CN102635091A - Earth and rockfill dam impervious element and building method thereof - Google Patents

Earth and rockfill dam impervious element and building method thereof Download PDF

Info

Publication number
CN102635091A
CN102635091A CN2012101319509A CN201210131950A CN102635091A CN 102635091 A CN102635091 A CN 102635091A CN 2012101319509 A CN2012101319509 A CN 2012101319509A CN 201210131950 A CN201210131950 A CN 201210131950A CN 102635091 A CN102635091 A CN 102635091A
Authority
CN
China
Prior art keywords
particle diameter
particle
earth
raw material
rockfill dam
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN2012101319509A
Other languages
Chinese (zh)
Inventor
叶发明
李小泉
王建洪
张伯骥
李建国
余学明
陈定贤
何兰
阮文兰
甘霖
吕衡
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Chengdu Hydroelectric Investigation and Design Institute of China Hydropower Engineering Consulting Group
Original Assignee
Chengdu Hydroelectric Investigation and Design Institute of China Hydropower Engineering Consulting Group
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Chengdu Hydroelectric Investigation and Design Institute of China Hydropower Engineering Consulting Group filed Critical Chengdu Hydroelectric Investigation and Design Institute of China Hydropower Engineering Consulting Group
Priority to CN2012101319509A priority Critical patent/CN102635091A/en
Publication of CN102635091A publication Critical patent/CN102635091A/en
Pending legal-status Critical Current

Links

Landscapes

  • Revetment (AREA)

Abstract

The invention discloses an earth and rockfill dam impervious element built from a gravelly soil raw material with lower content of clay and meeting the requirement of an osmotic coefficient and a building method of the earth and rockfill dam impervious element. The earth and rockfill dam impervious element is built by adopting the following steps of: a, selecting the gravelly soil raw material: the gravelly soil raw material contains various particles with particle sizes from 0.002mm-200mm, and the content of the particle with the particles size less than 0.005mm is 3.5-5.5 percent; b, screening the gravelly soil raw material, eliminating the particle with the particle size more than 80mm to obtain a seepage preventing material which contains 41.1-69.1 percent of particle with the particle size less than or equal to 5mm, 11.5-36.6 percent of particle with particle size less than or equal to 0.075 mm and 5.3-7.0 percent of particle with particle size less than 0.005mm in each unit weight of the gravelly soil; and c, filling the seepage preventing material and compacting to form the earth and rockfill dam impervious element to ensure that the dry density of the gravelly soil of the earth and rockfill dam impervious element after being compacted is 2.30-2.36(g/cm<3>).

Description

Earth and rockfill dam antiseepage body and construction method thereof
Technical field
The present invention relates to the geotechnical engineering technical field, be specifically related to a kind of earth and rockfill dam antiseepage body and construction method thereof.
Background technology
" rolling earth-rock dam design specifications " (DL/T5395-2007) in to filling the requirement of antiseepage body gravelly soil: " particle diameter should not surpass 50% greater than the granule content of 5mm; the granule content below the 0.075mm should be less than 15%, and content should not be less than 8% less than the particle (promptly glutinous grain) of 0.005mm." in " water power hydraulic engineering natural building material prospecting rules " to filling the requirement of antiseepage body gravelly soil: " particle diameter should not be greater than 50% greater than the granule content of 5mm; 0.075mm following granule content should be less than 15%; And particle (the promptly glutinous grain) content less than 0.005mm should be not less than 6%~8% in full grating, hit real back transmission coefficient less than 1 * 10 -5Cm/s." visible, when the glutinous grain content in the gravelly soil in stock ground was lower than above-mentioned requirements, transmission coefficient often can't meet the demands, and therefore, those skilled in the art not will consider usually and adopt this gravelly soil as the raw material of building earth and rockfill dam.
Summary of the invention
Technical problem to be solved by this invention provides a kind ofly builds and satisfies the earth and rockfill dam antiseepage body that transmission coefficient requires and the construction method of this antiseepage body by the lower gravelly soil raw material of glutinous grain content.
Earth and rockfill dam antiseepage body of the present invention is built by following method and is formed; The step that this method comprises is: a, selection calculous soil raw material: contain the various particles of particle diameter from 0.002mm~200mm in the selected calculous soil raw material, and the granule content of particle diameter<0.005mm is 3.5%~5.5%; B, above-mentioned calculous soil raw material is screened; Reject particle diameter>80mm particle; The granule content that obtains particle diameter≤5mm in the calculous soil of per unit weight is 41.1%~69.1%; It is 11.5%~36.6% that the particle of particle diameter≤0.075mm contains, and the granule content of particle diameter<0.005mm is 5.2%~7.0% anti-bleed; C, above-mentioned anti-bleed is filled and compacting forms earth and rockfill dam antiseepage body, make that the calculous soil dry density of this antiseepage body is 2.30 (g/cm after the compacting 3)~2.36 (g/cm 3).
The construction method of earth and rockfill dam antiseepage body, the step that comprises is: a, selection calculous soil raw material: contain the various particles of particle diameter from 0.002mm~200mm in the selected calculous soil raw material, and the granule content of particle diameter<0.005mm is 3.5%~5.5%; B, above-mentioned calculous soil raw material is screened; Reject particle diameter>80mm particle; The granule content that obtains particle diameter≤5mm in the calculous soil of per unit weight is 41.1%~69.1%; It is 11.5%~36.6% that the particle of particle diameter≤0.075mm contains, and the granule content of particle diameter<0.005mm is 5.2%~7.0% anti-bleed; C, above-mentioned anti-bleed is filled and compacting forms earth and rockfill dam antiseepage body, make that the calculous soil dry density of this antiseepage body is 2.30 (g/cm after the compacting 3)~2.36 (g/cm 3).
The selected calculous soil raw material of the present invention is the less wide grating calculous soil of glutinous grain content, and this raw material has surpassed in the world that the core-wall material of building a dam of statistics rolls off the production line, so those skilled in the art not will consider usually and use this raw material to build earth and rockfill dam antiseepage body.Test shows; Because the present invention has taked the control to the control of calculous soil maximum particle diameter and calculous soil compacting degree, make the antiseepage index of antiseepage body exceed the requirement of existing " rolling earth-rock dam design specifications " and " water power hydraulic engineering natural building material is reconnoitred rules ".The present invention will stick the less wide grating calculous soil of a content first and build earth and rockfill dam antiseepage body as raw material, surmount current specifications, widen the material source range of choice, can supply the similar engineering reference.
The specific embodiment
Embodiment 1
Contain the various particles of particle diameter in the selected calculous soil raw material, and the granule content of particle diameter<0.005mm is 3.5% from 0.002mm~200mm; Above-mentioned calculous soil raw material is screened; Reject particle diameter>80mm particle; The granule content that obtains particle diameter≤5mm in the calculous soil of per unit weight is 46.6%, and the granule content of particle diameter≤0.075mm is 17.0%, and the granule content of particle diameter<0.005mm is 4.6% anti-bleed; Above-mentioned anti-bleed is filled and high function (2400kJ/m 3) compacting forms earth and rockfill dam antiseepage body, makes that the calculous soil dry density of this antiseepage body is 2.32g/cm after the compacting 3Through test, this antiseepage body transmission coefficient is 4.8 * 10 -6Cm/s.
Embodiment 2
Contain the various particles of particle diameter in the selected calculous soil raw material, and the granule content of particle diameter<0.005mm is 4.0% from 0.002mm~200mm; Above-mentioned calculous soil raw material is screened; Reject particle diameter>80mm particle; The granule content that obtains particle diameter≤5mm in the calculous soil of per unit weight is 41.8%, and the granule content of particle diameter≤0.075mm is 16.1%, and the granule content of particle diameter<0.005mm is 5.2% anti-bleed; Above-mentioned anti-bleed is filled and high function (2550kJ/m 3) compacting forms earth and rockfill dam antiseepage body, makes that the calculous soil dry density of this antiseepage body is 2.30 after the compacting.Through test, this antiseepage body transmission coefficient is 3.7 * 10 - 6Cm/s.
Embodiment 3
Contain the various particles of particle diameter in the selected calculous soil raw material, and the granule content of particle diameter<0.005mm is 4.3% from 0.002mm~200mm; Above-mentioned calculous soil raw material is screened; Reject particle diameter>80mm particle; The granule content that obtains particle diameter≤5mm in the calculous soil of per unit weight is 51.1%, and the granule content of particle diameter≤0.075mm is 21.9%, and the granule content of particle diameter<0.005mm is 5.5% anti-bleed; Above-mentioned anti-bleed is filled and high function (2740kJ/m 3) compacting forms earth and rockfill dam antiseepage body, makes that the calculous soil dry density of this antiseepage body is 2.31 after the compacting.Through test, this antiseepage body transmission coefficient is 1.2 * 10 - 6Cm/s.

Claims (2)

1. earth and rockfill dam antiseepage body is formed by following method construction, and the step that this method comprises is:
A, selection calculous soil raw material: contain the various particles of particle diameter in the selected calculous soil raw material, and the granule content of particle diameter<0.005mm is 3.5%~5.5% from 0.002mm~200mm;
B, above-mentioned calculous soil raw material is screened; Reject particle diameter>80mm particle; The granule content that obtains particle diameter≤5mm in the calculous soil of per unit weight is 41.1%~69.1%; It is 11.5%~36.6% that the particle of particle diameter≤0.075mm contains, and the granule content of particle diameter<0.005mm is 5.2%~7.0% anti-bleed;
C, above-mentioned anti-bleed is filled and compacting forms earth and rockfill dam antiseepage body, make that the calculous soil dry density of this antiseepage body is 2.30 (g/cm after the compacting 3)~2.36 (g/cm 3).
2. the construction method of earth and rockfill dam antiseepage body, the step that comprises is:
A, selection calculous soil raw material: contain the various particles of particle diameter in the selected calculous soil raw material, and the granule content of particle diameter<0.005mm is 3.5%~5.5% from 0.002mm~200mm;
B, above-mentioned calculous soil raw material is screened; Reject particle diameter>80mm particle; The granule content that obtains particle diameter≤5mm in the calculous soil of per unit weight is 41.1%~69.1%; It is 11.5%~36.6% that the particle of particle diameter≤0.075mm contains, and the granule content of particle diameter<0.005mm is 5.2%~7.0% anti-bleed;
C, above-mentioned anti-bleed is filled and compacting forms earth and rockfill dam antiseepage body, make that the calculous soil dry density of this antiseepage body is 2.30 (g/cm after the compacting 3)~2.36 (g/cm 3).
CN2012101319509A 2012-04-28 2012-04-28 Earth and rockfill dam impervious element and building method thereof Pending CN102635091A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2012101319509A CN102635091A (en) 2012-04-28 2012-04-28 Earth and rockfill dam impervious element and building method thereof

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2012101319509A CN102635091A (en) 2012-04-28 2012-04-28 Earth and rockfill dam impervious element and building method thereof

Publications (1)

Publication Number Publication Date
CN102635091A true CN102635091A (en) 2012-08-15

Family

ID=46619658

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2012101319509A Pending CN102635091A (en) 2012-04-28 2012-04-28 Earth and rockfill dam impervious element and building method thereof

Country Status (1)

Country Link
CN (1) CN102635091A (en)

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
EP0550926B1 (en) * 1991-12-09 2000-03-29 B.V. Grint- en Zandexploitatiemaatschappij v/h Gebrs. Smals Method for extracting and providing in desired composition granular material such as sand
NL1012405C2 (en) * 1999-06-22 2000-12-28 Dekker Zandbaggerbedrijf B V Screening raw sand and gravel then crushing larger grains and mixing crushed material with original finer grains to produce mixture with required properties for making concrete
CN101653765A (en) * 2009-09-11 2010-02-24 中国葛洲坝集团股份有限公司 Method for adjusting gradation of gravel earth material
CN101672026A (en) * 2009-09-18 2010-03-17 中国水电顾问集团华东勘测设计研究院 Face plate rock-fill dam structure of reasonably utilizing sand gravel material and construction method thereof
CN102152398A (en) * 2011-01-27 2011-08-17 葛洲坝集团试验检测有限公司 Gravel doped grinding system for anti-leakage wall and preparation method thereof

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
EP0550926B1 (en) * 1991-12-09 2000-03-29 B.V. Grint- en Zandexploitatiemaatschappij v/h Gebrs. Smals Method for extracting and providing in desired composition granular material such as sand
NL1012405C2 (en) * 1999-06-22 2000-12-28 Dekker Zandbaggerbedrijf B V Screening raw sand and gravel then crushing larger grains and mixing crushed material with original finer grains to produce mixture with required properties for making concrete
CN101653765A (en) * 2009-09-11 2010-02-24 中国葛洲坝集团股份有限公司 Method for adjusting gradation of gravel earth material
CN101672026A (en) * 2009-09-18 2010-03-17 中国水电顾问集团华东勘测设计研究院 Face plate rock-fill dam structure of reasonably utilizing sand gravel material and construction method thereof
CN102152398A (en) * 2011-01-27 2011-08-17 葛洲坝集团试验检测有限公司 Gravel doped grinding system for anti-leakage wall and preparation method thereof

Non-Patent Citations (3)

* Cited by examiner, † Cited by third party
Title
余挺: "砾质土防渗料在高土石坝上的应用", 《水电站设计》, vol. 19, no. 3, 30 September 2003 (2003-09-30) *
吕衡、李小泉: "瀑布沟工程宽级配砾石土抗渗性能改善试验研究", 《四川水力发电》, no. 2, 30 June 1996 (1996-06-30) *
雷泽宏: "瀑布沟水电站黑马Ⅰ区防渗料的选择", 《岩土力学与工程学报》, vol. 21, no. 9, 30 September 2002 (2002-09-30) *

Similar Documents

Publication Publication Date Title
CN204940333U (en) From embedded infiltration greening block and ecological retaining wall
CN205088628U (en) Plant and give birth to ecological concrete slope protection structure
CN104380870B (en) Method for land reclamation of coal mine area based on utilization of demolished building wastes
CN104806290A (en) Loess tunnel surrounding rock classification method
CN103242029B (en) Similar material for simulating expansive soil tunnel surrounding rock in model test and preparation method thereof
JP2013123691A (en) Hydrothermally solidified foam made mainly of incineration ash, and method for producing the same
CN102635091A (en) Earth and rockfill dam impervious element and building method thereof
CN201187047Y (en) Novel hexagonal metal gauze
CN202509452U (en) Ecological slope protection building block
CN202164520U (en) Eco-concrete parking lot with vagetaion function
CN204238101U (en) One is exempted to fill lawn
CN204023588U (en) A kind of pervious ecological protective slope structure
CN203782723U (en) Embankment slope hollow brick protective structure
CN202157303U (en) Interlocking type composite ecologic concrete member
CN212294541U (en) Ecological bank protection that water utilized
CN204212141U (en) Sandstone matter building waste gravel sand stabilization structure
CN103650968A (en) Device for dibble planting of plants on side slope
CN203007959U (en) Net cage pad type revetment structure
CN202227218U (en) Novel garden greening brick
CN203618453U (en) Slope dibbling plant apparatus
CN202009593U (en) Vegetation planting trough for ecological recovery of highway cut slope in semiarid regions
CN207685836U (en) A kind of compound grid ecological safeguard structure
CN203530807U (en) Grass planting water permeable brick
CN108346363A (en) A kind of experimental provision and its application method of simulated groundwater inverted well
JP5902337B2 (en) Method for producing foamed hydrothermal solidified product using incinerated ash as the main raw material

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C53 Correction of patent of invention or patent application
CB02 Change of applicant information

Address after: The North Qingyang District of Chengdu City, Sichuan Province, No. 610072

Applicant after: Chengdu Hydroelectric Investigation & Design Institute of SPC

Address before: The North Qingyang District of Chengdu City, Sichuan Province, No. 610072

Applicant before: Chengdu Hydroelectric Investigation & Design Institute of China Hydropower Consu

COR Change of bibliographic data

Free format text: CORRECT: APPLICANT; FROM: CHENGDU HYDROELECTRIC INVESTIGATION + DESIGN INSTITUTE OF CHINA HYDROPOWER CONSU TO: CHENGDU HYDROELECTRIC INVESTIGATION + DESIGN INSTITUTE OF SPC

C53 Correction of patent of invention or patent application
CB02 Change of applicant information

Address after: The North Qingyang District of Chengdu City, Sichuan Province, No. 610072

Applicant after: Co., Ltd of Chengdu survey and design academy of electricity Jian group of China

Address before: The North Qingyang District of Chengdu City, Sichuan Province, No. 610072

Applicant before: Chengdu Hydroelectric Investigation & Design Institute of SPC

COR Change of bibliographic data

Free format text: CORRECT: APPLICANT; FROM: CHENGDU HYDROELECTRIC INVESTIGATION + DESIGN INSTITUTE OF SPC TO: CHINA POWER GROUP CHENGDU INVESTIGATION DESIGN + RESEARCH INSTITUTE CO., LTD.

C12 Rejection of a patent application after its publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20120815