CN102691366A - Precast concrete self-insulating shear wall and assembly type concrete building shear wall structure - Google Patents

Precast concrete self-insulating shear wall and assembly type concrete building shear wall structure Download PDF

Info

Publication number
CN102691366A
CN102691366A CN2012101785683A CN201210178568A CN102691366A CN 102691366 A CN102691366 A CN 102691366A CN 2012101785683 A CN2012101785683 A CN 2012101785683A CN 201210178568 A CN201210178568 A CN 201210178568A CN 102691366 A CN102691366 A CN 102691366A
Authority
CN
China
Prior art keywords
shear wall
concrete
wall
insulating
self
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN2012101785683A
Other languages
Chinese (zh)
Other versions
CN102691366B (en
Inventor
张吉华
张晨
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
JIANGSU JINTONG PREFABRICATED CONSTRUCTION DEVELOPMENT Co Ltd
Original Assignee
JIANGSU JINTONG PREFABRICATED CONSTRUCTION DEVELOPMENT Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by JIANGSU JINTONG PREFABRICATED CONSTRUCTION DEVELOPMENT Co Ltd filed Critical JIANGSU JINTONG PREFABRICATED CONSTRUCTION DEVELOPMENT Co Ltd
Priority to CN201210178568.3A priority Critical patent/CN102691366B/en
Publication of CN102691366A publication Critical patent/CN102691366A/en
Application granted granted Critical
Publication of CN102691366B publication Critical patent/CN102691366B/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Building Environments (AREA)

Abstract

The invention relates to an improvement on a precast concrete self-insulating shear wall and an assembly type concrete building shear wall structure. The precast concrete self-insulating shear wall is characterized in that a self-insulating wall body overlapped connecting bolt is a metal bolt of which at least one end is coated with a low heat conducting fiber resin layer, wherein a bolt head is positioned on a concrete leaf wall; section steel joints extends out of concrete end surfaces on the left side and the right side of a precast wall body; the upper ends and the lower ends of the section steel joints extend out of the concrete end surfaces and are connected with steel reinforcing bars; the heads of the section steel joints are radially-thickened cylindrical bolt heads and/or cylindrical threaded heads; if the heads are the cylindrical bolt heads, the inner sides of the bolt heads are sleeved in advance with connecting sleeves of which the outer ends are provided with internal threads and the inner ends are necked; and such precast concrete self-insulating shear walls are assembled through a corner splicing combination structure. The invention has the advantages that a cold/heat bridge in the precast concrete self-insulating shear wall is effectively avoided and a low anchoring cost is obtained; and in addition, during assembly, the hoisting is simple and the assembly is quick, and after the hoisting is in place, a wall board can be stably positioned by only connecting the section steel joints with shear wall corner section steel, and thus a large amount of temporary fixed support frames are omitted.

Description

Prefabricated concrete self-insulating shear wall and assembling concrete building shear wall structure
Technical field
The present invention is the improvement to prefabricated concrete self-insulating shear wall and assembling concrete building shear wall structure; Relate in particular to and a kind ofly can effectively cut off cold and hot bridge; Wall heat transfer coefficient is lower, and the anchor connector cost is low, assembles simpler; And can omit a large amount of supplemental support, can realize the prefabricated concrete self-insulating shear wall and the assembly structure of assembling fast.
Background technology
Shear wall can bear vertical and horizontal loading, can load-bearing go along with sb. to guard him again, and continuous from top to bottom, usually for the bulk strength building of having relatively high expectations, employing shear wall structure.Existing shear wall concrete building mostly adopts scene formwork erection pour concrete successively, applies outer insulation.For example Chinese patent CN101289883, CN101089306, CN202202518, CN202214844, CN200952198, CN202081536, CN201722816 etc. are said.Along with the technological progress of building industry, assembled architecture rises gradually.Shear wall also has employing prefabricated, site assembly.
Chinese patent CN1888343 composite heat insulation concrete shear wall is covered with the prefabricated thermal insulation concrete wall of adiabator layer with in-situ concrete wall is compound forms by one side, the at interval embedding steel member connection of compound employing.It only is that part realizes factory prefabricating, and also need arriving cast-in-site, to coagulate the cob wall body superimposed, thereby do not realize the prefabricated fully of shear wall; Secondly, composite monolithic connects, and adopts the steel member of high heat conduction, thereby has cold and hot bridge, influences the further reduction of self heat insulation wall coefficient of thermal conductivity.
Chinese patent CN201217855 one-shot forming band heat insulation facing precast concrete short-limb shear wall provided; By shear wall, insulation layer, mortar bonding layer three range upon range of closing; The tyre architectural surface, the completion that is prefabricated in the factory, three layers through being welded with the steel mesh reinforcement connection of tension rib.The same thickness direction adopts simple reinforcing bar drawknot to have cold and hot bridge.
Above-mentioned prefabricated shear wall adopts three layer construction; The centre is provided with isolation layer, is connected but still adopt the heat conductor reinforcing bar to draw between outer concrete Ye Qiang and interior concrete shear wall, and connecting reinforcement unavoidably will produce heat bridge (thermal bridges) or cold bridge (cold bridges); And the self heat insulation wall heat transfer property; Largely be decided by cold and hot bridge phenomenon,, thereby limited the further reduction of self-heat preservation heat insulation wall thermal transmittance if exist cold and hot bridge that heat transfer property is increased substantially.
Chinese patent CN201687102 assembled integral shear wall structure system, the aforementioned three layer construction of the same employing of prefabricated concrete self-insulating shear wall, its improvement is to make three interlayer spot distribution anchor connectors, adopts FRP plate, FRP joint bar and plastic sheath ring connector.More above-mentioned prior art owing to adopt the FRP connector of low heat conduction, thereby can effectively reduce or eliminates cold and hot bridge, makes the self heat insulation wall heat-proof quality improve major step.But the FRP connector, self cost is high far beyond reinforcing bar, and especially the tensile property of FRP material own is better; But resistance to compression and shear behavior are relatively poor relatively; Therefore for satisfying building required resistance to compression of combined wall and shear behavior, the connector cross section is relatively large, has increased the cost of connector especially; Secondly, the FRP connector is made relative complex, also is the another reason that causes the connector cost up.For using in a large number in the body of wall, architectural being difficult to of high cost accepted, thereby can limit it and apply.
Secondly, monoblock wallboard splicing structure (plate-plate assembly unit) is adopted in existing prefabricated concrete shear wall assembling (CN201687102), and assembling is stretched out body of wall transverse structure reinforcing bar anchoring overlap joint by the side about the wall body, and formwork erection cast ater-casting concrete connects into integral body; Body of wall assembly unit up and down; It is the reinforced bar sleeve of pre-buried and connection identical with body of wall longitudinal screw main reinforcement quantity in prefabricated concrete wall bottom; During assembling the prefabricated concrete shear wall in upper strata is sling, made pre-buried each reinforced bar sleeve in bottom be inserted in the main reinforcement that stretch out lower floor prefabricated concrete wall upper end, use interim support fixation body of wall again; Through to the slip casting one by one of each reinforced bar sleeve, make lower floor body of wall upper end stretch out main reinforcement fixed in the body of wall bottom sleeves of upper strata (forming embedded bar sleeve+slip casting connects).The main deficiency of this assembly structure has three: one, because shear wall is that solid concrete wall weight is bigger, full piece assembly unit requires high to the hanging device hoisting weight, need large-scale hoisting machinery; The 2nd, site assembly bothers and is difficult to accomplish quick; For example lift by crane the prefabricated concrete shear wall in upper strata, need hole, a hole and lower floor's concrete shear wall to stretch out the reinforcing bar contraposition and insert, consuming time more; And it is fixing also to need more supplemental support to help after the body of wall lifting puts in place, causes the supplemental support large usage quantity; The 3rd, lower floor's body of wall reinforcing bar is connected with upper strata body of wall sleeve slip casting; Sleeve slip casting connects, and not only length sleeve is longer, has also increased the body of wall cost; And slip casting workload one by one is big; And the slip casting quality of connection influenced by manual operation bigger, slip casting is unreal to be prone to cause jointing intensity to reduce, thereby quality of connection is difficult to reliably guaranteed.Particularly full piece assembly unit can not realize the quick assembling of assembled architecture, can lose assembled architecture part advantage, also makes assembly cost improve.
The building scale of construction is big, and is low-cost very important, and therefore above-mentioned prior art deficiency still has is worth improved place.
Summary of the invention
The present invention's first purpose is to overcome the deficiency of above-mentioned prior art, provides a kind of and can effectively cut off cold and hot bridge, and wall heat transfer coefficient is lower, and the anchor connector cost is low, is suitable for quick assembling, and does not need the prefabricated concrete self-insulating shear wall of supplemental support basically.
Another purpose of the present invention is to provide a kind of can omit a large amount of supplemental support, assembles simplyr, and can realize the assembling concrete building shear wall structure of fast assembling.
The present invention's first purpose realizes; Main improvement one is with the three range upon range of connectors that close; Change the metal bolts that at least one end that can effectively cut off cold and hot bridge is surrounded by low heat conducting fiber resin bed outward into, the 2nd, the shaped steel joint that stretches out the concrete end face is also respectively arranged two sides at least at body of wall, and upper and lower side is stretched out the connecting reinforcement head process cylindrical bolt head and/or the cylindrical thread head that is fit to the sleeve connection; Thereby overcome the deficiency of prior art, realize the object of the invention.Specifically; The prefabricated concrete self-insulating shear wall of the present invention; Comprise prefabricated superimposed concrete shear wall, low thermal conductivity heat-insulating layer and outer concrete leaf wall, the thickness of spot distribution connects crab-bolt, reaches the connecting reinforcement that peripheric surface stretches out; It is characterized in that said connection crab-bolt is the metal bolts that at least one end is surrounded by low heat conducting fiber resin bed outward, bolt head is positioned at concrete leaf wall; Prefabricated concrete wall at least each side has the shaped steel joint that stretches out the concrete end face; Upper and lower side stretches out concrete end face connecting reinforcement, and head is for radially increasing thick cylindrical bolt head and/or cylindrical thread head, if the cylindrical bolt head, it is that internal thread, the inner are the branch sleeve of reducing that the bolt head inboard is arranged with the outer end in advance.
The present invention's second purpose realizes; The main improvement makes the assembly unit of the shear wall left and right sides, changed into by preformed self thermal insulation shear wall and preformed self thermal insulation shear wall corner assembling combination structure (promptly not adopting the adjacent left and right sides assembly unit of single shear wall) by full piece assembly unit, is similar to frame construction and assembles (the shear wall corner is similar to framework during assembling) and make it to become; Between adjacent shear wall corner; According to architectural design, can be a prefabricated concrete shear wall, also can be two prefabricated concrete shear walls.Assembling concrete building shear wall structure of the present invention specifically; Comprise adjacent, the splicing up and down of prefabricated concrete self-insulating shear wall; Link into an integrated entity in the filling of Mosaic face teeming concrete, it is characterized in that with layer left and right sides assembly unit by prefabricated concrete self-insulating shear wall and the combination of prefabricated concrete self-insulating shear wall corner; Said prefabricated concrete self-insulating shear wall and prefabricated concrete self-insulating shear wall corner; Superimposed by concrete shear wall, low thermal conductivity heat-insulating layer and outer concrete leaf wall; At least one end of thickness spot distribution is surrounded by the metal bolts anchoring of low heat conducting fiber resin bed outward; Prefabricated concrete wall and corner at least each side have shaped steel joint and the connecting reinforcement that stretches out the concrete end face; Upper and lower side respectively has the connecting reinforcement that stretches out the concrete end face, and head is and radially increases thick cylindrical bolt head and/or cylindrical thread head, if the cylindrical bolt head; Then the bolt head inboard is arranged with the outer end in advance and is internal thread, inner is the branch sleeve of reducing that cylindrical bolt head and the cylindrical thread head that steel bar end is respectively pairing stretched out at two ends when prefabricated concrete wall connected up and down; Prefabricated concrete shear wall corner upper and lower side also respectively has the shaped steel joint that stretches out the concrete end face.
In this patent.
Two sides are stretched out the shaped steel joint of concrete end face about prefabricated concrete shear wall; Being mainly used in when assembling is connected (for example shear wall, shear wall corner) with adjacent preforms; Both can realize that omitting supplemental support fixes, and also can improve connecting portion mechanical strength and anti-seismic performance again simultaneously.It is provided with the position and does not have special qualification, can be top, bottom or the middle part of side, and according to prefabricated concrete shear wall size, the shaped steel joint that stretches out can be one, also can be two or more than.
The low thermal conductivity heat-insulating layer is mainly used in and cuts off interior exterior wall heat transfer, plays the self-heat conserving effect, and commonly used and economy has: expansion polyphenyl plate (EPS plate), extruded polystyrene board (XPS plate), rock cotton board etc., and they have the thermal transmittance more much lower than concrete, and this belongs to prior art; In addition, along with scientific and technological progress, the heat-barrier material that exploitation has aforementioned similar performance also can use.
At least one end is surrounded by the metal bolts of low heat conducting fiber resin bed outward; Be mainly used in the crab-bolt of anchor connection inside and outside wall board (three layers); Make three range upon range of synthetic integral body; The heat conducting fiber resin bed is hanged down in all or part of outsourcing of bolt, and cut off concrete and conducted heat (cold) through metal bolts, thus cold and hot bridge inside and outside effectively having intercepted.The heat conducting fiber resin bed is hanged down in outsourcing; Mainly from the existing low heat conduction of prior art and high with the concrete bond strength, useful life is long (can with same life-span of building), good economy performance, the simple angle of construction are considered; Select low heat conducting fiber resin bed (for example glass fiber reinforced plastic, fibrous epoxy resin); But,, can use equally if develop similar low cost, low Heat Conduction Material along with the material technology progress.One termination portion enlarges and forms bolt head, mainly is the bonding strength that strengthens connecting reinforcement and thin siphonal lobe wallboard, satisfies the requirement of building assembled wall board bulk strength.Metal bolts, a kind of more economical employing indented bars head jumping-up formation that is, the grip of bolt does not need thread cutting, and the grip of bolt is threaded and also is fine certainly, has just increased the weight of the cost of anchoring piece like this.The heat-conducting resin fibrage is hanged down in the metal bolts outsourcing, and a kind of better is that the low heat-conducting resin fibrage of outsourcing is stretching into the grip of bolt of shear wall, outer packet length to isolation layer and be the U type that closed metal contacts with concrete.
Upper and lower side stretches out concrete end face connecting reinforcement (body of wall longitudinal screw main reinforcement); Head adopts and radially increases thick cylindrical bolt head and/or cylindrical thread head; Then mainly be to be convenient to the sleeve that up and down prefabricated concrete shear force wall reinforcing steel bar adopts fast, quality assurance property is good directly connect; And connect, thereby really realize the quick assembling of assembled architecture without slow welding of prior art speed of application or sleeve slip casting.For guaranteeing to surpass the bonding strength of reinforcing bar body, head increases thick better ring limit thick >=4mm, for example 4-8mm is convenient the making, the cylindrical bolt head increases slightly identical with the cylindrical thread head.If cylindrical bolt head; It is that internal thread, the inner are the branch sleeve of reducing that the bolt head inboard is arranged with the outer end in advance; This sleeve connected mode can realize that member location, the motionless reinforced bar sleeve of reinforcing bar connect that (the branch sleeve one end port that contracts draws with the rotation of cylindrical bolt head and is connected (can rotate and move axially); The other end is threaded with relative connecting reinforcement, thereby realizes prefabricated concrete element spacer bars sleeve mechanical connection).The inboard adapter sleeve tube length of bolt head is preferably 60-150mm.
Prefabricated concrete self-insulating shear wall corner mainly is from prefabricated angle of assembling, and it is separated into independent prefabricated units (thickness is identical with the assembling shear wall) from the shear wall side, realizes simplifying assembling.According to architectural design, can only be corner, also can be short supported shear wall.The corner cross section according to architectural design, can be T shape, Z-shaped, right angle type, arc or the like.Its height can be the 2-5 layer according to reinforcing bar length and shear wall thickness, and the column that is equivalent to frame construction during assembling gives assembling earlier, for the assembling shear wall provides positioning and fixing, supports to omit body of wall temporarily, still belongs to shear wall after assembling with shear wall.Prefabricated concrete self-insulating shear wall corner structure; The same prefabricated concrete self-insulating shear wall; About and the connecting reinforcement (cylindrical bolt head of reinforcing bar head and/or cylindrical thread head up and down) that stretches out the concrete end face all arranged up and down; And the shaped steel joint of concrete face is stretched out at two ends in addition up and down, is mainly used in the installation of corner and does not connect into whole preceding fixing.
Prefabricated concrete shear wall, a kind of better is precast wall body height and story height basic identical (promptly highly being one deck), is convenient to form the building integral structure with laminated floor slab, guarantees building level rigidity.
The prefabricated concrete self-insulating shear wall of this patent; Remove and to carry inner thermal insulating layer and three and range upon range ofly close anchor connector and upper and lower side to stretch out concrete connecting reinforcement head construction different, and prefabricated concrete wall left and right sides respectively has outside the shaped steel joint that stretches out the concrete end face, all the other are not mentioned all with existing concrete self-insulating shear wall or shear wall especially; For example shear wall thickness, reinforcing bar configuration are confirmed by architectural design; Body of wall adopts way and double-layer steel bar concrete or the like by prior art, narration separately no longer one by one, and it is open that explanation of the prior art is equivalent to the present invention; This is familiar with by the technician, to practice thrift length.
Prefabricated concrete self-insulating shear wall of the present invention and assembling concrete building shear wall structure; With respect to prior art; The superimposed anchoring of concrete self-insulating shear wall; Adopt at least one end to be surrounded by the metal bolts of low heat conducting fiber resin bed outward, and about increasing on the prefabricated concrete wall, assemble the shaped steel joint, the upper and lower side reinforcing bar connects the employing sleeve and directly connects.Not only solve the cold and hot bridge phenomenon that the prefabricated concrete self-insulating shear wall of prior art exists, made it to have better thermal insulation (cold) performance; And lifting is simple when assembling, need not resemble to insert reinforced bar sleeve slip casting connection accurately contraposition one by one; The lifting back that puts in place only needs the shaped steel joint fixed with adjacent members and can make the wallboard strong fix, can omit a large amount of temporary fixed bracing frames; The levels reinforcing bar connects the employing sleeve and directly connects, and not only the reinforcing bar quality of connection is guaranteed, and makes the prefabricated units assembling more quick, helps the scene of realizing and assembles fast.The anchoring of concrete wall metal bolts has better coupling bonding strength (reinforcing bar (metal) is the most effective connected mode with concrete, by the building protracted experience is accumulated) with concrete, and makes simply, and cost is low, meets the low-cost requirement of constructional materials.Member shaped steel joint can realize that not only connected node strengthens connection, can also increase the ater-casting concrete strength.Assembling concrete building shear wall structure; Adopt prefabricated concrete self-insulating shear wall and prefabricated concrete self-insulating shear wall corner assembly structure (promptly not adopting the adjacent left and right sides assembly unit of single shear wall); Be similar to frame construction assembling (the shear wall corner is similar to upright of frame during assembling), it is big also to have overcome the shear wall structure overall weight, the lifting difficulty; And the shortcoming that needs large-scale hanging device; Particularly can the shear wall corner be prefabricated into multilayer (for example 2-5 layer) highly, in assembling, can be used as frame column like this, play the role of positioning during for the assembling of lifting shear wall; Can omit a large amount of temporary fixed bracing frames, realize the fast, efficient, safe assembling of shear wall assembled architecture.Prefabricated concrete self-insulating shear wall of this patent and assembly structure are specially adapted to dwelling house and similar shear wall system building.Prefabricated concrete self-insulating shear wall (comprising concrete shear wall corner); Interlayer forms integral fastening and adopts at least one end to be surrounded by the metal bolts of low heat conducting fiber resin bed outward; The shaped steel joint that stretches out the concrete end face is respectively arranged about precast wall body; The connecting reinforcement head that upper and lower side stretches out the concrete face increases thick expansion, and available sleeve directly connects, for being different from the prefabricated concrete shear wall of other band self-heat conservings important symbol.The shear wall assembly structure by the shear wall corner combination of the shear wall that decomposes with the similar corner post of left and right sides, makes and assembles similar frame construction, also is the distinguishing characteristics that is different from the prefabricated concrete shear wall of prior art assembly structure.
Below in conjunction with three specific embodiments, essence of the present invention is further understood in exemplary illustration and help, but the embodiment detail only is for the present invention is described; Do not represent the present invention to conceive whole technical schemes down; Therefore should not be construed as the technical scheme qualification total to the present invention, some are In the view of the technician, and the unsubstantiality that does not depart from the present invention's design increases and/or change; For example simple the change or replacement of technical characterictic to have same or similar technique effect all belongs to protection domain of the present invention.
Description of drawings
Fig. 1 is a kind of prefabricated concrete self-insulating shear wall front schematic view of the present invention.
Fig. 2 is Fig. 1 side-looking structural representation.
Fig. 3 is a kind of structural representation of connector among Fig. 1.
Fig. 4 is the another kind of structural representation of connector among Fig. 1.
Fig. 5 is assembling concrete building shear wall assembly structure schematic top plan view of the present invention.
Fig. 6 is a B-B assembly structure sketch map among Fig. 5.
Fig. 7 directly connects the structure for amplifying sketch map for Fig. 6 E portion reinforced bar sleeve.
Fig. 8 is Fig. 5 exterior wall assembling facade structures sketch map.
Fig. 9 is Fig. 5 interior wall assembling facade structures sketch map.
The specific embodiment
Embodiment 1: referring to Fig. 1-4 and 7; The prefabricated concrete self-insulating shear wall of the present invention; By interior concrete shear wall 1 (thickness >=200mm; Specifically confirm according to architectural design), thick middle 30-50mm low thermal conductivity heat-insulating layer 2 (EPS plate), outer thick 40-60mm concrete slender lobule plate 3 superimposed compositions, the metope thickness direction point that looses is buried underground and is distributed with superimposed anchor connector 4.Middle low thermal conductivity heat-insulating layer 2 and outer concrete slender lobule plate 3, the four sides exceeds shearing metope 1, as the heat insulation and siphonal lobe wall of the adjacent shear wall of assembly unit ater-casting, simultaneously can also be as the external mold (ater-casting only needs internal mold to get final product) of ater-casting.Prefabricated concrete shear wall each side has the connecting reinforcement (wall structure reinforcing bar) 6 that stretches out the concrete end face, and the shaped steel of stretching out joint 7 is respectively arranged at top; Respectively there is the connecting reinforcement (body of wall screw thread main reinforcement) 5 that stretches out the concrete end face at two ends up and down; (go up wainscot sheathing during assembling connects two ends and stretches out and increase the bar reinforcement head and be respectively thick cylindrical bolt head of increasing of pairing and cylindrical thread head upper and lower side connecting reinforcement head for the cylindrical bolt head that increases thick thickening 8mm (radius thickens) and/or cylindrical thread head 8; Can sleeve connect); Wherein cylindrical bolt head 8 axial inner ends faces are processed into the plane, and the bolt head inboard is with long 110mm, outer end in advance and is internal thread 9.1, innerly is the contract branch sleeve 9 of port 9.2 (less than the cylindrical bolt head, rotate and hook the cylindrical bolt head) of plane; Connecting reinforcement cylindrical bolt head 8 inboard next-door neighbour's cylindrical bolt heads increase thick for 8 one sections slightly; Be processed with external screw thread, and nut engaged 10 is with it arranged, prefabricated as required concrete wall upper and lower side connects the shaped steel joint in addition.Precast wall body is reserved with window opening 9 (also can be windowless hole).
Superimposed anchor connector 4 (Fig. 3-4) is the reinforcing bar bolt (the better indented bars that increases thick bolt head for band) that an end has enlarged head 4.2, and an end or whole outer glass fiber reinforced plastic that is surrounded by twine isolation layer 4.1, to block the inside and outside cold and hot bridge of concrete.Embodiment preferentially selects, and the low heat-conducting resin fibrage of outsourcing is arranged on the grip of bolt that stretches into shear wall, outer packet length to isolation layer and be the U type that closed metal contacts with concrete.Enlarged head 4.2 places outer concrete leaf wall.
Embodiment 2: like embodiment 1, and can also outer decorative floor block of siphonal lobe wall and precast wall body one is prefabricated.For example when building concrete, anti-shop outer decorative layer face brick is placed siphonal lobe wall steel mesh reinforcement then on framed bed die, and cast siphonal lobe wall is placed isolation layer and shear force wall reinforcing steel bar net, the cast shear wall; Also can water interior shear wall earlier, after water the siphonal lobe wall, lay the mortar bonding tapestry brick then.Can also be that exterior wall coating material is adopted in prefabricated back, earlier in the brushing of siphonal lobe wall outside, assembling then.
Embodiment 3: referring to Fig. 5-9 (demonstration 16, A, B, C, D8 piece wallboard; Two layers of assembling); Assembling concrete building shear wall assembly structure of the present invention; Mainly (structure is embodiment 1,2 self-heat conserving shear walls roughly the same, and just upper and lower side increases shaped steel joint 11.1 and 14.1 respectively, are used for the vertically fixing and extension connection of corner with the concrete self-insulating shear wall corner of prefabricated 2-5 layer height by the concrete self-insulating shear wall (like embodiment 1,2) of a prefabricated layer height; Successively there is the shaped steel joint 15 that stretches out the concrete end face that joins with body of wall shaped steel joint the side); Exterior wall is prefabricated concrete self-insulating shear wall 13, and internal partition wall then omits shear wall thermal insulation layer and siphonal lobe layer, only is prefabricated concrete shear wall 16 (other are identical with the preformed self thermal insulation shear wall).
During assembling, be connected with 14.1 with midfeather T type corner 14 and through shaped steel joint 11.1 by the hoisting prefabricated concrete self-insulating shear wall right-angled corner 11 of design earlier and fix " column " framework when making it to become assembling; Between column, distinguish hoisting prefabricated concrete self-insulating shear wall 13 (exterior wall) and prefabricated concrete shear wall 16 (internal partition wall) then.Reach body of wall and corner column between body of wall, the shaped steel joint 15 that stretches out through the side connects, and makes the assembling body of wall obtain no support fixation.Connect between body of wall or stretch out reinforcing bar 6 (anchoring overlap joint) between body of wall and corner column; And placement longitudinal reinforcement; Water connecting band 12 (common wide 300-400mm) after the formation, the bottom adopts sleeve directly to connect (E portion amplification by lower floor's reinforcing bar and upper strata body of wall lower rebar; Fig. 7; Rotation is preset in stretches out the inboard branch sleeve 9 of band cylindrical bolt head connecting reinforcement, makes the tension that is spirally connected of the internal thread 9.1 of outer end and the cylindrical thread head of connecting reinforcement relatively, the nut 10 outside the sleeve of screwing at last); Prop up the U-shaped ater-casting 12 that template forms dual-side and base connection at inner face, through watering connecting band after U-shaped two ends high-order notes concrete slurries (the slip casting concrete is higher than 1 label of prefabricated concrete), the full formation of vibrating; Accomplish one deck assembling (adopting the prefabricated concrete shear wall of no self-heat conserving structure at a distance from shear wall 16 in the building).Hoisting prefabricated concrete laminated floor slab 17.1; Lay steel mesh reinforcement in the above, water build floor overlapping layers 17.2, have integrally-built laminated floor slab 17 thereby form with assembled wallboard; Concrete Ye Qiang slit between levels is downward-sloping, and interior filling blocks water and fills 18 (for example rubber strips).Repeat said process, assembling successively is until accomplishing whole building shear wall assembling building.
To those skilled in the art, under this patent design and specific embodiment enlightenment, some distortion that can directly derive or associate from this patent disclosure and general knowledge; Those of ordinary skills will recognize also can adopt additive method, or uses substituting of known technology in the prior art always, and the equivalence of characteristic changes or modification; Mutual various combination between characteristic, the change of low heat conducting fiber resin on the for example prefabricated concrete shear wall thickness anchor bolt, thickness of wall body and structure change (for example offering or offer window opening, door opening) according to the reality building; The shear wall corner configurations changes, and the shear wall assembly structure can also be used for not being with the prefabricated concrete shear wall assembled architecture of isolation layer, shaped steel joint and number change; And the variations in detail of some unsubstantialities changes under this patent design; Or the like unsubstantiality change, can be employed equally, can both realize this patent representation function and effect; Launch for example no longer one by one to describe in detail, all belong to this patent protection domain.
Easy for describing, the said concrete of this patent all refers to steel bar concrete.

Claims (10)

1. prefabricated concrete self-insulating shear wall; Comprise prefabricated superimposed concrete shear wall, low thermal conductivity heat-insulating layer and outer concrete leaf wall; The thickness of spot distribution connects crab-bolt; Reach the connecting reinforcement that peripheric surface stretches out, it is characterized in that said connection crab-bolt is the metal bolts that at least one end is surrounded by low heat conducting fiber resin bed outward, bolt head is positioned at concrete leaf wall; Prefabricated concrete wall at least each side has the shaped steel joint that stretches out the concrete end face; Upper and lower side stretches out concrete end face connecting reinforcement, and head is for radially increasing thick cylindrical bolt head and/or cylindrical thread head, if the cylindrical bolt head, it is that internal thread, the inner are the branch sleeve of reducing that the bolt head inboard is arranged with the outer end in advance.
2. according to the said prefabricated concrete self-insulating shear wall of claim 1, it is characterized in that it is the indented bars bolt of indented bars head jumping-up that thickness connects metal bolts.
3. according to the said prefabricated concrete self-insulating shear wall of claim 1, it is characterized in that the low heat-conducting resin fibrage of metal bolts outsourcing is stretching into the grip of bolt of shear wall, outer packet length to isolation layer and be the U type that closed metal contacts with concrete.
4. according to the said prefabricated concrete self-insulating shear wall of claim 1, it is characterized in that cylindrical bolt head reinforcing bar bolt head inboard increases thick slightly and is processed with external screw thread, has nut outward.
5. according to the said prefabricated concrete self-insulating shear wall of claim 1, it is characterized in that cylindrical bolt head axial inner ends face is the plane, the branch sleeve reducing is the inner plane reducing.
6. according to the said prefabricated concrete self-insulating shear wall of arbitrary claim in the claim 1 to 5, it is characterized in that low thermal conductivity heat-insulating layer and outer concrete leaf wall stretch out the concrete shear wall all around.
7. the assembling concrete is built shear wall structure; Comprise adjacent, the splicing up and down of prefabricated concrete self-insulating shear wall; Link into an integrated entity in the filling of Mosaic face teeming concrete, it is characterized in that with layer left and right sides assembly unit by prefabricated concrete self-insulating shear wall and the combination of prefabricated concrete self-insulating shear wall corner; Said prefabricated concrete self-insulating shear wall and prefabricated concrete self-insulating shear wall corner; Superimposed by concrete shear wall, low thermal conductivity heat-insulating layer and outer concrete leaf wall; At least one end of thickness spot distribution is surrounded by the metal bolts anchoring of low heat conducting fiber resin bed outward; Prefabricated concrete wall and corner at least each side have shaped steel joint and the connecting reinforcement that stretches out the concrete end face; Upper and lower side respectively has the connecting reinforcement that stretches out the concrete end face, and head is and radially increases thick cylindrical bolt head and/or cylindrical thread head, if the cylindrical bolt head; Then the bolt head inboard is arranged with the outer end in advance and is internal thread, inner is the branch sleeve of reducing that cylindrical bolt head and the cylindrical thread head that steel bar end is respectively pairing stretched out at two ends when prefabricated concrete wall connected up and down; Prefabricated concrete shear wall corner upper and lower side also respectively has the shaped steel joint that stretches out the concrete end face.
8. according to the said assembling concrete building of claim 7 shear wall structure, it is characterized in that prefabricated concrete self-insulating shear wall height is a story height.
9. according to the said assembling concrete building of claim 7 shear wall structure, it is characterized in that preformed self thermal insulation shear wall corner height is the 2-5 layer.
10. according to the said assembling concrete of claim 7 building shear wall structure, it is characterized in that the concrete Ye Qiang slit between levels is downward-sloping, the interior filling filling that blocks water.
CN201210178568.3A 2012-06-02 2012-06-02 Precast concrete self-insulating shear wall and assembly type concrete building shear wall structure Expired - Fee Related CN102691366B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201210178568.3A CN102691366B (en) 2012-06-02 2012-06-02 Precast concrete self-insulating shear wall and assembly type concrete building shear wall structure

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201210178568.3A CN102691366B (en) 2012-06-02 2012-06-02 Precast concrete self-insulating shear wall and assembly type concrete building shear wall structure

Publications (2)

Publication Number Publication Date
CN102691366A true CN102691366A (en) 2012-09-26
CN102691366B CN102691366B (en) 2014-02-26

Family

ID=46857091

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201210178568.3A Expired - Fee Related CN102691366B (en) 2012-06-02 2012-06-02 Precast concrete self-insulating shear wall and assembly type concrete building shear wall structure

Country Status (1)

Country Link
CN (1) CN102691366B (en)

Cited By (15)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103510640A (en) * 2013-09-25 2014-01-15 上海市建工设计研究院有限公司 Fabricated shear wall and assembly method thereof
CN103628594A (en) * 2013-12-16 2014-03-12 长沙远大住宅工业有限公司 Cast-in-place shear wall structure equivalent to prefabricated sandwiched superposed shear wall continuous steel bar
CN104005495A (en) * 2014-04-22 2014-08-27 四川正升声学科技有限公司 Assembling type bridge-cutoff sound absorbing and isolating wall body
CN104736781A (en) * 2012-10-22 2015-06-24 阿海珐有限公司 Wall element for building in prefabricated construction
CN105178432A (en) * 2015-08-18 2015-12-23 北京建工华创科技发展股份有限公司 Precast concrete shear wall structure and construction method thereof
CN106065669A (en) * 2014-09-29 2016-11-02 中铁四局集团有限公司 Bar connecting mode in precast shear wall connecting elements
WO2017028476A1 (en) * 2015-08-19 2017-02-23 周兆弟 Prefabricated hoisting wall of assembly-type building
CN106639132A (en) * 2016-10-28 2017-05-10 南通联泷建筑材料有限公司 Linear dry-splicing steel connecting structure for wallboards
CN108222314A (en) * 2018-01-31 2018-06-29 刘士祥 A kind of lightweight measuring fiber concrete filling wall and its manufacture craft
CN108425442A (en) * 2018-05-09 2018-08-21 李藏柱 The connection structure and its construction method of concrete prefabricated panel and steel column
CN108442512A (en) * 2018-04-25 2018-08-24 李藏柱 A kind of prefabricated post/beam and its connection structure and its construction method
CN108612254A (en) * 2018-04-25 2018-10-02 李藏柱 A kind of prefabricated panel and its connection structure and its construction method
CN108661221A (en) * 2018-04-25 2018-10-16 李藏柱 A kind of precast floor slab and its connection structure and its construction method
CN108711354A (en) * 2018-06-12 2018-10-26 重庆大学 A kind of prefabricated assembled frame structure joint structure signal and construction simulation teaching aid
CN109667425A (en) * 2019-01-29 2019-04-23 中国水利水电第八工程局有限公司 The construction method of prefabricated Side fascia with after-pouring band

Citations (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH08100463A (en) * 1994-09-30 1996-04-16 Maeda Corp Work execution method for concrete structure
KR100211534B1 (en) * 1997-02-24 1999-08-02 전주한 The coupling structure between pc wall and pc slab, and the method thereof
US20090120026A1 (en) * 2005-04-12 2009-05-14 Dirk Wetzel Core-Insulated Pre-Fabricated Wall Piece With Connector Pins
CN101603336A (en) * 2008-06-12 2009-12-16 黑龙江宇辉新型建筑材料有限公司 Band filling type wallboard precast concrete short-limb shear wall provided and attaching method thereof
CN101818527A (en) * 2010-06-04 2010-09-01 北京万科企业有限公司 Assembled integral shear wall structure system and construction method thereof
CN101818539A (en) * 2010-06-04 2010-09-01 北京万科企业有限公司 Assembled integral building and construction method thereof
CN101831986A (en) * 2010-06-04 2010-09-15 北京万科企业有限公司 Precast composite outer insulated wall plate and manufacturing method thereof
CN202081537U (en) * 2011-05-04 2011-12-21 南京工业大学 Node connecting structure of reinforced concrete superimposed wall bodies
CN102418385A (en) * 2010-09-28 2012-04-18 杨峰 Novel reinforced concrete prefabricated whole-poured building structure system and construction method thereof
CN202809892U (en) * 2012-06-02 2013-03-20 江苏金砼预制装配建筑发展有限公司 Precast concrete self-insulating shear wall and assembly type concrete building shear wall structure

Patent Citations (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH08100463A (en) * 1994-09-30 1996-04-16 Maeda Corp Work execution method for concrete structure
KR100211534B1 (en) * 1997-02-24 1999-08-02 전주한 The coupling structure between pc wall and pc slab, and the method thereof
US20090120026A1 (en) * 2005-04-12 2009-05-14 Dirk Wetzel Core-Insulated Pre-Fabricated Wall Piece With Connector Pins
CN101603336A (en) * 2008-06-12 2009-12-16 黑龙江宇辉新型建筑材料有限公司 Band filling type wallboard precast concrete short-limb shear wall provided and attaching method thereof
CN101818527A (en) * 2010-06-04 2010-09-01 北京万科企业有限公司 Assembled integral shear wall structure system and construction method thereof
CN101818539A (en) * 2010-06-04 2010-09-01 北京万科企业有限公司 Assembled integral building and construction method thereof
CN101831986A (en) * 2010-06-04 2010-09-15 北京万科企业有限公司 Precast composite outer insulated wall plate and manufacturing method thereof
CN102418385A (en) * 2010-09-28 2012-04-18 杨峰 Novel reinforced concrete prefabricated whole-poured building structure system and construction method thereof
CN202081537U (en) * 2011-05-04 2011-12-21 南京工业大学 Node connecting structure of reinforced concrete superimposed wall bodies
CN202809892U (en) * 2012-06-02 2013-03-20 江苏金砼预制装配建筑发展有限公司 Precast concrete self-insulating shear wall and assembly type concrete building shear wall structure

Cited By (21)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104736781A (en) * 2012-10-22 2015-06-24 阿海珐有限公司 Wall element for building in prefabricated construction
CN103510640A (en) * 2013-09-25 2014-01-15 上海市建工设计研究院有限公司 Fabricated shear wall and assembly method thereof
CN103510640B (en) * 2013-09-25 2016-01-20 上海市建工设计研究院有限公司 A kind of fabricated shear wall and assembly method thereof
CN103628594A (en) * 2013-12-16 2014-03-12 长沙远大住宅工业有限公司 Cast-in-place shear wall structure equivalent to prefabricated sandwiched superposed shear wall continuous steel bar
CN103628594B (en) * 2013-12-16 2016-05-11 长沙远大住宅工业集团有限公司 Prefabricated sandwich overlapped shear wall continuity reinforcement(bar) is equal to cast-in-place shear wall structure
CN104005495A (en) * 2014-04-22 2014-08-27 四川正升声学科技有限公司 Assembling type bridge-cutoff sound absorbing and isolating wall body
CN106065669A (en) * 2014-09-29 2016-11-02 中铁四局集团有限公司 Bar connecting mode in precast shear wall connecting elements
CN105178432A (en) * 2015-08-18 2015-12-23 北京建工华创科技发展股份有限公司 Precast concrete shear wall structure and construction method thereof
WO2017028476A1 (en) * 2015-08-19 2017-02-23 周兆弟 Prefabricated hoisting wall of assembly-type building
CN106639132A (en) * 2016-10-28 2017-05-10 南通联泷建筑材料有限公司 Linear dry-splicing steel connecting structure for wallboards
CN108222314A (en) * 2018-01-31 2018-06-29 刘士祥 A kind of lightweight measuring fiber concrete filling wall and its manufacture craft
CN108442512A (en) * 2018-04-25 2018-08-24 李藏柱 A kind of prefabricated post/beam and its connection structure and its construction method
CN108612254A (en) * 2018-04-25 2018-10-02 李藏柱 A kind of prefabricated panel and its connection structure and its construction method
CN108661221A (en) * 2018-04-25 2018-10-16 李藏柱 A kind of precast floor slab and its connection structure and its construction method
WO2019206193A1 (en) * 2018-04-25 2019-10-31 Li Cangzhu Prefabricated wall panel, connection structure thereof and construction method therefor
CN108442512B (en) * 2018-04-25 2024-04-23 李藏柱 Prefabricated column/beam and connecting structure and construction method thereof
CN108425442A (en) * 2018-05-09 2018-08-21 李藏柱 The connection structure and its construction method of concrete prefabricated panel and steel column
CN108425442B (en) * 2018-05-09 2024-02-06 李藏柱 Connection structure of concrete prefabricated wallboard and steel column and construction method thereof
CN108711354A (en) * 2018-06-12 2018-10-26 重庆大学 A kind of prefabricated assembled frame structure joint structure signal and construction simulation teaching aid
CN109667425A (en) * 2019-01-29 2019-04-23 中国水利水电第八工程局有限公司 The construction method of prefabricated Side fascia with after-pouring band
CN109667425B (en) * 2019-01-29 2021-05-07 中国水利水电第八工程局有限公司 Construction method of assembled prefabricated external wall panel with post-pouring belt

Also Published As

Publication number Publication date
CN102691366B (en) 2014-02-26

Similar Documents

Publication Publication Date Title
CN102691366B (en) Precast concrete self-insulating shear wall and assembly type concrete building shear wall structure
CN202809892U (en) Precast concrete self-insulating shear wall and assembly type concrete building shear wall structure
WO2017197853A1 (en) Insulation precast wall and prefabricated building
CN107740531A (en) Assembled wallboard and its attachment structure
CN205046685U (en) External heated board of prefabricated masonry wall
WO2018099199A1 (en) Prefabricated thermal insulation wall cladding manufacturing method
CN101787760A (en) Steel bar concrete precast floor slab
CN207314655U (en) Fill concrete wallboard in a kind of prefabricated thermal insulation
CN104594531B (en) A kind of modular lightweight band muscle partition wall and construction method thereof
CN207017445U (en) A kind of connecting structure of girder steel and retaining wall
CN105178503B (en) A kind of prefabricated strap-on insulation wallboard
CN113799250A (en) Production method of composite heat-insulation batten convenient to install
CN203795650U (en) Integrated building interior and exterior wall structure
CN219386745U (en) Short limb assembled light steel combined steel wire net frame mortar-perlite-polyphenyl enclosure wall
CN107299718A (en) The precast floor slab and its mounting process of light weight energy-conserving and environment-protective
CN115977278A (en) Assembled light steel combined truss supported steel wire mesh frame mortar-perlite-polyphenyl composite shear wall and manufacturing method thereof
CN106351373A (en) Lattice type prefabricated heat insulation and sound insulation floor
CN115928909A (en) Short-limb shear wall assembled light steel combined truss bearing steel wire mesh frame mortar-perlite-polyphenyl composite enclosure wall and manufacturing method thereof
CN206752744U (en) A kind of two-chamber heat-preserving wall component
CN213062620U (en) Prefabricated foam concrete filled double-sided superposed peripheral retaining wall and retaining wall combination
CN106968363A (en) A kind of two-chamber heat-preserving wall component
CN104563281B (en) A kind of prefabricated balcony structure and its construction method
CN209817222U (en) Connection node of coincide floor and wall body
CN106522408A (en) Assembly type cast-in-place concrete frame thermal-insulating wall component
CN218933507U (en) Assembled light steel wire mesh frame mortar-perlite-polyphenyl shear wall with window holes

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20140226

Termination date: 20150602