CN218933507U - Assembled light steel wire mesh frame mortar-perlite-polyphenyl shear wall with window holes - Google Patents
Assembled light steel wire mesh frame mortar-perlite-polyphenyl shear wall with window holes Download PDFInfo
- Publication number
- CN218933507U CN218933507U CN202223505385.6U CN202223505385U CN218933507U CN 218933507 U CN218933507 U CN 218933507U CN 202223505385 U CN202223505385 U CN 202223505385U CN 218933507 U CN218933507 U CN 218933507U
- Authority
- CN
- China
- Prior art keywords
- steel
- mortar
- steel wire
- frame
- layer
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Images
Classifications
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y02—TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
- Y02A—TECHNOLOGIES FOR ADAPTATION TO CLIMATE CHANGE
- Y02A30/00—Adapting or protecting infrastructure or their operation
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y02—TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
- Y02B—CLIMATE CHANGE MITIGATION TECHNOLOGIES RELATED TO BUILDINGS, e.g. HOUSING, HOUSE APPLIANCES OR RELATED END-USER APPLICATIONS
- Y02B30/00—Energy efficient heating, ventilation or air conditioning [HVAC]
- Y02B30/90—Passive houses; Double facade technology
Landscapes
- Building Environments (AREA)
Abstract
本实用新型公开了装配式带窗洞轻钢钢丝网架砂浆‑珍珠岩‑聚苯剪力墙,涉及装配式混凝土建筑结构工程技术领域。包括钢丝网砂浆‑珍珠岩面层,由钢丝网砂浆层以及珍珠岩防火层构成;承重钢丝网架,由内、外钢丝网点焊水平腹丝及斜向腹丝构成;轻钢框格,由C形钢焊接而成;轻钢组合桁架由钢丝网砂浆层条带外弦、轻钢框格竖向C形钢内弦、沉头断桥长自攻钉构成;窗边框自攻钉集块组合连接构造,为配筋砂浆条带与混凝土剪力墙窗框轻钢框格的连接节点;装配式剪力墙组合连接构造,是指上、下混凝土剪力墙板间采用钢筋套筒装配,左、右剪力墙采用后浇混凝土条带装配。本实用新型厚度小、质量轻,抗火、防水和隔热性能好。
The utility model discloses an assembled light steel wire grid mortar-perlite-polyphenyl shear wall with window holes, and relates to the technical field of assembled concrete building structure engineering. Including steel mesh mortar-perlite surface layer, which is composed of steel mesh mortar layer and perlite fireproof layer; load-bearing steel wire mesh frame, composed of inner and outer steel mesh spot-welded horizontal webs and oblique webs; C-shaped steel is welded; light steel composite truss is composed of steel wire mesh mortar layer strip outer chord, light steel frame vertical C-shaped steel inner chord, countersunk head broken bridge long self-tapping nails; window frame self-tapping nail aggregates The combined connection structure is the connection node between the reinforced mortar strip and the light steel frame of the concrete shear wall window frame; the combined connection structure of the prefabricated shear wall refers to the assembly of the upper and lower concrete shear wall panels with a steel sleeve , the left and right shear walls are assembled with post-cast concrete strips. The utility model has the advantages of small thickness, light weight, good fire resistance, waterproof and heat insulation performance.
Description
技术领域technical field
本实用新型属于装配式混凝土建筑结构工程技术领域,更具体地说,是涉及一种装配式带窗洞轻钢组合桁架承托钢丝网架砂浆-珍珠岩-聚苯复合剪力墙。The utility model belongs to the technical field of prefabricated concrete building structure engineering, and more specifically relates to a prefabricated light steel composite truss with window holes supporting a steel wire grid mortar-perlite-polyphenyl composite shear wall.
背景技术Background technique
目前,多、高层住宅建筑中装配式混凝土结构广泛应用,但与其匹配的保温节能预制部构件的创新发展较为滞后,超低能耗、近零能耗建筑的围护结构热工性能不高、集成程度低等问题仍然存在。因此研发多功能一体化装配式剪力墙外墙体系,研发集装饰、防火、防水、隔热、耐候一体化的装配式复合外墙体系,是国家装配式绿色建筑发展的重大需求。At present, prefabricated concrete structures are widely used in multi- and high-rise residential buildings, but the innovation and development of matching thermal insulation and energy-saving prefabricated components lag behind. The problem of low level still exists. Therefore, it is a major demand for the development of national prefabricated green buildings to develop a multi-functional integrated prefabricated shear wall exterior wall system, and to develop a prefabricated composite exterior wall system that integrates decoration, fire protection, waterproof, heat insulation, and weather resistance.
现有技术存在的瓶颈问题:1、传统外墙外保温在风荷载、长期荷载作用下易脱且落耐候性差,近年来,外墙外保温层脱落导致的安全事故频繁发生,事故集中表现在保温砂浆脱落和粘结为主的无机轻集料防火保温板脱落;一旦外墙外保温层空鼓脱落,将连同外部装饰面层大面积从高空掉落,极易造成周边行人受伤或物体损坏;2、超厚保温层长期荷载下变形难以控制,传统外保温层的使用受建筑高度限制,由于外墙外保温沿建筑外墙通高设置,且保温板弹性模量较低、变形较大,其砂浆保温层的重力荷载无法完全传递到本层的主体结构上,因此随结构高度提高会产生重力荷载累积效应,不利于外保温层的整体稳定性,国内部分地区已经对薄抹灰外墙保温系统应用高度进行了严格限制;3、传统外保温墙体窗洞口构造整体性差,外保温构造容易在窗洞口处开裂剥落,耐候性以及保温性能难以满足使用需求;4、传统外保温墙体抗火性能差,多数外保温构造无防火保护层,且聚苯乙烯、聚氨酯、发泡橡胶等有机保温板耐火性能差,导致了多起外墙外保温系统火灾事故的发生;5、外保温构造与基层墙体多采用膨胀塑料锚栓以及保温塑料钉进行锚固连接,非金属连接件抗拉及抗剪强度低、耐候性差,无法保证保温构造与墙板的有效拉结;6、传统外保温板拼缝及洞口处理困难,拼缝位置渗漏水问题较为严重,极易造成保温构造松动发生脱落。Bottleneck problems in the existing technology: 1. The traditional external wall insulation is easy to fall off under the action of wind load and long-term load, and its weather resistance is poor. The insulation mortar falls off and the bonded inorganic light aggregate fireproof insulation board falls off; once the outer insulation layer of the outer wall falls off, it will fall from a large area together with the external decorative surface layer, which will easily cause injuries to nearby pedestrians or damage to objects ;2. The deformation of the ultra-thick insulation layer under long-term load is difficult to control. The use of the traditional external insulation layer is limited by the height of the building. Since the external insulation of the external wall is set along the overall height of the external wall of the building, and the elastic modulus of the insulation board is low, the deformation is large , the gravity load of the mortar insulation layer cannot be completely transmitted to the main structure of this layer, so as the height of the structure increases, the cumulative effect of gravity load will occur, which is not conducive to the overall stability of the external insulation layer. The application height of the wall insulation system is strictly limited; 3. The structure of the window opening of the traditional external thermal insulation wall is poor in integrity, and the external thermal insulation structure is easy to crack and peel off at the window opening, and the weather resistance and thermal insulation performance are difficult to meet the needs of use; 4. The traditional external thermal insulation wall Most of the external insulation structures have no fire protection layer, and organic insulation boards such as polystyrene, polyurethane, and foam rubber have poor fire resistance, which has led to many fire accidents in the external insulation system of external walls; 5. The thermal insulation structure and the base wall are mostly anchored and connected by expansion plastic anchor bolts and thermal insulation plastic nails. The non-metallic connectors have low tensile and shear strength and poor weather resistance, which cannot guarantee the effective connection between the thermal insulation structure and the wallboard; 6. Traditional The joints and openings of the external insulation boards are difficult to deal with, and the problem of water leakage at the joints is more serious, which can easily cause the insulation structure to loosen and fall off.
实用新型内容Utility model content
本实用新型所要解决的技术问题是提供一种装配式带窗洞轻钢组合桁架承托钢丝网架砂浆-珍珠岩-聚苯复合剪力墙,适于装配式混凝土剪力墙结构超低能耗房屋带窗洞外墙,厚度小、质量轻,抗火、防水和隔热性能好。The technical problem to be solved by the utility model is to provide a prefabricated light steel composite truss with window holes supporting a steel wire grid mortar-perlite-polyphenyl composite shear wall, which is suitable for ultra-low energy consumption houses with prefabricated concrete shear wall structures The outer wall with window openings is small in thickness, light in weight, and has good fire resistance, waterproof and heat insulation performance.
为解决上述技术问题,本实用新型所采取的技术方案是:In order to solve the problems of the technologies described above, the technical solution adopted by the utility model is:
装配式带窗洞轻钢组合桁架承托钢丝网架砂浆-珍珠岩-聚苯复合剪力墙包括:Prefabricated light steel composite truss with window holes supporting steel wire grid mortar-perlite-polystyrene composite shear wall includes:
装配式混凝土剪力墙,由混凝土剪力墙、窗洞以及窗洞上部的连梁组成;剪力墙分布钢筋、剪力墙竖向连接钢筋、拉结钢筋以及连梁钢筋笼和连梁竖向连接钢筋绑扎形成剪力墙钢筋笼,剪力墙竖向连接钢筋下部连接有灌浆套筒,剪力墙竖向连接钢筋在墙板顶部伸出的部分以及连梁竖向连接钢筋在墙板顶部伸出的部分均与装配式混凝土楼板以及上一层的灌浆套筒连接;Prefabricated concrete shear walls are composed of concrete shear walls, window openings and coupling beams on the upper part of window openings; shear wall distribution reinforcement, shear wall vertical connection reinforcement, tie reinforcement, and coupling beam reinforcement cage and coupling beam vertical connection The steel bars are bound to form a shear wall reinforcement cage. The lower part of the vertical connection reinforcement of the shear wall is connected with a grouting sleeve. The part out is connected with the prefabricated concrete floor and the grouting sleeve on the upper floor;
轻钢框格,布置在剪力墙分布钢筋的外侧,由轻钢框格竖向C形钢以及轻钢框格横向C形钢焊接而成,窗框边的横向和竖向C形钢焊接形成窗框轻钢框格;轻钢框格的腹板上开有轻钢框格自攻钉孔,翼缘开有轻钢框格翼缘凹槽;The light steel frame is arranged on the outside of the distributed reinforcement of the shear wall. It is welded by the vertical C-shaped steel of the light steel frame and the horizontal C-shaped steel of the light steel frame. The horizontal and vertical C-shaped steel of the window frame edge is welded Form the light steel sash of the window frame; the web plate of the light steel sash is provided with light steel sash self-tapping nail holes, and the flange is provided with the groove of the light steel sash flange;
内叶内钢丝网砂浆层:由内叶砂浆层钢丝网与内叶砂浆连接层构成,U形钢丝的翼缘与内叶砂浆层钢丝网点焊,U形钢丝的腹杆与轻钢框格焊接;Inner leaf inner steel wire mesh mortar layer: It is composed of inner leaf mortar layer steel wire mesh and inner leaf mortar connecting layer, the flange of U-shaped steel wire is spot-welded with the steel wire mesh of inner leaf mortar layer, and the web bar of U-shaped steel wire is welded with light steel frame ;
钢丝网架砂浆-珍珠岩-聚苯保温构造,由带聚苯保温板燕尾槽的聚苯保温板、珍珠岩板以及外叶砂浆层和外叶砂浆层钢丝网组成,聚苯保温板上的燕尾槽与内叶砂浆连接层机械咬合;The steel wire grid mortar-perlite-polystyrene insulation structure is composed of polystyrene insulation board with polystyrene insulation board dovetail groove, perlite board, outer leaf mortar layer and outer leaf mortar layer steel wire mesh, polystyrene insulation board The dovetail groove is mechanically engaged with the mortar connection layer of the inner leaf;
承重钢丝网架,由外叶砂浆层钢丝网、内叶砂浆层钢丝网点焊钢丝网架水平腹丝以及钢丝网架斜向腹丝构成,钢丝网架水平腹丝及钢丝网架斜向腹丝穿透珍珠岩板以及聚苯保温板后伸入剪力墙混凝土,从而实现对钢丝网架砂浆-珍珠岩-聚苯保温构造与混凝土剪力墙的拉结;The load-bearing steel wire frame is composed of the outer leaf mortar layer steel wire mesh, the inner leaf mortar layer steel wire mesh spot-welded steel wire mesh frame horizontal belly wire and the steel wire mesh frame oblique belly wire, the steel wire mesh frame horizontal belly wire and the steel wire mesh frame oblique belly wire After penetrating the perlite board and polystyrene insulation board, it extends into the concrete of the shear wall, so as to realize the connection between the steel wire grid mortar-perlite-polystyrene insulation structure and the concrete shear wall;
轻钢组合桁架,由外砂浆面层与外叶砂浆层钢丝网构成的钢丝网砂浆层条带外弦、轻钢框格竖向C形钢以及轻钢框格横向C形钢的内弦、水平沉头断桥长自攻钉连接件的腹杆以及组合沉头断桥长自攻钉连接件的弦杆构成;断桥自攻钉连接件钻透珍珠岩板聚苯保温板后自攻连接轻钢框格竖向C形钢与轻钢框格横向C形钢;Light steel composite truss, the outer chord of the steel mesh mortar layer strip composed of the outer mortar surface layer and the outer leaf mortar layer steel mesh, the vertical C-shaped steel of the light steel frame and the inner chord of the horizontal C-shaped steel of the light steel frame, The web bar of the horizontal countersunk head broken bridge long self-tapping screw connector and the chord rod of the combined countersunk head broken bridge long self-tapping screw connector; the broken bridge self-tapping screw connector is self-tapping after drilling through the perlite board polystyrene insulation board Connect the vertical C-shaped steel of the light steel frame and the horizontal C-shaped steel of the light steel frame;
窗洞自攻钉集块连接构造,窗框砂浆条带内置窗框砂浆条带钢丝网,窗框砂浆条带钢架网与外叶砂浆层钢丝网以及内叶砂浆层钢丝网搭接,在窗框砂浆条带钢丝网上焊接砂浆条带传力钢板,砂浆条带传力钢板与窗框轻钢框格的C形钢对接,在窗框砂浆条带的凹槽内放入开自攻钉孔的连接钢板,采用自攻钉穿过连接钢板后自攻连接砂浆条带传力钢板以及窗框轻钢框格的C形钢翼缘;采用高新性能砂浆抹平窗框砂浆条带的凹槽,形成自攻钉集块节点;Window hole self-tapping screw block connection structure, window frame mortar strip with built-in window frame mortar strip steel wire mesh, window frame mortar strip steel frame mesh and outer leaf mortar layer steel mesh and inner leaf mortar layer steel mesh overlap, in the window Weld the mortar strip force-transmission steel plate on the steel wire mesh of the frame mortar strip, and the mortar strip force transmission steel plate is connected with the C-shaped steel of the light steel frame of the window frame, and put the self-tapping nail holes in the groove of the window frame mortar strip The connecting steel plate is connected by self-tapping nails through the connecting steel plate and then self-tapping to connect the mortar strip to the force-transmitting steel plate and the C-shaped steel flange of the light steel frame of the window frame; use high-tech performance mortar to smooth the groove of the mortar strip on the window frame , forming a self-tapping nail cluster node;
组合连接构造,包括上、下剪力墙中的剪力墙分布钢筋与灌浆套筒内的注灌浆料、左、右剪力墙的混凝土后浇条带构成的剪力墙连接构造;还包括聚苯保温板企口涂抹水泥基胶浆构成的保温层连接构造以及外叶钢丝网水泥砂浆层后抹条带连接上、下及左、右墙板的外叶砂浆层钢丝网的连接构造;所述外叶钢丝网水泥砂浆层后抹条带为墙板上、下以及左、右外钢丝网砂浆层连接构造;预制墙板上、下以及左、右端部预留75mm宽外砂浆面层后抹条带,墙板吊装定位后,上、下或左、右相邻的墙板外钢丝网砂浆层连接位置为150mm宽后抹层,内置50mm间距、2mm直径加强钢丝网,并涂抹高性能保温砂浆;所述混凝土后浇条带为左、右相邻墙板装配连接构造,水平分布钢筋突出墙板左右两端280mm与相邻墙板搭接并绑扎竖向构造筋和拉结钢筋后浇筑混凝土后浇条带,完成左、右墙板的装配连接。Combined connection structure, including the shear wall connection structure composed of the shear wall distribution reinforcement in the upper and lower shear walls, the grouting material in the grouting sleeve, and the concrete post-casting strips of the left and right shear walls; it also includes The connection structure of the insulation layer composed of cement-based mortar applied to the tongue and groove of the polystyrene insulation board and the connection structure of the steel wire mesh of the outer leaf mortar layer of the outer leaf steel wire mesh cement mortar layer connected by the upper, lower, left and right wall panels; The steel wire mesh cement mortar layer of the outer leaf is wiped strips for the connection structure of the wallboard, bottom, left and right outer steel wire mesh mortar layers; 75mm wide outer mortar surface layer is reserved for the prefabricated wallboard, bottom, left and right ends After the wall panel is hoisted and positioned, the connection position of the outer steel wire mesh mortar layer of the upper, lower or left and right adjacent wall panels is 150mm wide. Performance insulation mortar; the concrete post-casting strips are assembled and connected structures of left and right adjacent wall panels, and horizontally distributed steel bars protrude from the left and right ends of the wall panels by 280mm to overlap with adjacent wall panels and bind vertical structural bars and tie bars After pouring the concrete and pouring strips, the assembly connection of the left and right wall panels is completed.
优选地,所述混凝土剪力墙,为装配式钢筋混凝土剪力墙;剪力墙分布钢筋采用双排配筋,水平分布钢筋的直径为10mm,间距为200mm,竖向分布钢筋直径为10mm,间距为200mm,净保护层厚度为20mm,间隔400mm布置直径为6mm的拉结钢筋;采用灌浆套筒装配连接,在墙板底部间距600设置16个灌浆套筒,采用对称布置的16根直径为16mm的钢筋作为上、下剪力墙的剪力墙竖向连接钢筋以及连梁竖向连接钢筋;剪力墙分布钢筋中的竖向分布钢筋不突出墙板,剪力墙纵向连接钢筋以及连梁竖向连接钢筋的顶部突出墙板240mm与装配式混凝土楼板以及上墙板相连;在墙板底部的灌浆套筒及其上300mm范围内,总加密高度为500mm,加密布置剪力墙分布钢筋的直径为10mm、间距为100mm的水平分布钢筋,水平分布钢筋突出墙板左右两端280mm与相邻墙板搭接后浇筑混凝土后浇条带。Preferably, the concrete shear wall is a prefabricated reinforced concrete shear wall; the distribution reinforcement of the shear wall adopts double rows of reinforcement, the diameter of the horizontal distribution reinforcement is 10mm, the spacing is 200mm, and the diameter of the vertical distribution reinforcement is 10mm. The spacing is 200mm, the net protective layer thickness is 20mm, and the tie bars with a diameter of 6mm are arranged at an interval of 400mm; grouting sleeves are used for assembly and connection, and 16 grouting sleeves are set at the bottom of the wallboard at a spacing of 600. The 16 symmetrically arranged diameters are The 16mm steel bar is used as the vertical connecting steel bar of the shear wall and the vertical connecting steel bar of the connecting beam of the upper and lower shear walls; The top of the vertically connected reinforcement of the beam protrudes from the wall panel by 240mm and is connected with the prefabricated concrete floor and the upper wall panel; within the scope of the grouting sleeve at the bottom of the wall panel and the upper 300mm, the total densification height is 500mm, and the densification layout of the shear wall distributes the reinforcement Horizontally distributed steel bars with a diameter of 10mm and a spacing of 100mm, the horizontally distributed steel bars protrude from the left and right ends of the wallboard by 280mm to overlap with the adjacent wallboards, and then pour concrete and pour strips.
优选地,所述连梁为混凝土剪力墙的窗洞顶部的连接构造,其长度与窗洞宽度相等,截面高度为窗洞上沿至墙板混凝土顶部的距离,截面宽度与墙体厚度相等;其内部配置6根直径10mm的纵向钢筋,以及直径8mm间距150mm的箍筋;纵向钢筋与箍筋形成了连梁钢筋笼;在连梁的纵筋之间配置直径16mm的连梁竖向连接钢筋,与上墙板的灌浆套筒连接;连梁的底部,即窗洞上沿配置有窗框轻钢框格的横向C形钢,连梁沿长度方向等距布置两段轻钢框格竖向C形钢。Preferably, the connecting beam is a connection structure at the top of the window opening of the concrete shear wall, its length is equal to the width of the window opening, the section height is the distance from the upper edge of the window opening to the concrete top of the wall panel, and the section width is equal to the thickness of the wall body; Configure 6 longitudinal steel bars with a diameter of 10mm and stirrups with a diameter of 8mm and a spacing of 150mm; The grouting sleeve connection of the upper wall panel; the bottom of the connecting beam, that is, the upper edge of the window opening is equipped with a horizontal C-shaped steel of light steel sash for the window frame, and the connecting beam is arranged with two sections of light steel sash vertically C-shaped equidistantly along the length direction steel.
优选地,所述轻钢框格竖向C形钢与所述轻钢框格横向C形钢是由竖向、水平间距均不大于800的C形钢焊接而成,轻钢框格在与内叶砂浆层钢丝网净距10mm的位置采用直径为2mm的U形钢丝分别点焊以连接钢丝网和轻钢框格,轻钢框格竖向C形钢与内叶砂浆层钢丝网水平分布钢丝点焊,轻钢框格横向C形钢与内叶砂浆层钢丝网竖向分布钢丝点焊,水平、竖向点焊的间距不大于200mm;轻钢框格截面高70mm、宽50mm、板厚不小于2mm,轻钢框格开宽140mm、高60mm轻钢框格翼缘凹槽,从而形成净距140mm、高60mm、宽60mm的凸出钢段;轻钢框格竖向C形钢凸出钢段从剪力墙的水平及竖向分布钢筋之间距外侧分布钢筋净距10mm的位置锚入剪力墙混凝土,内叶砂浆层钢丝网与剪力墙外侧分布钢筋的净距为20mm,浇筑剪力墙混凝土后带凸出钢段的轻钢框格10mm通高截面嵌入剪力墙混凝土10mm,凸出钢段锚固于剪力墙混凝土中60mm;为便于自攻钉连接间自攻轻钢框格的C形钢腹板,在轻钢框格竖向C形钢与轻钢框格横向C形钢的腹板上开小于自攻钉直径的圆孔,以便于自攻钉穿过。Preferably, the vertical C-shaped steel of the light steel sash and the transverse C-shaped steel of the light steel sash are welded by C-shaped steel with vertical and horizontal spacings not greater than 800, and the light steel sash is welded with U-shaped steel wires with a diameter of 2mm are spot-welded at the 10mm net distance of the steel wire mesh of the inner leaf mortar layer to connect the steel wire mesh and the light steel frame, and the vertical C-shaped steel of the light steel frame is horizontally distributed with the steel wire mesh of the inner leaf mortar layer Steel wire spot welding, light steel frame horizontal C-shaped steel and inner leaf mortar layer steel wire mesh vertically distributed steel wire spot welding, the distance between horizontal and vertical spot welding is not more than 200mm; the light steel frame section is 70mm high, 50mm wide, plate The thickness is not less than 2mm, and the light steel frame has a width of 140mm and a height of 60mm. The flange groove of the light steel frame forms a protruding steel section with a clear distance of 140mm, a height of 60mm, and a width of 60mm; the vertical C-shaped steel of the light steel frame The protruding steel section is anchored into the concrete of the shear wall at a position of 10mm between the horizontal and vertical distribution steel bars of the shear wall and the outer distribution steel bars, and the net distance between the steel wire mesh of the inner leaf mortar layer and the outer distribution steel bars of the shear wall is 20mm After pouring the shear wall concrete, the 10mm high section of the light steel frame with protruding steel section is embedded in the shear wall concrete for 10mm, and the protruding steel section is anchored in the shear wall concrete for 60mm; in order to facilitate self-tapping between self-tapping nail connections For the C-shaped steel web of the light steel frame, round holes smaller than the diameter of self-tapping screws are opened on the webs of the vertical C-shaped steel of the light steel frame and the horizontal C-shaped steel of the light steel frame, so that the self-tapping screws can penetrate Pass.
优选地,所述窗框轻钢框格为沿混凝土剪力墙的窗洞四周布置的轻钢框格,沿窗框左、右边缘布置轻钢框格竖向C形钢,沿窗框上、下边缘布置轻钢框格横向C形钢,窗框轻钢框格靠近传动一侧翼缘外表面与窗框表面混凝土平齐,其翼缘内侧粘贴木块,自攻钉穿过连接钢板上的自攻钉孔,自攻连接窗框轻钢框格翼缘,自攻钉钻入翼缘内侧的木块。Preferably, the light steel sash of the window frame is a light steel sash arranged around the window opening of the concrete shear wall, the vertical C-shaped steel of the light steel sash is arranged along the left and right edges of the window frame, and the vertical C-shaped steel of the light steel sash is arranged along the upper, Light steel sash horizontal C-shaped steel is arranged on the lower edge, the outer surface of the light steel sash of the window frame near the drive side is flush with the concrete on the surface of the window frame, wood blocks are pasted on the inner side of the flange, and self-tapping screws pass through the joints on the connecting steel plate Self-tapping nail holes, self-tapping connection to the light steel sash flange of the window frame, self-tapping nails drilled into the wood block inside the flange.
优选地,所述内叶砂浆连接层内叶砂浆层钢丝网为聚苯保温板燕尾槽与剪力墙混凝土的砂浆层,内叶砂浆层钢丝网与带燕尾槽聚苯保温板的净间距为10mm,采用强度不低于C20的14mm厚的砂浆带麻面抹平内叶砂浆层钢丝网与聚苯保温板燕尾槽的间隙;U形钢丝为内叶砂浆层钢丝网与轻钢框格连接构造,其弯折翼缘与内叶砂浆层钢丝网钢丝点焊,腹杆与轻钢框格竖向C形钢以及轻钢框格横向C形钢焊接;所述聚苯保温板为内侧与内叶砂浆连接层连接处带有燕尾槽的聚苯保温板;所述珍珠岩板为墙板防火层,其厚度为25mm;所述外叶砂浆层为墙板外侧强度大于或等于C20的25mm厚的砂浆层,外叶砂浆层内置直径为2mm间距50mm的外叶砂浆层钢丝网,外叶砂浆层钢丝网的砂浆净保护层厚度为10mm。Preferably, the inner leaf mortar layer steel wire mesh of the inner leaf mortar connection layer is a mortar layer of polystyrene insulation board dovetail groove and shear wall concrete, and the net distance between the inner leaf mortar layer steel wire mesh and the polystyrene insulation board with dovetail groove is 10mm, use a 14mm thick mortar with a strength not lower than C20 to smooth the gap between the steel wire mesh of the inner leaf mortar layer and the dovetail groove of the polystyrene insulation board; the U-shaped steel wire is the connection structure between the steel wire mesh of the inner leaf mortar layer and the light steel frame , the bent flange is spot-welded with the steel wire mesh steel wire of the inner leaf mortar layer, the web bar is welded with the vertical C-shaped steel of the light steel frame and the horizontal C-shaped steel of the light steel frame; the polystyrene insulation board is the inner and inner The polystyrene insulation board with dovetail grooves at the joint of the leaf mortar connection layer; the perlite board is the fireproof layer of the wallboard, and its thickness is 25mm; the outer leaf mortar layer is 25mm thick with the outer strength of the wallboard greater than or equal to C20 The outer leaf mortar layer has a built-in outer leaf mortar layer steel wire mesh with a diameter of 2mm and a spacing of 50mm, and the mortar net protective layer thickness of the outer leaf mortar layer steel mesh is 10mm.
优选地,所述窗框砂浆条带为连接内叶砂浆连接层与外叶砂浆层的窗框封边混凝土砂浆条带,其厚度为50mm,宽度为外叶砂浆层至混凝土剪力墙外表面的距离,其内部配置直径4mm间距200mm的窗框砂浆条带钢筋网,窗框砂浆条带钢筋网嵌入内叶砂浆连接层与外叶砂浆层100mm与内叶砂浆层钢丝网和外叶砂浆层钢丝网搭接并绑扎;长220mm宽80mm的砂浆条带传力钢板与窗框砂浆条带钢筋网的2根沿剪力墙平面外方向的分布钢筋焊接,钢板外侧与剪力墙平面平行方向的分布钢筋焊接以加强钢板与窗框砂浆条带的锚固性能,砂浆条带传力钢板处的窗框砂浆条带留有凹槽,砂浆条带传力钢板与窗框轻钢框格对接,采用自攻钉穿过连接钢板自攻钉孔,自攻钻入砂浆条带传力钢板以及窗框轻钢框格,最后采用高性能砂浆将砂浆条带传力钢板处窗框砂浆条带凹槽填平。Preferably, the window frame mortar strip is a window frame edge-sealing concrete mortar strip connecting the inner leaf mortar connection layer and the outer leaf mortar layer, its thickness is 50mm, and the width is from the outer leaf mortar layer to the outer surface of the concrete shear wall The distance between the window frames and mortar strips with a diameter of 4mm and a spacing of 200mm is arranged inside, and the window frame mortar strips and steel mesh are embedded in the inner leaf mortar connection layer and the outer leaf mortar layer 100mm, and the inner leaf mortar layer steel wire mesh and the outer leaf mortar layer The steel mesh is lapped and bound; the 220mm long and 80mm wide mortar strip force-transmitting steel plate is welded to the two distributed reinforcement bars of the window frame mortar strip steel mesh along the direction outside the plane of the shear wall, and the outside of the steel plate is parallel to the plane of the shear wall The distribution of steel bars is welded to strengthen the anchoring performance of the steel plate and the window frame mortar strip. The window frame mortar strip at the force transmission steel plate of the mortar strip has grooves, and the mortar strip force transmission steel plate is docked with the light steel frame of the window frame. Use self-tapping nails to pass through the self-tapping holes of the connecting steel plates, self-tapping drill into the mortar strip force-transmission steel plate and the light steel frame of the window frame, and finally use high-performance mortar to make the mortar strip concave on the window frame mortar strip at the force-transmission steel plate Groove filled.
优选地,所述水平沉头断桥长自攻钉连接件与组合沉头断桥长自攻钉连接件均为轻钢组合桁架的腹杆,是连接25mm厚钢丝网砂浆层条带外弦与轻钢框格内弦的连接件;水平沉头断桥长自攻钉连接件与组合沉头断桥长自攻钉连接件沉入尺寸大于或等于50mm的沉头纤维复合连接件钻透珍珠岩-聚苯保温层并自攻连接轻钢框格;沉头纤维复合连接件为3mmX60mmX60mm的外方板、退台4mmX46mmX46mm方板、居中的外径14mm内径10mm长50mm的空心圆杆、居中的外径14mm内径6mm长20mm的空心圆杆一次成型的连接件;水平沉头断桥长自攻钉连接件的沉头纤维复合连接件的方板与空心圆杆的角度为90度,组合沉头断桥长自攻钉连接件沉头纤维复合连接件的矩形板与空心圆杆的角度分为穿过水平长自攻钉的90度、穿过斜向向上长自攻钉的45度两种;钢制自攻钉的钉帽直径10mm、钉杆6mm、通长带螺纹;在轻钢框格竖向C形钢的顶部与底部布置水平沉头断桥长自攻钉连接件,中部布置组合沉头断桥长自攻钉连接件;轻钢框格横向C形钢上布置水平沉头断桥长自攻钉连接件,间距不超过800mm。Preferably, the horizontal countersunk head broken bridge long self-tapping screw connector and the combined countersunk head broken bridge long self-tapping screw connector are the webs of the light steel composite truss, which are connected to the outer chord of the 25mm thick steel wire mesh mortar layer strip The connecting piece with the inner chord of the light steel frame; the horizontal countersunk head broken bridge long self-tapping screw connecting piece and the combined countersunk head broken bridge long self-tapping screw connecting piece sink into the countersunk head fiber composite connecting piece with a size greater than or equal to 50mm and drill through The perlite-polystyrene insulation layer is self-tapping and connected to the light steel frame; the countersunk fiber composite connector is an outer square plate of 3mmX60mmX60mm, a setback 4mmX46mmX46mm square plate, a hollow round rod with an outer diameter of 14mm and an inner diameter of 10mm and a length of 50mm in the center, The hollow round rod with an outer diameter of 14mm and an inner diameter of 6mm and a length of 20mm is a connecting piece formed at one time; the angle between the square plate and the hollow round rod of the horizontal countersunk broken bridge long self-tapping screw connector is 90 degrees, and the combination Countersunk head broken bridge long self-tapping screw connector The angle between the rectangular plate of the countersunk head fiber composite connector and the hollow round rod is divided into 90 degrees through the horizontal long self-tapping screw and 45 degrees through the oblique upward long self-tapping screw Two types; the steel self-tapping screw has a cap diameter of 10mm, a nail shaft of 6mm, and a threaded length; the horizontal countersunk head broken bridge long self-tapping screw connector is arranged on the top and bottom of the vertical C-shaped steel of the light steel frame, Combined countersunk head broken bridge long self-tapping screw connectors are arranged in the middle; horizontal countersunk head broken bridge long self-tapping screw connectors are arranged on the horizontal C-shaped steel of the light steel frame grid, and the spacing does not exceed 800mm.
优选地,所述钢丝网架水平腹丝与钢丝网架斜向腹丝,为连接内叶砂浆层钢丝网与外叶砂浆层钢丝网的承托钢筋丝;钢丝网架由内叶砂浆层钢丝网、外叶砂浆层钢丝网点焊间距200mm的直径为2mm的钢丝网架水平腹丝及斜向向上45度的钢丝网架斜向腹丝构成,钢丝网架水平腹丝及钢丝网架斜向腹丝穿透25mm厚的珍珠岩板以及24mm厚的内叶砂浆连接层粘接带燕尾槽的200mm厚的聚苯保温板后伸入剪力墙混凝土水平投影60mm。Preferably, the horizontal abdominal wires of the steel wire mesh frame and the oblique abdominal wires of the steel wire mesh frame are supporting steel wires connecting the inner leaf mortar layer steel wire mesh and the outer leaf mortar layer steel wire mesh; the steel wire mesh frame is composed of inner leaf mortar layer steel wires The net and the outer blade mortar layer steel wire mesh are spot welded at a distance of 200mm, and the horizontal abdominal wires of the steel wire grid with a diameter of 2mm and the oblique abdominal wires of the steel wire grid with an upward angle of 45 degrees are formed. The horizontal abdominal wires of the steel wire grid and the oblique The abdominal wire penetrates the 25mm thick perlite slab and the 24mm thick inner leaf mortar connection layer, which is bonded with the 200mm thick polystyrene insulation board with dovetail grooves, and then extends into the shear wall concrete for a horizontal projection of 60mm.
装配式带窗洞轻钢组合桁架承托钢丝网架砂浆-珍珠岩-聚苯复合剪力墙的作法包括以下内容:The method of prefabricated light steel composite truss with window holes supporting steel wire grid mortar-perlite-polystyrene composite shear wall includes the following contents:
首先,制备保温剪力墙,工艺如下:First, prepare the thermal insulation shear wall, the process is as follows:
第一步、工厂加工轻钢框格竖向和横向C形钢并焊接,绑扎剪力墙钢筋笼、连梁钢筋笼,安装灌浆套筒,购买聚苯保温板与珍珠岩板,并将其切割拼装成所需尺寸;制备内外钢丝网、钢丝网架腹丝以及焊接有传力钢板的窗框砂浆条带钢筋网,预制水平沉头断桥长自攻钉连接件和组合沉头断桥长自攻钉连接件;The first step, the factory processes and welds the vertical and horizontal C-shaped steel of the light steel frame, binds the shear wall reinforcement cage and the connecting beam reinforcement cage, installs the grouting sleeve, purchases the polystyrene insulation board and the perlite board, and installs them Cutting and assembling into the required size; preparation of internal and external steel wire mesh, steel wire mesh frame belly wire and window frame mortar strip steel mesh welded with force-transmitting steel plates, prefabricated horizontal countersunk broken bridge long self-tapping nail connectors and combined countersunk broken bridge Long self-tapping screw connector;
第二步、将轻钢框格安装定位在剪力墙钢筋笼上,通过U形钢丝将内钢丝网连接在轻钢框格上,通过工程塑料等垫块在轻钢框格与聚苯保温板燕尾槽表面间隔内砂浆层的厚度并定位聚苯保温板、珍珠岩板以及外钢丝网;将窗框砂浆条带钢筋网与内外叶钢丝网进行绑扎,其上焊接的砂浆条带传力钢板与窗框轻钢框格对齐;The second step is to install and position the light steel frame on the steel cage of the shear wall, connect the inner steel wire mesh to the light steel frame through U-shaped steel wires, and use engineering plastics and other pads to insulate the light steel frame and polystyrene The thickness of the mortar layer in the surface interval of the dovetail groove of the board and the positioning of the polystyrene insulation board, the perlite board and the outer steel wire mesh; the window frame mortar strip steel mesh and the inner and outer leaf steel mesh are bound, and the mortar strip welded on it transmits force The steel plate is aligned with the light steel frame of the window frame;
第三步、将钢丝网架水平腹丝和钢丝网架斜向腹丝依次穿透珍珠岩板、聚苯保温板,将将钢丝网架腹丝两端与内、外钢丝网点焊形成钢丝网架,并伸入剪力墙内部一定锚固距离;将水平断桥自攻钉连接件以及组合断桥自攻钉连接件长自攻依次穿透珍珠岩板、聚苯保温板,自攻连接轻钢框格,并伸入剪力墙内部一定锚固距离;The third step is to penetrate the horizontal abdominal wire of the steel wire grid and the oblique abdominal wire of the steel wire grid in turn through the perlite board and the polystyrene insulation board, and spot weld the two ends of the abdominal wire of the steel wire grid with the inner and outer steel wire mesh to form a steel wire mesh and extend into the shear wall for a certain anchoring distance; the long self-tapping of the horizontal broken bridge self-tapping screw connector and the combined broken bridge self-tapping screw connector penetrates the perlite board and the polystyrene insulation board in sequence, and the self-tapping connection is light steel frame, and extend into the interior of the shear wall for a certain anchorage distance;
第四步、浇筑内、外钢丝网砂浆面层以及带有凹槽的窗框砂浆条带,并养护;在窗框砂浆条带凹槽内放入连接钢板,其表面与砂浆条带传力钢板以及窗框轻钢框格窗洞一侧翼缘贴合,采用自攻钉穿过连接钢板自攻钉孔,自攻连接砂浆条带传力钢板以及窗框轻钢框格翼缘;采用性能砂浆抹平窗框砂浆条带凹槽;The fourth step is to pour the inner and outer steel wire mesh mortar surfaces and the window frame mortar strips with grooves, and maintain them; put the connecting steel plates in the grooves of the window frame mortar strips, and the surface and the mortar strips transmit force The steel plate and the light steel frame of the window frame are bonded to the side flange of the window hole, and self-tapping nails are used to pass through the self-tapping nail holes of the connecting steel plate, and the self-tapping connection mortar strips are attached to the force-transmitting steel plate and the light steel frame flange of the window frame; performance mortar is used Smooth out the grooves of the window frame mortar strips;
第五步、以钢丝网架砂浆-珍珠岩-聚苯保温构造为底模,浇筑剪力墙混凝土,并养护;The fifth step is to pour the shear wall concrete with the steel wire grid mortar-perlite-polystyrene insulation structure as the base form, and maintain it;
然后将制备好的保温剪力墙装配起来,其施工流程如下:Then assemble the prepared thermal insulation shear wall. The construction process is as follows:
第六步:将装配式混凝土楼板安装到下层混凝土剪力墙上部,铺设砂浆垫层;将左、右装配式剪力墙水平钢筋搭接,绑扎竖向构造钢筋和拉结钢筋,并在左、右相邻墙板竖向混凝土后浇条带内侧支模板,外侧聚苯保温板兼做模板;Step 6: Install the prefabricated concrete floor slab on the upper part of the concrete shear wall of the lower floor, and lay a mortar cushion; lap the horizontal steel bars of the left and right prefabricated shear walls, bind the vertical structural steel bars and tie bars, and , The vertical concrete post-casting strip of the right adjacent wall panel has an inner supporting formwork, and the outer polystyrene insulation board is also used as a formwork;
第七步:将下层剪力墙及连梁顶部纵向受力钢筋,与上层剪力墙底部灌浆套筒对接,并将上下墙板的聚苯保温板企口以及后抹砂浆条带对接,通过预留孔向套筒中灌注灌浆料,在水平预留条带中绑扎附加钢丝网并采用高性能保温砂浆抹平上、下墙板间水平砂浆条带;在左、右墙板件的竖向后浇条带中建筑混凝土,在竖向预留条带中绑扎附加钢丝网并采用高性能保温砂浆抹平左、右墙板间竖向砂浆条带;Step 7: Connect the lower shear wall and the longitudinal steel bar at the top of the connecting beam to the grouting sleeve at the bottom of the upper shear wall, and connect the polystyrene insulation board grooves of the upper and lower wall panels and the back-applied mortar strips. Fill the grouting material into the sleeve through the reserved holes, bind the additional steel wire mesh in the horizontal reserved strips, and use high-performance thermal insulation mortar to smooth the horizontal mortar strips between the upper and lower wall panels; The building concrete in the strip is poured backward, the additional steel wire mesh is bound in the vertical reserved strip, and the vertical mortar strip between the left and right wall panels is smoothed with high-performance thermal insulation mortar;
第八步:拆除模板,形成上、下墙板后抹砂浆条带与灌浆套筒组合连接构造,以及左右墙板的后抹砂浆条带与后浇混凝土组合连接构造,用防水涂料粉刷墙板外叶砂浆面层,采用内墙涂料粉刷墙板内部钢筋混凝土剪力墙。Step 8: Remove the formwork to form the combined connection structure of the upper and lower wall panels with mortar strips and grouting sleeves, and the combined connection structure of the left and right wall panels with mortar strips and post-cast concrete, and paint the wall panels with waterproof paint For the mortar surface of the outer leaves, use interior wall paint to paint the internal reinforced concrete shear walls of the wall panels.
采用上述技术方案所产生的有益效果在于:The beneficial effects produced by adopting the above-mentioned technical scheme are:
1、钢丝网砂浆-珍珠岩面层解决了传统外保温墙体抗火性能差的缺点,珍珠岩板具有防火、隔热性能好的优点,可以有效提高墙体外保温系统的耐火性能,降低装配式保温剪力墙外墙系统火灾事故风险。高性能砂浆层具有良好的结构、防水、耐候性能。1. Steel mesh mortar-perlite surface layer solves the shortcomings of poor fire resistance of traditional external thermal insulation walls. Perlite board has the advantages of good fire resistance and heat insulation performance, which can effectively improve the fire resistance of external wall thermal insulation systems and reduce Fire accident risk of prefabricated thermal insulation shear wall exterior wall system. The high-performance mortar layer has good structure, waterproof and weather resistance.
2、轻钢组合桁架与承重钢丝网架构造可有效抵抗长期荷载下砂浆层向下的剪切变形,并可将这种剪切变形控制在各楼层并不向下传递,解决了超厚保温层长期荷载下变形难以控制的技术瓶颈问题。轻钢组合桁架与承重钢丝网架中的水平系杆可以有效抵抗垂直于墙板平面的剥离作用,如风吸力等,防止保温层因脱离墙板表面而剥落。断桥自攻钉连接件强度高、隔热性能好、安装方便,避免了传统金属连接件的冷桥问题,相比传统非金属连接件的拉结强度也有显著提高。轻钢框格与钢筋混凝土剪力墙间具有可靠的锚固能力,增强了外保温系统与剪力墙的整体性。2. The structure of light steel composite truss and load-bearing steel wire grid can effectively resist the downward shear deformation of the mortar layer under long-term load, and can control this shear deformation in each floor and not transmit downward, which solves the problem of ultra-thick insulation The technical bottleneck problem that the deformation of the layer under long-term load is difficult to control. The light steel composite truss and the horizontal tie bars in the load-bearing steel wire grid can effectively resist the peeling effect perpendicular to the wall panel plane, such as wind suction, and prevent the insulation layer from peeling off due to the separation from the wall panel surface. The broken bridge self-tapping screw connector has high strength, good heat insulation performance, and easy installation, which avoids the cold bridge problem of traditional metal connectors, and has significantly improved knot strength compared with traditional non-metallic connectors. There is a reliable anchorage capability between the light steel frame and the reinforced concrete shear wall, which enhances the integrity of the external thermal insulation system and the shear wall.
3、自攻钉集块连接节点主要起到抗剪和抗拉作用,来抵抗外保温构造的自重以及风吸力造成的剥离作用。可有效抵抗长期荷载下窗边框周围砂浆层向下的剪切变形,并可将这种剪切变形控制在本层并不向下传递。窗框砂浆条带和自攻钉集块连接节点增强了窗洞口处外墙板保温构造与混凝土剪力墙的连接,也提高了窗洞口的密封保温性能,提高了保温构造的耐候性。3. The connection nodes of self-tapping nail clusters mainly play the role of shear resistance and tensile resistance, so as to resist the self-weight of the external insulation structure and the peeling effect caused by wind suction. It can effectively resist the downward shear deformation of the mortar layer around the window frame under long-term load, and can control this shear deformation in this layer and not transmit it downward. The window frame mortar strips and self-tapping nail cluster connection nodes strengthen the connection between the external wall panel thermal insulation structure and the concrete shear wall at the window opening, and also improve the sealing and thermal insulation performance of the window opening, and improve the weather resistance of the thermal insulation structure.
4、组合连接构造中的钢丝网砂浆后抹条带增强了墙板砂浆面层的整体性,解决了传统保温板拼缝连接问题,提高了墙板防水性能,使墙板保温构造具有良好的耐候性。保温板可作为后浇带的模板,方便装配施工。4. The post-wiping strip of steel mesh mortar in the combined connection structure enhances the integrity of the wallboard mortar surface, solves the joint connection problem of the traditional insulation board, improves the waterproof performance of the wallboard, and makes the wallboard insulation structure have good performance. weather resistance. The insulation board can be used as a formwork for the post-casting belt, which is convenient for assembly and construction.
附图说明Description of drawings
图1是剪力墙的结构示意图;Fig. 1 is the structural representation of shear wall;
图2是图1中的1-1剖面示意图;Fig. 2 is a schematic sectional view of 1-1 in Fig. 1;
图3是图1中的2-2剖面示意图;Fig. 3 is a schematic sectional view of 2-2 in Fig. 1;
图4是图1中的3-3剖面示意图;Fig. 4 is a schematic sectional view of 3-3 in Fig. 1;
图5是图1中的4-4剖面示意图;Fig. 5 is a schematic sectional view of 4-4 in Fig. 1;
图6是图1中的5-5剖面示意图;Fig. 6 is a schematic sectional view of 5-5 in Fig. 1;
图7是图1中的6-6剖面示意图;Fig. 7 is a schematic sectional view of 6-6 in Fig. 1;
图8是图1中的7-7剖面示意图;Fig. 8 is a schematic sectional view of 7-7 in Fig. 1;
图9是组合沉头断桥长自攻钉连接件的连接状态及结构剖面示意图;Fig. 9 is a schematic diagram of the connection state and structural section of the combined countersunk head broken bridge long self-tapping screw connector;
图10是图9中的1-1剖面示意图;Fig. 10 is a schematic cross-sectional view of 1-1 in Fig. 9;
图11是水平沉头断桥长自攻钉连接件的连接状态及结构剖面示意图;Fig. 11 is a schematic diagram of the connection state and structural section of the long self-tapping screw connector of the horizontal countersunk broken bridge;
图12是图11中的2-2剖面结构示意图;Fig. 12 is a schematic diagram of the sectional structure of 2-2 in Fig. 11;
图13是钢丝网架水平腹丝与钢丝网架斜向腹丝的连接状态剖面示意图;Fig. 13 is a schematic cross-sectional view of the connection state of the horizontal abdominal wire of the steel wire grid and the oblique abdominal wire of the steel wire grid;
图14是图13中的3-3剖面示意图;Fig. 14 is a schematic sectional view of 3-3 in Fig. 13;
图15是窗口的顶部和底部的剖面结构示意图;Fig. 15 is a schematic cross-sectional structure diagram of the top and bottom of the window;
图16是窗口的顶部和顶部的剖面结构的又一视图;Fig. 16 is another view of the top of the window and the cross-sectional structure of the top;
图17是窗口的左侧和右侧的剖面结构示意图;Fig. 17 is a schematic cross-sectional structure diagram of the left and right sides of the window;
图18是窗口的左侧和右侧的剖面结构的又一视图;Fig. 18 is another view of the cross-sectional structure of the left and right sides of the window;
图19是上下剪力墙的连接结构的一剖面视图;Fig. 19 is a sectional view of the connection structure of the upper and lower shear walls;
图20是上下剪力墙的连接结构的又一剖面视图;Fig. 20 is another sectional view of the connection structure of the upper and lower shear walls;
图21是左右剪力墙的连接结构的剖面示意图;Figure 21 is a schematic cross-sectional view of the connection structure of the left and right shear walls;
图中:1、混凝土剪力墙;2、剪力墙分布钢筋;3、剪力墙竖向连接钢筋;4、拉结钢筋;5、灌浆套筒;6、连梁;7、连梁钢筋笼;8、连梁竖向连接钢筋;9、轻钢框格竖向C形钢;10、轻钢框格横向C形钢;11、窗框轻钢框格;12、内叶砂浆连接层;13、内叶砂浆层钢丝网;14、U形钢丝;15、聚苯保温板;16、珍珠岩板;17、外叶砂浆层;18、外叶砂浆层钢丝网;19、窗框砂浆条带;20、窗框砂浆条带钢丝网;21、砂浆条带传力钢板;22、连接钢板;23、自攻钉;24、水平沉头断桥长自攻钉连接件;25、组合沉头断桥长自攻钉连接件;26、钢丝网架水平腹丝;27、钢丝网架斜向腹丝;28、外叶钢丝网水泥砂浆层后抹条带;29、水泥基胶浆;30、聚苯保温板企口;31、装配式混凝土楼板;32、剪力墙砂浆垫层;33、灌浆料;34、混凝土后浇条带。In the figure: 1. Concrete shear wall; 2. Distribution reinforcement of shear wall; 3. Vertical connection reinforcement of shear wall; 4. Tie reinforcement; 5. Grouting sleeve; 6. Coupling beam; 7. Coupling beam reinforcement Cage; 8. Vertical connecting steel bar of connecting beam; 9. Vertical C-shaped steel of light steel frame; 10. Horizontal C-shaped steel of light steel frame; 11. Light steel frame of window frame; 12. Inner leaf mortar connection layer ;13. Inner leaf mortar layer steel wire mesh; 14. U-shaped steel wire; 15. Polystyrene insulation board; 16. Perlite board; 17. Outer leaf mortar layer; 18. Outer leaf mortar layer steel wire mesh; 19. Window frame mortar Strips; 20. Window frame mortar strip steel wire mesh; 21. Mortar strip force transmission steel plate; 22. Connecting steel plate; 23. Self-tapping nails; Long self-tapping nail connector for countersunk broken bridge; 26. Horizontal abdominal wire of steel wire grid; 27. Oblique abdominal wire of steel wire grid; 28. Wipe strip after cement mortar layer of outer leaf steel wire mesh; 29. Cement-based mortar ; 30. Polystyrene insulation board tongue and groove; 31. Prefabricated concrete floor slab; 32. Shear wall mortar cushion; 33. Grouting material;
具体实施方式Detailed ways
下面将结合本申请实施例中的附图,对本申请实施例中的技术方案进行清楚、完整地描述,显然,所描述的实施例仅仅是本申请一部分实施例,而不是全部的实施例。基于本申请中的实施例,本领域普通技术人员在没有作出创造性劳动前提下所获得的所有其他实施例,都属于本申请保护的范围。The following will clearly and completely describe the technical solutions in the embodiments of the application with reference to the drawings in the embodiments of the application. Apparently, the described embodiments are only some of the embodiments of the application, not all of them. Based on the embodiments in this application, all other embodiments obtained by persons of ordinary skill in the art without creative efforts fall within the protection scope of this application.
本实用新型提出了一种装配式带窗洞轻钢组合桁架承托钢丝网架砂浆-珍珠岩-聚苯复合剪力墙,适于装配式混凝土剪力墙结构超低能耗房屋带窗洞外墙。其中,钢丝网架砂浆面层-珍珠岩构造厚度薄、质量轻,抗火和隔热性能好,强度等级不小于M20的高性能砂浆层具有良好的结构、防水、耐候性能。由钢丝网砂浆层、断桥自攻钉腹杆、框格轻钢弦杆构成的桁架,可承托剪力墙外砂浆、防火、保温层重量,有效限制长期荷载下砂浆层向下的剪切变形。在窗洞口处采用窗框砂浆条带加强构造,窗框砂浆条带与外叶钢丝网砂浆面层一体预制并采用自攻钉集块连接构造与混凝土剪力墙连接。聚苯保温层可根据建筑地域气候条件选择厚度,保证外墙保温、隔热性能。The utility model proposes an assembled light steel composite truss with window holes supporting steel wire grid mortar-perlite-polystyrene composite shear wall, which is suitable for the outer wall of ultra-low energy consumption houses with window holes in the assembled concrete shear wall structure. Among them, the steel wire grid mortar surface layer-perlite structure is thin in thickness, light in weight, good in fire resistance and heat insulation, and the high-performance mortar layer with a strength grade of not less than M20 has good structure, waterproof and weather resistance. The truss composed of steel wire mesh mortar layer, broken bridge self-tapping screw web, and frame light steel chord can support the weight of mortar, fire protection, and insulation layers outside the shear wall, and effectively limit the downward shear of the mortar layer under long-term load. Cut deformation. The window frame mortar strip is used to strengthen the structure at the window opening, and the window frame mortar strip and the steel wire mesh mortar surface layer of the outer leaf are prefabricated integrally and connected with the concrete shear wall by a self-tapping screw cluster connection structure. The thickness of the polystyrene insulation layer can be selected according to the regional climate conditions of the building to ensure the thermal insulation and heat insulation performance of the external wall.
如图1-21所示,本实用新型中的剪力墙主要构造包括:As shown in Figure 1-21, the main structure of the shear wall in the utility model includes:
钢丝网砂浆-珍珠岩面层,为各25mm厚的钢丝网砂浆层以及珍珠岩防火层,其重量仅为50mm厚混凝土保护层的1/2且抗火和隔热性能好,强度等级不小于M20的高性能砂浆层具有良好的结构、防水、耐候性能。Steel mesh mortar-perlite surface layer, each 25mm thick steel mesh mortar layer and perlite fireproof layer, its weight is only 1/2 of the 50mm thick concrete protective layer and has good fire resistance and heat insulation performance, and its strength level is not less than The high-performance mortar layer of M20 has good structure, waterproof and weather resistance.
承重钢丝网架,由外钢丝网、内钢丝网点焊间距200*200mm的直径为2mm的水平腹丝及斜向向上45度的腹丝构成,水平腹丝及斜向向上45度腹丝穿透25mm厚珍珠岩层5mm厚水泥胶浆粘接带燕尾槽的200厚聚苯层后伸入剪力墙混凝土水平投影60mm。The load-bearing steel wire mesh frame is composed of outer steel wire mesh, inner steel wire mesh with a spot welding distance of 200*200mm, horizontal abdominal wires with a diameter of 2mm, and oblique upward 45-degree abdominal wires. The horizontal abdominal wires and oblique upward 45-degree abdominal wires penetrate The 25mm thick perlite layer and the 5mm thick cement mortar are bonded to the 200 thick polyphenylene layer with dovetail grooves, and then extend into the shear wall concrete for a horizontal projection of 60mm.
轻钢框格,由竖向、水平间距均不大于800的C形钢焊接而成,轻钢框格C形钢在与内钢丝网净距10mm的位置采用直径为2mm的U形钢丝分别点焊连接钢丝网和C形钢,竖向C形钢与钢丝网水平分布钢丝点焊,水平C形钢与钢丝网竖向分布钢丝点焊,水平、竖向点焊的间距不大于200mm。在窗洞口四周布置窗边框轻钢框格,以加强窗边框受力性能并加强窗洞处墙板外保温构造与混凝土剪力墙的连接。The light steel frame is welded by C-shaped steel with a vertical and horizontal spacing of no more than 800. The C-shaped steel of the light steel frame is 10mm away from the inner steel wire mesh. The steel wire mesh and C-shaped steel are welded together, the vertical C-shaped steel is spot-welded with the horizontally distributed steel wires of the steel mesh, the horizontal C-shaped steel is spot-welded with the vertically distributed steel wires of the steel mesh, and the distance between horizontal and vertical spot welding is not greater than 200mm. Arrange the window frame light steel frame around the window opening to strengthen the mechanical performance of the window frame and strengthen the connection between the external thermal insulation structure of the wall panel at the window opening and the concrete shear wall.
轻钢组合桁架,为由钢丝网砂浆层、断桥自攻钉腹杆、框格轻钢弦杆构成的桁架,轻钢组合桁架由25mm厚钢丝网砂浆层条带外弦、轻钢框格竖向C形钢内弦、直径不小于5mm的沉头断桥长自攻钉水平腹杆和斜向向上45度的腹杆构成;沉头断桥长自攻钉穿过沉入尺寸不小于50的沉头纤维复合连接件、钻透珍珠岩-聚苯保温层、自攻连接C形轻钢;轻钢组合桁架可有效抵抗长期荷载下砂浆层向下的剪切变形,并可将这种剪切变形控制在各楼层并不向下传递。The light steel composite truss is a truss composed of a steel wire mesh mortar layer, a broken bridge self-tapping screw web, and a frame light steel chord. The light steel composite truss is composed of a 25mm thick steel wire mesh mortar layer with an outer The vertical C-shaped steel inner chord, the horizontal web bar of the long self-tapping screw with a diameter of not less than 5mm and the web bar inclined upward at 45 degrees; 50 countersunk head fiber composite connectors, drilled perlite-polystyrene insulation layer, self-tapping connection C-shaped light steel; the light steel composite truss can effectively resist the downward shear deformation of the mortar layer under long-term load, and can This shear deformation control is not propagated down the floors.
窗边框自攻钉集块组合连接构造,为窗洞边框处外保温构造的配筋砂浆条带与混凝土剪力墙窗框轻钢框格的连接节点。窗边框配筋砂浆条带配置Φ4间距为200mm的钢筋网,并在钢筋网靠近混凝土剪力墙窗洞一侧焊接传力钢板,砂浆条带传力钢板与剪力墙窗框轻钢框格C形钢外侧翼缘通过连接钢板自攻钉,从而将复合保温外墙的窗框砂浆条带与混凝土剪力墙窗框连接。自攻钉集块连接节点主要起到抗剪和抗拉作用,来抵抗外保温构造的自重以及风吸力造成的剥离作用。The window frame self-tapping nail cluster combination connection structure is the connection node between the reinforced mortar strip of the external thermal insulation structure at the window frame and the light steel frame of the concrete shear wall window frame. The window frame reinforcement mortar strips are equipped with Φ4 steel mesh with a spacing of 200mm, and the steel mesh is welded on the side of the steel mesh close to the window opening of the concrete shear wall, and the mortar strip is connected with the light steel frame C of the shear wall window frame. The outer flange of the shaped steel is connected with steel plate self-tapping screws, so as to connect the window frame mortar strip of the composite thermal insulation exterior wall with the window frame of the concrete shear wall. The self-tapping screw cluster connection node mainly plays the role of shear resistance and tensile resistance, so as to resist the self-weight of the external insulation structure and the peeling effect caused by wind suction.
装配式剪力墙组合连接构造,是指上、下混凝土剪力墙板之间采用钢筋套筒装配,左、右剪力墙采用后浇混凝土条带装配;上、下和左、右轻钢组合桁架承托钢丝网架砂浆-珍珠岩-聚苯保温系统之间的连接为珍珠岩层之间对接,聚苯层之间企口连接,相邻两钢丝网砂浆层之间留有150mm的后抹砂浆条带,后抹砂浆条带区域附加增强钢丝网。The prefabricated shear wall composite connection structure refers to the assembly of the upper and lower concrete shear wall panels with steel sleeves, the left and right shear walls are assembled with post-cast concrete strips; the upper, lower and left and right light steel The connection between the composite truss supporting the steel wire mesh mortar-perlite-polystyrene insulation system is the butt joint between the perlite layers, the tongue-and-groove connection between the polystyrene layers, and a gap of 150mm between adjacent two steel mesh mortar layers. Apply the mortar strips, and then attach the reinforced steel mesh to the area of the mortar strips.
各构造的具体结构及连接关系如下:The specific structure and connection relationship of each structure are as follows:
装配式混凝土剪力墙:由混凝土剪力墙1、窗洞以及窗洞上部的连梁6组成。剪力墙分布钢筋2、剪力墙竖向连接钢筋3、拉结钢筋4以及连梁钢筋笼7和连梁竖向连接钢筋8绑扎形成剪力墙钢筋笼,剪力墙竖向连接钢筋3下部连接有灌浆套筒5,剪力墙竖向连接钢筋3以及连梁竖向连接钢筋8在墙板顶部伸出的连接长度与装配式混凝土楼板31以及上一层的灌浆套筒5连接。轻钢框格布置在剪力墙分布钢筋2外侧。浇筑混凝土后,形成带轻钢框格的装配式灌浆套筒混凝土剪力墙。混凝土剪力墙1,为装配式钢筋混凝土剪力墙。剪力墙分布钢筋2采用双排配筋:水平分布钢筋为Φ10间距为200mm,竖向分布钢筋为Φ10间距为200,净保护层厚度为20mm,间隔400mm布置Φ6拉结钢筋4;采用灌浆套筒5装配连接,在墙板底部间距600设置16个灌浆套筒5,采用对称布置的16根Φ16钢筋作为上、下剪力墙竖向连接钢筋3以及连梁竖向连接钢筋8。剪力墙分布钢筋2中竖向分布钢筋不突出墙板,剪力墙纵向连接钢筋3以及连梁竖向连接钢筋8顶部突出墙板240mm与装配式混凝土楼板31以及上墙板相连。在墙板底部的灌浆套筒5及其上300mm范围内,总加密高度为500mm,加密布置剪力墙分布钢筋2的Φ10@100水平分布钢筋,水平分布钢筋突出墙板左右两端280mm与相邻墙板搭接后浇筑混凝土后浇条带34。Prefabricated concrete shear wall: composed of
轻钢框格:由轻钢框格竖向C形钢9以及轻钢框格横向C形钢10焊接而成,窗框边的横向和竖向C形钢焊接形成窗框轻钢框格11。轻钢框格腹板上开有轻钢框格自攻钉孔,翼缘开有轻钢框格翼缘凹槽。Light steel sash: It is welded by the vertical C-shaped
内叶内钢丝网砂浆层:由内叶砂浆层钢丝网13浇筑内叶砂浆连接层12构成,U形钢丝14翼缘与内叶砂浆层钢丝网13点焊,腹杆与轻钢框格焊接。Inner leaf inner steel wire mesh mortar layer: composed of inner leaf mortar layer
钢丝网架砂浆-珍珠岩-聚苯保温构造:由带聚苯保温板燕尾槽的聚苯保温板15,珍珠岩板16以及外叶砂浆层17和外叶砂浆层钢丝网18组成的钢丝网砂浆面层组成,聚苯保温板燕尾槽与内叶砂浆连接层机械咬合,钢丝网架砂浆-珍珠岩-聚苯保温构造则与装配式混凝土剪力墙通过轻钢组合桁架以及承重钢丝网架连接。Steel wire grid mortar-perlite-polystyrene insulation structure: steel wire mesh composed of
承重钢丝网架:由外叶砂浆层钢丝网18、内叶砂浆层钢丝网13点焊钢丝网架水平腹丝26以及钢丝网架斜向腹丝27构成,钢丝网架水平腹丝26及钢丝网架斜向腹丝27穿透珍珠岩板16以及聚苯保温板15后伸入剪力墙混凝土。从而实现对钢丝网架砂浆-珍珠岩-聚苯保温构造与混凝土剪力墙的拉结。Load-bearing steel wire frame: composed of outer leaf mortar layer
轻钢组合桁架:是外叶砂浆层17与外叶砂浆层钢丝网18构成的钢丝网架外砂浆面层、水平沉头断桥长自攻钉连接件24、组合沉头断桥长自攻钉连接件25弦杆构成的桁架。轻钢组合桁架由外砂浆面层17轻钢框格竖向C形钢9与轻钢框格横向C形钢10,是由竖向、水平间距均不大于800的C形钢焊接而成,轻钢框格在与内叶砂浆层钢丝网13净距10mm的位置采用直径为2mm的U形钢丝14分别点焊以连接钢丝网和轻钢框格,轻钢框格竖向C形钢9与内叶砂浆层钢丝网13水平分布钢丝点焊,轻钢框格横向C形钢10与内叶砂浆层钢丝网13竖向分布钢丝点焊,水平、竖向点焊的间距不大于200mm;轻钢框格截面高70mm、宽50mm、板厚不小于2mm,轻钢框格开宽140mm、高60mm轻钢框格翼缘凹槽,从而形成净距140mm、高60mm、宽60mm的凸出钢段;轻钢框格竖向C形钢9凸出钢段从剪力墙的水平及竖向分布钢筋之间距外侧分布钢筋净距10mm的位置锚入剪力墙混凝土1,内叶砂浆层钢丝网13与剪力墙外侧分布钢筋的净距为20mm,浇筑剪力墙混凝土后带凸出钢段的轻钢框格10mm通高截面嵌入剪力墙混凝土10mm,凸出钢段锚固于剪力墙混凝土中60mm。为便于自攻钉连接间自攻轻钢框格的C形钢腹板,在轻钢框格竖向C形钢9与轻钢框格横向C形钢10的腹板上开小于自攻钉直径的圆孔,以便于自攻钉穿过。Light steel composite truss: It is the outer mortar surface layer of the steel wire mesh frame composed of the outer
窗框轻钢框格11,为沿混凝土剪力墙1窗洞四周布置轻钢框格,沿窗框左、右边缘布置轻钢框格竖向C形钢9,沿窗框上、下边缘布置轻钢框格横向C形钢10,窗框轻钢框格11靠近传动一侧翼缘外表面与窗框表面混凝土平齐,其翼缘内侧粘贴木块,自攻钉穿过连接钢板22上的自攻钉孔,自攻连接窗框轻钢框格11翼缘,自攻钉钻入翼缘内侧的木块。与外叶砂浆层钢丝网18构成的钢丝网砂浆层条带外弦、轻钢框格竖向C形钢9以及轻钢框格横向C形钢10内弦、水平沉头断桥长自攻钉连接件24腹杆以及组合沉头断桥长自攻钉连接件25弦杆构成;断桥自攻钉连接件钻透珍珠岩板16、聚苯保温板15自攻连接轻钢框格竖向C形钢9与轻钢框格横向C形钢10。The
窗洞自攻钉集块连接构造:窗框砂浆条带19内置窗框砂浆条带钢丝网20,窗框砂浆条带钢架网20与外叶砂浆层钢丝网18以及内叶砂浆层钢丝网13搭接,在窗框砂浆条带钢丝网20上焊接砂浆条带传力钢板21,砂浆条带传力钢板21与窗框轻钢框格11C形钢对接,在窗框砂浆条带19凹槽内放入开自攻钉孔的连接钢板22,采用自攻钉23穿过连接钢板22自攻连接砂浆条带传力钢板21以及窗框轻钢框格11C形钢翼缘。采用高新性能砂浆抹平窗框砂浆条带19凹槽,形成自攻钉集块节点。Window hole self-tapping nail block connection structure: window
组合连接构造:包括上、下剪力墙分布钢筋2与灌浆套筒5内注灌浆料33;左、右剪力墙混凝土后浇条带34构成的剪力墙连接构造;聚苯保温板企口30涂抹水泥基胶浆29构成的保温层连接构造以及外叶钢丝网水泥砂浆层后抹条带28连接上、下及左、右墙板的外叶砂浆层钢丝网18的连接构造。Combined connection structure: including the upper and lower shear wall
连梁6,为混凝土剪力墙1窗洞顶部连连构造,其长度与窗洞宽度相等,截面高度为窗洞上沿至墙板混凝土顶部的距离,截面宽度与墙体厚度相等。其内部配置6根Φ10纵向钢筋,以及Φ8间距150mm箍筋。纵向钢筋与箍筋形成了连梁钢筋笼7。在连梁6纵筋之间配置Φ16的连梁竖向连接钢筋8,与上墙板的灌浆套筒5连接。连梁6底部即窗洞上沿配置有窗框轻钢框格11横向C形钢,连梁6沿长度方向等距布置2段轻钢框格竖向C形钢9区段。The connecting
内叶砂浆连接层12与内叶砂浆层钢丝网13,为聚苯保温板燕尾槽与剪力墙混凝土1的砂浆层,内叶砂浆层钢丝网13与带燕尾槽聚苯保温板15的净间距为10mm,采用强度不低于C20的14mm厚的砂浆带麻面抹平内叶砂浆层钢丝网13与聚苯保温板燕尾槽的间隙;U形钢丝14为内叶砂浆层钢丝网13与轻钢框格连接构造,其弯折翼缘与内叶砂浆层钢丝网13钢丝点焊,腹杆与轻钢框格竖向C形钢9以及轻钢框格横向C形钢10焊接。The inner leaf
聚苯保温板15,为内侧与内叶砂浆连接层12连接处带有燕尾槽的聚苯保温板,标准厚度为200mm,可根据建筑地域气候条件调整保温板厚度。The
珍珠岩板16,为墙板防火层,其厚度为25mm。The
外叶砂浆层17,为墙板外侧强度不低于C20的25mmm厚砂浆层,外叶砂浆层17内置直径为2mm间距50mm的外叶砂浆层钢丝网18,外叶砂浆层钢丝网18的砂浆净保护层10mm。The outer
窗框砂浆条带19,为连接内叶砂浆连接层12与外叶砂浆层17的窗框封边混凝土砂浆条带,其厚度为50mm,宽度为外叶砂浆层17至混凝土剪力墙1外表面的距离,其内部配置直径4mm间距200mm的窗框砂浆条带钢筋网20,窗框砂浆条带钢筋网20嵌入内叶砂浆连接层12与外叶砂浆层17100mm与内叶砂浆层钢丝网13和外叶砂浆层钢丝网18搭接并绑扎。长220mm宽80mm的砂浆条带传力钢板21与窗框砂浆条带钢筋网20的2根沿剪力墙平面外方向的分布钢筋焊接,钢板外侧与剪力墙平面平行方向的分布钢筋焊接以加强钢板与窗框砂浆条带19的锚固性能,砂浆条带传力钢板21处窗框砂浆条带19留有凹槽,砂浆条带传力钢板21与窗框轻钢框格11对接,采用自攻钉23穿过连接钢板22自攻钉孔,自攻钻入砂浆条带传力钢板21以及窗框轻钢框格11,最后采用高性能砂浆将砂浆条带传力钢板21处窗框砂浆条带19凹槽填平。The window
水平沉头断桥长自攻钉连接件24与组合沉头断桥长自攻钉连接件25,为轻钢组合桁架的腹杆,是连接25mm厚钢丝网砂浆层条带外弦与轻钢框格内弦的连接件。水平沉头断桥长自攻钉连接件24与组合沉头断桥长自攻钉连接件25沉入尺寸不小于50的沉头纤维复合连接件、钻透珍珠岩-聚苯保温层、自攻连接轻钢框格。沉头纤维复合连接件为厚3mm*60mm*60mm外方板、退台4mm*46mm*46mm方板、居中的外径14mm内径10mm长50mm的空心圆杆、居中的外径14mm内径6mm长20mm的空心圆杆一次成型的连接件。水平沉头断桥长自攻钉连接件24的沉头纤维复合连接件的方板与空心圆杆的角度为90度,组合沉头断桥长自攻钉连接件25沉头纤维复合连接件的矩形板与空心圆杆的角度分为穿过水平长自攻钉的90度、穿过斜向向上长自攻钉的45度两种;钢制自攻钉的钉帽直径10mm、钉杆6mm、通长带螺纹。在轻钢框格竖向C形钢9顶部与底部布置水平沉头断桥长自攻钉连接件24,中部布置组合沉头断桥长自攻钉连接件25。轻钢框格横向C形钢10上布置水平沉头断桥长自攻钉连接件24,间距不超过800mm。The long self-tapping
钢丝网架水平腹丝26与钢丝网架斜向腹丝27,为连接内叶砂浆层钢丝网13与外叶砂浆层钢丝网18的承托钢筋丝。钢丝网架由内叶砂浆层钢丝网13、外叶砂浆层钢丝网18点焊间距200mm的直径为2mm的钢丝网架水平腹丝26及斜向向上45度的钢丝网架斜向腹丝27构成,钢丝网架水平腹丝26及钢丝网架斜向腹丝27穿透25mm厚珍珠岩板16以及24mm厚内叶砂浆连接层12粘接带燕尾槽的200厚聚苯保温板15后伸入剪力墙混凝土1水平投影60mm。The horizontal
外叶钢丝网水泥砂浆层后抹条带28,为墙板上、下以及左、右外钢丝网砂浆层连接构造。预制墙板上、下以及左、右端部预留75mm宽外砂浆面层后抹条带,墙板吊装定位后,上、下或左、右相邻的墙板外钢丝网砂浆层连接位置为150mm宽后抹层,内置50mm间距、2mm直径加强钢丝网,并涂抹高性能保温砂浆,外叶钢丝网水泥砂浆层后抹条带28保证了墙板连接节点的完整性,且具有良好的防水性提高了墙板的耐候性能。Wipe the
水泥基胶浆29,为墙板连接位置聚苯保温板企口30处涂抹的无机粘结材料,可增强聚苯保温板企口30整体性与防水性能。The cement-based
装配式混凝土楼板31,为上、下装配式剪力墙间的预制混凝土楼板,其与剪力墙混凝土1通过剪力墙竖向连接钢筋3连接,在装配式混凝土楼板31与上层墙板间铺设剪力墙砂浆垫层32。The prefabricated
灌浆料33,为下层剪力墙竖向连接钢筋3、连梁竖向连接钢筋8与上层墙板灌浆套筒5的连接材料。上层墙板装配完成后,剪力墙竖向连接钢筋3与连梁竖向连接钢筋8穿入上层墙板灌浆套筒5中,在灌浆孔注入灌浆料33完成上下剪力墙竖向连接钢筋3的连接。The
混凝土后浇条带34,为左、右相邻墙板装配连接构造,水平分布钢筋突出墙板左右两端280mm与相邻墙板搭接并绑扎竖向构造筋和拉结钢筋后浇筑混凝土后浇条带34,完成左、右墙板的装配连接。Concrete
装配式带窗洞轻钢组合桁架承托钢丝网架砂浆-珍珠岩-聚苯复合剪力墙的作法如下:The prefabricated light steel composite truss with window holes supports the steel wire grid mortar-perlite-polystyrene composite shear wall as follows:
首先,制备保温剪力墙,工艺如下:First, prepare the thermal insulation shear wall, the process is as follows:
第一步、工厂加工轻钢框格竖向和横向C形钢并焊接,绑扎剪力墙钢筋笼、连梁钢筋笼,安装灌浆套筒,购买聚苯保温板与珍珠岩板,并将其切割拼装成所需尺寸;制备内外钢丝网、钢丝网架腹丝以及焊接有传力钢板的窗框砂浆条带钢筋网,预制水平沉头断桥长自攻钉连接件和组合沉头断桥长自攻钉连接件;The first step, the factory processes and welds the vertical and horizontal C-shaped steel of the light steel frame, binds the shear wall reinforcement cage and the connecting beam reinforcement cage, installs the grouting sleeve, purchases the polystyrene insulation board and the perlite board, and installs them Cutting and assembling into the required size; preparation of internal and external steel wire mesh, steel wire mesh frame belly wire and window frame mortar strip steel mesh welded with force-transmitting steel plates, prefabricated horizontal countersunk broken bridge long self-tapping nail connectors and combined countersunk broken bridge Long self-tapping screw connector;
第二步、将轻钢框格安装定位在剪力墙钢筋笼上,通过U形钢丝将内钢丝网连接在轻钢框格上,通过工程塑料等垫块在轻钢框格与聚苯保温板燕尾槽表面间隔内砂浆层的厚度并定位聚苯保温板、珍珠岩板以及外钢丝网;将窗框砂浆条带钢筋网与内外叶钢丝网进行绑扎,其上焊接的砂浆条带传力钢板与窗框轻钢框格对齐;The second step is to install and position the light steel frame on the steel cage of the shear wall, connect the inner steel wire mesh to the light steel frame through U-shaped steel wires, and use engineering plastics and other pads to insulate the light steel frame and polystyrene The thickness of the mortar layer in the surface interval of the dovetail groove of the board and the positioning of the polystyrene insulation board, the perlite board and the outer steel wire mesh; the window frame mortar strip steel mesh and the inner and outer leaf steel mesh are bound, and the mortar strip welded on it transmits force The steel plate is aligned with the light steel frame of the window frame;
第三步、将钢丝网架水平腹丝和钢丝网架斜向腹丝依次穿透珍珠岩板、聚苯保温板,将将钢丝网架腹丝两端与内、外钢丝网点焊形成钢丝网架,并伸入剪力墙内部一定锚固距离;将水平断桥自攻钉连接件以及组合断桥自攻钉连接件长自攻依次穿透珍珠岩板、聚苯保温板,自攻连接轻钢框格,并伸入剪力墙内部一定锚固距离;The third step is to penetrate the horizontal abdominal wire of the steel wire grid and the oblique abdominal wire of the steel wire grid in turn through the perlite board and the polystyrene insulation board, and spot weld the two ends of the abdominal wire of the steel wire grid with the inner and outer steel wire mesh to form a steel wire mesh and extend into the shear wall for a certain anchoring distance; the long self-tapping of the horizontal broken bridge self-tapping screw connector and the combined broken bridge self-tapping screw connector penetrates the perlite board and the polystyrene insulation board in sequence, and the self-tapping connection is light steel frame, and extend into the interior of the shear wall for a certain anchorage distance;
第四步、浇筑内、外钢丝网砂浆面层以及带有凹槽的窗框砂浆条带,并养护;在窗框砂浆条带凹槽内放入连接钢板,其表面与砂浆条带传力钢板以及窗框轻钢框格窗洞一侧翼缘贴合,采用自攻钉穿过连接钢板自攻钉孔,自攻连接砂浆条带传力钢板以及窗框轻钢框格翼缘;采用性能砂浆抹平窗框砂浆条带凹槽;The fourth step is to pour the inner and outer steel wire mesh mortar surfaces and the window frame mortar strips with grooves, and maintain them; put the connecting steel plates in the grooves of the window frame mortar strips, and the surface and the mortar strips transmit force The steel plate and the light steel frame of the window frame are bonded to the side flange of the window hole, and self-tapping nails are used to pass through the self-tapping nail holes of the connecting steel plate, and the self-tapping connection mortar strips are attached to the force-transmitting steel plate and the light steel frame flange of the window frame; performance mortar is used Smooth out the grooves of the window frame mortar strips;
第五步、以钢丝网架砂浆-珍珠岩-聚苯保温构造为底模,浇筑剪力墙混凝土,并养护;The fifth step is to pour the shear wall concrete with the steel wire grid mortar-perlite-polystyrene insulation structure as the base form, and maintain it;
然后将制备好的保温剪力墙装配起来,其施工流程如下:Then assemble the prepared thermal insulation shear wall. The construction process is as follows:
第六步:将装配式混凝土楼板安装到下层混凝土剪力墙上部,铺设砂浆垫层;将左、右装配式剪力墙水平钢筋搭接,绑扎竖向构造钢筋和拉结钢筋,并在左、右相邻墙板竖向混凝土后浇条带内侧支模板,外侧聚苯保温板兼做模板;Step 6: Install the prefabricated concrete floor slab on the upper part of the concrete shear wall of the lower floor, and lay a mortar cushion; lap the horizontal steel bars of the left and right prefabricated shear walls, bind the vertical structural steel bars and tie bars, and , The vertical concrete post-casting strip of the right adjacent wall panel has an inner supporting formwork, and the outer polystyrene insulation board is also used as a formwork;
第七步:将下层剪力墙及连梁顶部纵向受力钢筋,与上层剪力墙底部灌浆套筒对接,并将上下墙板的聚苯保温板企口以及后抹砂浆条带对接,通过预留孔向套筒中灌注灌浆料,在水平预留条带中绑扎附加钢丝网并采用高性能保温砂浆抹平上、下墙板间水平砂浆条带;在左、右墙板件的竖向后浇条带中建筑混凝土,在竖向预留条带中绑扎附加钢丝网并采用高性能保温砂浆抹平左、右墙板间竖向砂浆条带;Step 7: Connect the lower shear wall and the longitudinal steel bar at the top of the connecting beam to the grouting sleeve at the bottom of the upper shear wall, and connect the polystyrene insulation board grooves of the upper and lower wall panels and the back-applied mortar strips. Fill the grouting material into the sleeve through the reserved holes, bind the additional steel wire mesh in the horizontal reserved strips, and use high-performance thermal insulation mortar to smooth the horizontal mortar strips between the upper and lower wall panels; The building concrete in the strip is poured backward, the additional steel wire mesh is bound in the vertical reserved strip, and the vertical mortar strip between the left and right wall panels is smoothed with high-performance thermal insulation mortar;
第八步:拆除模板,形成上、下墙板后抹砂浆条带与灌浆套筒组合连接构造,以及左右墙板的后抹砂浆条带与后浇混凝土组合连接构造,用防水涂料粉刷墙板外叶砂浆面层,采用内墙涂料粉刷墙板内部钢筋混凝土剪力墙。Step 8: Remove the formwork to form the combined connection structure of the upper and lower wall panels with mortar strips and grouting sleeves, and the combined connection structure of the left and right wall panels with mortar strips and post-cast concrete, and paint the wall panels with waterproof paint For the mortar surface of the outer leaves, use interior wall paint to paint the internal reinforced concrete shear walls of the wall panels.
以上,仅为本实用新型较佳的具体实施方式,但本实用新型的保护范围并不局限于此,任何熟悉本技术领域的技术人员在本实用新型揭露的技术范围内,根据本实用新型的技术方案及其实用新型构思加以等同替换或改变,都应涵盖在本实用新型的保护范围之内。The above is only a preferred embodiment of the present utility model, but the scope of protection of the present utility model is not limited thereto. Anyone familiar with the technical field is within the technical scope disclosed by the utility model. Any equivalent replacement or change of the technical solution and the concept of the utility model shall fall within the scope of protection of the utility model.
Claims (9)
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN202223505385.6U CN218933507U (en) | 2022-12-27 | 2022-12-27 | Assembled light steel wire mesh frame mortar-perlite-polyphenyl shear wall with window holes |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN202223505385.6U CN218933507U (en) | 2022-12-27 | 2022-12-27 | Assembled light steel wire mesh frame mortar-perlite-polyphenyl shear wall with window holes |
Publications (1)
| Publication Number | Publication Date |
|---|---|
| CN218933507U true CN218933507U (en) | 2023-04-28 |
Family
ID=86065093
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| CN202223505385.6U Active CN218933507U (en) | 2022-12-27 | 2022-12-27 | Assembled light steel wire mesh frame mortar-perlite-polyphenyl shear wall with window holes |
Country Status (1)
| Country | Link |
|---|---|
| CN (1) | CN218933507U (en) |
Cited By (1)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN116044052A (en) * | 2022-12-27 | 2023-05-02 | 北京工业大学 | Prefabricated light steel composite truss with window holes supporting steel wire grid mortar-perlite-polystyrene composite shear wall and its method |
-
2022
- 2022-12-27 CN CN202223505385.6U patent/CN218933507U/en active Active
Cited By (2)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN116044052A (en) * | 2022-12-27 | 2023-05-02 | 北京工业大学 | Prefabricated light steel composite truss with window holes supporting steel wire grid mortar-perlite-polystyrene composite shear wall and its method |
| CN116044052B (en) * | 2022-12-27 | 2025-11-28 | 北京工业大学 | Assembled light steel combined truss bearing steel wire net rack mortar-perlite-polyphenyl composite shear wall with window holes and manufacturing method thereof |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| CN215253698U (en) | Ceramsite foam concrete exterior wall hanging plate in assembly type building | |
| CN205776895U (en) | Heat insulation prefabricated body of wall and prefabricated buildings | |
| CN202265932U (en) | Compound die card building block | |
| CN108301531A (en) | Assembled built-in heat insulation layer concrete composite wall-light steel frame-floor connecting node | |
| CN202809892U (en) | Precast concrete self-insulating shear wall and assembly type concrete building shear wall structure | |
| CN114687459B (en) | Assembled composite wallboard and floor self-tapping screw assembly and post-pouring belt assembly connection structure and construction method | |
| CN219327204U (en) | Steel frame assembled light steel wire net rack mortar-perlite-polyphenyl enclosure wall | |
| CN103243847B (en) | Prefabricating assembling type cold molding steel floor system and construction method thereof | |
| CN114592741A (en) | A combined connection structure and method of self-tapping nail block and post-casting strip of assembled L-shaped composite wallboard | |
| CN218933507U (en) | Assembled light steel wire mesh frame mortar-perlite-polyphenyl shear wall with window holes | |
| CN217602256U (en) | Assembly type L-shaped composite wallboard self-tapping nail cluster and post-cast strip combined connection structure | |
| CN114687600B (en) | A self-tapping screw block connection structure and method for assembled composite wall panels and cantilevered composite roofs | |
| CN219386745U (en) | Short limb assembled light steel combined steel wire net frame mortar-perlite-polyphenyl enclosure wall | |
| CN218894248U (en) | Assembled light steel combined steel wire net rack mortar-perlite-polyphenyl composite shear wall | |
| CN218933508U (en) | Assembled light steel bearing steel wire net rack mortar-perlite-polyphenyl enclosure wall | |
| CN115977278B (en) | Prefabricated light steel composite truss supporting steel wire mesh frame mortar-perlite-polystyrene composite shear wall and construction method | |
| CN115928909B (en) | Short-limb shear wall assembled light steel combined truss supported steel wire net rack mortar-perlite-polyphenyl composite enclosure wall and manufacturing method thereof | |
| CN116044053B (en) | Concrete frame prefabricated light steel composite truss supporting steel wire mesh mortar-perlite-polystyrene composite enclosure wall and its construction method | |
| CN217480420U (en) | Assembly type composite wallboard and floor slab self-tapping nail cluster and post-cast strip combined connection structure | |
| CN217517861U (en) | A connection structure of a prefabricated T-shaped column and an ecological interior wall self-tapping nail block | |
| CN218438553U (en) | Assembly type composite wallboard and exterior cantilever-free composite roof self-tapping nail cluster connecting structure | |
| CN216920804U (en) | Assembled Z shape post and ecological interior wall self-tapping nail cluster joint construction | |
| CN114658141B (en) | A kind of prefabricated composite wall panel T-shaped structural column and independent foundation connection structure and method | |
| CN218437756U (en) | Assembly type linear composite wallboard self-tapping nail cluster and post-cast strip combined connection structure | |
| CN218117399U (en) | Assembled L-shaped composite wallboard through-length force-transmitting steel plate self-tapping nail cluster connection structure |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| GR01 | Patent grant | ||
| GR01 | Patent grant |