CN104563281B - A kind of prefabricated balcony structure and its construction method - Google Patents

A kind of prefabricated balcony structure and its construction method Download PDF

Info

Publication number
CN104563281B
CN104563281B CN201410744506.3A CN201410744506A CN104563281B CN 104563281 B CN104563281 B CN 104563281B CN 201410744506 A CN201410744506 A CN 201410744506A CN 104563281 B CN104563281 B CN 104563281B
Authority
CN
China
Prior art keywords
prefabricated balcony
prefabricated
balcony
connection
built
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201410744506.3A
Other languages
Chinese (zh)
Other versions
CN104563281A (en
Inventor
王国富
王威汐
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Jinan Rail Transit Group Co Ltd
Original Assignee
Jinan Rail Transit Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Jinan Rail Transit Group Co Ltd filed Critical Jinan Rail Transit Group Co Ltd
Priority to CN201410744506.3A priority Critical patent/CN104563281B/en
Publication of CN104563281A publication Critical patent/CN104563281A/en
Application granted granted Critical
Publication of CN104563281B publication Critical patent/CN104563281B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B1/00Constructions in general; Structures which are not restricted either to walls, e.g. partitions, or floors or ceilings or roofs
    • E04B1/003Balconies; Decks

Abstract

The invention belongs in building element field, more particularly to a kind of prefabricated balcony structure, including prefabricated balcony main body, the prefabricated balcony main body includes prefabricated balcony plate, the both sides of the prefabricated balcony plate are equipped with Cantilever Beams, and the front end of Cantilever Beams is connected with the built-in connection with building body grafting.The present invention makes the construction of balcony independent of the construction of major structure of construction, has the advantages that to can be individually attached, speed of application is fast, construction efficiency is high, short construction period.

Description

A kind of prefabricated balcony structure and its construction method
Technical field
The invention belongs to building element field, more particularly to a kind of prefabricated balcony structure and its construction method.
Background technology
With the propulsion of China's housing industrialization, dwelling construction sustainable development, more and more enterprises are added to house production The ranks of industry.Balcony is always Jiao that numerous enterprises are paid close attention to as the important component in housing industrialization component system Point.Meanwhile balcony is as part special in building structure, is the bridge of the outer transition of architecture indoor, be the mankind get close to from Right platform, also also has the function that architectural exterior form important.But the balcony slab of traditional architecture is poured using scene mostly The form of construction work of note, there are site operation amount is big, complex process, progress is slow, efficiency is low, the cycle is long and construction personnel's degree of safety not The problem of high, be unfavorable for playing Modern Residence industrialization advantage.
A kind of prefabricated thermal insulation balcony of suitable industrialized production is disclosed in Chinese invention patent CN103255834A, it is such as attached Shown in Fig. 5, balcony floor 1 includes lower precast surface layer 4, balcony floor insulating layer 5, upper precast surface layer 6 and balcony floor reinforcement bar support Frame, lower precast surface layer 4, balcony floor insulating layer 5 and upper precast surface layer 6 are connected as one by balcony floor Steel bar rack, on There is reinforcing bar is overhanging to form overhanging anchor bar 3 in precast surface layer 6, overhanging anchor bar 3 is one with reinforcing bar in upper precast surface layer 6 It is overall.Balcony fence 2 includes outer precast surface layer 7, balcony fence insulating layer 8, interior precast surface layer 9 and balcony fence Steel bar rack, Outer precast surface layer 7, balcony fence insulating layer 8 and interior precast surface layer 9 are connected as one by balcony fence Steel bar rack, interior prefabricated There is reinforcing bar is overhanging to form overhanging anchor bar 3 in surface layer 9, overhanging anchor bar 3 is whole for one with reinforcing bar in interior precast surface layer 9 Body.
The prefabricated thermal insulation balcony is in construction, since overhanging anchor bar and balcony floor and balcony fence are integral knots Structure, it is therefore necessary to be poured at the same time with building body, site operation amount is big, at the same in construction have to take into account building body with The construction time of balcony, progress is slow, efficiency is low, long construction period.
The content of the invention
It is an object of the invention to solve above-mentioned technical problem, there is provided a kind of fabrication and installation technique is simple, installation is fast Degree is fast, construction efficiency is high, the prefabricated balcony structure and its construction method of short construction period.
The technical scheme is that:A kind of prefabricated balcony structure, including prefabricated balcony main body, the prefabricated balcony main body Including prefabricated balcony plate, the both sides of the prefabricated balcony plate are equipped with Cantilever Beams, and the front end of Cantilever Beams is connected with inserts with building body The built-in connection connect.
In construction, the installation of prefabricated balcony main body can individually construct the prefabricated balcony independent of building body, you can After the completion of building body, prefabricated balcony main body to be connected by built-in connection with building body, it is not necessary to while take into account and build Build the construction time of main body and prefabricated balcony main body, construction efficiency height and short construction period.
Preferably, the building body includes shear wall, and the connecting tube with built-in connection grafting is embedded with shear wall, Connecting tube is equipped with injected hole and bleeder port.
Preferably, the prefabricated balcony plate includes main part and the clinch positioned at body portion inner side, overlapping part Between the built-in connection of both sides.Clinch is set on the inside of prefabricated balcony plate, is on the one hand conducive to the waterproof of prefabricated balcony, On the other hand the reasonable mechanical of balcony slab is contributed to.
Closer, the prefabricated balcony plate is to be integrally formed, the thickness of clinch and the main part of prefabricated balcony plate The thickness divided is identical.This kind design can make that technique is simple, shortens construction period.
Preferably, the Cantilever Beams are embedded with ring flange close to the end of building body, and built-in connection is from ring flange Pass through.It on the one hand can play the role of accurate installation positioning when balcony is installed by increasing ring flange, on the other hand can be into one Step reinforcement balcony is fixedly connected with intensity with agent structure.
Closer, the outside of the prefabricated balcony plate main part is equipped with side bar, and side bar is equipped with least two Support hook.By setting support hook, it can conveniently construct, improve speed of application.
Preferably, the length of the built-in connection is overhang beam length 1.5 times.
Preferably, the built-in connection is H profile steel or banding steel cage.
Preferably, the front end of the building body is equipped with Vierendeel girder, and Vierendeel girder is between adjacent connecting tube.
Preferably, the connecting tube is rectangular steel pipe.
A kind of construction method of prefabricated balcony structure, mainly includes the following steps that:
A, prefabricated prefabricated balcony main body is transported to construction site;
B, prefabricated balcony main body is promoted to installed height mark by lifting Lift-on/Lift-off System;
C, by Cantilever Beams in the connecting tube of the built-in connection insertion building body of the end of building body;
D, temporary rod is connected with support hook, supporting rod is connected with brace groove, carries out temporary support;
E, the ring flange of Cantilever Beams front end is fixedly connected with the ring flange of connecting tube front end using bolt;
F, the slip casting into connecting tube from injected hole;
G, after grouting concrete reaches desired strength, temporary rod and supporting rod are removed;
H, balcony detailed treatment is carried out;
I, the installation of balcony Accessory Members is carried out.
The beneficial effects of the invention are as follows:The prefabricated balcony main body of the present invention and other structure components are Prefabrication in factory, Be transported to construction site as the system integration and complete sets of Techniques global facility, can reach engineering site assemble it is simple and direct, construction it is fast The advantages of speed, production efficiency height, good engineering quality, construction safety, short construction period, there are good economic benefits.
Brief description of the drawings
Fig. 1 is the planar structure schematic diagram of prefabricated balcony structure of the present invention.
Fig. 2 is building body part planar structural representation of the present invention.
Fig. 3 is the mounting plane structure diagram of prefabricated balcony structure of the present invention.
Fig. 4 is the seating side structure diagram of prefabricated balcony structure of the present invention.
Fig. 5 is the prefabricated balcony structure diagram of the prior art.
In figure, 1, support hook, 2, Cantilever Beams, 3, built-in connection, 4, main part, 5, ring flange, 6, side bar, 7, take Socket part, 8, connecting tube, 9, shear wall, 10, bolt, 11, injected hole, 12, supporting rod, 13, bleeder port, 14, building body, 16, Temporary rod, 17, guardrail mounting hole.
Embodiment
Technical scheme is described in detail below in conjunction with the accompanying drawings.
As shown in Figure 1, the present invention a kind of prefabricated balcony structure, can in factory Prefabrication, the system integration can be used as Construction site is transported to the global facility of complete sets of Techniques, site operation amount can be reduced, construction is simple convenience can be made, accelerate construction Speed, shorten the construction period.
Prefabricated balcony main body includes the prefabricated balcony plate, Cantilever Beams 2 and side bar 6 by armored concrete pouring molding, prefabricated Balcony slab is poured and is integrated with both sides Cantilever Beams 2, side bar 6.Cantilever Beams 2 are set in the left and right sides of prefabricated balcony plate, are being overhang The connecting pin of beam 2 is equipped with built-in connection 3.Specifically, built-in connection 3 is made of H profile steel or banding steel cage, and will be pre-buried The Design of length of connector 3 meets Architectural Structure Design requirement into 1.5 times of 2 length of Cantilever Beams.Due to the prefabricated balcony main body Can be completely achieved prefabrication production, in-site installation construction, therefore, the construction of prefabricated balcony main body independent of building body, Can individually it construct, you can after the completion of building body, prefabricated balcony main body to be connected by built-in connection with building body, The construction time of building body and prefabricated balcony main body, construction efficiency height and short construction period need not be taken into account at the same time.
Prefabricated balcony plate includes main part 4 and the clinch 7 positioned at the inner side of main part 4.Clinch is set, on the one hand Can make to be completely embedded the waterproof for being conducive to prefabricated balcony, on the other hand can increase contact area contribute to balcony slab it is reasonable by Power.Specifically, which is located between the built-in connection 3 of both sides, the thickness of clinch 7 and the thickness of prefabricated balcony plate 4 Identical, clinch 7 and the main part 4 of prefabricated balcony plate are to be integrally formed, and precasting process is simple, swift to operate.
Ring flange 5 is fixed with the front end of Cantilever Beams 2, passes through built-in connection 3 from ring flange 5 when prefabricated.Pass through On the one hand increase ring flange can play the role of accurate installation positioning during balcony installation, on the other hand can further strengthen balcony Intensity is fixedly connected with agent structure.
Side bar 6 is equipped with the outside of prefabricated balcony plate, side bar 6 is equipped with least two support hooks 1.As shown in figure 4, peace Fill prefabricated balcony structure when, can be fixed temporarily by temporary support bar 12 and temporary rod 16, can facilitate balcony installation, Improve speed of application.Specifically, support hook 1 is arranged at intervals above side bar 6, sets strut recessed below Cantilever Beams 2 Groove.The guardrail mounting hole 17 for installing guardrail is also reserved with side bar 6 and Cantilever Beams 2.
As shown in Figures 2 and 3, a kind of prefabricated balcony structure of the invention, including the present invention prefabricated balcony main body and with The building body 14 of prefabricated balcony main body assembling, building body 14 include shear wall 9, are provided with and pre-buried connection in shear wall 9 The connecting tube 8 that part 3 connects, specifically rectangular steel pipe.In connecting tube 8 be equipped with for casting concrete injected hole 11 and The bleeder port 13 being vented in casting process.
In the front end of building body 14, that is, the one end being connected with prefabricated balcony main body, equipped with being taken with prefabricated balcony plate The Vierendeel girder that socket part 7 connects.Specifically, the Vierendeel girder is between adjacent connecting tube 8.In the front end of connecting tube 8, that is, One end being connected with prefabricated balcony main body, equipped with the ring flange 5 being connected with 2 front end flange disk 5 of Cantilever Beams.Specifically, two methods Blue disk 5 is connected by bolt 10.
In the embodiment of the present invention, the manufacturing process of armored concrete prefabricated balcony structure is:
First, one-piece casting prefabricated balcony plate, Cantilever Beams 2, side bar 6, support hook 1 and ring flange 5 are prefabricated in the factory Component;
Secondly, the overhanging certain lap of splice in side is overlapped in prefabricated balcony plate, that is, forms clinch 7;
Finally, the H profile steel or banding steel cage of certain length are reserved in 2 inside cross-sectional of Cantilever Beams, so as to building body 14 consolidations.
In the embodiment of the present invention, the installation process of armored concrete prefabricated balcony structure is:
The first step, the prefabricated balcony main body being prefabricated in the factory is transported to construction site;
Second step, installed height mark is promoted to by Special-purpose lifting Lift-on/Lift-off System by prefabricated balcony main body;
3rd step, reserved overlap joint H profile steel or banding steel cage insertion of the Cantilever Beams 2 close to the end of building body 14 is cut In pre-buried connecting tube 8 in power wall 9;
4th step, temporary rod 16 is connected with support hook 1, supporting rod 12 is connected with brace groove, is carried out interim Support;
The ring flange 5 of 2 front end of Cantilever Beams, is fixedly connected by the 5th step using bolt 10 with the ring flange of 8 front end of connecting tube;
6th step, from the slip casting into rectangular tube 8 of injected hole 11;
7th step, after grouting concrete reaches desired strength, removes the supporting rod 12 and temporary rod 16 of temporary support;
8th step, carries out the installation of balcony Accessory Members.
Although the foregoing describing the embodiment of the present invention, it will be appreciated by those of skill in the art that these It is merely illustrative of, protection scope of the present invention is to be defined by the appended claims.Those skilled in the art without departing substantially from On the premise of the principle of the present invention and essence, various changes or modifications can be made to these embodiments, but these changes and Modification each falls within protection scope of the present invention.

Claims (9)

1. a kind of prefabricated balcony structure, including prefabricated balcony main body, the prefabricated balcony main body includes prefabricated balcony plate, its feature It is:The both sides of the prefabricated balcony plate are equipped with Cantilever Beams(2), Cantilever Beams(2)Front end be connected with and building body(14)Insert The built-in connection connect(3), the building body(14)Including shear wall(9), shear wall(9)Inside it is embedded with and built-in connection (3)The connecting tube of grafting(8), connecting tube(8)It is equipped with injected hole(11)And bleeder port(13).
A kind of 2. prefabricated balcony structure as claimed in claim 1, it is characterised in that:The prefabricated balcony plate includes main part (4)With positioned at main part(4)The clinch of inner side(7), clinch(7)Built-in connection positioned at both sides(3)Between.
A kind of 3. prefabricated balcony structure as claimed in claim 2, it is characterised in that:The prefabricated balcony plate is to be integrally formed, Clinch(7)Thickness and prefabricated balcony plate main part(4)Thickness it is identical.
A kind of 4. prefabricated balcony structure as claimed in claim 2, it is characterised in that:The Cantilever Beams(2)Close to building body (14)End be embedded with ring flange(5), built-in connection(3)From ring flange(5)In pass through.
A kind of 5. prefabricated balcony structure as claimed in claim 4, it is characterised in that:The prefabricated balcony plate main part(4) Outside be equipped with side bar(6), side bar(6)It is equipped with least two support hooks(1).
A kind of 6. prefabricated balcony structure as claimed in claim 5, it is characterised in that:The built-in connection(3)Be H profile steel or Banding steel cage, built-in connection(3)Length be Cantilever Beams(2)1.5 times of length.
A kind of 7. prefabricated balcony structure as claimed in claim 1, it is characterised in that:The building body(14)Front end be equipped with Vierendeel girder, Vierendeel girder are located at adjacent connecting tube(8)Between.
A kind of 8. prefabricated balcony structure as described in claim 1 or 7, it is characterised in that:The connecting tube(8)For rectangle steel Pipe.
9. the construction method of the prefabricated balcony structure as described in above-mentioned any claim, mainly includes the following steps that:
A, prefabricated prefabricated balcony main body is transported to construction site;
B, prefabricated balcony main body is promoted to installed height mark by lifting Lift-on/Lift-off System;
C, by Cantilever Beams(2)Close to building body(14)End built-in connection(3)It is inserted into building body(14)Connection Pipe(8)In;
D, by temporary rod(16)With support hook(1)Connection, by supporting rod(12)It is connected with brace groove, carries out interim branch Support;
E, using bolt(10)By Cantilever Beams(2)The ring flange of front end(5)And connecting tube(8)The ring flange of front end(5)It is fixed to connect Connect;
F, by injected hole(11)To connecting tube(8)Middle slip casting;
G, after grouting concrete reaches desired strength, temporary rod is removed(16)And supporting rod(12);
H, balcony detailed treatment is carried out;
I, the installation of balcony Accessory Members is carried out.
CN201410744506.3A 2014-12-09 2014-12-09 A kind of prefabricated balcony structure and its construction method Active CN104563281B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201410744506.3A CN104563281B (en) 2014-12-09 2014-12-09 A kind of prefabricated balcony structure and its construction method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201410744506.3A CN104563281B (en) 2014-12-09 2014-12-09 A kind of prefabricated balcony structure and its construction method

Publications (2)

Publication Number Publication Date
CN104563281A CN104563281A (en) 2015-04-29
CN104563281B true CN104563281B (en) 2018-05-08

Family

ID=53080285

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201410744506.3A Active CN104563281B (en) 2014-12-09 2014-12-09 A kind of prefabricated balcony structure and its construction method

Country Status (1)

Country Link
CN (1) CN104563281B (en)

Families Citing this family (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107227793A (en) * 2017-07-03 2017-10-03 浙江绿筑集成科技有限公司 A kind of PC balconies and the attachment structure of steel construction main body
CN109944321A (en) * 2019-04-23 2019-06-28 北京盛世建业科技有限公司 Assembled architecture and assembled architecture construction method

Citations (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN204282528U (en) * 2014-12-09 2015-04-22 济南轨道交通集团有限公司 A kind of prefabricated balcony structure

Family Cites Families (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2967816B1 (en) * 1998-05-21 1999-10-25 株式会社ツヅキ Balcony structure
JP2005299241A (en) * 2004-04-13 2005-10-27 Yukio Hirahara Connecting method of pre-cast concrete structure member
NO326748B1 (en) * 2007-03-19 2009-02-09 Sb Produksjon As Device for joining two building elements together with the use of an elastic sleeve in a building element.
NO332957B1 (en) * 2009-04-17 2013-02-11 Svein Berg Holding As balcony Fixing
CN202248960U (en) * 2011-08-03 2012-05-30 中冶建筑研究总院有限公司 Ultra-high-performance concrete prefabricated assembly balcony bottom plate
DE102012103546A1 (en) * 2012-04-23 2013-10-24 Johann Moissl Anchor for fixing at walls of protruding structure e.g. awning, has filling channels guided from front end side of anchor to last profile elevation of outer profile, where channels are diagonally arranged opposite to mantle of anchor body
CN103255834B (en) * 2013-06-05 2015-03-11 南京工业大学 Prefabricated heat preservation balcony suitable for industrial production and construction method of prefabricated heat preservation balcony

Patent Citations (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN204282528U (en) * 2014-12-09 2015-04-22 济南轨道交通集团有限公司 A kind of prefabricated balcony structure

Also Published As

Publication number Publication date
CN104563281A (en) 2015-04-29

Similar Documents

Publication Publication Date Title
CN102691366B (en) Precast concrete self-insulating shear wall and assembly type concrete building shear wall structure
CN106013517A (en) Fabricated reinforced concrete shear wall and manufacturing method thereof
CN103850363B (en) Prefabricated through hole assembly type reinforced concrete shear wall and construction method of prefabricated through hole assembly type reinforced concrete shear wall
CN105696817A (en) Multilayer cold-formed steel integrally prefabricated house and splicing method thereof
KR101182536B1 (en) Prefabricated double wall precast concrete pannel having surface material, reinforcing rod according to the purpose
CN108661221A (en) A kind of precast floor slab and its connection structure and its construction method
CN103982041A (en) Method for constructing reinforced-concrete prefabricated element fabricated building with frame structure system
CN101629440A (en) Integrally prefabricated composite external wall panel and manufacturing method thereof
CN105064555A (en) Structural wallboard for superimposed decorative layer and insulating layer and construction method
CN204225283U (en) The assembled syndeton of assembly concrete frame structure Shear-wall Connecting Beam Used
KR101478131B1 (en) Construction Method of Precast Pier
CN103334497A (en) Connection method of scope system frame column steel bar
CN105133726A (en) Assembled monolithic concrete frame structure system and frame shear structure system formed by assembled monolithic concrete frame structure system
CN205046669U (en) Assemble integral concrete frame structure system and structure system is cut to frame that constitutes thereof
CN202809892U (en) Precast concrete self-insulating shear wall and assembly type concrete building shear wall structure
CN106592777B (en) Assembled steel-is mixed to combine beam-column node structure and its implementation method
CN105297893A (en) Tenon-and-mortise type concrete superposed beam cross connection structure and construction method thereof
CN104563281B (en) A kind of prefabricated balcony structure and its construction method
CN110541485A (en) Connection node of assembled floor and roof beam
CN104314105B (en) The connection vertical piece structure of the basement wall and cast-in-place buttress and construction method
CN105040823A (en) Partition plate and floor beam connecting structure for scissors staircase and construction method of partition plate and floor beam connecting structure
CN211286028U (en) Connection node of assembled floor and roof beam
CN204282528U (en) A kind of prefabricated balcony structure
CN204753834U (en) Partition plate of scissors stair and connection structure of floor roof beam
CN204151835U (en) The vertical piece structure of connection of the basement wall and cast-in-place buttress

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant