Prefabricated sandwich overlapped shear wall continuity reinforcement(bar) is equal to cast-in-place shear wall structure
Technical field
The present invention relates to construction engineering technical field, be specifically related to a kind of prefabricated sandwich overlapped shear wall continuity reinforcement(bar) and be equal to cast-in-place shear wall structure.
Background technology
Existing overlapped shear wall, without sandwich heat preservation layer, when its upper and lower layer body of wall is installed, reinforcing bar does not connect mutually, only outside body of wall, in the middle of the cast-in-place concrete layer between impeller and interior impeller, place vertical reinforcement, the overlapped shear wall that the single reinforcing bar of this levels body of wall connects, anti-shear ability is poor, structural strength is low, generally can only in low-rise building, apply, can not be applied to skyscraper, and difficulty of construction be large, cost of labor is high, is unfavorable for suitability for industrialized production application.
Summary of the invention
Technical problem to be solved by this invention is: solve the problem that above-mentioned prior art exists, and provide a kind of prefabricated sandwich overlapped shear wall continuity reinforcement(bar) to be equal to cast-in-place shear wall structure, greatly improve structural strength and the anti-shear ability of the upper and lower layer of building wall connecting, break through the sandwich overlapped shear wall levels of skyscraper wall connecting technical barrier, realize the high-quality suitability for industrialized production of skyscraper.
The technical solution used in the present invention is:
A kind of prefabricated sandwich overlapped shear wall continuity reinforcement(bar) is equal to cast-in-place shear wall structure, prefabricated sandwich overlapped shear wall is by the outer impeller of prefabricated overlapped shear wall, heat-insulation layer, prefabricated overlapped shear wall intermediate plate, lattice reinforcing bar, in prefabricated overlapped shear wall, impeller connects and composes, in prefabricated overlapped shear wall intermediate plate and prefabricated overlapped shear wall, impeller is upper, lower two ends are all shorter than the outer impeller of prefabricated overlapped shear wall and heat-insulation layer, and stretch out reinforcing bar, when construction and installation, the prefabricated overlapped shear wall intermediate plate in upper strata, interior impeller stretch out downwards reinforcing bar respectively with the prefabricated overlapped shear wall intermediate plate of lower floor, interior impeller protrudes upward reinforcing bar and is fixedly connected with, casting concrete between the intermediate plate of prefabricated overlapped shear wall and interior impeller, formation contains heat-insulation layer and is equal to the structural system of cast-in-place shear wall.
In technique scheme, the described reinforcing bar that stretches out is fixedly connected with, and adopts connector to be fixed and connects or welding.
In technique scheme, the intermediate plate of described prefabricated overlapped shear wall and interior impeller bottom have two or more precast concrete pin.
The present invention has thoroughly changed conventional art overlapped shear wall without sandwich heat preservation layer, levels wallboard no-reinforcing-bar connects, the original backward situation that structural strength is poor, the present invention makes, the reinforcing bar that stretches out of lower floor's overlapped shear wall is connected and fixed, and be prefabricated with sandwich heat preservation layer, structural strength and the anti-shear ability of overlapped shear wall are greatly improved, heat preservation energy-saving, construction quality and antidetonation level are got a promotion, particularly the present invention can be applied to skyscraper by sandwich overlapped shear wall, and structural strength is high, be equal to cast-in-place shear wall, construction quality is good, human resources and building cost are saved, realize high efficiency suitability for industrialized production, it is the new breakthrough of Building technology.
Brief description of the drawings
Fig. 1 is structural profile schematic diagram of the present invention;
Fig. 2 is structural upright schematic diagram of the present invention.
In figure, the outer impeller of the prefabricated overlapped shear wall of 1-, 2-heat-insulation layer, the intermediate plate of the prefabricated overlapped shear wall of 3-, 4-stretches out reinforcing bar, 5-connector, impeller in the prefabricated overlapped shear wall of 6-, 7-laminated floor slab, 8-embedded bar, 9-lattice reinforcing bar.
Detailed description of the invention
Referring to accompanying drawing, prefabricated sandwich overlapped shear wall continuity reinforcement(bar) of the present invention is equal to cast-in-place shear wall structure, prefabricated sandwich overlapped shear wall is by the outer impeller of prefabricated overlapped shear wall, heat-insulation layer, prefabricated overlapped shear wall intermediate plate, lattice reinforcing bar, in prefabricated overlapped shear wall, impeller connects and composes, in prefabricated overlapped shear wall intermediate plate and prefabricated overlapped shear wall, impeller is upper, lower two ends are all shorter than the outer impeller of prefabricated overlapped shear wall and heat-insulation layer, and stretch out reinforcing bar, when construction and installation, the prefabricated overlapped shear wall intermediate plate in upper strata, interior impeller stretch out downwards reinforcing bar respectively with the prefabricated overlapped shear wall intermediate plate of lower floor, interior impeller protrudes upward reinforcing bar and is fixedly connected with, casting concrete between the intermediate plate of prefabricated overlapped shear wall and interior impeller, formation contains heat-insulation layer and is equal to the structural system of cast-in-place shear wall.
In technique scheme, the described reinforcing bar that stretches out is fixedly connected with, and adopts connector to be fixed and connects or welding.
In technique scheme, the intermediate plate of described prefabricated overlapped shear wall and interior impeller bottom have two or more precast concrete pin.