CN103825223A - Tool and working method for live change of 220KV narrow base tower strain insulator string - Google Patents
Tool and working method for live change of 220KV narrow base tower strain insulator string Download PDFInfo
- Publication number
- CN103825223A CN103825223A CN201410115287.2A CN201410115287A CN103825223A CN 103825223 A CN103825223 A CN 103825223A CN 201410115287 A CN201410115287 A CN 201410115287A CN 103825223 A CN103825223 A CN 103825223A
- Authority
- CN
- China
- Prior art keywords
- right angle
- yoke plate
- clamping tool
- triangle
- link plate
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
Images
Landscapes
- Electric Cable Installation (AREA)
- Insulators (AREA)
Abstract
The invention discloses a tool for live change of a 220KV narrow base tower strain insulator string. The tool is formed by detachably connecting a triangular yoke plate clamp for connecting a triangular yoke plate, an insulating pull rod, a hydraulic lead screw, and a right-angle yoke plate clamp for connecting a right-angle yoke plate, wherein the triangular yoke plate clamp is used for connecting one end of the triangular yoke plate and the right-angle yoke plate clamp is used for connecting one end of the right-angle yoke plate to form a dual-clamping plate structure; the triangular yoke plate can be clamped and fixed between the two clamping plates of the triangular yoke plate clamp, and the right-angle yoke plate can be clamped and fixed between the two clamping plates of the right-angle yoke plate clamp. The tool disclosed by the invention is simple in structure, and easy to mount and operate; the live working method can reduce maintenance difficulty and improve efficiency, and is firmer to connect, high in strength, good in balance, capable of reducing potential safety hazard, effectively satisfying safety requirement in a narrow base tower live working process, realizing safe live maintenance and greatly improving safety and reliability of power grid operation.
Description
Technical field
The present invention relates to electrical network and hot line maintenance technical field, particularly a kind of charged for replacement 220KV narrow base tower strain insulator string instrument.
Background technology
Along with socioeconomic development, society is increasing for the demand of electric power, is impelling electrical network scale constantly to expand, the main body mode that overhead wire transmission is carried as current electric power, and line size also constantly increases thereupon.And along with the quickening of urbanization process, land resource is more and more aobvious nervous, conventional typical angle steel tower busy line channel width and steel tower are large with opening, present situation that can not adapt to economic development developed regions shortage of land resource.If but adopt steel pipe pole, although can meet the requirement that reduces floor space, steel pipe pole circuit, service condition requires high than steel tower, processing transport difficulty is large, the vertical heavy mechanical equipment that needs of group, high to job site environmental requirement, project cost is large, is unfavorable for operation maintenance.
On this basis, arise at the historic moment take narrow base steel tube tower as the narrow base tower of example.Compared to conventional angle steel iron, steel tube tower, narrow base steel tube tower has the advantages such as little, the overall turriform of floor space is compact firmly, the exhibition of tower body arm is compact, line holding space is few, and therefore newly-increased circuit construction project more and more tends to use such turriform in recent years.
Along with the continuous lifting of society to electric power degree of dependence, it has great requirement for the quality of power supply and continued power, will cause huge economic loss and social effect once have a power failure, therefore service without power-off is safeguarded has become the conventional means that grid maintenance is safeguarded.But narrow base steel tube tower is because tower body compactness own, arm are opened up the features such as short, and the operation gap that conventional charged operational method requires cannot meet; Can say that service without power-off on narrow base tower safeguards that aspect is almost a blank field.
The use of at present new narrow base tower, its incident New insulated configuration, i.e. double insulator, one end is triangle yoke plate, and the other end is right angle yoke plate, and traditional machete jig and wing type clamp apparatus cannot use thereon.Between the general same group of yoke plate of the existing device for charged changing tension-resisting insulator, at least need to install two groups of devices, complex structure, load and unload loaded down with trivial details, and syndeton is connected with yoke plate by screw, therefore intensity is low, easily, because loosened screw causes potential safety hazard, security reliability is low, and cannot meet the safety requirements in its operation process for some narrow base tower.
Summary of the invention
Main purpose of the present invention is the shortcoming that overcomes prior art, provide a kind of simple in structure, can realize disassembled for transport, easily install and operation, can reduce service work difficulty, raise the efficiency, intensity is high, security reliability is high, and can effectively meet charged for replacement 220KV narrow base tower strain insulator string tool and the operational method of the safety requirements in narrow base tower live line working process.
The present invention adopts following technical scheme:
A kind of charged for replacement 220KV narrow base tower strain insulator string instrument, by the triangle link plate clamping tool in order to connect triangle yoke plate, insulation pull-rod, hydraulic screw rod and in order to connect the right angle link plate clamping tool of the right angle yoke plate formation that removably connects, described insulation pull-rod is connected between triangle link plate clamping tool and right angle link plate clamping tool by a hydraulic screw rod, described triangle link plate clamping tool all forms double plate structure for the one end and the right angle link plate clamping tool that connect triangle yoke plate for the one end that connects right angle yoke plate, the double plate of triangle link plate clamping tool can be folded in triangle yoke plate fixing therebetween, the double plate of right angle link plate clamping tool can be folded in right angle yoke plate fixing therebetween.
Further, described triangle link plate clamping tool, hydraulic screw rod, insulation pull-rod and right angle link plate clamping tool removably connect in turn by securing member.
Further, one end that described triangle link plate clamping tool connects triangle yoke plate is formed with the first train wheel bridge and the first lower plate, triangle yoke plate can be folded in therebetween, on the first train wheel bridge and the first lower plate, correspondence offers two pin-and-holes that match with fixing hole on triangle yoke plate respectively, can triangle link plate clamping tool be locked on triangle yoke plate by two movable latch.
Further, one end that described right angle link plate clamping tool connects right angle yoke plate is formed with the second train wheel bridge and the second lower plate, right angle yoke plate can be folded in therebetween, the second train wheel bridge and the second lower plate end respectively correspondence offer two pin-and-holes, can right angle link plate clamping tool be locked on right angle yoke plate by two movable latch.
Further, between described right angle yoke plate and right angle link plate clamping tool end, be also arranged with an adjusting block, described adjusting block is formed with a draw-in groove, can be arranged in the movable latch that is arranged on right angle link plate clamping tool end.
Further, described triangle link plate clamping tool is fixed on triangle yoke plate centre position, and right angle link plate clamping tool is fixed on yoke plate centre position, right angle.
A charged for replacement 220KV narrow base tower strain insulator string operational method based on charged for replacement 220KV narrow base tower strain insulator string tool, comprises the following steps:
1. assembling tool, is connected triangle link plate clamping tool, hydraulic screw rod, insulation pull-rod in turn with right angle link plate clamping tool;
2. triangle link plate clamping tool is locked in to triangle yoke plate centre position, right angle link plate clamping tool is locked in to yoke plate centre position, right angle;
3. tighten up hydraulic screw rod, unclamp insulator string;
4. change insulator string and recover hydraulic screw rod, removing instrument of the present invention, completing the operation of charged for replacement 220KV narrow base tower strain insulator string.
From the above-mentioned description of this invention, compared with prior art, the invention has the beneficial effects as follows: triangle link plate clamping tool and right angle link plate clamping tool are connected to triangle yoke plate and yoke plate centre position, right angle, only need that one group of instrument is installed and can complete the charged for replacement operation of its both sides insulator string, simple in structure, easily install and operation, can reduce service work personnel's work difficulty, shorten working hours, raise the efficiency, and can realize disassembled for transport, simultaneously, triangle link plate clamping tool and right angle link plate clamping tool adopt double plate structure, lock and connect by movable latch and triangle yoke plate and right angle yoke plate, it is more firm to connect, intensity is high, and balance is good, can avoid occurring that slippage rocks, get loose and drop or " cannot get up, under do not go " etc. bad phenomenon, can reduce potential safety hazard, effectively meet the safety requirements in narrow base tower live line working process.Therefore, operational method of the present invention can realize safe hotline maintenance, reduces the change that stops power transmission operational ton and whole power system operating mode, not only can realize huge economic benefit, also can greatly improve the security reliability of operation of power networks.
Accompanying drawing explanation
Fig. 1 is the mounting structure schematic diagram of the specific embodiment of the invention;
Fig. 2 is the triangle yoke plate of the specific embodiment of the invention and the syndeton cutaway view of triangle link plate clamping tool;
Fig. 3 is the right angle yoke plate of the specific embodiment of the invention and the syndeton cutaway view of right angle link plate clamping tool.
In figure: 1. triangle yoke plate, 2. triangle link plate clamping tool, 20. first train wheel bridges, 21. first lower plate, 3. hydraulic screw rods, 4. insulation pull-rod, 5. right angle yoke plate, 6. right angle link plate clamping tool, 60. second train wheel bridges, 61. second lower plates, 7. movable latch, 8. regulates block, 80. draw-in grooves.
Embodiment
Below by embodiment, the invention will be further described.
With reference to Fig. 1, Fig. 2 and Fig. 3, a kind of charged for replacement 220KV narrow base tower strain insulator string tool of the present invention, by the triangle link plate clamping tool 2 in order to connect triangle yoke plate 1, hydraulic screw rod 3, insulation pull-rod 4 and removably connected and form in turn by securing member in order to the right angle link plate clamping tool 6 that connects right angle yoke plate 5.
Described triangle link plate clamping tool 2 all forms double plate structure for the one end and the right angle link plate clamping tool 6 that connect triangle yoke plate 1 for the one end that connects right angle yoke plate 5, the double plate of triangle link plate clamping tool 2 can be folded in triangle yoke plate 1 fixing therebetween, and the double plate of right angle link plate clamping tool 6 can be folded in right angle yoke plate 5 fixing therebetween.Described triangle link plate clamping tool 2 is fixed on triangle yoke plate 1 centre position, and right angle link plate clamping tool 6 is fixed on right angle yoke plate 5 centre positions.
One end that described triangle link plate clamping tool 2 connects triangle yoke plate 1 is formed with the first train wheel bridge 20 and the first lower plate 21, triangle yoke plate 1 can be folded in therebetween, on the first train wheel bridge 20 and the first lower plate 21, correspondence offers two pin-and-holes that match with fixing hole on triangle yoke plate 1 respectively, can triangle link plate clamping tool 2 be locked on triangle yoke plate 1 by two movable latch 7.
One end that described right angle link plate clamping tool 6 connects right angle yoke plate 5 is formed with the second train wheel bridge 60 and the second lower plate 61, right angle yoke plate 5 can be folded in therebetween, the second train wheel bridge 60 and the second lower plate 61 ends respectively correspondence offer two pin-and-holes, can right angle link plate clamping tool 6 be locked on right angle yoke plate 5 by two movable latch 7.Between described right angle yoke plate 5 and right angle link plate clamping tool 6 ends, be also arranged with an adjusting block 8, described adjusting block 8 is formed with a draw-in groove 80, can be arranged in the movable latch 7 that is arranged on right angle link plate clamping tool 6 ends.
With reference to Fig. 1, Fig. 2 and Fig. 3, the present invention carries out the operational method of earth potential method charged for replacement 220KV insulator string, comprises the following steps:
1. assembling tool, is connected triangle link plate clamping tool 2, hydraulic screw rod 3, insulation pull-rod 4 in turn with right angle link plate clamping tool 6;
2. triangle link plate clamping tool 2 is locked in to triangle yoke plate 1 centre position, right angle link plate clamping tool 6 is locked in to right angle yoke plate 5 centre positions;
3. tighten up hydraulic screw rod 3, unclamp insulator string;
4. change insulator string and recover hydraulic screw rod 3, removing instrument of the present invention, completing the operation of charged for replacement 220KV narrow base tower strain insulator string.
Above are only a specific embodiment of the present invention, but design concept of the present invention is not limited to this, allly utilizes this design to carry out the change of unsubstantiality to the present invention, all should belong to the behavior of invading protection range of the present invention.
Claims (7)
1. a charged for replacement 220KV narrow base tower strain insulator string tool, it is characterized in that: by the triangle link plate clamping tool in order to connect triangle yoke plate, insulation pull-rod, hydraulic screw rod and in order to connect the right angle link plate clamping tool of the right angle yoke plate formation that removably connects, described insulation pull-rod is connected between triangle link plate clamping tool and right angle link plate clamping tool by a hydraulic screw rod, described triangle link plate clamping tool all forms double plate structure for the one end and the right angle link plate clamping tool that connect triangle yoke plate for the one end that connects right angle yoke plate, the double plate of triangle link plate clamping tool can be folded in triangle yoke plate fixing therebetween, the double plate of right angle link plate clamping tool can be folded in right angle yoke plate fixing therebetween.
2. a kind of charged for replacement 220KV narrow base tower strain insulator string tool as claimed in claim 1, is characterized in that: described triangle link plate clamping tool, hydraulic screw rod, insulation pull-rod and right angle link plate clamping tool removably connect in turn by securing member.
3. a kind of charged for replacement 220KV narrow base tower strain insulator string tool as claimed in claim 2, it is characterized in that: one end that described triangle link plate clamping tool connects triangle yoke plate is formed with the first train wheel bridge and the first lower plate, triangle yoke plate can be folded in therebetween, on the first train wheel bridge and the first lower plate, correspondence offers two pin-and-holes that match with fixing hole on triangle yoke plate respectively, can triangle link plate clamping tool be locked on triangle yoke plate by two movable latch.
4. a kind of charged for replacement 220KV narrow base tower strain insulator string tool as claimed in claim 2, it is characterized in that: one end that described right angle link plate clamping tool connects right angle yoke plate is formed with the second train wheel bridge and the second lower plate, right angle yoke plate can be folded in therebetween, the second train wheel bridge and the second lower plate end respectively correspondence offer two pin-and-holes, can right angle link plate clamping tool be locked on right angle yoke plate by two movable latch.
5. a kind of charged for replacement 220KV narrow base tower strain insulator string tool as claimed in claim 4, it is characterized in that: between described right angle yoke plate and right angle link plate clamping tool end, be also arranged with an adjusting block, described adjusting block is formed with a draw-in groove, can be arranged in the movable latch that is arranged on right angle link plate clamping tool end.
6. a kind of charged for replacement 220KV narrow base tower strain insulator string tool as described in claim 3 or 4, is characterized in that: described triangle link plate clamping tool is fixed on triangle yoke plate centre position, and right angle link plate clamping tool is fixed on yoke plate centre position, right angle.
7. a charged for replacement 220KV narrow base tower strain insulator string operational method for a kind of charged for replacement 220KV narrow base tower strain insulator string tool based on described in claim 1 to 6, is characterized in that: comprise the following steps:
1. assembling tool, is connected triangle link plate clamping tool, hydraulic screw rod, insulation pull-rod in turn with right angle link plate clamping tool;
2. triangle link plate clamping tool is locked in to triangle yoke plate centre position, right angle link plate clamping tool is locked in to yoke plate centre position, right angle;
3. tighten up hydraulic screw rod, unclamp insulator string;
4. change insulator string and recover hydraulic screw rod, removing instrument of the present invention, completing the operation of charged for replacement 220KV narrow base tower strain insulator string.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201410115287.2A CN103825223B (en) | 2014-03-25 | 2014-03-25 | Charged for replacement 220KV narrow base tower strain insulator string tool and operational method |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201410115287.2A CN103825223B (en) | 2014-03-25 | 2014-03-25 | Charged for replacement 220KV narrow base tower strain insulator string tool and operational method |
Publications (2)
Publication Number | Publication Date |
---|---|
CN103825223A true CN103825223A (en) | 2014-05-28 |
CN103825223B CN103825223B (en) | 2016-09-14 |
Family
ID=50760148
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201410115287.2A Active CN103825223B (en) | 2014-03-25 | 2014-03-25 | Charged for replacement 220KV narrow base tower strain insulator string tool and operational method |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN103825223B (en) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN105406399A (en) * | 2015-12-16 | 2016-03-16 | 国家电网公司 | Tool and method for replacing phase insulator string in 500kV compact type circuit on live line |
CN109473900A (en) * | 2018-04-03 | 2019-03-15 | 金华送变电工程有限公司 | A kind of overhead transmission line two strings of strain insulators replacement tool and replacing options |
Citations (9)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN201134305Y (en) * | 2007-12-29 | 2008-10-15 | 辽宁省电力有限公司本溪供电公司 | Support frame of paired insulator chain |
CN201570808U (en) * | 2009-12-10 | 2010-09-01 | 宁夏电力公司宁东供电局 | Device for simultaneously replacing two strings of strain insulators |
CN101820144A (en) * | 2010-03-26 | 2010-09-01 | 福建省电力有限公司莆田电业局 | Special tool of live line work for replacing rectilinear insulator string of large-section double multiple wire |
CN202058513U (en) * | 2011-05-06 | 2011-11-30 | 辽宁省电力有限公司本溪供电公司 | Support frame with adjustable distance |
CN202127196U (en) * | 2011-05-19 | 2012-01-25 | 福建省电力有限公司宁德电业局 | Inserted pin type yoke plate clamp for replacing linear rod double-linkage double-hanging-point insulator chain |
CN103227431A (en) * | 2013-03-19 | 2013-07-31 | 国家电网公司 | Method for replacing insulator chains in 220 kV long-span high tower in live working |
CN203456797U (en) * | 2013-08-15 | 2014-02-26 | 国网浙江省电力公司杭州供电公司 | Broadsword fixture for replacing entire string of insulator of duplex insulator string during power failure |
CN103825222A (en) * | 2014-03-25 | 2014-05-28 | 国家电网公司 | Tool for changing 220kV narrow base tower strain insulator string with charges |
CN203813320U (en) * | 2014-03-25 | 2014-09-03 | 国家电网公司 | Tool for live exchange of 220 kV narrow base tower strain insulator string |
-
2014
- 2014-03-25 CN CN201410115287.2A patent/CN103825223B/en active Active
Patent Citations (9)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN201134305Y (en) * | 2007-12-29 | 2008-10-15 | 辽宁省电力有限公司本溪供电公司 | Support frame of paired insulator chain |
CN201570808U (en) * | 2009-12-10 | 2010-09-01 | 宁夏电力公司宁东供电局 | Device for simultaneously replacing two strings of strain insulators |
CN101820144A (en) * | 2010-03-26 | 2010-09-01 | 福建省电力有限公司莆田电业局 | Special tool of live line work for replacing rectilinear insulator string of large-section double multiple wire |
CN202058513U (en) * | 2011-05-06 | 2011-11-30 | 辽宁省电力有限公司本溪供电公司 | Support frame with adjustable distance |
CN202127196U (en) * | 2011-05-19 | 2012-01-25 | 福建省电力有限公司宁德电业局 | Inserted pin type yoke plate clamp for replacing linear rod double-linkage double-hanging-point insulator chain |
CN103227431A (en) * | 2013-03-19 | 2013-07-31 | 国家电网公司 | Method for replacing insulator chains in 220 kV long-span high tower in live working |
CN203456797U (en) * | 2013-08-15 | 2014-02-26 | 国网浙江省电力公司杭州供电公司 | Broadsword fixture for replacing entire string of insulator of duplex insulator string during power failure |
CN103825222A (en) * | 2014-03-25 | 2014-05-28 | 国家电网公司 | Tool for changing 220kV narrow base tower strain insulator string with charges |
CN203813320U (en) * | 2014-03-25 | 2014-09-03 | 国家电网公司 | Tool for live exchange of 220 kV narrow base tower strain insulator string |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN105406399A (en) * | 2015-12-16 | 2016-03-16 | 国家电网公司 | Tool and method for replacing phase insulator string in 500kV compact type circuit on live line |
CN109473900A (en) * | 2018-04-03 | 2019-03-15 | 金华送变电工程有限公司 | A kind of overhead transmission line two strings of strain insulators replacement tool and replacing options |
Also Published As
Publication number | Publication date |
---|---|
CN103825223B (en) | 2016-09-14 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN103606854A (en) | Operating method for replacing tension insulator on super and ultra-high voltage direct current transmission line in electrified mode | |
CN104505766A (en) | Tool and method for live replacement of 500kV strain insulator strings in substations | |
CN101814707B (en) | Tool for live replacement of 220kV line 'V' string insulator and method | |
CN103825222A (en) | Tool for changing 220kV narrow base tower strain insulator string with charges | |
CN203813320U (en) | Tool for live exchange of 220 kV narrow base tower strain insulator string | |
CN203813334U (en) | Right-angle yoke plate clamp for live exchange of 220 kV strain insulator string | |
CN204588434U (en) | Circuit is charged upgrades device for hoisting for the two division of a kind of high voltage power transmission | |
CN103825223A (en) | Tool and working method for live change of 220KV narrow base tower strain insulator string | |
CN203014270U (en) | A triangular connecting plate connector used for a double bundled conductor in a power transmission line | |
CN203289006U (en) | Insulation adjustable yoke plate | |
CN202602171U (en) | A tool for power-on replacing multi-loop double split conductor insulator of 220kV line | |
CN203813335U (en) | Triangular yoke plate clamp for live exchange of 220 kV strain insulator string | |
CN205355667U (en) | Change with electricity looks insulator chain's in 500kV compact circuit instrument | |
CN204947466U (en) | Portable live line working line lifter | |
CN104852324A (en) | Lead support device assisting in replacing porcelain cross arm | |
CN104348122B (en) | Ground potential mounting type shunt wire clamp device and mounting method thereof | |
CN105977860B (en) | A kind of replacement overhead transmission line composite cross-arm insulator device and method | |
CN102966257A (en) | 750kV composite material cross arm | |
CN206575086U (en) | Insulate turnbuckle plate pulling device | |
CN201584701U (en) | Tool for replacing 'V' string insulator of 220kV line in live state | |
CN201994614U (en) | Conducting-wire expander | |
CN204793977U (en) | Can hang strain insulator pole of overhead ground wire | |
CN205646197U (en) | Novel high pressure bonding device | |
CN204167810U (en) | A kind of lightning protection pillar insulator live line working wire stripping support | |
CN103269038A (en) | Aerodynamic disc-shaped suspending type glass insulator replacing clamp |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
C14 | Grant of patent or utility model | ||
GR01 | Patent grant |