CN1972057A - 基于线路故障状态和控制断面有功功率的复故障判别方法 - Google Patents

基于线路故障状态和控制断面有功功率的复故障判别方法 Download PDF

Info

Publication number
CN1972057A
CN1972057A CN 200610167704 CN200610167704A CN1972057A CN 1972057 A CN1972057 A CN 1972057A CN 200610167704 CN200610167704 CN 200610167704 CN 200610167704 A CN200610167704 A CN 200610167704A CN 1972057 A CN1972057 A CN 1972057A
Authority
CN
China
Prior art keywords
control section
fault
control
time
electrical network
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN 200610167704
Other languages
English (en)
Other versions
CN100481666C (zh
Inventor
刘兵
雷为民
李哲
吴兆国
李轶群
许先华
顿敦
娄霄楠
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Beijing Sifang Automation Co Ltd
Zhejiang Electric Power Research Institute
Original Assignee
Beijing Sifang Automation Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Beijing Sifang Automation Co Ltd filed Critical Beijing Sifang Automation Co Ltd
Priority to CN 200610167704 priority Critical patent/CN100481666C/zh
Publication of CN1972057A publication Critical patent/CN1972057A/zh
Application granted granted Critical
Publication of CN100481666C publication Critical patent/CN100481666C/zh
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Supply And Distribution Of Alternating Current (AREA)

Abstract

本发明涉及电力系统领域中安全稳定控制的复故障判别方法。公开了一种通过对电网中线路故障状态、控制断面有功功率的监测,综合判别电网N-2复故障的方法。该方法包括如下步骤:某控制断面N-1故障控制措施实施后,经控制断面潮流调整过程延时Ttrans (可以整定),如果该控制断面实时有功功率Pt∑小于控制断面N-2暂态稳定极限定值PN-2trans (可以整定)且持续控制断面有功功率确认时间Taffirm,则认为电网进入跳闸后转化性检修运行方式;若该控制断面N-1故障控制措施实施后经延时装置强制复归时间Treturn (可以整定,且Ttrans+Taffirm≤Treturn),强制认为电网进入跳闸后转化性检修运行方式;在电网发生N-1故障后进入转化性检修运行方式前,若发生同一控制断面的另一回线路跳闸故障,则判为N-2复故障方式。

Description

基于线路故障状态和控制断面有功功率的复故障判别方法
技术领域
本发明涉及电力系统领域,更具体地涉及电网安全稳定控制的方法。
背景技术
随着电力体制改革的深入和实现全国电力资源优化配置的客观要求,全国基本形成以三峡工程为核心,以华中电网为依托,向东西南北四个方向辐射互联交流同步电网,并实现交、直流混合输电。在实现资源优化配置、区域互供的同时,电网的安全稳定运行面临挑战。尤其在全国联网初期,交流弱联电网的安全稳定问题十分突出。其次电磁环网问题仍普遍存在,影响了输电能力的充分发挥。再者电网无功补偿容量不足,负荷中心的电压支撑不够。最后受端电网薄弱问题尤为突出。因此,电网安全稳定控制系统(装置)在电网中发挥不可或缺的重要作用。
控制策略表法是目前国内外电网安全稳定控制实际采用的主导方法。在电网当前运行方式下发生故障时,按照不同的故障元件、故障方式和控制断面有功功率等搜索控制策略表。因此,故障方式的判别是电网安全稳定控制的关键技术。
在实际电网安全稳定控制系统中,控制装置很难界定电网发生复故障是否在“同一时间”。因此,传统的复故障判别是指“在装置整组复归时间(5秒)”内发生两个元件(线路、主变或机组)的相继故障。装置在“同一时间”判断出单一故障或复故障后,按照既定的控制策略表实施控制。装置在整组复归时间内判断出相继故障,按最严重的“复故障控制实施”对“N-1故障控制措施”实施“追加”控制。实际上,由于电网中潮流的动态交换、电网内机组的调节系统的作用,当N-1故障控制措施实施后,控制断面潮流经过一个调整的过渡过程后相应减小。
因此,按照传统的复故障判别将可能产生两种结果。当N-1故障控制措施实施后,在整组复归时间内,控制断面潮流调整到N-2暂态稳定极限内,此间发生该控制断面另一回线路跳闸故障,若按N-2复故障控制策略实施控制,势必导致“过量”控制。当N-1控制措施实施后,在整组复归时间外,控制断面潮流仍未调整到N-2暂态稳定极限内,此间发生该控制断面另一回线路跳闸故障,若按两个独立单一故障控制策略实施控制,势必造成“欠量”控制。无论哪种结果,都可能导致电网内其它继电保护装置或安全稳定控制装置连锁动作,造成不必要损失,甚至导致电网失稳,酿成大面积停电事故。
因此,有必要提出新的复故障判断方法,以适应电网结构的变化,实现最优的控制代价,确保电网安全稳定运行。
发明内容
为适应不同电网结构对稳定控制功能的不同要求,本发明公开了一种“基于线路故障状态和控制断面有功功率的复故障判别方法”。本方法物理意义明确,有效避免传统复故障判别方法可能导致的“过量”或“欠量”控制,对解决N-2故障时电网稳定问题具有积极意义。
该方法包括如下步骤:某控制断面N-1故障控制措施实施后,经控制断面潮流调整过程延时Ttrans(可以整定),如果该控制断面实时有功功率Pt∑小于控制断面N-2暂态稳定极限定值PN-2trans(可以整定)且持续控制断面有功功率确认时间Taffirm,则认为电网进入跳闸后转化性检修运行方式;若该控制断面N-1故障控制措施实施后经延时装置强制复归时间Treturn(可以整定,且Ttrans+Taffirm≤Treturn),强制认为电网进入跳闸后转化性检修运行方式;在电网发生N-1故障后进入转化性检修运行方式前,若发生同一控制断面的另一回线路跳闸故障,则判为N-2复故障方式。
对不同的电网结构,依据电网安全稳定分析计算结果,整定N-1控制措施实施后控制断面潮流调整过程延时Ttrans、控制断面N-2暂态稳定极限PN-2trans、控制断面有功功率确认时间Taffirm以及强制复归时间Treturn,可以有效避免“过量”或“欠量”控制。
本方法的创新,在复故障判断过程中考虑了N-1控制措施实施后控制断面潮流的调整过程,综合线路故障状态和N-2暂态稳定极限(有功功率)进行判断。本方法物理意义明确,对解决N-2故障时电网稳定问题具有积极意义。
附图说明
图1显示了N-2复故障判别时间关系图;
图2显示了N-2复故障判别逻辑。
具体实施方案
下面参考图1和图2具体介绍N-2复故障判别的过程。
首先,装置根据安装处的TA和TV测得电流和电压的瞬时值,计算出各出线的电压、电流有效值和有功功率。
监测控制系统的运行状态,包括装置自检和相关对外通道的跟踪监测。监测电网的运行状态,包括就地或远方相关控制断面的线路、主变等的投停、异常等。当装置监测到异常状态,则立即闭锁装置。
当电网发生扰动,控制系统/装置感受到电流或功率突变量启动,装置开放出口电源,并保存启动前200ms的某控制断面有功功率值P-200ms∑。当该控制断面内发生N-1故障时,根据当前运行方式、故障线路、故障类型、故障前控制断面有功功率值P-200ms∑查找控制策略表,并执行对应的控制措施。同时复位控制断面潮流调整过程延时计数器Tcount=0,实时计算控制断面有功功率Pt∑。当N-1故障控制措施实施后控制断面潮流调整过程延时Tcount≥Ttrans(定值)后,若条件“Pt∑<PN-2trans(定值)”满足,且延时Taffirm,判断电网进入跳闸后转化性检修运行方式。否则,电网仍为正常运行方式。
当延时Tcount≥Treturn(定值,且满足Ttrans+Taffirm≤Treturn),强制认为电网进入跳闸后转化性检修运行方式。
在电网进入转化性检修运行方式前,若发生同一控制断面的两回线路跳闸故障,则判为N-2复故障方式。根据故障前运行方式、故障线路、故障类型、故障前断面功率值P-200ms∑查找控制策略表,执行相应的控制措施。当N-2复故障方式下控制措施较N-1故障方式下控制措施“严厉”时,采取“追加”控制措施。
在电网进入转化性检修运行方式后,再发生同一控制断面的另一回线路跳闸故障,则判为检修方式下的单一故障方式,和前一故障为两个独立的故障,独立查找控制策略表,较上次控制不采取“追加”控制措施。并且故障前断面功率值P-200ms∑为第二次故障启动前200ms的断面功率。
定值整定说明
Ttrans:表示某控制断面N-1故障控制措施实施后控制断面潮流调整过程延时定值;
PN-2trans:表示某控制断面N-2暂态稳定极限定值;
Taffirm:表示某控制断面有功功率确认时间,防止由于潮流波动引起的误判;
Treturn:表示装置强制复归时间。
综上所述,基于线路故障状态和控制断面有功功率的复故障判别方法,依据电网安全稳定分析计算结果,整定N-1故障控制措施实施后控制断面潮流调整过程延时Ttrans、控制断面N-2暂态稳定极限PN-2trans、控制断面有功功率确认时间Taffirm以及强制复归时间Treturn,有效避免“过量”或“欠量”控制。物理意义明确,对解决N-2故障时电网稳定问题具有积极意义。

Claims (3)

1、基于线路故障状态和控制断面有功功率复故障判别的电网稳定控制方法,该方法包括步骤:
某控制断面N-1故障控制措施实施后,经控制断面潮流调整过程延时Ttrans,如果该控制断面实时有功功率Pt∑小于控制断面N-2暂态稳定极限定值PN-2trans且持续控制断面有功功率确认时间Taffirm,则认为电网进入跳闸后转化性检修运行方式;
若该控制断面N-1故障控制措施实施后经延时装置强制复归时间Treurn,强制认为电网进入跳闸后转化性检修运行方式;
在电网发生N-1故障后进入转化性检修运行方式前,若发生同一控制断面的另一回线路跳闸故障,则判为N-2复故障方式。
2、如权利要求1所述的方法,其中控制断面潮流调整过程延时Ttrans和控制断面N-2暂态稳定极限PN-2trans可以整定。
3、如权利要求1所述的方法,其中延时装置强制复归时间Treturn可以整定,并且Ttrans+Taffirm≤Treturn
CN 200610167704 2006-12-19 2006-12-19 基于线路故障状态和控制断面有功功率的复故障判别方法 Active CN100481666C (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN 200610167704 CN100481666C (zh) 2006-12-19 2006-12-19 基于线路故障状态和控制断面有功功率的复故障判别方法

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN 200610167704 CN100481666C (zh) 2006-12-19 2006-12-19 基于线路故障状态和控制断面有功功率的复故障判别方法

Publications (2)

Publication Number Publication Date
CN1972057A true CN1972057A (zh) 2007-05-30
CN100481666C CN100481666C (zh) 2009-04-22

Family

ID=38112710

Family Applications (1)

Application Number Title Priority Date Filing Date
CN 200610167704 Active CN100481666C (zh) 2006-12-19 2006-12-19 基于线路故障状态和控制断面有功功率的复故障判别方法

Country Status (1)

Country Link
CN (1) CN100481666C (zh)

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101527454B (zh) * 2009-04-27 2012-07-18 国网电力科学研究院 一种电网年度运行方式报告自动生成方法
CN102709955A (zh) * 2012-05-30 2012-10-03 中国电力科学研究院 一种基于多断面潮流控制的方法
CN109449940A (zh) * 2018-12-28 2019-03-08 国电南瑞科技股份有限公司 应对动态过程相继事件的紧急控制广域协调方法
CN111478317A (zh) * 2020-04-02 2020-07-31 贵州电网有限责任公司 一种反馈型过载联切安控装置控制策略的在线模拟方法
CN111900737A (zh) * 2020-07-28 2020-11-06 国网河南省电力公司电力科学研究院 适应双特高压直流馈入网架的关键断面通道检修评估方法

Cited By (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101527454B (zh) * 2009-04-27 2012-07-18 国网电力科学研究院 一种电网年度运行方式报告自动生成方法
CN102709955A (zh) * 2012-05-30 2012-10-03 中国电力科学研究院 一种基于多断面潮流控制的方法
CN102709955B (zh) * 2012-05-30 2014-08-27 中国电力科学研究院 一种基于多断面潮流控制的方法
CN109449940A (zh) * 2018-12-28 2019-03-08 国电南瑞科技股份有限公司 应对动态过程相继事件的紧急控制广域协调方法
CN109449940B (zh) * 2018-12-28 2022-04-19 国电南瑞科技股份有限公司 应对动态过程相继事件的紧急控制广域协调方法
CN111478317A (zh) * 2020-04-02 2020-07-31 贵州电网有限责任公司 一种反馈型过载联切安控装置控制策略的在线模拟方法
CN111900737A (zh) * 2020-07-28 2020-11-06 国网河南省电力公司电力科学研究院 适应双特高压直流馈入网架的关键断面通道检修评估方法
CN111900737B (zh) * 2020-07-28 2022-04-08 国网河南省电力公司电力科学研究院 适应双特高压直流馈入网架的关键断面通道检修评估方法

Also Published As

Publication number Publication date
CN100481666C (zh) 2009-04-22

Similar Documents

Publication Publication Date Title
CN100481666C (zh) 基于线路故障状态和控制断面有功功率的复故障判别方法
Dong et al. Simulation and analysis of cascading faults in hybrid AC/DC power grids
Nikolaidis et al. Design strategies for load-shedding schemes against voltage collapse in the Hellenic system
CN103368203B (zh) 光伏逆功率闭环控制系统及方法
CN102253298A (zh) 直流变频空调控制器pfc故障检测的方法
CN109347182B (zh) 充电桩控制单元
Benasla et al. Power system security enhancement by HVDC links using a closed-loop emergency control
CN109378887B (zh) 充电桩控制系统
CN104393602B (zh) 一种分布式能源网络的调节方法及装置
Ouyang et al. Prediction method of successive commutation failure for multi-infeed high voltage direct current systems under fault of weak receiving-end grid
CN101951017A (zh) 防止电动机意外停机的工频自动切换装置
CN110071499B (zh) 一种快速判断配电网安全合环的方法和系统
CN115589060A (zh) 一种站用直流系统备用装置
Wang et al. Multi-circuit HVDC system emergency DC power support with reactive control
CN202004466U (zh) 无串联变压器级联多电平动态电压调节器
Yang et al. Reliability analysis of distribution network with closed-loop operation
JP5571983B2 (ja) 単独運転回避装置、単独運転回避方法および単独運転回避プログラム
CN206180959U (zh) 一种光伏发电系统
Wu et al. Research on the influence of Multi-HVDC power coordinated control strategy on frequency stability in multi partitioned power grid
TWI724731B (zh) 自動卸載電力保護系統與自動卸載電力保護方法
CN216016517U (zh) 一种给煤机变频器抗晃电路
Han et al. Interaction Characteristics of Ports of PET in AC/DC Hybrid System under Large Disturbances
Peng et al. Characteristic and influence analysis on the inrush current of HVDC converter transformer
CN108832653B (zh) 一种调相机-变压器组非全相运行的调节方法
CN201898476U (zh) 防止电动机意外停机的工频自动切换装置

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
ASS Succession or assignment of patent right

Owner name: ELECTRIC POWER RESEARCH INSTITUTE OF STATE GRID ZH

Effective date: 20150109

C41 Transfer of patent application or patent right or utility model
TR01 Transfer of patent right

Effective date of registration: 20150109

Address after: 100085 Beijing city on the base of the information industry on the street, No. four, No. 9, Haidian District

Patentee after: Beijing Sifang Jibao Automation Co., Ltd.

Patentee after: Electric Power Research Institute of State Grid Zhejiang Electric Power Company

Address before: 100085 Beijing city on the base of the information industry on the street, No. four, No. 9, Haidian District

Patentee before: Beijing Sifang Jibao Automation Co., Ltd.