   1.0062   -15.1133   1.0193   -20.5593
  BUS14   0.9950   -7.1096   1.0006   -13.8991
  BUS15   0.9955   -6.9982   0.9994   -13.6711
  BUS16   0.9973   -18.3425   1.0033   -22.9334
  BUS17   0.9727   -18.0447   0.9789   -22.6154
  BUS18   0.9983   -18.3157   1.0001   -21.2999
  BUS19   1.0036   -6.0543   0.9967   -11.4996
  BUS20   1.0068   -14.5549   1.0113   -23.8235
  BUS21   1.0057   -8.3350   0.9957   -17.0615
  BUS22   1.0419   -6.3715   1.0317   -21.4670
  BUS23   0.9730   3.5956   1.0213   -12.0922
  BUS24   1.0383   18.6466   1.0903   -0.8652
  BUS25   1.0178   -0.2900   1.0592   -13.0398
  BUS26   1.0158   -7.9833   1.0357   -15.6950
  BUS27   1.0157   -8.0328   1.0356   -15.7220
  BUS28   1.0063   -15.0856   1.0195   -20.5400
  BUS29   0.9973   -18.3582   1.0032   -22.9465
  BUS30   1.0479   4.0818   1.0040   5.1023
  BUS31   1.0479   4.0831   1.0040   5.1051
  BUS33   1.0479   4.0696   1.0040   5.0879
  BUS34   0.9973   -18.3439   1.0031   -22.9300
  BUS50   0.9983   -18.3156   1.0001   -21.2999
  BUS51   0.9850   3.9853   1.0344   -11.5454
  BUS52   0.9955   -6.9982   0.9994   -13.6711
由计算结果可见,各机群内发电机有功功率变化率相同,即按照有功控制因子实现控制或平衡功能;控制机群内机组的无功功率按照无功控制因子实现对断面无功的控制。各母线电压幅值和相角均正常,其中,平衡机所在母线取为相位参考点。
需要声明的是,本发明内容及具体实施方式意在证明本发明所提供技术方案的实际应用,不应解释为对本发明保护范围的限定。本领域技术人员在本发明的精神和原理启发下,可作各种修改、等同替换、或改进。但这些变更或修改均在申请待批的保护范围内。

Claims (8)

1.一种基于多断面潮流控制的方法,其特征在于,所述方法包括以下步骤:
(1).输入原始数据,并对电压进行初始化,所述输入的原始数据和电压初始化包括节点参数和支路参数;
(2).形成导纳矩阵,
导纳矩阵(Y)为:
Y = Y 11 Y 12 Y 13 . . . Y 1 n Y 21 Y 22 Y 23 . . . Y 2 n Y 31 Y 32 Y 33 . . . Y 3 n . . . . . . . . . . . . . . . Y n 1 Y n 2 Y n 3 . . . Y nn
其中,n表示电力网络的节点数,导纳矩阵反映的是节点之间的电气连接关系,若两个节点之间没有直接相连,则互导纳为0;
(3).设定各节点的初值
(4).将各点电压初值带入到注入功率和节点电压平方的不平衡式中,求出不平衡量;
(5).形成雅可比矩阵并求出各个元素;
(6).求解修正方程;
(7).得到所要点解断面功率到目标值的发电机量的改变量;
其中在所述步骤5中,雅可比矩阵为:
其中与断面功率方程无关的雅可比矩阵中的元素含义为:
H ij = ∂ P i ∂ f j ; N ij ∂ P i ∂ e j
J ij = ∂ Q i ∂ f j ; L ij ∂ Q i ∂ e j
R ij = ∂ U i 2 ∂ f j ; S ij = ∂ U i 2 ∂ e j
其中,对每个断面,式1中的B分块矩阵中非0元素是该断面有无功功率方程对组成该断面所有线路端节点电压实部和虚部的导数;式2表示m断面雅可比矩阵行中与k线路对应的元素,即该断面功率方程对组成该断面的k线路I侧和J侧电压实部和虚部的导数;组成m断面的其余Nm‐1条线路可依此类推;
. . . ∂ Δ P c ( m ) ∂ V Irk ∂ Δ P c ( m ) ∂ V Iik . . . ∂ Δ P c ( m ) ∂ V Jrk ∂ Δ P c ∂ V Jik . . .
. . . ∂ Δ Q c ( m ) ∂ V Irk ∂ Δ Q c ( m ) ∂ V Iik . . . ∂ Δ Q c ( m ) ∂ V Jrk ∂ Δ Q c ∂ V Jik . . . - - - ( 2 )
其中上两式中元素详细表达式如下,VIrk表示k线路I侧电压的实部,VIik其表示k线路I侧电压虚部,VJrk表示k线路J侧电压实部,VJik表示k线路J侧电压虚部,Rk表示k线路的电阻,Xk表示k线路的电抗,Bk表示k线路为线路电容;
公式(2)的推导展开如下:
∂ Δ P c ( m ) ∂ V Irk = R k · ( 2 V Irk - V Jrk ) - X k · V Jik R k 2 + X k 2
∂ Δ P c ( m ) ∂ V Iik = R k · ( 2 V Irk - V Jrk ) + X k · V Jik R k 2 + X k 2
∂ Δ P c ( m ) ∂ V Jrk = - R k · 2 V Irk + X k · V Iik R k 2 + X k 2
∂ Δ P c ( m ) ∂ V Jik = - R k · 2 V Irk - X k · V Iik R k 2 + X k 2
∂ Δ Q c ( m ) ∂ V Irk = R k · V Jik + X k · ( 2 V Irk - V Jrk R k 2 + X k 2 - 2 V Irk · B k
∂ Δ Q c ( m ) ∂ V Iik = - R k · V Jrk + X k · ( 2 V Iik - V Jik R k 2 + X k 2 - 2 V Iik · B k
∂ ΔQ c ( m ) ∂ V Jrk = - R k · V Iik - X k · V Irk R k 2 + X k 2
∂ ΔQ c ( m ) ∂ V Jik = R k · V Irk - X k · V Iik R k 2 + X k 2
其中,各节点的初值包括各节点电压和相角。
2.如权利要求1所述的方法,其特征在于,支路参数包括:输电线路的电阻、电抗和对地导纳,以及变压器支路的电阻、电抗和变比;节点参数包括:节点类型、节点电压以及功率数据。
3.如权利要求1所述的方法,其特征在于,在所述步骤3中,所述各节点的初值是指PV节点和平衡节点的电压幅值取给定值,PQ节点的电压取1.0;各个电压的相角都取0.0。
4.如权利要求1所述的方法,其特征在于,在所述步骤4中,注入功率和节点电压平方的不平衡方程为:
ΔP c ( m ) = Σ k = 1 N m P line ( k ) - P des ( m ) = 0
ΔP c ( m ) = Σ k = 1 N m Q line ( k ) - Q des ( m ) = 0
其中,ΔPc(m)和ΔQc(m)分别表示m断面的有功功率偏差和无功功率偏差;分别表示m断面的有功功率和无功功率,是构成该断面的Nm条线路功率之和;Pdes(m)和Qdes(m)分别表示m断面有功功率目标值和无功功率目标值。
5.如权利要求4所述的方法,其特征在于,所述步骤4中的所述不平衡方程中,每一组机群控制一个断面,即承担断面功率变化和该机群所在电网区域系统损耗变化;发电机的调控作用通过附加功率项体现;第i台机控制第m个断面时i机的有功功率方程Pg(i)和无功功率方程Qg(i)分别为:
P g ( i ) = e i ( G ii e i - B ii f i ) + f i ( G ii f i + B ii e i ) + Σ j = 1 j ≠ i j = n [ e i ( G ij e j - B ij f j ) + f i ( G ij f j + B ij e j ) ] + α ( m ) · ΔP c ( m ) · ΔP vail ( i ) Q g ( i ) = f i ( G ii e i - B ii f i ) + e i ( G ii f i + B ii e i ) + Σ j = 1 j ≠ i j = n [ f i ( G ij e j - B ij f j ) + e i ( G ij f j + B ij e j ) ] + β ( m ) · ΔQ c ( m ) · ΔQ vail ( i ) 其中, e i ( G ii e i - B ii f i ) + f i ( G ii f i + B ii e i ) + Σ j = 1 j ≠ i j = n [ e i ( G ij e j - B ij f j ) + f i ( G ij f j + B ij e j ) ] f i ( G ii e i - B ii f i ) + e i ( G ii f i + B ii e i ) + Σ j = 1 j ≠ i j = n [ f i ( G ij e j - B ij f j ) - e i ( G ij f j + B ij e j ) ] 为传统牛顿法的潮流不平衡方程,α(m)、β(m)为与m断面相关的有功和无功功率控制因子;ΔPvail(i)为带权重的发电机有功可调出力,根据对机群功率增减的预测,可为:
ΔPvail(i)=Wp(i)·(Pmax(i)-Pg0(i))或者ΔPvail(i)=Wp(i)·(Pg0(i)-Pmin(i))
其中,Pmax(i)、Pmin(i)、Pg0(i)分别表示发电机i的有功出力上限、有功出力下限和调整前的有功发电;Wp(i)为发电机i的有功调节权重;
ΔQvail(i)为带权重的发电机无功可调出力,同理可取为:
ΔQvail(i)=Wq(i)·(Qmax(i)-Qg0(i))或者ΔQvail(i)=Wq(i)·(Qg0(i)-Qmin(i))
其中,Qmax(i)、Qmin(i)、Qg0(i)分别表示发电机i的无功出力上限、无功出力下限和调整前的无功发电,Wq(i)为发电机i的无功调节权重。
6.如权利要求5所述的方法,其特征在于,在雅可比矩阵中,若有一个断面有两条组成线路的端点相同,则在雅可比矩阵中将断面在这两条线路中对该节点电压的导数相加,作为断面对该节点电压的雅可比元素;
若第i台机控制m断面功率,雅可比矩阵与该发电机对应的两行分别增加与联络线端节点相对应的元素和与控制因子α(m)、β(m)相对应的元素;下两式表示i台机控制的m断面包含k线路时对雅可比矩阵进行的相应修改;所述雅可比矩阵A,C矩阵块中的元素为:
. . . ∂ P g ( i ) ∂ V Irk ∂ P g ( i ) ∂ V Iik . . . ∂ P g ( i ) ∂ V Jrk ∂ P g ( i ) ∂ V Jik . . . ∂ P g ( i ) ∂ α ( m )
. . . ∂ Q g ( i ) ∂ V Irk ∂ Q g ( i ) ∂ V Iik . . . ∂ Q g ( i ) ∂ V Jrk ∂ Q g ( i ) ∂ V Jik . . . ∂ Q g ( i ) ∂ β ( m )
其中,各元素表达式如下:
∂ P g ( i ) ∂ V Irk = ∂ ΔP c ( m ) ∂ V Irk · α ( m ) · ΔP vail ( i )
∂ P g ( i ) ∂ V Iik = ∂ ΔP c ( m ) ∂ V Iik · α ( m ) · ΔP vail ( i )
∂ P g ( i ) ∂ V Jr k = ∂ ΔP c ( m ) ∂ V Jrk · α ( m ) · ΔP vail ( i )
∂ P g ( i ) ∂ V Jik = ∂ ΔP c ( m ) ∂ V Jik · α ( m ) · ΔP vail ( i )
∂ P g ( i ) ∂ α ( m ) = Δ P c ( m ) · ΔP vail ( i )
∂ Q g ( i ) ∂ V Irk = ∂ Δ Q c ( m ) ∂ V Irk · β ( m ) · Δ Q vail ( i )
∂ Q g ( i ) ∂ V Iik = ∂ Δ Q c ( m ) ∂ V Iik · β ( m ) · Δ Q vail ( i )
∂ Q g ( i ) ∂ V Jrk = ∂ Δ Q c ( j ) ∂ V Jrk · β ( m ) · Δ Q vail ( i )
∂ Q g ( i ) ∂ V Jik = ∂ Δ Q c ( j ) ∂ V Jik · β ( m ) · Δ Q vail ( i )
∂ Q g ( i ) αβ ( m ) = ΔQ c ( m ) · ΔQ vail ( i ) .
7.如权利要求1所述的方法,其特征在于,在所述步骤6中,所述求解修正方程,将节点电压的变化量求出,进行迭代,直到得到符合约束条件的结果。
8.如权利要求1所述的方法,其特征在于,在所述步骤7中,所述得到所要点解断面功率到目标值的发电机量的改变量是ΔPc(m)和ΔQc(m)。
CN201210174254.6A 2012-05-30 2012-05-30 一种基于多断面潮流控制的方法 Active CN102709955B (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201210174254.6A CN102709955B (zh) 2012-05-30 2012-05-30 一种基于多断面潮流控制的方法

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201210174254.6A CN102709955B (zh) 2012-05-30 2012-05-30 一种基于多断面潮流控制的方法

Publications (2)

Publication Number Publication Date
CN102709955A CN102709955A (zh) 2012-10-03
CN102709955B true CN102709955B (zh) 2014-08-27

Family

ID=46902571

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201210174254.6A Active CN102709955B (zh) 2012-05-30 2012-05-30 一种基于多断面潮流控制的方法

Country Status (1)

Country Link
CN (1) CN102709955B (zh)

Families Citing this family (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103488876A (zh) * 2013-09-06 2014-01-01 南瑞(武汉)电气设备与工程能效测评中心 一种基于支路损耗因子分析的电网节能降损方法
CN104850718B (zh) * 2015-06-02 2018-08-14 中国海洋石油集团有限公司 一种海上油田群电网的研究态方法
CN106532697A (zh) * 2016-12-30 2017-03-22 国网山东省电力公司泰安供电公司 建立多断面模型的方法及装置
CN107204617B (zh) * 2017-01-24 2020-06-19 华南理工大学 基于线性规划的直角坐标形式的区间潮流计算方法
CN108306301B (zh) * 2018-02-06 2021-05-04 国网河南省电力公司电力科学研究院 转子角控制模式下适用的潮流计算方法
CN112260283B (zh) * 2020-10-22 2023-08-22 云南电网有限责任公司 一种电力系统输电断面潮流调整方法及装置

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP3514944B2 (ja) * 1997-05-22 2004-04-05 三菱電機株式会社 電力系統シミュレータ
CN1972057A (zh) * 2006-12-19 2007-05-30 北京四方继保自动化股份有限公司 基于线路故障状态和控制断面有功功率的复故障判别方法
CN101867183A (zh) * 2010-06-08 2010-10-20 国网电力科学研究院 多断面稳定输送水平交互影响的输电极限计算方法
CN101982917A (zh) * 2010-10-17 2011-03-02 华中电网有限公司 用于电网调度的可用输电能力的计算方法

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP3514944B2 (ja) * 1997-05-22 2004-04-05 三菱電機株式会社 電力系統シミュレータ
CN1972057A (zh) * 2006-12-19 2007-05-30 北京四方继保自动化股份有限公司 基于线路故障状态和控制断面有功功率的复故障判别方法
CN101867183A (zh) * 2010-06-08 2010-10-20 国网电力科学研究院 多断面稳定输送水平交互影响的输电极限计算方法
CN101982917A (zh) * 2010-10-17 2011-03-02 华中电网有限公司 用于电网调度的可用输电能力的计算方法

Non-Patent Citations (2)

* Cited by examiner, † Cited by third party
Title
JP特许3514944B2 2004.04.05
丁平等.大型互联电网多断面功率约束潮流算法.《中国电机工程学报》.2010,第30卷(第10期),全文. *

Also Published As

Publication number Publication date
CN102709955A (zh) 2012-10-03

Similar Documents

Publication Publication Date Title
CN102709955B (zh) 一种基于多断面潮流控制的方法
ES2382786B1 (es) Metodo y sistema de control de tension de una central de generacion electrica y parque eolico
DK3158617T3 (en) Method for controlling power distribution
CN103150606B (zh) 一种分布式电源最优潮流优化方法
CN106655227B (zh) 一种基于智能软开关的有源配电网馈线负载平衡方法
CN108599154A (zh) 一种考虑不确定性预算的三相不平衡配电网鲁棒动态重构方法
CN103760400B (zh) 基于广域量测系统的电压稳定在线监测方法
Martinez-Lucas et al. Frequency control support of a wind-solar isolated system by a hydropower plant with long tail-race tunnel
CN107579543A (zh) 一种基于分层控制策略的孤岛微电网分布式协调控制方法
CN101872975B (zh) 电力系统暂态功角稳定在线分析的自适应动态等值方法
CN103077480B (zh) 一种电力系统的安全校核方法
CN105375513B (zh) 一种基于实时在线等值的110千伏风电场自动电压控制方法
CN106786715A (zh) 一种多端vsc‑hvdc系统下垂控制系数确定方法
CN103346573B (zh) 基于黄金分割云粒子群优化算法的风电系统无功规划方法
CN105914783A (zh) 一种孤岛型微电网小干扰稳定性分析方法
CN104769802A (zh) 用于计算机辅助控制电网中的功率的方法
CN108092284A (zh) 一种基于线性模型的三相不平衡智能配电网网络重构方法
CN108599239A (zh) 一种下垂控制型孤岛微电网电压质量概率评估方法
CN105529703B (zh) 一种基于供电能力瓶颈分析的城市电网改造规划方法
CN105281325A (zh) 一种提升受端电网外受电能力的网架优化方法
CN104934973B (zh) 一种考虑温度的电力线路损耗计算方法
CN106953320A (zh) 一种基于upfc的输电线路过载控制方法
CN105337290A (zh) 一种适用于电力系统低频振荡辅助决策的无功调整方法
CN114861411A (zh) 一种基于多目标双层规划的分布式电源选址定容方法
CN105656055A (zh) 一种风电场集群无功电压优化控制系统及控制方法

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
ASS Succession or assignment of patent right

Owner name: STATE ELECTRIC NET CROP.

Effective date: 20130715

C41 Transfer of patent application or patent right or utility model
TA01 Transfer of patent application right

Effective date of registration: 20130715

Address after: 100192 Beijing city Haidian District Qinghe small Camp Road No. 15

Applicant after: China Electric Power Research Institute

Applicant after: State Grid Corporation of China

Address before: 100192 Beijing city Haidian District Qinghe small Camp Road No. 15

Applicant before: China Electric Power Research Institute

C14 Grant of patent or utility model
GR01 Patent grant
C41 Transfer of patent application or patent right or utility model
CB03 Change of inventor or designer information

Inventor after: Qiu Jian

Inventor after: He Xiaoyang

Inventor after: Ge Yanfeng

Inventor after: Li Dalu

Inventor after: Wu Tao

Inventor after: Gao Kai

Inventor after: Ding Ping

Inventor after: Wang Tianqi

Inventor after: Lu Jun

Inventor after: Liu Yuxing

Inventor after: Niu Linlin

Inventor after: Zhang Yanjun

Inventor before: Qiu Jian

Inventor before: Wu Tao

Inventor before: Ding Ping

Inventor before: Wang Tianqi

Inventor before: Lu Jun

Inventor before: Liu Yuxing

Inventor before: Niu Lingling

COR Change of bibliographic data
TR01 Transfer of patent right

Effective date of registration: 20170221

Address after: 100192 Beijing city Haidian District Qinghe small Camp Road No. 15

Patentee after: China Electric Power Research Institute

Patentee after: State Grid Corporation of China

Patentee after: State Grid Liaoning Electric Power Co., Ltd.

Address before: 100192 Beijing city Haidian District Qinghe small Camp Road No. 15

Patentee before: China Electric Power Research Institute

Patentee before: State Grid Corporation of China