CN103606854A - Operating method for replacing tension insulator on super and ultra-high voltage direct current transmission line in electrified mode - Google Patents

Operating method for replacing tension insulator on super and ultra-high voltage direct current transmission line in electrified mode Download PDF

Info

Publication number
CN103606854A
CN103606854A CN201310616143.0A CN201310616143A CN103606854A CN 103606854 A CN103606854 A CN 103606854A CN 201310616143 A CN201310616143 A CN 201310616143A CN 103606854 A CN103606854 A CN 103606854A
Authority
CN
China
Prior art keywords
card
insulator
tension
ultra
install
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201310616143.0A
Other languages
Chinese (zh)
Inventor
刘越
汤正汉
刘继承
张珣
李明
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Maintenance Branch of State Grid Hubei Electric Power Co Ltd
State Grid Corp of China
Original Assignee
Maintenance Branch of State Grid Hubei Electric Power Co Ltd
State Grid Corp of China
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Maintenance Branch of State Grid Hubei Electric Power Co Ltd, State Grid Corp of China filed Critical Maintenance Branch of State Grid Hubei Electric Power Co Ltd
Priority to CN201310616143.0A priority Critical patent/CN103606854A/en
Publication of CN103606854A publication Critical patent/CN103606854A/en
Pending legal-status Critical Current

Links

Images

Landscapes

  • Insulators (AREA)
  • Electric Cable Installation (AREA)

Abstract

本发明提供一种超、特高压直流线路带电更换耐张绝缘子的作业方法,包括以下步骤:利用联板做支点安装翼型卡,利用绝缘子钢帽做支点安装绝缘子闭式卡前卡,用液压丝杆连接翼型卡和绝缘子闭式卡组成紧线系统;利用牵引板和平行挂板做支点安装耐张卡,利用绝缘子钢帽做支点安装闭式卡后卡,用液压丝杆组件连接耐张卡和绝缘子闭式卡组成紧线系统;利用绝缘子钢帽做支点分别安装绝缘子闭式卡的前卡和后卡,用液压丝杆连接绝缘子闭式卡的前卡和后卡组成紧线系统;操作液压丝杆收紧紧线系统,转移被检修绝缘子上的机械荷载。本发明可实现对超、特高压输电线路中耐张绝缘子的单片更换,保证了耐张绝缘子串作为常规检修的作业便捷度。

Figure 201310616143

The invention provides a working method for live replacement of strain insulators on super- and extra-high-voltage DC lines, which includes the following steps: using the connecting plate as the fulcrum to install the airfoil clamp, using the insulator steel cap as the fulcrum to install the front clamp of the insulator closed clamp, and using hydraulic pressure The screw rod connects the airfoil card and the insulator closed card to form a tight line system; use the traction plate and the parallel hanging plate as the fulcrum to install the tension card, use the insulator steel cap as the fulcrum to install the closed card rear card, and use the hydraulic screw assembly to connect the durable The tension card and the insulator closed card form a tight line system; use the insulator steel cap as the fulcrum to install the front card and the rear card of the insulator closed card respectively, and connect the front card and the rear card of the insulator closed card with a hydraulic screw rod to form a line tightening system ; Operate the hydraulic screw to tighten the tightening system and transfer the mechanical load on the overhauled insulator. The invention can realize the single-chip replacement of the tension insulators in the ultra-high voltage and ultra-high voltage transmission lines, and ensures the operation convenience of the tension insulator strings as routine maintenance.

Figure 201310616143

Description

超、特高压直流线路带电更换耐张绝缘子的作业方法Operation method for live replacement of tension insulators on super- and ultra-high voltage DC lines

【技术领域】【Technical field】

本发明涉及特高压输变电领域,尤其涉及一种超、特高压直流线路带电更换耐张绝缘子的作业方法。The invention relates to the field of ultra-high voltage power transmission and transformation, in particular to an operating method for live replacement of tension insulators in ultra-high voltage and ultra-high voltage direct current lines.

【背景技术】【Background technique】

输电线路运行维护检修工作是掌握电网运行情况、及时发现和处理设备缺陷的重要手段,也是确保线路安全稳定运行的基础工作。由于特高压电网在整个国家电网运行中处于核心地位,因此特高压电网的运行检修工作对于保证特高压电网乃至整个国家电网的安全、稳定、可靠运行具有十分重要的意义。Transmission line operation, maintenance and repair work is an important means to grasp the operation of the power grid, discover and deal with equipment defects in time, and is also the basic work to ensure the safe and stable operation of the line. Since the UHV power grid is at the core of the operation of the entire national grid, the operation and maintenance of the UHV power grid is of great significance to ensure the safe, stable and reliable operation of the UHV power grid and even the entire national power grid.

更换耐张绝缘子、绝缘子串是输电线路检修和带电作业的常规项目,也是输电线路运行检修的日常工作。一般的检修工艺中更换耐张绝缘子、绝缘子串有传统的采用托瓶架更换耐张绝缘子法和改进后的旋放法更换耐张绝缘子法。Replacing tension insulators and insulator strings is a routine item for transmission line maintenance and live work, and it is also a daily work for transmission line operation and maintenance. In the general maintenance process, the replacement of strain insulators and insulator strings includes the traditional method of replacing strain insulators with bottle holders and the improved method of replacing strain insulators with rotary release.

托瓶架法是,在检修绝缘子串两端安装紧线系统,并在其下方放置托瓶架,收紧紧线系统使绝缘子串免受导线张力,然后脱开绝缘子串与导线、横担的链接,然后通过绝缘吊绳用托瓶架将检修绝缘子串放置地面,之后反作业流程完成检修作业。The bottle support method is to install a tightening system at both ends of the insulator string for inspection and maintenance, and place a bottle holder below it, tighten the tightening system to protect the insulator string from the tension of the wire, and then disengage the insulator string from the wire and the cross arm. Link, and then place the overhaul insulator string on the ground with the bottle holder through the insulating sling, and then reverse the operation process to complete the overhaul operation.

旋放法是,先用绝缘子串张力调整器放松绝缘子,然后用牵引系统反牵绝缘子将导线侧瓷瓶脱开,沿塔悬挂点旋放瓷瓶串至垂直位置后再放至地面。反作业流程完成检修作业。The method of rotation is to loosen the insulator with the insulator string tension adjuster first, then use the traction system to pull the insulator back to disengage the porcelain bottle on the wire side, and rotate the porcelain bottle string along the suspension point of the tower to a vertical position before placing it on the ground. Reverse the operation process to complete the maintenance work.

±500kV同塔双回线路耐张绝缘子串设计为水平玻璃绝缘子或瓷棒式绝缘子双联串组装方式。其中玻璃串最小(轻污区)40片,长达10.737米,单串重量达0.73T,最大(重污区)57片,长达14.222米,单串重达约0.97T;瓷棒式绝缘子串由7支组成,长达14.772米,单串重约0.95T。The tension insulator strings of ±500kV double-circuit lines on the same tower are designed as horizontal glass insulators or porcelain rod insulators in double-connected series assembly. Among them, the smallest glass string (light pollution area) is 40 pieces, with a length of 10.737 meters, and the weight of a single string is 0.73T; the largest (heavy pollution area) is 57 pieces, with a length of 14.222 meters, and a single string weight of about 0.97T; porcelain rod insulators The string is composed of 7 pieces, with a length of 14.772 meters, and a single string weighs about 0.95T.

在±800kV特高压直流输电线路向上直流线路中,耐张绝缘子串设计成水平三联串组装方式,一般串长达18m,单串重量达1.5T。In the upward DC line of the ±800kV UHV DC transmission line, the tension insulator strings are designed to be assembled in horizontal triple strings. Generally, the string length is 18m, and the weight of a single string is 1.5T.

虽然整串更换的检修方式采用传统的耐张绝缘子串更换方法进行施工机具的组织和现场的实际操作在技术上都是可以实现的,但作为常规检修,特别是采取带电作业的方式进行检修还是有相当大的难度。Although the maintenance method of replacing the whole string is technically achievable by adopting the traditional tension insulator string replacement method for the organization of construction equipment and the actual operation on site, as a routine maintenance, especially the maintenance by means of live work is still a problem. There is considerable difficulty.

【发明内容】【Content of invention】

有鉴于此,为克服现有技术的不足,有必要提供一种适用于超、特高压直流线路带电更换耐张绝缘子的作业方法。In view of this, in order to overcome the deficiencies of the prior art, it is necessary to provide an operating method suitable for live replacement of tension insulators on super- and extra-high voltage DC lines.

一种超、特高压直流线路带电更换耐张绝缘子的作业方法,包括以下步骤:从耐张塔进入等电位;利用联板做支点安装翼型卡,利用绝缘子钢帽做支点安装绝缘子闭式卡前卡,用液压丝杆连接翼型卡和绝缘子闭式卡组成紧线系统;利用牵引板和平行挂板做支点安装耐张卡,利用绝缘子钢帽做支点安装闭式卡后卡,用液压丝杆组件连接耐张卡和绝缘子闭式卡组成紧线系统;利用绝缘子钢帽做支点分别安装绝缘子闭式卡的前卡和后卡,用液压丝杆连接绝缘子闭式卡的前卡和后卡组成紧线系统;操作液压丝杆收紧紧线系统,转移被检修绝缘子上的机械荷载;拆下待检修的绝缘子。An operating method for live replacement of tension insulators on super- and extra-high-voltage DC lines, comprising the following steps: entering the equipotential from the tension tower; using the connecting plate as a fulcrum to install an airfoil card, and using the insulator steel cap as a fulcrum to install an insulator closed-type card The front card is connected with the airfoil card and the insulator closed card by hydraulic screw rod to form a tight line system; the tension card is installed by using the traction plate and the parallel hanging plate as the fulcrum, and the closed card is installed by using the insulator steel cap as the fulcrum. The screw assembly connects the tension card and the insulator closed card to form a tight line system; the insulator steel cap is used as the fulcrum to install the front card and the rear card of the insulator closed card respectively, and the hydraulic screw rod is used to connect the front card and the rear card of the insulator closed card Clamp to form a tightening system; operate the hydraulic screw to tighten the tightening system, transfer the mechanical load on the insulator to be overhauled; remove the insulator to be overhauled.

在其中至少一个实施例中,所述联板为P-42S-120型或LS-84600500S型。In at least one embodiment, the connecting plate is P-42S-120 or LS-84600500S.

在其中至少一个实施例中,所述牵引板为QY-42S型,所述平行挂板为P-4215S或P-42S型。In at least one of the embodiments, the traction plate is QY-42S type, and the parallel hanging plate is P-4215S or P-42S type.

在其中至少一个实施例中,所述翼型卡为牵引板翼型卡或导线侧翼型卡。In at least one of the embodiments, the wing card is a tractor wing card or a wire side wing card.

在其中至少一个实施例中,所述耐张卡为三联耐张卡或横担侧耐张卡。In at least one of the embodiments, the tensile card is a three-way durable card or a cross-arm side durable card.

在其中至少一个实施例中,在所述组成进线系统步骤后,还包括安装用于传送工具及绝缘子三角架组件的步骤。In at least one of the embodiments, after the step of forming the incoming line system, a step of installing a transmission tool and an insulator tripod assembly is further included.

本发明的超、特高压直流线路带电更换耐张绝缘子的作业方法采用单只更换的作业方式,可实现对超、特高压直流输电线路中耐张绝缘子的单只更换,保证了耐张绝缘子串作为常规检修的作业便捷度。The operating method for live replacement of tension insulators in ultra-high voltage and ultra-high voltage DC lines of the present invention adopts a single replacement operation method, which can realize single replacement of tension insulators in ultra-high voltage and ultra-high voltage direct current transmission lines, and ensures the stringing of tension insulators Ease of operation as a routine maintenance.

【附图说明】【Description of drawings】

图1为本发明的优选实施例±800kV特高压直流输电线路中带电更换耐张绝缘子的作业方法的操作示意图。Fig. 1 is a schematic diagram of the operation method for live replacement of tension insulators in a ±800kV UHV DC transmission line according to a preferred embodiment of the present invention.

图2为图1中所采用的牵引板翼型卡的结构示意图。Fig. 2 is a schematic structural diagram of the traction plate airfoil card used in Fig. 1 .

图3A、3B分别为图1中所采用的液压式闭式卡前卡和后卡的结构示意图。3A and 3B are schematic diagrams of the structure of the front card and the rear card of the hydraulic closed card used in FIG. 1, respectively.

图4A、4B分别为图1中所采用的三联耐张卡的局部剖视图和另一角度的局部剖视图。结构示意图。4A and 4B are a partial cross-sectional view and a partial cross-sectional view from another angle, respectively, of the triple strain card used in FIG. 1 . Schematic.

图5为本发明的另一优选实施例±500kV同塔双回直流线路中带电更换耐张棒瓷绝缘子的作业方法的操作示意图。Fig. 5 is an operation schematic diagram of another preferred embodiment of the present invention, the operation method of live replacement of tension rod porcelain insulators in the ±500 kV double-circuit DC line on the same tower.

图6A、6B分别为图5中所采用的横担侧耐张卡的局部剖视图和另一角度的局部剖视图。6A and 6B are respectively a partial cross-sectional view and a partial cross-sectional view from another angle of the cross-arm side tension card used in FIG. 5 .

图7A、7B分别为图1中所采用的液压式闭式卡前卡和后卡的结构示意图。7A and 7B are schematic diagrams of the structure of the front card and the rear card of the hydraulic closed card used in FIG. 1 respectively.

图8为图5中所采用的导线侧翼型卡的结构示意图。FIG. 8 is a schematic structural diagram of the wire-side wing card used in FIG. 5 .

【具体实施方式】【Detailed ways】

为更好地理解本发明,以下将结合附图和具体实例对发明进行详细的说明。In order to better understand the present invention, the invention will be described in detail below in conjunction with the accompanying drawings and specific examples.

根据超、特高压直流线路工程的双联耐张、三联耐张的设计结构和采用的绝缘形式,本发明提供一种单只更换的作业方式更换耐张绝缘子,从而达到更换绝缘子串的目的。According to the design structure and insulation form of double-connected strain-resistant and triple-connected strain-resistant in ultra-high voltage and ultra-high voltage direct current line projects, the present invention provides a single replacement operation mode to replace the strain-resistant insulators, so as to achieve the purpose of replacing the insulator strings.

请结合参阅图1,其为在±800kV特高压直流输电线路中更换耐张绝缘子的示意图,其具体的操作流程如下:Please refer to Figure 1, which is a schematic diagram of replacing tension insulators in ±800kV UHV DC transmission lines. The specific operation process is as follows:

(1)从耐张塔进入等电位;(1) Enter the equipotential from the strain tower;

(2)利用联板(P-42S-120型)做支点安装牵引板翼型卡(如图2中所示),利用绝缘子钢帽做支点安装绝缘子闭式卡前卡(如图3A中所示)用液压丝杆连接翼型卡和闭式卡组成紧线系统;(2) Use the joint plate (P-42S-120 type) as the fulcrum to install the traction plate airfoil card (as shown in Figure 2), and use the insulator steel cap as the fulcrum to install the insulator closed card front card (as shown in Figure 3A (shown) use a hydraulic screw rod to connect the airfoil card and the closed card to form a tightening system;

(3)利用绝缘子钢帽做支点分别安装绝缘子闭式卡的前卡和后卡(如图3A、3B中所示),用液压丝杆连接绝缘子闭式卡的前卡和后卡组成紧线系统;(3) Use the steel cap of the insulator as the fulcrum to install the front card and the rear card of the insulator closed card respectively (as shown in Figure 3A and 3B), and connect the front card and the rear card of the insulator closed card with a hydraulic screw rod to form a tight line system;

(4)利用绝缘子钢帽做支点安装绝缘子闭式卡后卡,利用做牵引板(QY-42S型)和平行挂板(P-4215S)支点安装三联耐张卡(如图4A、4B中所示),用液压丝杆连接闭式卡和三联耐张卡组成紧线系统;(4) Use the insulator steel cap as the fulcrum to install the insulator closed card rear card, and use the traction plate (QY-42S type) and parallel hanging plate (P-4215S) as the fulcrum to install the triple tension card (as shown in Figure 4A and 4B) As shown), the hydraulic screw rod is used to connect the closed card and the triple tension card to form a tightening system;

(5)操作液压丝杆收紧紧线系统,转移被检修绝缘子上的机械荷载;(5) Operate the hydraulic screw rod to tighten the tightening system to transfer the mechanical load on the overhauled insulator;

(6)拆下待检修的绝缘子。(6) Remove the insulator to be overhauled.

请结合参阅图5,其为±500kV同塔双回直流线路中带电更换棒瓷绝缘子的示意图,其具体的操作流程如下:Please refer to Figure 5, which is a schematic diagram of live replacement of rod porcelain insulators in a ±500kV double-circuit DC line on the same tower. The specific operation process is as follows:

(1)从耐张塔进入等电位;(1) Enter the equipotential from the strain tower;

(2)利用牵引板(QY-42S型)和平行挂板(P-42S)做支点安装横担侧耐张卡(如图6A、6B中所示),利用瓷棒式绝缘子钢帽做支点安装闭式卡后卡(如图7B中所示),用液压丝杆组件连接耐张卡和闭式卡组成紧线系统,然后安装三角架组件用于传送工具及绝缘子;(2) Use the traction plate (QY-42S type) and the parallel hanging plate (P-42S) as the fulcrum to install the cross-arm side tension card (as shown in Figure 6A and 6B), and use the porcelain rod insulator steel cap as the fulcrum Install the closed card rear card (as shown in Figure 7B), use the hydraulic screw assembly to connect the tension card and the closed card to form a tight line system, and then install the tripod assembly for the transmission of tools and insulators;

(3)利用前后棒式绝缘子钢帽做支点分别安装闭式卡的前卡和后卡(如图7A、7B中所示),用液压丝杆组件连接闭式卡的前卡和后卡组成紧线系统,然后安装三角架组件用于传送工具及绝缘子;(3) Use the front and rear rod-type insulator steel caps as fulcrums to install the front card and the rear card of the closed card respectively (as shown in Figure 7A and 7B), and use the hydraulic screw assembly to connect the front card and the rear card of the closed card. Tighten the wire system, then install the tripod assembly for conveying tools and insulators;

(4)利用绝缘子钢帽做支点安装闭式卡前卡,利用联板(LS-84600500S型)做支点安装导线侧翼型卡(如图8中所示),用液压丝杆组件连接闭式卡和导线侧翼型卡构成紧线系统,然后安装三角架组件用于传送工具及绝缘子;(4) Use the insulator steel cap as the fulcrum to install the front card of the closed card, use the connecting plate (LS-84600500S type) as the fulcrum to install the wire side wing card (as shown in Figure 8), and use the hydraulic screw assembly to connect the closed card And the wire side wing type card constitutes a tight wire system, and then installs the tripod assembly for the transmission tool and insulator;

(5)操作液压丝杆收紧紧线系统,转移被检修瓷棒式绝缘子上的机械荷载;(5) Operate the hydraulic screw rod to tighten the tightening system to transfer the mechanical load on the overhauled porcelain rod insulator;

(6)拆下待检修的绝缘子。(6) Remove the insulator to be overhauled.

通过上述工艺,可实现对超、特高压直流输电线路中耐张绝缘子串的单片(单只)更换,保证了耐张绝缘子串作为常规检修的作业便捷度。Through the above-mentioned process, the single-piece (single) replacement of the tension insulator string in the ultra-high voltage and ultra-high voltage direct current transmission lines can be realized, which ensures the convenience of the tension insulator string as a routine maintenance operation.

以上所述实施例仅表达了本发明的几种实施方式,其描述较为具体和详细,但并不能因此而理解为对本发明专利范围的限制。应当指出的是,对于本领域的普通技术人员来说,在不脱离本发明构思的前提下,还可以做出若干变形和改进,这些都属于本发明的保护范围。因此,本发明专利的保护范围应以所附权利要求为准。The above-mentioned embodiments only express several implementation modes of the present invention, and the description thereof is relatively specific and detailed, but should not be construed as limiting the patent scope of the present invention. It should be pointed out that those skilled in the art can make several modifications and improvements without departing from the concept of the present invention, and these all belong to the protection scope of the present invention. Therefore, the protection scope of the patent for the present invention should be based on the appended claims.

Claims (6)

1.一种超、特高压直流线路带电更换耐张绝缘子的作业方法,包括以下步骤:1. A working method for live replacement of tension insulators on super- and extra-high-voltage DC lines, comprising the following steps: 从耐张塔进入等电位;Enter the equipotential from the strain tower; 利用联板做支点安装翼型卡,利用绝缘子钢帽做支点安装绝缘子闭式卡前卡,用液压丝杆连接翼型卡和绝缘子闭式卡组成紧线系统;Use the connecting plate as the fulcrum to install the airfoil card, use the insulator steel cap as the fulcrum to install the insulator closed card front card, and use the hydraulic screw to connect the airfoil card and the insulator closed card to form a tight line system; 利用牵引板和平行挂板做支点安装耐张卡,利用绝缘子钢帽做支点安装闭式卡后卡,用液压丝杆组件连接耐张卡和绝缘子闭式卡组成紧线系统;Use the traction plate and the parallel hanging plate as the fulcrum to install the tension card, use the insulator steel cap as the fulcrum to install the closed card rear card, and use the hydraulic screw assembly to connect the tension card and the insulator closed card to form a tightening system; 利用绝缘子钢帽做支点分别安装绝缘子闭式卡的前卡和后卡,用液压丝杆连接绝缘子闭式卡的前卡和后卡组成紧线系统;Use the steel cap of the insulator as the fulcrum to install the front and rear clamps of the insulator closed clamp respectively, and connect the front clamp and the rear clamp of the insulator closed clamp with a hydraulic screw rod to form a tightening system; 操作液压丝杆收紧紧线系统,转移被检修绝缘子上的机械荷载;Operate the hydraulic screw to tighten the tightening system and transfer the mechanical load on the overhauled insulator; 拆下待检修的绝缘子。Remove the insulator to be repaired. 2.根据权利要求1所述的超、特高压直流线路带电更换耐张绝缘子的作业方法,其特征在于:所述联板为P-42S-120型或LS-84600500S型。2. The operation method for live replacement of tension insulators on super- and ultra-high-voltage DC lines according to claim 1, characterized in that: the connecting plate is P-42S-120 or LS-84600500S. 3.根据权利要求1所述的超、特高压直流线路带电更换耐张绝缘子的作业方法,其特征在于:所述牵引板为QY-42S型,所述平行挂板为P-4215S或P-42S型。3. The operation method for live replacement of tension insulators on super- and extra-high voltage DC lines according to claim 1, characterized in that: the traction plate is QY-42S type, and the parallel hanging plate is P-4215S or P- Type 42S. 4.根据权利要求1所述的超、特高压直流线路带电更换耐张绝缘子的作业方法,其特征在于:所述翼型卡为牵引板翼型卡或导线侧翼型卡。4. The operation method for live replacement of tension insulators on ultra-high voltage and ultra-high voltage DC lines according to claim 1, characterized in that: the airfoil card is a traction board airfoil card or a conductor side airfoil card. 5.根据权利要求1所述的超、特高压直流线路带电更换耐张绝缘子的作业方法,其特征在于:所述耐张卡为三联耐张卡或横担侧耐张卡。5. The operation method for live replacement of tension insulators on ultra-high voltage and ultra-high voltage DC lines according to claim 1, characterized in that: said tension cards are triple tension cards or cross-arm side tension cards. 6.根据权利要求1至5中任一项所述的超、特高压直流线路带电更换耐张绝缘子的作业方法,其特征在于:在所述组成进线系统步骤后,还包括安装用于传送工具及绝缘子三角架组件的步骤。6. The operation method for live replacement of tension insulators for ultra-high voltage and ultra-high voltage DC lines according to any one of claims 1 to 5, characterized in that: after the step of composing the incoming line system, it also includes installing for transmission Tools and steps for insulator tripod assembly.
CN201310616143.0A 2013-11-27 2013-11-27 Operating method for replacing tension insulator on super and ultra-high voltage direct current transmission line in electrified mode Pending CN103606854A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201310616143.0A CN103606854A (en) 2013-11-27 2013-11-27 Operating method for replacing tension insulator on super and ultra-high voltage direct current transmission line in electrified mode

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201310616143.0A CN103606854A (en) 2013-11-27 2013-11-27 Operating method for replacing tension insulator on super and ultra-high voltage direct current transmission line in electrified mode

Publications (1)

Publication Number Publication Date
CN103606854A true CN103606854A (en) 2014-02-26

Family

ID=50125061

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201310616143.0A Pending CN103606854A (en) 2013-11-27 2013-11-27 Operating method for replacing tension insulator on super and ultra-high voltage direct current transmission line in electrified mode

Country Status (1)

Country Link
CN (1) CN103606854A (en)

Cited By (12)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104077947A (en) * 2014-07-24 2014-10-01 国家电网公司 Simple operation ability training bench for line workers
CN104201602A (en) * 2014-07-25 2014-12-10 国网上海市电力公司 Charged replacement method for whole string of insulators of ultra-high-voltage transmission line, and hardware fitting thereof
CN104201606A (en) * 2014-07-25 2014-12-10 国网上海市电力公司 Separating clamp for 500KV strain insulator string
CN104218493A (en) * 2014-08-13 2014-12-17 国家电网公司 Process for electrified replacing of tension-resistant hard tube bus jumper insulator for +/-800kV extra-high-voltage direct-current line
CN104300435A (en) * 2014-10-22 2015-01-21 国家电网公司 Wire tightener used for replacing double insulator strings
CN105576550A (en) * 2014-10-11 2016-05-11 国家电网公司 Method for live-line replacement of high voltage power transmission line monolithic strain insulator
CN107895900A (en) * 2017-09-19 2018-04-10 国家电网公司 Gate framework sedimentation breaker method processing HGIS equipment leakage defect methods
CN108448488A (en) * 2018-05-25 2018-08-24 国网河南省电力公司检修公司 840kN grades of tension resistant four cross-arm side insulator replacement tools and method
CN108899805A (en) * 2018-09-26 2018-11-27 广东电网有限责任公司 A kind of Multifunctional clamp of transmission line of electricity replacement deep bid diameter glass insulator
CN109217178A (en) * 2018-11-19 2019-01-15 国网四川省电力公司检修公司 Anticreep moves large-tonnage strain insulator more changing device and replacing options
CN110011218A (en) * 2019-03-28 2019-07-12 国网浙江慈溪市供电有限公司 A kind of replacing options of 10kV distribution strain insulator string
EP4004842A1 (en) * 2019-07-31 2022-06-01 Hitachi Energy Switzerland AG Autonomous semantic data discovery for distributed networked systems

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN201484214U (en) * 2009-06-04 2010-05-26 华北电网有限公司廊坊供电公司 Universal airfoil fixture for live replacement of single-strand insulators
CN201611749U (en) * 2010-02-10 2010-10-20 云南电网公司昆明供电局 Secondary protector for 35kV-110kV for charged changing tension-resisting insulator chain
CN102064490A (en) * 2009-11-18 2011-05-18 甘肃省电力公司兰州超高压输变电公司 Carbon fiber fixture for replacing insulator on 750-kV line and manufacturing method thereof
CN203150997U (en) * 2013-03-07 2013-08-21 江苏省电力公司检修分公司 Tool for live replacement of middle-phase vertical string insulator of power transmission line

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN201484214U (en) * 2009-06-04 2010-05-26 华北电网有限公司廊坊供电公司 Universal airfoil fixture for live replacement of single-strand insulators
CN102064490A (en) * 2009-11-18 2011-05-18 甘肃省电力公司兰州超高压输变电公司 Carbon fiber fixture for replacing insulator on 750-kV line and manufacturing method thereof
CN201611749U (en) * 2010-02-10 2010-10-20 云南电网公司昆明供电局 Secondary protector for 35kV-110kV for charged changing tension-resisting insulator chain
CN203150997U (en) * 2013-03-07 2013-08-21 江苏省电力公司检修分公司 Tool for live replacement of middle-phase vertical string insulator of power transmission line

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
刘振亚等: "《2009年特高压直流输电技术研究成果专辑 》", 31 October 2011, 中国电力出版社 *

Cited By (20)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104077947A (en) * 2014-07-24 2014-10-01 国家电网公司 Simple operation ability training bench for line workers
CN104077947B (en) * 2014-07-24 2016-02-24 国家电网公司 The simple and easy practical traning platform of a kind of linemen's' manipulative ability
CN104201602B (en) * 2014-07-25 2016-08-31 国网上海市电力公司 A kind of UHV transmission line bunch of insulator charged for replacement method and gold utensil thereof
CN104201602A (en) * 2014-07-25 2014-12-10 国网上海市电力公司 Charged replacement method for whole string of insulators of ultra-high-voltage transmission line, and hardware fitting thereof
CN104201606A (en) * 2014-07-25 2014-12-10 国网上海市电力公司 Separating clamp for 500KV strain insulator string
CN104218493A (en) * 2014-08-13 2014-12-17 国家电网公司 Process for electrified replacing of tension-resistant hard tube bus jumper insulator for +/-800kV extra-high-voltage direct-current line
CN104218493B (en) * 2014-08-13 2017-03-01 国家电网公司 ± 800kV UHVDC Transmission Lines live-line replacing strain hard tube mother's wire jumper insulator technique
CN105576550B (en) * 2014-10-11 2018-08-14 国家电网公司 A kind of charged for replacement UHV transmission line single chip tension insulator method
CN105576550A (en) * 2014-10-11 2016-05-11 国家电网公司 Method for live-line replacement of high voltage power transmission line monolithic strain insulator
CN104300435A (en) * 2014-10-22 2015-01-21 国家电网公司 Wire tightener used for replacing double insulator strings
CN107895900A (en) * 2017-09-19 2018-04-10 国家电网公司 Gate framework sedimentation breaker method processing HGIS equipment leakage defect methods
CN107895900B (en) * 2017-09-19 2023-05-30 国家电网公司 Handling of Leakage Defects of HGIS Equipment by Subsidence Circuit Breaker Method of Portal Frame
CN108448488A (en) * 2018-05-25 2018-08-24 国网河南省电力公司检修公司 840kN grades of tension resistant four cross-arm side insulator replacement tools and method
CN108899805A (en) * 2018-09-26 2018-11-27 广东电网有限责任公司 A kind of Multifunctional clamp of transmission line of electricity replacement deep bid diameter glass insulator
CN108899805B (en) * 2018-09-26 2024-07-05 广东电网有限责任公司 A multifunctional fixture for replacing large-diameter glass insulators on power transmission lines
CN109217178A (en) * 2018-11-19 2019-01-15 国网四川省电力公司检修公司 Anticreep moves large-tonnage strain insulator more changing device and replacing options
CN110011218A (en) * 2019-03-28 2019-07-12 国网浙江慈溪市供电有限公司 A kind of replacing options of 10kV distribution strain insulator string
CN110011218B (en) * 2019-03-28 2020-10-27 国网浙江慈溪市供电有限公司 A replacement method for tensile insulator strings in 10kV distribution network
EP4004842A1 (en) * 2019-07-31 2022-06-01 Hitachi Energy Switzerland AG Autonomous semantic data discovery for distributed networked systems
EP4004842B1 (en) * 2019-07-31 2025-11-05 Hitachi Energy Ltd Autonomous semantic data discovery for distributed networked systems

Similar Documents

Publication Publication Date Title
WO2012088987A1 (en) Maintenance tool for insulator of direct current transmission line
CN103618251A (en) Technology for electrified overhaul of +-800kV ultrahigh voltage direct-current transmission line
CN104505766B (en) The instrument and method of a kind of charged for replacement transformer station 500kV strain insulator strings
CN203456796U (en) Broadsword fixture for replacing single insulator of duplex insulator string during power failure
CN103594968B (en) A kind of transmission tower multiple fission conductor lifting device
CN103606853A (en) Operating method for replacing linear V insulator string on super and ultra-high voltage direct current transmission line in electrified mode
CN106451214B (en) A kind of combination tool of charged for replacement extra-high voltage same tower double circuit strain insulator
CN104752996B (en) Method for live replacement of tension duplex whole-string insulators of 330kV power transmission line
CN108847612A (en) The specific purpose tool of charged for replacement 35kV strain insulator string
CN106505466A (en) A kind of lift insulator crossarm of distribution uninterrupted operation and its operational method
CN204391613U (en) A kind of wire support device of auxiliary replacement porcelain pole arm
CN102623927B (en) Charged for replacement 220kV circuit multiloop double bundle conductor insulator tool and method
CN204382187U (en) A kind of contact net inclined cantilever insulator replacement tool
CN105162028A (en) Method for replacing linear insulator of 220kV steel pipe tower in live working state
CN204424804U (en) Equipotential changes the instrument of the two soft bus strain insulator of simply connected
CN202602171U (en) A tool for power-on replacing multi-loop double split conductor insulator of 220kV line
CN104852324A (en) Lead support device assisting in replacing porcelain cross arm
CN103618250A (en) Operating method for electrified replacement of double-V double-L insulator chains of extra-high voltage circuit
CN103606849B (en) Transmission tower multiple fission conductor live line working lifting device and special mould clamp thereof
CN204144800U (en) The special cross-arm card of a kind of ZML type tower
CN206099164U (en) Change combination tool of extra -high voltage with two dead end insulator of returning of tower with electricity
CN108847617A (en) The device and method of UHV transmission line live-line replacing strain wire jumper insulator chain
CN102983529B (en) Replacing tool for quadruple composite tension insulator chains of ultra-high voltage lines
CN207490436U (en) The double models for hanging V-type composite insulator string replacing options of ± 500kV DC power transmission lines duplex
CN108448488A (en) 840kN grades of tension resistant four cross-arm side insulator replacement tools and method

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20140226