CN102653943A - 地下预埋钢柱调直限位装置 - Google Patents
地下预埋钢柱调直限位装置 Download PDFInfo
- Publication number
- CN102653943A CN102653943A CN2012101391855A CN201210139185A CN102653943A CN 102653943 A CN102653943 A CN 102653943A CN 2012101391855 A CN2012101391855 A CN 2012101391855A CN 201210139185 A CN201210139185 A CN 201210139185A CN 102653943 A CN102653943 A CN 102653943A
- Authority
- CN
- China
- Prior art keywords
- steel column
- level
- steel
- carriage
- support
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
Images
Landscapes
- Underground Structures, Protecting, Testing And Restoring Foundations (AREA)
Abstract
本发明涉及一种地下预埋钢柱调直限位装置,包括水平调节支架,垂直导向筒,其特点是:垂直导向筒安放在已调整水平的水平调节支架上,并用限位插销与水平调节支架定位连接;垂直导向筒筒仓内吊入设有导向吊筋的地下预埋钢柱,并用扁担固定地下预埋钢柱于垂直导向筒上。本发明采用垂直导向筒与水平调节支架连接,形成筒体托架起到水平限位作用,利用与钢柱设置的导向吊筋连接达到高程精度控制目的。本发明与现有技术相比结构稳定、操作简便、可循环利用、能极大的提高地下预埋钢柱施工精度。经工程实践验证,本发明操作方便,精度控制良好。
Description
技术领域
本发明涉及一种地下预埋钢柱施工的装置,具体是一种用于地下连续墙预埋钢柱的下放并控制该预埋钢柱的定位精度的装置。
背景技术
随着城市的不断发展,土地资源紧张的情况日渐显著。提高建筑的空间开发利用率则成为了当务之急。为了提高建筑的空间开发利用率,越来越多的结构设计将竖向荷载节点移入地下连续墙中,地下连续墙结构中预埋钢柱的应用也成为大势所趋。
由于一般地下连续墙钢筋笼吨位大,入槽深对整体地墙钢筋笼的定位控制往往达不到相应设计要求的精度,加上现浇混凝土扰动对预埋件的冲击、使得该类钢柱构件预埋的施工难度很大,施工精度难以得到保证。因此,需要专门开发研制一种能提高此类预埋钢柱施工效率,保证预埋钢柱就位精度、可重复利用的简易轻质构件显得尤为必要。
发明内容
本发明是要解决现有地下预埋钢柱预埋施工精度低、施工效率低下、材料损耗较大的技术问题,而提供一种操作简单、控制精度高、可重复利用的地下预埋钢柱调直限位装置。
为实现上述目的,本发明的技术方案是:一种地下预埋钢柱调直限位装置,包括水平调节支架,垂直导向筒,其特点是:垂直导向筒安放在已调整水平的水平调节支架上,并用限位插销与水平调节支架定位连接;垂直导向筒筒仓内吊入设有导向吊筋的地下预埋钢柱,并用扁担固定地下预埋钢柱于垂直导向筒上。
水平调节支架包括可调节标高的调节底座;可调节间距的横向钢梁;可置换不同尺寸的纵向钢梁,横梁调节螺杆及横梁限位螺母;二根纵向钢梁上面分别通过横梁调节螺杆及横梁限位螺母连接二根横向钢梁,调节螺杆通过二端的螺杆托架固定在纵向钢梁,二根纵向钢梁下面二端分别装有调节底座;横向钢梁上设有垂直导向筒限位孔。
垂直导向筒包括与预埋钢柱类构件相适配的导向筒体,托架,导向筒体两侧面上分别固定连接有托架,托架上面设有托架固定孔。
水平调节支架的纵向钢梁与调节底座之间设有标高调节垫片,并通过定位螺杆和紧固螺母与硬地坪连接。
纵向钢梁和横向钢梁上分别设有水平尺。
本发明的有益效果是:
本发明采用垂直导向筒与水平调节支架连接,形成筒体托架起到水平限位作用,利用与钢柱设置的导向吊筋连接达到高程精度控制目的。本发明通过调节支架底座,水平调节支架水平,确保垂直导向筒的竖向垂直。利用垂直固定的导向筒,限制预埋钢柱入仓及下方过程垂直。该装置通过限制钢柱上端的平面位置及侧向倾斜,借助钢柱构建自重作用,可有效控制地下预埋钢柱的施工精度。
本发明与现有技术相比结构稳定、操作简便、可循环利用、能极大的提高地下预埋钢柱施工精度。经工程实践验证,本发明操作方便,精度控制良好。
附图说明
图1是本发明的结构示意图;
图2是水平调节支架结构示意图;
图3是图2中沿A-A的剖视旋转图;
图4图2中沿B-B的剖视图;
图5是调节螺杆和横梁限位螺母与横向钢梁连接剖视图;
图6是垂直导向筒结构立体示意图;
图7是垂直导向筒的托架与横向钢梁定位连接示意图;
图8是地下预埋钢柱立体示意图。
具体实施方式
下面结合附图与实施例对本发明作进一步说明。
如图1至图8所示,本发明的地下预埋钢柱调直限位装置,包括水平调节支架1,垂直导向筒2,地下预埋钢柱3等。
如图1所示,垂直导向筒2安放在已调整水平的水平调节支架1上,并用限位插销19与水平调节支架1定位连接(图7);垂直导向筒2筒仓内吊入设有导向吊筋4的地下预埋钢柱3(图8),并用扁担5固定地下预埋钢柱3于垂直导向筒2上。
如图2至图5所示,水平调节支架1包括可调节标高的调节底座10;可调节间距的横向钢梁7;可置换不同尺寸的纵向钢梁6,横梁调节螺杆9及横梁限位螺母12;二根纵向钢梁6上面分别通过横梁调节螺杆8及横梁限位螺母12连接二根横向钢梁7(图5),横梁调节螺杆9通过二端的螺杆托架13固定在纵向钢梁6,二根纵向钢梁6下面二端分别装有调节底座10;横向钢梁7上设有垂直导向筒限位孔8。纵向钢梁6和横向钢梁7上分别设有水平尺11。水平调节支架的纵向钢梁6与调节底座10之间设有标高调节垫片15,并通过定位螺杆14和紧固螺母16与硬地坪连接(图4)。
水平支架的调节原理:通过标高调节垫片15调整水平调至水平调节支架四角标高;观察纵向钢梁6和横向钢梁7上的水平尺11,使水平调节支架1水平。
横向钢梁调节原理:松动横向钢梁7两端限位螺母12,使横向钢梁7可以在横梁调节螺杆9上座水平移动,从而调节横向钢梁7净距,满足垂直导向筒2安装。
如图6所示,垂直导向筒2包括与预埋钢柱类构件相适配的导向筒体20,托架17,导向筒体20两侧面上分别固定连接有托架17,托架17上面设有托架固定孔18。
垂直导向筒与横向钢梁连接原理:水平调节支架1固定调平后将横向钢梁7调节至适当位置,随后吊放插入垂直导向筒2、将垂直导向筒托架17上的限位孔18与横向钢梁7上限位孔8对齐,插入限位插销19即可固定垂直导向筒2。
应用本发明的对地下预埋钢柱调直限位的施工方法:
(1)确定预埋钢柱3构件的结构尺寸、形式及精度要求,选用或定制合适的垂直导向筒2。
(2)预先测量施工区域标高、在预埋钢柱3顶端合理位置设置导向吊筋4。
(3)预先测量定位确定水平调节支架1四个调节底座10的位置并打入定位螺杆14。
(4)预先根据所需尺寸将横向钢梁7调整到位,旋紧限位螺母12。
(5)地墙钢筋笼下放完毕后,将水平调节支架1套至定位螺杆14上,增加或减少标高调节垫片15,观察纵、横向钢梁上的水平尺11,使得水平调节支架1水平。
6)将垂直导向筒2安放在已调至水平的水平调节支架1上,插入限位插销19。
(7)吊装钢柱3、将钢柱3从垂直导向筒2筒仓内放入,放置设计标高后通过扁担5固定钢柱3于垂直导向筒2上。
(8)抽去扁担5,拆除垂直导向筒2及水平调节支架1(作循环使用)。
Claims (5)
1.一种地下预埋钢柱调直限位装置,包括水平调节支架(1),垂直导向筒(2),其特征在于:所述垂直导向筒(2)安放在已调整水平的水平调节支架(1)上,并用限位插销(19)与水平调节支架(1)定位连接;垂直导向筒(2)筒仓内吊入设有导向吊筋(4)的地下预埋钢柱(3),并用扁担(5)固定地下预埋钢柱(3)于垂直导向筒(2)上。
2.根据权利要求1所述的地下预埋钢柱调直限位装置,其特征在于:所述水平调节支架(1)包括可调节标高的调节底座(10);可调节间距的横向钢梁(7);可置换不同尺寸的纵向钢梁(6),横梁调节螺杆(9)及横梁限位螺母(12);二根纵向钢梁(6)上面分别通过横梁调节螺杆(9)及横梁限位螺母(12)连接二根横向钢梁(7),横梁调节螺杆(9)通过二端的螺杆托架(13)固定在纵向钢梁(6),二根纵向钢梁(6)下面二端分别装有调节底座(10);横向钢梁(7)上设有垂直导向筒限位孔(8)。
3.根据权利要求1所述的地下预埋钢柱调直限位装置,其特征在于:所述垂直导向筒(2)包括与预埋钢柱类构件相适配的导向筒体(20),托架(17),导向筒体(20)两侧面上分别固定连接有托架(17),托架(17)上面设有托架固定孔(18)。
4.根据权利要求2所述的地下预埋钢柱调直限位装置,其特征在于:所述水平调节支架的纵向钢梁(6)与调节底座(10)之间设有标高调节垫片(15),并通过定位螺杆(14)和紧固螺母(16)与硬地坪连接。
5.根据权利要求1或2所述的地下预埋钢柱调直限位装置,其特征在于:所述纵向钢梁(6)和横向钢梁(7)上分别设有水平尺(11)。
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201210139185.5A CN102653943B (zh) | 2012-05-08 | 2012-05-08 | 地下预埋钢柱调直限位装置 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201210139185.5A CN102653943B (zh) | 2012-05-08 | 2012-05-08 | 地下预埋钢柱调直限位装置 |
Publications (2)
Publication Number | Publication Date |
---|---|
CN102653943A true CN102653943A (zh) | 2012-09-05 |
CN102653943B CN102653943B (zh) | 2015-02-18 |
Family
ID=46729662
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201210139185.5A Active CN102653943B (zh) | 2012-05-08 | 2012-05-08 | 地下预埋钢柱调直限位装置 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN102653943B (zh) |
Cited By (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN105735319A (zh) * | 2016-01-28 | 2016-07-06 | 上海建工二建集团有限公司 | 一种大直径钢管立柱桩快速定位调垂装置及施工方法 |
CN108239980A (zh) * | 2018-02-08 | 2018-07-03 | 中铁上海工程局集团有限公司 | 一种用于车站围护结构预制叠合桩定位装置及其使用方法 |
CN108867628A (zh) * | 2018-08-30 | 2018-11-23 | 上海市城市建设设计研究总院(集团)有限公司 | 咬合桩围护先期桩方形钢筋笼定位装置及其定位成桩方法 |
CN111501755A (zh) * | 2020-06-04 | 2020-08-07 | 中铁城建集团第三工程有限公司 | 一种smw型工法桩芯材定位装置组合及其使用方法 |
Citations (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN1424469A (zh) * | 2002-08-23 | 2003-06-18 | 上海市第一建筑有限公司 | 钢桩柱垂直度调控方法及装置 |
CN201065533Y (zh) * | 2007-07-17 | 2008-05-28 | 上海市第一建筑有限公司 | 钢桩柱垂直度调控装置 |
-
2012
- 2012-05-08 CN CN201210139185.5A patent/CN102653943B/zh active Active
Patent Citations (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN1424469A (zh) * | 2002-08-23 | 2003-06-18 | 上海市第一建筑有限公司 | 钢桩柱垂直度调控方法及装置 |
CN201065533Y (zh) * | 2007-07-17 | 2008-05-28 | 上海市第一建筑有限公司 | 钢桩柱垂直度调控装置 |
Cited By (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN105735319A (zh) * | 2016-01-28 | 2016-07-06 | 上海建工二建集团有限公司 | 一种大直径钢管立柱桩快速定位调垂装置及施工方法 |
CN108239980A (zh) * | 2018-02-08 | 2018-07-03 | 中铁上海工程局集团有限公司 | 一种用于车站围护结构预制叠合桩定位装置及其使用方法 |
CN108239980B (zh) * | 2018-02-08 | 2023-09-15 | 中铁上海工程局集团有限公司 | 一种用于车站围护结构预制叠合桩定位装置及其使用方法 |
CN108867628A (zh) * | 2018-08-30 | 2018-11-23 | 上海市城市建设设计研究总院(集团)有限公司 | 咬合桩围护先期桩方形钢筋笼定位装置及其定位成桩方法 |
CN111501755A (zh) * | 2020-06-04 | 2020-08-07 | 中铁城建集团第三工程有限公司 | 一种smw型工法桩芯材定位装置组合及其使用方法 |
Also Published As
Publication number | Publication date |
---|---|
CN102653943B (zh) | 2015-02-18 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN210766774U (zh) | 一种钢筋笼及格构柱的定位装置 | |
CN201071510Y (zh) | 格构柱定位调垂导架装置 | |
CN203783165U (zh) | 预埋件多方位精确调节装置 | |
CN202090437U (zh) | 可调节钢柱柱脚装置 | |
CN102653943A (zh) | 地下预埋钢柱调直限位装置 | |
CN104032969A (zh) | 一种隔震支座预埋板精确定位及过程调控装置 | |
CN202000651U (zh) | 立柱加固用可调节附壁支撑装置 | |
CN205804768U (zh) | 一种可调高度可周转使用的马凳 | |
CN103114572A (zh) | 一种地下连续墙导墙移动模架 | |
CN110670873B (zh) | 一种超高大截面混凝土柱钢模板的托撑体系及施工方法 | |
CN204298830U (zh) | 基于地下基坑内格构柱平面及高程调控装置 | |
CN102653947B (zh) | 地下预埋钢构件限位调直施工方法 | |
CN203361735U (zh) | 一种高效调节的滑模系统 | |
CN202559747U (zh) | 一种铝合金剪力墙模板的脚部支撑及尺寸控制装置 | |
CN203361633U (zh) | 一种滑模系统的模板调节系统 | |
CN210659385U (zh) | 梁板支撑立杆定位护砼地面可调节底座 | |
CN103334584A (zh) | 一种滑模系统的模板调节系统 | |
CN204163356U (zh) | 一种安装内墙板用的设备 | |
CN210947718U (zh) | 一种土木施工浇筑板支撑装置 | |
CN203113314U (zh) | 一种地下连续墙导墙移动模架 | |
CN202194073U (zh) | 大体积长悬臂盖梁施工装置 | |
CN217811167U (zh) | 一种可调节塔吊预埋支腿标高的固定支托 | |
CN204401983U (zh) | 建筑用抹灰工具 | |
CN215331599U (zh) | 一种用于深基坑工程中格构柱的安装定位装置 | |
CN205474858U (zh) | 一种桥梁盖梁或系梁模板支撑调节装置 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
C53 | Correction of patent of invention or patent application | ||
CB02 | Change of applicant information |
Address after: 200433 Yangpu District, Shanghai Star Road, No. 231 Applicant after: Shanghai Foundation Engineering Group Co., Ltd. Address before: 200433 Yangpu District, Shanghai Star Road, No. 231 Applicant before: Shanghai Foundation Engineering Co., Ltd. |
|
COR | Change of bibliographic data |
Free format text: CORRECT: APPLICANT; FROM: SHANGHAI FOUNDATION ENGINEERING CO., LTD. TO: SHANGHAI FOUNDATION ENGINEERING GROUP CO., LTD. |
|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant |