CN102689849A - Lifting device for replacing transformer - Google Patents
Lifting device for replacing transformer Download PDFInfo
- Publication number
- CN102689849A CN102689849A CN2012101975211A CN201210197521A CN102689849A CN 102689849 A CN102689849 A CN 102689849A CN 2012101975211 A CN2012101975211 A CN 2012101975211A CN 201210197521 A CN201210197521 A CN 201210197521A CN 102689849 A CN102689849 A CN 102689849A
- Authority
- CN
- China
- Prior art keywords
- lifting
- steering rod
- transformer
- steel rope
- lifting steering
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Images
Landscapes
- Types And Forms Of Lifts (AREA)
Abstract
本发明涉及一种更换变压器起吊装置,其结构为,起重转向轴套装于起重转向杆内,起重转向杆的一端插入底座内,起重转向杆的另一端与固定牵引钢绳的一端相连;固定牵引钢绳的另一端穿扣固定于线杆上;抱箍与底座焊接。本发明降低施工强度,省时省力,可以有效避免线路的长时间、大面积停电作业,不仅给企业带来经济上的利益,提高了线路的供电可靠率,而且可以有效避免用户因停电而造成的损失;另一方面可以有效提高工作效率。还可避免使用大型起重机械带来的燃油等损失及对环境所造成的污染。
The invention relates to a lifting device for replacing a transformer. Its structure is that a lifting steering shaft is sleeved in a lifting steering rod, one end of the lifting steering rod is inserted into a base, and the other end of the lifting steering rod is connected with one end of a fixed traction steel rope. connected; the other end of the fixed traction steel rope is buckled and fixed on the pole; the hoop is welded to the base. The invention reduces construction intensity, saves time and effort, can effectively avoid long-term and large-area power outage operations on the line, not only brings economic benefits to the enterprise, improves the power supply reliability of the line, and can effectively prevent users from being caused by power outages. loss; on the other hand, it can effectively improve work efficiency. It can also avoid the loss of fuel oil caused by the use of large lifting machinery and the pollution to the environment.
Description
技术领域 technical field
本发明涉及一种更换变压器装置,尤其涉及一种更换变压器起吊装置。 The present invention relates to a transformer replacement device, in particular to a lifting device for transformer replacement.
背景技术 Background technique
供电可靠率是与供电质量有关的的一项基本指标,它的高低不仅直接关系到供电企业的经济效益,更代表着供电企业的服务质量和管理水平。 The reliability rate of power supply is a basic index related to the quality of power supply. Its level is not only directly related to the economic benefits of power supply enterprises, but also represents the service quality and management level of power supply enterprises.
自2011年开始,各电力公司着力进行新型节能环保的S11型非晶合金配电变压器更换工作。之前在10千伏配网上,特别是农村配电网上运行的配电变压器还有很大一部分是S7型,高耗低能渗漏严重,且早已超负荷运行。 Since 2011, various power companies have focused on the replacement of new energy-saving and environmentally friendly S11 amorphous alloy distribution transformers. A large part of the distribution transformers operating on the 10 kV distribution network, especially the rural distribution network, are S7 type, which have high power consumption and low energy leakage, and have already been overloaded.
在初期更换变压器的工作中,遇到的问题为:1、地理位置限制了起重机械作业,地形复杂,尤其是农村台区变压器有的在菜园子里、有的在小胡同里、有的被粮仓等障碍物包围,起重机械根本无法展开作业;2、线路不能停电又限制了使用起重机械作业,如矿山、医院等,班组停电作业计划一拖再拖。 In the initial work of replacing the transformer, the problems encountered are: 1. The geographical location limits the lifting machinery operation, and the terrain is complex, especially in rural areas. Some transformers are in vegetable gardens, some are in small alleys, and some Surrounded by obstacles such as granaries, the hoisting machinery cannot carry out operations at all; 2. The line cannot be powered off and the use of hoisting machinery is restricted, such as mines, hospitals, etc., and the power outage operation plan of the team is delayed again and again.
传统的变压器更换作业方法是在布置线的横担上搭上一根横木,拴上手拉葫芦,拆卸台架内铁后起吊。施工强度大、用时长、人员多,费时费力。克服这些地理条件、线路运行条件、机械作业使用条件的不足,提高更换变压器的工作效率问题,成为了当务之急。 The traditional transformer replacement operation method is to put a crossbar on the cross arm of the line layout, tie a chain hoist, and lift after dismantling the inner iron of the stand. The construction intensity is high, it takes a long time, and there are many personnel, which is time-consuming and labor-intensive. It has become a top priority to overcome these geographical conditions, line operating conditions, and mechanical operation conditions, and improve the work efficiency of transformer replacement.
发明内容 Contents of the invention
本发明针对上述现有技术中存在的问题,提供了一种更换变压器起吊装置,解决了现有技术中更换变压器施工强度大、费时费力的问题,而且提高了线路的供电可靠率。 Aiming at the problems in the above-mentioned prior art, the present invention provides a transformer replacement lifting device, which solves the problem of high construction intensity, time-consuming and labor-intensive construction of transformer replacement in the prior art, and improves the power supply reliability of the line.
本发明的技术方案如下: Technical scheme of the present invention is as follows:
起重转向轴套装于起重转向杆内,起重转向杆的一端插入底座内,起重转向杆的另一端与固定牵引钢绳的一端相连;固定牵引钢绳的另一端穿扣固定于线杆上;抱箍与底座焊接。 The lifting steering shaft is set in the lifting steering rod, one end of the lifting steering rod is inserted into the base, the other end of the lifting steering rod is connected with one end of the fixed traction steel rope; the other end of the fixed traction steel rope is buckled and fixed on the wire on the rod; the hoop is welded to the base.
所述的底座上设有防止起重转向轴滑脱的封盖。 The base is provided with a cover to prevent the lifting steering shaft from slipping off.
所述的固定牵引钢绳设有调节其长度的花兰螺丝。 The fixed traction steel rope is provided with turnbuckles for adjusting its length.
所述的起重转向杆的垂直夹角为45度。 The vertical angle of the lifting steering rod is 45 degrees.
本发明的优点效果如下: The advantages and effects of the present invention are as follows:
降低施工强度,省时省力,可以有效避免线路的长时间、大面积停电作业,不仅给企业带来经济上的利益,提高了线路的供电可靠率,而且能够提升企业在用户中的形象地位,可以有效避免用户因停电而造成的损失;另一方面可以有效解决因地理位置影响无法使用机械作业,采用传统方法作业时所形成的人力、物力的大量投入,并且可以有效提高工作效率。采用传统的作业方法更换一台50千伏安的变压器需人员10人,用时2个小时,同等条件下使用该装置只需6人,用时30分钟即可完成,可以更好地促进农网升级改造工程的如期顺利完成。另外该装置的推广应用还可避免使用大型起重机械带来的燃油等损失及对环境所造成的污染。 Reduce the construction intensity, save time and effort, and can effectively avoid long-term and large-scale power outages on the line, which not only brings economic benefits to the enterprise, improves the power supply reliability of the line, but also improves the image status of the enterprise among users. It can effectively avoid the loss of users caused by power outages; on the other hand, it can effectively solve the inability to use mechanical operations due to geographical location, and the large investment of manpower and material resources formed when using traditional methods of operation, and can effectively improve work efficiency. Using the traditional operation method to replace a 50 kVA transformer requires 10 people and takes 2 hours. Under the same conditions, it only takes 6 people to use the device and it takes 30 minutes to complete it, which can better promote the upgrading of rural power grids The renovation project was successfully completed on schedule. In addition, the popularization and application of the device can also avoid the loss of fuel oil and the like caused by the use of large hoisting machinery and the pollution to the environment.
附图说明 Description of drawings
图1为本发明的结构示意图。 Fig. 1 is a structural schematic diagram of the present invention.
图2为本发明工作示意图。 Fig. 2 is a working schematic diagram of the present invention.
图中,1、抱箍,2、起重转向杆,3、固定牵引钢绳,4、变压器台,5、变压器,6、手拉葫芦,7、避雷器横担,8、线杆,9、起重吊钩。 In the figure, 1. hoop, 2. hoisting steering rod, 3. fixed traction steel rope, 4. transformer platform, 5. transformer, 6. chain hoist, 7. lightning arrester crossarm, 8. pole, 9. Lifting hook.
具体实施方式 Detailed ways
下面参照附图结合具体实施例详细描述本发明。 The present invention will be described in detail below in conjunction with specific embodiments with reference to the accompanying drawings.
实施例 Example
如图1-2所示,起重转向轴套装于起重转向杆2内,起重转向杆2的一端插入底座内,底座上设有防止起重转向轴滑脱的封盖;起重转向杆2的另一端通过钩环与固定牵引钢绳3的一端相连,固定牵引钢绳3调节起重转向杆2的垂直夹角为45度;固定牵引钢绳3的另一端穿扣固定于线杆8上;固定牵引钢绳3设有调节其长度的花兰螺丝;抱箍1与底座焊接,抱箍调节连扳根据线杆8粗细调节长度。
As shown in Figure 1-2, the lifting steering shaft is sleeved in the
配合使用的工器具包括手拉葫芦6或二三滑轮组、手绳及扳手等。 Cooperating tools include chain hoists 6 or two or three pulley blocks, hand ropes and wrenches.
本发明的使用过程如下: The use process of the present invention is as follows:
将抱箍1固定在线杆8上,略高于变压器台4,通过调节连板和调节螺丝使抱箍1紧固。
Fix the
将起重转向轴套装于起重转向杆2内,起重转向杆2的顶端用固定牵引钢绳3固定在线杆8的相应高度,通过花兰螺丝调节固定牵引钢绳3的长度,从而调节起重转向杆2的垂直夹角,一般以45度为宜。
Set the lifting steering shaft in the
在变压器台4的一侧将变压器5起吊至略高于变压器台4后,通过拴在变压器上的手绳拉动起重转向杆及变压器旋转,将变压器旋转至变压器台4上合适位置,起吊工作结束。
After lifting the transformer 5 on one side of the
本发明进行了两次承重试验,分别起吊了50千伏安和200千伏安的变压器,承重均通过了检验。 The present invention has carried out two load-bearing tests, respectively lifting transformers of 50 kVA and 200 kVA, and the load-bearing has passed the inspection.
农网的变压器容量一般都在100千伏安以下,本发明的承重使用范围目前设定在160千伏安以下的变压器,满足了更换的需要。 The capacity of transformers in rural power grids is generally below 100 kVA, and the load-bearing application range of the present invention is currently set at transformers below 160 kVA, which meets the needs of replacement.
Claims (4)
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN2012101975211A CN102689849A (en) | 2012-06-15 | 2012-06-15 | Lifting device for replacing transformer |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN2012101975211A CN102689849A (en) | 2012-06-15 | 2012-06-15 | Lifting device for replacing transformer |
Publications (1)
| Publication Number | Publication Date |
|---|---|
| CN102689849A true CN102689849A (en) | 2012-09-26 |
Family
ID=46855611
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| CN2012101975211A Pending CN102689849A (en) | 2012-06-15 | 2012-06-15 | Lifting device for replacing transformer |
Country Status (1)
| Country | Link |
|---|---|
| CN (1) | CN102689849A (en) |
Cited By (8)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN103613031A (en) * | 2013-11-28 | 2014-03-05 | 国家电网公司 | Simple transformer hoisting device |
| CN103663235A (en) * | 2013-09-10 | 2014-03-26 | 国家电网公司 | Hand-jack for rod |
| CN103730231A (en) * | 2013-12-23 | 2014-04-16 | 国家电网公司 | Transformer top cover lifting device |
| CN104787693A (en) * | 2015-04-29 | 2015-07-22 | 国网河南省电力公司漯河供电公司 | Auxiliary replacement device of forced-oil-air cooling main transformer upper fan |
| CN105060154A (en) * | 2015-08-14 | 2015-11-18 | 重庆民生变压器有限责任公司 | Suspension installation machine of suspended load type transformer |
| CN106451156A (en) * | 2016-11-25 | 2017-02-22 | 国网河南省电力公司平顶山供电公司 | Transformer maintenance platform |
| CN112062021A (en) * | 2020-09-11 | 2020-12-11 | 国网四川省电力公司自贡供电公司 | Combined distribution transformer hoisting device |
| CN113734993A (en) * | 2021-09-08 | 2021-12-03 | 中国石油化工股份有限公司 | Power-failure-free replacement method for pole-mounted transformer |
Citations (5)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN2801743Y (en) * | 2005-04-27 | 2006-08-02 | 山西省电力公司临汾供电分公司 | Rotatable Transformer Lifting Device |
| CN101769826A (en) * | 2008-12-31 | 2010-07-07 | 董明晓 | Jib crane test bed |
| CN101908731A (en) * | 2010-07-12 | 2010-12-08 | 河南省电力公司驻马店供电公司 | Transformer on-load tap-changer hoist |
| CN201882847U (en) * | 2010-01-29 | 2011-06-29 | 重庆市电力公司沙坪坝供电局 | Hoisting tool of pole-mounted transformer |
| CN202080847U (en) * | 2011-05-23 | 2011-12-21 | 辽宁省电力有限公司抚顺供电公司 | Portable foldable lifting device |
-
2012
- 2012-06-15 CN CN2012101975211A patent/CN102689849A/en active Pending
Patent Citations (5)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN2801743Y (en) * | 2005-04-27 | 2006-08-02 | 山西省电力公司临汾供电分公司 | Rotatable Transformer Lifting Device |
| CN101769826A (en) * | 2008-12-31 | 2010-07-07 | 董明晓 | Jib crane test bed |
| CN201882847U (en) * | 2010-01-29 | 2011-06-29 | 重庆市电力公司沙坪坝供电局 | Hoisting tool of pole-mounted transformer |
| CN101908731A (en) * | 2010-07-12 | 2010-12-08 | 河南省电力公司驻马店供电公司 | Transformer on-load tap-changer hoist |
| CN202080847U (en) * | 2011-05-23 | 2011-12-21 | 辽宁省电力有限公司抚顺供电公司 | Portable foldable lifting device |
Cited By (12)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN103663235A (en) * | 2013-09-10 | 2014-03-26 | 国家电网公司 | Hand-jack for rod |
| CN103613031A (en) * | 2013-11-28 | 2014-03-05 | 国家电网公司 | Simple transformer hoisting device |
| CN103613031B (en) * | 2013-11-28 | 2016-04-06 | 国家电网公司 | Voltage transformer simple and easy hoisting device |
| CN103730231A (en) * | 2013-12-23 | 2014-04-16 | 国家电网公司 | Transformer top cover lifting device |
| CN104787693A (en) * | 2015-04-29 | 2015-07-22 | 国网河南省电力公司漯河供电公司 | Auxiliary replacement device of forced-oil-air cooling main transformer upper fan |
| CN105060154A (en) * | 2015-08-14 | 2015-11-18 | 重庆民生变压器有限责任公司 | Suspension installation machine of suspended load type transformer |
| CN105060154B (en) * | 2015-08-14 | 2018-05-04 | 重庆民生变压器有限责任公司 | Hang load formula transformer suspended fixing apparatus |
| CN106451156A (en) * | 2016-11-25 | 2017-02-22 | 国网河南省电力公司平顶山供电公司 | Transformer maintenance platform |
| CN106451156B (en) * | 2016-11-25 | 2018-03-13 | 国网河南省电力公司平顶山供电公司 | A kind of Repair of Transformer platform |
| CN112062021A (en) * | 2020-09-11 | 2020-12-11 | 国网四川省电力公司自贡供电公司 | Combined distribution transformer hoisting device |
| CN113734993A (en) * | 2021-09-08 | 2021-12-03 | 中国石油化工股份有限公司 | Power-failure-free replacement method for pole-mounted transformer |
| CN113734993B (en) * | 2021-09-08 | 2024-01-09 | 中国石油化工股份有限公司 | Power-outage-free replacement method for pole-mounted transformer |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| CN206163968U (en) | Transformer maintenance platform | |
| CN106451156B (en) | A kind of Repair of Transformer platform | |
| CN204369468U (en) | A kind of lifting device for 220kV tension-resistant china bottle replacement | |
| CN201458590U (en) | A special spreader for substation equipment | |
| CN201882847U (en) | Hoisting tool of pole-mounted transformer | |
| CN201266542Y (en) | Suspended core stent of trestle type distribution transformer | |
| CN203653143U (en) | Hoisting tool for replacing transformer | |
| CN201826262U (en) | Prestress tensioning trolley | |
| CN203284128U (en) | Hoisting tool of main mechanism of switch blade | |
| CN206188298U (en) | Transformer lifting device | |
| CN201605871U (en) | An inner suspension and outer pull wire holding rod | |
| CN209507399U (en) | Be applied to prefab stable form hoist of sling cart | |
| CN203728448U (en) | Light mounting and dismounting frame for tower crane | |
| CN202353036U (en) | Maintenance tool for on-load regulating switch | |
| CN202594699U (en) | Power transmission line lifting device for steel pipe tower | |
| CN202175527U (en) | Portable manual multifunctional lifting jack | |
| CN201868786U (en) | Special repairing lifter for 220KV lightning wire of power transmission line | |
| CN202296895U (en) | Main transformer on-load voltage regulation switch overhauling device | |
| CN204760824U (en) | Small -size assembled hoist device | |
| CN203545559U (en) | Electric meter box hoisting tool | |
| CN203582376U (en) | Slidably mounting and lifting structure | |
| CN203415877U (en) | Hoisting tool for replacing isolation switch | |
| CN202864797U (en) | Portable assembly and disassembly frame | |
| CN203715156U (en) | Convenient crane | |
| CN202268651U (en) | Fixing device of transmission wire lifter |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| C06 | Publication | ||
| PB01 | Publication | ||
| ASS | Succession or assignment of patent right |
Owner name: STATE ELECTRIC NET CROP. Effective date: 20120926 |
|
| C41 | Transfer of patent application or patent right or utility model | ||
| TA01 | Transfer of patent application right |
Effective date of registration: 20120926 Address after: 113008 West Xinfu Road, Liaoning, Fushun, No. 13 Applicant after: Fushun Power Supply Company of Liaoning Electric Power Co., Ltd. Applicant after: State Grid Corporation of China Address before: 113008 West Xinfu Road, Liaoning, Fushun, No. 13 Applicant before: Fushun Power Supply Company of Liaoning Electric Power Co., Ltd. |
|
| C10 | Entry into substantive examination | ||
| SE01 | Entry into force of request for substantive examination | ||
| C12 | Rejection of a patent application after its publication | ||
| RJ01 | Rejection of invention patent application after publication |
Application publication date: 20120926 |
