CN102611039B
CN102611039B CN201210116050.7A CN201210116050A CN102611039B CN 102611039 B CN102611039 B CN 102611039B CN 201210116050 A CN201210116050 A CN 201210116050A CN 102611039 B CN102611039 B CN 102611039B
Authority
CN
China
Prior art keywords
spanner
rotary
bar mounting
lead interval
universal
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201210116050.7A
Other languages
Chinese (zh)
Other versions
CN102611039A (en
Inventor
李占文
杨霄
张晓宾
吴国强
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
State Grid Corp of China SGCC
Maintenance Branch of State Grid Hebei Electric Power Co Ltd
Original Assignee
State Grid Corp of China SGCC
Maintenance Branch of State Grid Hebei Electric Power Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by State Grid Corp of China SGCC, Maintenance Branch of State Grid Hebei Electric Power Co Ltd filed Critical State Grid Corp of China SGCC
Priority to CN201210116050.7A priority Critical patent/CN102611039B/en
Publication of CN102611039A publication Critical patent/CN102611039A/en
Application granted granted Critical
Publication of CN102611039B publication Critical patent/CN102611039B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Manufacture Of Motors, Generators (AREA)

Abstract

The invention relates to a universal lead interval bar mounting spanner, comprising a rotary spanner, a rotary supporting block, rotary rods, a winding claw fixing frame and a winding claw, wherein the rotary supporting block is fixedly arranged at the end part of the rotary spanner, the rotary rods are symmetrically arranged at the two ends of the rotary supporting block, and the winding claw fixing frame and the winding claw are fixedly arranged on the rotary rods and are vertically arranged axially. According to the universal lead interval bar mounting spanner disclosed by the invention, an interval rod spanner is designed according to a lever principle according to a structural size of the interval rod spanner; when a lead interval rod is mounted and dismantled, the interval rod is quickly mounted and dismantled according to the lever principle, and each four-split lead interval rod can be dismantled; in addition, through the universal lead interval bar mounting spanner disclosed by the invention, the operating speed of an old tool is increased more than dozens of times; and due to the characteristic of strong universality, the working efficiency is largely improved, and the labor strength is reduced.

Description

Universal lead spacer assembly wrench
Technical field
The present invention relates to a kind of universal lead spacer assembly wrench.
Background technology
In current 500kV overhead transmission line, sub-conductor many employings quadripartion conductor spacer is fixed, due to building time, construction unit, buying producer difference, the conductor spacer type kind that wire uses presents diversity, and corresponding special spanner also has various ways.Due to the conductor spacer type kind diversity that wire uses, single need of work operating personnel carries many dissimilar spacer wrench, adds labor intensity.Sometimes the O&M service work of a circuit, needs operating personnel to carry many dissimilar special spanner for spacer rod, virtually adds labor intensity.Cannot conductor spacer be dismantled because spacer wrench is not general and affects the normal progress of work sometimes.
The administrative 500kV conductors on quad bundled in current work area uses conductor spacer model to have two kinds, a kind of porose, a kind of atresia, and they use two kinds respectively, and different spiral special spanner-insert eye is rotary and double hook is rotary.These two kinds of instruments are all carry out dismounting, inconvenient operation after utilizing spiral principle to carry out " clamping ", need the long period just can complete.
Summary of the invention
Technical problem to be solved by this invention be to provide a kind ofly to install fast, convenient disassembly, universal lead spacer assembly wrench ease in use, applied widely.
The present invention adopts following technical scheme:
The present invention includes rotary spanner, be fixedly installed on the rotation of rotary spanner end and prop up block, be symmetricly set in the swingle and the coiling pawl fixed mount be fixedly installed on swingle and coiling pawl that rotate block two ends, described coiling pawl fixed mount and the axial direction of rotary spanner are vertical setting.
Good effect of the present invention is as follows:
The present invention is according to lead spacer physical dimension, lever principle is utilized spacer wrench to be designed, when assembling and disassembling lead spacer, fast assembling and disassembling is carried out to conductor spacer by lever principle, and can be used for the dismounting of various conductors on quad bundled conductor spacer.
Use the present invention than using old instrument speed to improve more than tens times, and due to universal strong, substantially increase operating efficiency, alleviate labour intensity.
Accompanying drawing explanation
Accompanying drawing 1 is structural representation of the present invention.
Embodiment
As shown in Figure 1, the present invention it comprise rotary spanner 1, be fixedly installed on the rotation of rotary spanner 1 end and prop up block 2, be symmetricly set in the swingle 3 and the coiling pawl fixed mount 4 be fixedly installed on swingle 3 and coiling pawl 5 that rotate block 2 two ends, described coiling pawl fixed mount 4 is vertical setting with the axial direction of rotary spanner 1.
The present invention is according to lead spacer physical dimension, lever principle is utilized spacer wrench to be designed, when assembling and disassembling lead spacer, fast assembling and disassembling is carried out to conductor spacer by lever principle, and can be used for the dismounting of various conductors on quad bundled conductor spacer.
Use the present invention than using old instrument speed to improve more than tens times, and due to universal strong, substantially increase operating efficiency, alleviate labour intensity.

Claims (1)

1. a universal lead spacer assembly wrench, it is characterized in that it comprises rotary spanner (1), is fixedly installed on the rotation of rotary spanner (1) end and props up block (2), be symmetricly set in the swingle (3) and the coiling pawl fixed mount (4) be fixedly installed on swingle (3) and coiling pawl (5) that rotate block (2) two ends, the axial direction of described coiling pawl fixed mount (4) and rotary spanner (1) is vertical setting.
CN201210116050.7A 2012-04-19 2012-04-19 Universal lead interval bar mounting spanner Active CN102611039B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201210116050.7A CN102611039B (en) 2012-04-19 2012-04-19 Universal lead interval bar mounting spanner

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201210116050.7A CN102611039B (en) 2012-04-19 2012-04-19 Universal lead interval bar mounting spanner

Publications (2)

Publication Number Publication Date
CN102611039A CN102611039A (en) 2012-07-25
CN102611039B true CN102611039B (en) 2015-01-21

Family

ID=46528265

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201210116050.7A Active CN102611039B (en) 2012-04-19 2012-04-19 Universal lead interval bar mounting spanner

Country Status (1)

Country Link
CN (1) CN102611039B (en)

Families Citing this family (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103187695B (en) * 2013-03-29 2015-07-08 国家电网公司 Tool specially for assembling and disassembling power circuit spacer and assembling and disassembling method thereof
CN104121218B (en) * 2013-04-23 2017-05-31 上海宝钢化工有限公司 Centrifugal pump turning tool
CN103406871B (en) * 2013-06-04 2015-04-08 兰州吉利汽车工业有限公司 Spanner for installing car drive shaft
CN103427368A (en) * 2013-08-16 2013-12-04 国家电网公司 Special spanner for spacer rod

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN2248119Y (en) * 1995-07-04 1997-02-26 汤正汉 Conductor spacer spanner
CN201797262U (en) * 2010-06-18 2011-04-13 湖北省超能超高压电力科技开发有限公司 Special tool for replacing spacers
CN201895284U (en) * 2010-12-06 2011-07-13 南京线路器材厂 Special wrench for ice-coating-proof conductor spacers
CN201900590U (en) * 2010-12-01 2011-07-20 万勇 Special wrench for high-tension line lead spacers
CN202668420U (en) * 2012-04-19 2013-01-16 国家电网公司 Universal type installation wrench for wire spacer rod

Family Cites Families (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2010178462A (en) * 2009-01-28 2010-08-12 Chugoku Electric Power Co Inc:The Indirect live wire holding tool

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN2248119Y (en) * 1995-07-04 1997-02-26 汤正汉 Conductor spacer spanner
CN201797262U (en) * 2010-06-18 2011-04-13 湖北省超能超高压电力科技开发有限公司 Special tool for replacing spacers
CN201900590U (en) * 2010-12-01 2011-07-20 万勇 Special wrench for high-tension line lead spacers
CN201895284U (en) * 2010-12-06 2011-07-13 南京线路器材厂 Special wrench for ice-coating-proof conductor spacers
CN202668420U (en) * 2012-04-19 2013-01-16 国家电网公司 Universal type installation wrench for wire spacer rod

Also Published As

Publication number Publication date
CN102611039A (en) 2012-07-25

Similar Documents

Publication Publication Date Title
CN102611039B (en) Universal lead interval bar mounting spanner
CN201898310U (en) Double-hook wire grip
CN103594968B (en) A kind of transmission tower multiple fission conductor lifting device
CN204391613U (en) A kind of wire support device of auxiliary replacement porcelain pole arm
CN103840392A (en) Concrete pole operation platform
CN102761077B (en) Insulating hoisting bracket for strain insulator string of 1000kV extra-high alternating current line
CN202668420U (en) Universal type installation wrench for wire spacer rod
CN202678823U (en) Jacking tool for tower ground wire clamp
CN203456834U (en) Multifunctional separate-type spacer
CN202712741U (en) Mounting spanner for lead interval bar
JP5205813B2 (en) Tensile insulator
CN104852324A (en) Lead support device assisting in replacing porcelain cross arm
CN203222389U (en) Ground resistance testing line winding and unwinding device
CN112952708B (en) Triangle clamping plate type spacing rod for live working
CN202917892U (en) Replacing tool for supporting insulator of tubular busbar
CN201663250U (en) Turnable grounding wire hook
CN205846661U (en) A kind of high-tension bus-bar conductor spacer
CN104348122B (en) Ground potential mounting type shunt wire clamp device and mounting method thereof
CN202949167U (en) Tool for mounting insulators
CN203813320U (en) Tool for live exchange of 220 kV narrow base tower strain insulator string
CN110571704A (en) Tool and method suitable for disassembling B-phase drainage line insulator of strain tower
CN202534972U (en) Over-current clamping device
CN103825223A (en) Tool and working method for live change of 220KV narrow base tower strain insulator string
CN210577387U (en) Insulator is dismantled and is changed device
CN102969672B (en) Crossing-type straight-route clamp

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
ASS Succession or assignment of patent right

Owner name: THE MAINTENANCE BRANCH OF HEBEI ELECTRIC POWER COR

Effective date: 20121213

Owner name: STATE GRID CORPORATION OF CHINA

Free format text: FORMER OWNER: HEBEI POWER COMPANY ULTRA-HV TRANSMISSION + DISTRIBUTION COMPANY

Effective date: 20121213

C41 Transfer of patent application or patent right or utility model
COR Change of bibliographic data

Free format text: CORRECT: ADDRESS; FROM: 050070 SHIJIAZHUANG, HEBEI PROVINCE TO: 100761 DONGCHENG, BEIJING

TA01 Transfer of patent application right

Effective date of registration: 20121213

Address after: 100761 West Chang'an Avenue, Beijing, No. 86

Applicant after: State Grid Corporation of China

Applicant after: Maintenance Branch, Hebei Electric Power Co.,Ltd.

Address before: 050070 Hebei city of Shijiazhuang province Zhong Sheng Lu No. 66

Applicant before: Hebei Power Company Ultra-HV Transmission & Distribution Company

C14 Grant of patent or utility model