CN203434492U - Combination-type electric hoisting apparatus - Google Patents

Combination-type electric hoisting apparatus Download PDF

Info

Publication number
CN203434492U
CN203434492U CN201320524026.7U CN201320524026U CN203434492U CN 203434492 U CN203434492 U CN 203434492U CN 201320524026 U CN201320524026 U CN 201320524026U CN 203434492 U CN203434492 U CN 203434492U
Authority
CN
China
Prior art keywords
pole
support pole
hoisting
electric hoist
pulley
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201320524026.7U
Other languages
Chinese (zh)
Inventor
李钦
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
State Grid Corp of China
Pingxiang Power Supply Co of State Grid Jiangxi Electric Power Co Ltd
Original Assignee
Jiangxi Pingxiang Power Supply Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Jiangxi Pingxiang Power Supply Co Ltd filed Critical Jiangxi Pingxiang Power Supply Co Ltd
Priority to CN201320524026.7U priority Critical patent/CN203434492U/en
Application granted granted Critical
Publication of CN203434492U publication Critical patent/CN203434492U/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Landscapes

  • Jib Cranes (AREA)

Abstract

本实用新型公开了组合式电动起吊装置,它包括电动提升机(2)和支撑抱杆,电动提升机包括钢绳(4)和滑轮(6),支撑抱杆包括上支撑抱杆(8)和下支撑抱杆(11),上支撑抱杆和下支撑抱杆采用榫头(17)相镶并用夹板(9)和螺杆(10)相连,在下支撑抱杆底端焊接设置有安装支架(15)和底板(1),电动提升机固定在安装支架上,在上支撑抱杆顶端设置有横板(7),滑轮(6)活动设在横板上。本实用新型可广泛应用于110kV及以下的隔离开关、电压互感器、电流互感器以及避雷器的等较单一、工作量较小的吊装工作,且能做到使用方便、安全可靠、作业高效,省时省力、节省吊装成本;可最大限度地缩小停电范围,缩短停电时间。

Figure 201320524026

The utility model discloses a combined electric hoisting device, which comprises an electric hoist (2) and a supporting pole, the electric hoist comprises a steel rope (4) and a pulley (6), and the supporting pole comprises an upper supporting pole (8) And the lower support pole (11), the upper support pole and the lower support pole are inlaid with tenons (17) and connected with the splint (9) and the screw (10), and the bottom end of the lower support pole is welded with a mounting bracket (15 ) and the bottom plate (1), the electric hoist is fixed on the mounting bracket, a horizontal plate (7) is arranged on the top of the upper support pole, and the pulley (6) is movable on the horizontal plate. The utility model can be widely used in the hoisting work of 110kV and below isolation switches, voltage transformers, current transformers and lightning arresters, etc. It saves time, labor and hoisting costs; it can minimize the scope of power outages and shorten the time of power outages.

Figure 201320524026

Description

组合式电动起吊装置Combined electric lifting device

技术领域 technical field

 本实用新型涉及起吊装置,尤其是涉及电力设施安装用组合式电动起吊装置。 The utility model relates to a lifting device, in particular to a combined electric lifting device for installing electric facilities.

背景技术 Background technique

在输送电生产工作中,当我们要对某一间隔内的某一特定的一次设备进行更换时,起重吊装作业是其中最重要的一项作业内容之一。尤其是在大修技改工作中,经常需要对一些相对简单的一次设备进行吊装,例如110kV及以下的隔离开关的吊装;110kV及以下电压互感器、电流互感器的吊装;110kV及以下避雷器的吊装。在以往的起重吊装作业中,这些吊装工作在生产检修中占用了大量的时间、人力以及物力。变电检修人员通常都是视工作现场的实际情况而临时决定如何进行起吊作业,并没有一套统一、固定的起吊装置和起吊方式。一般都是使用吊车直接吊装,或者是采用人工立抱杆的方式进行吊装。这两种吊装方式虽然都有其各自的优越性,但同时又都存在着很大的局限性。一是对于110kV及以下的一些简单的一次设备,如果使用吊车起吊,由于吊车活动范围大,为保证吊车作业时与设备带电部位保持足够的安全距离,通常需要停跨越作业设备的母线或相邻间隔;在电力负荷高的情况,这种扩大停电范围的做法常常得不到调度部门的批准,需被动等待负荷低时对相关设备停电再进行吊装作业,造成大修技改计划不能及时完成。而且,吊车吊装的成本相对较高。二是虽然采用人工立抱杆作业对作业环境的要求相对较小,成本小,通常无需要求相邻间隔停电,只要作业面上空无跨越间隔或与跨越间隔的导电部位,能保持足够的安全距离,就能作业,但需要大量人员进行施工,一般要6-7人进行工作,工作量和工作强度大,工作效率十分低下。 In the power transmission production work, when we want to replace a specific primary equipment in a certain interval, lifting operation is one of the most important operations. Especially in the overhaul and technical transformation work, it is often necessary to hoist some relatively simple primary equipment, such as the hoisting of isolating switches of 110kV and below; the hoisting of voltage transformers and current transformers of 110kV and below; the hoisting of arresters of 110kV and below . In previous hoisting operations, these hoisting tasks took up a lot of time, manpower and material resources in production and maintenance. Substation maintenance personnel usually decide how to carry out the lifting operation temporarily depending on the actual situation of the work site, and there is no unified and fixed lifting device and lifting method. Generally, it is directly hoisted by a crane, or it is hoisted by a manual vertical pole. Although these two hoisting methods have their own advantages, they all have great limitations at the same time. First, for some simple primary equipment of 110kV and below, if a crane is used to lift it, due to the large range of movement of the crane, in order to ensure a sufficient safety distance between the crane and the live parts of the equipment during operation, it is usually necessary to stop across the busbar of the operating equipment or adjacent to it. In the case of high power load, this method of expanding the scope of power outages is often not approved by the dispatching department, and it is necessary to passively wait for the power outage of related equipment when the load is low before carrying out hoisting operations, resulting in the overhaul and technical transformation plan not being completed in time. Moreover, the cost of crane hoisting is relatively high. The second is that although the manual vertical pole operation has relatively small requirements on the working environment and low cost, it is usually not required to cut off power at adjacent intervals, as long as there is no conductive part across the interval or across the interval on the working surface, a sufficient safety distance can be maintained , just can work, but need a large number of personnel to carry out construction, generally need 6-7 people to carry out work, workload and intensity of work are big, work efficiency is very low.

实用新型内容 Utility model content

针对上述现有技术中电力设备安装起吊中所存在的问题,本实用新型提供了一种适合电力设施在单一间隔内安装使用安全和方便的组合式电动起吊装置。 Aiming at the problems existing in the installation and lifting of electric equipment in the prior art, the utility model provides a combined electric lifting device suitable for installation and use of electric facilities in a single interval, which is safe and convenient.

本实用新型要解决的技术问题所采取的技术方案是:所述组合式电动起吊装置包括电动提升机和支撑抱杆,所述电动提升机包括钢绳和滑轮,所述支撑抱杆包括上支撑抱杆和下支撑抱杆,所述上支撑抱杆和下支撑抱杆用榫头相镶并用夹板和螺杆相连接,在下支撑抱杆底端焊接固定设置有安装支架和底板,所述电动提升机固定在安装支架上,在上支撑抱杆顶端设置有横板,所述滑轮活动设在横板上。 The technical solution adopted for the technical problem to be solved by the utility model is: the combined electric hoisting device includes an electric hoist and a support pole, the electric hoist includes a steel rope and a pulley, and the support pole includes an upper support The supporting pole and the lower supporting pole, the upper supporting pole and the lower supporting pole are inlaid with tenons and connected with splints and screws, and the bottom end of the lower supporting pole is welded and fixed with a mounting bracket and a bottom plate. The electric hoist It is fixed on the mounting bracket, and a horizontal plate is arranged on the top of the upper supporting pole, and the pulley is movable on the horizontal plate.

本实用新型根据起吊高度需要,也可在上支撑杆与下支撑杆之间采用榫头相镶并用夹板和螺杆的方式连接有一根或多根中间支撑抱杆。 According to the requirements of the lifting height, the utility model can also adopt tenons to be inlaid between the upper support rod and the lower support rod and be connected with one or more middle support holding rods by means of splints and screws.

在电力设施最大重量不大于800Kg时,所述支撑抱杆采用10号槽钢制成,所述电动提升机选用最大载荷量为1吨。 When the maximum weight of the power facility is not greater than 800Kg, the support pole is made of No. 10 channel steel, and the maximum load of the electric hoist is 1 ton.

本实用新型所述组合式起吊装置综合解决了用吊车机械作业和人工立抱杆作业进行电力设施安装所存在的问题,既不需扩大停电范围,且起吊一次设备时可做到安全、方便、省时、省力、作业高效和低成本,从而提高了起重吊装作业的工作效率,确保工期如期完成。吊装一组110kV及以下一次设备的准备时间和吊装时间短(准备时间一般为10分钟、吊装时间不超过4分钟)、 The combined lifting device described in the utility model comprehensively solves the problems existing in the installation of power facilities by means of crane mechanical operation and manual vertical pole operation. Time-saving, labor-saving, high-efficiency operation and low cost, thereby improving the work efficiency of lifting operations and ensuring that the construction period is completed on schedule. The preparation time and hoisting time for hoisting a group of 110kV and below primary equipment are short (the preparation time is generally 10 minutes, and the hoisting time does not exceed 4 minutes),

本实用新型可广泛应用于110kV及以下的隔离开关、电压互感器、电流互感器以及避雷器的等较单一、工作量较小的吊装工作。使用该组合式电动起吊装置既能做到使用方便、安全可靠、作业高效,省时省力、节省吊装成本;又能最大限度地缩小停电范围,缩短停电时间,减少因扩大停电范围所带来的供电量损失。 The utility model can be widely used in relatively simple hoisting work with less workload such as isolating switches, voltage transformers, current transformers and lightning arresters of 110kV and below. The use of the combined electric lifting device can not only achieve convenient use, safety and reliability, efficient operation, save time and effort, and save hoisting costs; it can also minimize the scope of power outages, shorten the time of power outages, and reduce Power loss.

附图说明 Description of drawings

图1是本实用新型使用时的主视结构示意图, Fig. 1 is the front view structure schematic diagram when the utility model is in use,

图2是本实用新型使用时的右视结构示意图, Fig. 2 is a right view structural representation when the utility model is in use,

图3是图2的I-I结构放大示意图。 FIG. 3 is an enlarged schematic diagram of the I-I structure in FIG. 2 .

在图中,1、底板  2、电动提升机  3、绳辊  4、钢绳  5、吊钩  6、滑轮  7、横板 8、上支撑抱杆  9、夹板 10、螺杆11、下支撑抱杆  12、台板  13、抱箍  14、水泥墩  15、安装支架  16、座板  17、榫头。 In the figure, 1, bottom plate 2, electric hoist 3, rope roller 4, steel rope 5, hook 6, pulley 7, horizontal plate 8, upper support pole 9, splint 10, screw rod 11, lower support pole 12 , Platen 13, Hoop 14, Cement Pier 15, Mounting Bracket 16, Seat Plate 17, Tenon.

具体实施方式 Detailed ways

在图1和图2中,所述组合式电动起吊装置包括电动提升机2和支撑抱杆,所述电动提升机包括绳辊3、钢绳4和滑轮6,所述支撑抱杆包括上支撑抱杆8和下支撑抱杆11,所述上支撑抱杆和下支撑抱杆用榫头17相镶后并用夹板9和螺杆10固定相连接,钢绳4一端绕过滑轮并连接有吊钩5、另一端缠绕在绳辊上,在下支撑抱杆底端焊固定设置有安装支架15和底板1,安装支架由四块槽钢和中间连接块组合焊接固定在下支撑抱杆下端,安装支架上设置有四只安装孔, 安装孔的大小和位置与座板16上的孔相对应,所述电动提升机通过其上的座板16用螺杆固定在安装支架上,在上支撑抱杆顶端设置有横板7,所述滑轮活动设在横板上。使用前,先根据起吊高度来组装置支撑抱杆,一是用上支撑抱杆和下支撑抱杆组合成支撑抱杆,也可用上支撑抱杆、中间支撑抱杆(图中未画出)和下支撑抱杆组合成支撑抱杆,组合后将支撑抱杆竖立并紧靠水泥墩14,水泥墩顶端设置有安装电力设施的台板12,吊装的电力设施固定在台板上,在下支撑抱杆上端和下端分别用抱箍13将下支撑抱杆和水泥墩固定在一起。 In Figures 1 and 2, the combined electric hoisting device includes an electric hoist 2 and a support pole, the electric hoist includes a rope roller 3, a steel rope 4 and a pulley 6, and the support pole includes an upper support The holding rod 8 and the lower supporting holding rod 11, the upper supporting holding rod and the lower supporting holding rod are inlaid with the tenon 17 and fixedly connected with the splint 9 and the screw rod 10, and one end of the steel rope 4 goes around the pulley and is connected with the hook 5 , the other end is wound on the rope roller, and the bottom end of the lower support pole is welded and fixed with a mounting bracket 15 and a bottom plate 1, and the mounting bracket is welded and fixed on the lower end of the lower support pole by four pieces of channel steel and an intermediate connecting block. There are four installation holes, and the size and position of the installation holes correspond to the holes on the seat plate 16. The electric hoist is fixed on the mounting bracket by the seat plate 16 on it with screws, and the top of the upper support pole is provided with Horizontal plate 7, described pulley activity is located on horizontal plate. Before use, first assemble the supporting pole according to the lifting height. One is to use the upper supporting pole and the lower supporting pole to form a supporting pole, or you can use the upper supporting pole and the middle supporting pole (not shown in the figure) Combined with the lower support pole to form a support pole, after the combination, the support pole is erected and close to the cement pier 14, the top of the cement pier is provided with a platform 12 for installing power facilities, the hoisted power facilities are fixed on the platform, and the lower support The upper and lower ends of the pole are fixed together with the hoop 13 to support the pole and the cement pier respectively.

Claims (1)

1. 组合式电动起吊装置,它包括电动提升机(2)和支撑抱杆,所述电动提升机包括钢绳(4)和滑轮(6),其特征是:所述支撑抱杆包括上支撑抱杆(8)和下支撑抱杆(11),所述上支撑抱杆和下支撑抱杆用榫头(17)相镶并用夹板(9)和螺杆(10)相连接,在下支撑抱杆底端焊接固定设置有安装支架(15)和底板(1),所述电动提升机固定在安装支架上,在上支撑抱杆顶端设置有横板(7),所述滑轮(6)活动设在横板上。 1. Combined electric lifting device, which includes an electric hoist (2) and a support pole, the electric hoist includes a steel rope (4) and a pulley (6), and the feature is: the support pole includes an upper support The holding rod (8) and the lower supporting holding rod (11), the upper supporting holding rod and the lower supporting holding rod are inlaid with the mortise (17) and connected with the splint (9) and the screw rod (10), at the bottom of the lower supporting holding rod An installation bracket (15) and a bottom plate (1) are fixedly installed by welding at the end, the electric hoist is fixed on the installation bracket, a horizontal plate (7) is arranged on the top of the upper support pole, and the pulley (6) is movable on the horizontal board.
CN201320524026.7U 2013-08-27 2013-08-27 Combination-type electric hoisting apparatus Expired - Fee Related CN203434492U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201320524026.7U CN203434492U (en) 2013-08-27 2013-08-27 Combination-type electric hoisting apparatus

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201320524026.7U CN203434492U (en) 2013-08-27 2013-08-27 Combination-type electric hoisting apparatus

Publications (1)

Publication Number Publication Date
CN203434492U true CN203434492U (en) 2014-02-12

Family

ID=50063510

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201320524026.7U Expired - Fee Related CN203434492U (en) 2013-08-27 2013-08-27 Combination-type electric hoisting apparatus

Country Status (1)

Country Link
CN (1) CN203434492U (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103523704A (en) * 2013-10-25 2014-01-22 国网安徽省电力公司池州供电公司 Detachable support applied to lifting of small-sized electric power device and construction method thereof
CN113794141A (en) * 2021-09-30 2021-12-14 海南电网有限责任公司海南输变电检修分公司 A Tool for Repairing Current Transformer of 10kV Switchgear
CN115043344A (en) * 2022-07-06 2022-09-13 国网冀北电力有限公司唐山供电公司 Special 35 kV PT hoisting structure and hoisting method

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103523704A (en) * 2013-10-25 2014-01-22 国网安徽省电力公司池州供电公司 Detachable support applied to lifting of small-sized electric power device and construction method thereof
CN113794141A (en) * 2021-09-30 2021-12-14 海南电网有限责任公司海南输变电检修分公司 A Tool for Repairing Current Transformer of 10kV Switchgear
CN115043344A (en) * 2022-07-06 2022-09-13 国网冀北电力有限公司唐山供电公司 Special 35 kV PT hoisting structure and hoisting method

Similar Documents

Publication Publication Date Title
CN102689849A (en) Lifting device for replacing transformer
CN103730231A (en) Transformer top cover lifting device
CN201266542Y (en) Suspended core stent of trestle type distribution transformer
CN203903830U (en) Small framework quickly-assembled jack for equipment
CN204237458U (en) The laborsaving lifting utensil of a kind of electrical equipment
CN203284128U (en) Hoisting tool of main mechanism of switch blade
CN201737616U (en) Double-lifting pole
CN203108026U (en) High-voltage bus safety belt hanging support
CN204732751U (en) On-load tap-changer of transformer service kit
CN205543906U (en) Cubical switchboard hoisting accessory
CN204324741U (en) Load switch of transformer suspended core apparatus
CN203445481U (en) 66kV isolating switch set replacement special spreader
CN201252354Y (en) On-load tapping changing switch suspension bracket
CN205676052U (en) Bench type transformer crane device
CN202175527U (en) Portable manual multifunctional lifting jack
CN209161349U (en) Combined lifting device for on-load tap-changer of transformer
CN203746609U (en) Transformer top cover lifting device
CN205034948U (en) Rack formula hanging beam device
CN102570325B (en) A kind of light hoisting device for converting station
CN210885002U (en) A hoisting device for a substation
CN203754287U (en) Small-sized interval dual-purpose lifting appliance
CN203415877U (en) Hoisting tool for replacing isolation switch
CN107069508A (en) 110kV and following disconnecting switch support insulator change aid
CN201512370U (en) A switch knife hoisting frame
CN201536236U (en) Bracket for hoisting heavy objects on utility poles

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
ASS Succession or assignment of patent right

Owner name: STATE GRID CORPORATION OF CHINA

Free format text: FORMER OWNER: JIANGXI PINGXIANG POWER SUPPLY COMPANY

Effective date: 20141218

Owner name: PINGXIANG POWER SUPPLY BRANCH OF STATE GRID JIANGX

Effective date: 20141218

C41 Transfer of patent application or patent right or utility model
COR Change of bibliographic data

Free format text: CORRECT: ADDRESS; FROM: 337000 PINGXIANG, JIANGXI PROVINCE TO: 100031 XICHENG, BEIJING

TR01 Transfer of patent right

Effective date of registration: 20141218

Address after: 100031 Beijing, Xicheng District, West A, No. 1,

Patentee after: State Grid Corporation of China

Patentee after: PINGXIANG POWER SUPPLY BRANCH, STATE GRID JIANGXI ELECTRIC POWER CO., LTD.

Address before: 337000, No. 2 West Ping Lu, Anyuan District, Jiangxi, Pingxiang

Patentee before: Jiangxi Pingxiang Power Supply Co., Ltd.

CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20140212

Termination date: 20160827

CF01 Termination of patent right due to non-payment of annual fee