CN203014270U - A triangular connecting plate connector used for a double bundled conductor in a power transmission line - Google Patents
A triangular connecting plate connector used for a double bundled conductor in a power transmission line Download PDFInfo
- Publication number
- CN203014270U CN203014270U CN 201220648914 CN201220648914U CN203014270U CN 203014270 U CN203014270 U CN 203014270U CN 201220648914 CN201220648914 CN 201220648914 CN 201220648914 U CN201220648914 U CN 201220648914U CN 203014270 U CN203014270 U CN 203014270U
- Authority
- CN
- China
- Prior art keywords
- plate
- side plate
- double
- triangular
- triangular connecting
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Images
Landscapes
- Electric Cable Installation (AREA)
Abstract
Description
技术领域: Technical field:
本实用新型涉及一种线路维修工具,特别是涉及一种输电线路双分裂导线用三角联板接头,属于输电线路运行维护技术领域。 The utility model relates to a line maintenance tool, in particular to a triangular joint plate joint for a double-split conductor of a transmission line, which belongs to the technical field of transmission line operation and maintenance.
背景技术: Background technique:
输电线路的双分裂导线12由导线夹与三角联板10下端相连(参见图2),三角联板10的上端部由销锁与线路绝缘子9相连,线路绝缘子9悬挂在铁塔支架上。线路绝缘子9是输电线路的重要组成部分,当需要进行检修时,需将三角联板10托起,将销锁拔出,使三角联板10与线路绝缘子9分离,对线路绝缘子9进行检修或更换。而目前采用的是等电位操作检修线路绝缘子9,不能实现带电间接操作检修或更换线路绝缘子。
The double-
实用新型内容: Utility model content:
本实用新型所要解决的技术问题是:提供一种可实现带电间接操作检修或更换线路绝缘子的输电线路双分裂导线用三角联板接头。 The technical problem to be solved by the utility model is to provide a triangular joint plate joint for double-split conductors of transmission lines that can realize live indirect operation maintenance or replacement of line insulators.
本实用新型为解决技术问题所采取的技术方案是: The technical scheme that the utility model takes for solving the technical problem is:
一种输电线路双分裂导线用三角联板接头,包括“U”型板托架,所述“U”型板托架为具有一定间隔的双层结构,所述“U”型板托架底部为平面结构,所述平面结构下端设置有连接块,所述连接块通过底部螺栓将双层结构固定连接在一起;所述“U”型板托架顶部两侧分别设置有左侧板和右侧板,左侧板和右侧板平行设置,所述左侧板和右侧板上均对应设置有螺栓孔,螺栓穿过左侧板和右侧板的螺栓孔由螺帽固定。 A triangular plate connector for double-split conductors of transmission lines, including a "U"-shaped plate bracket, the "U"-shaped plate bracket is a double-layer structure with a certain interval, and the bottom of the "U"-shaped plate bracket It is a planar structure, and the lower end of the planar structure is provided with a connecting block, and the connecting block fixes the double-layer structure together through the bottom bolts; the two sides of the top of the "U"-shaped plate bracket are respectively provided with a left side plate and a right side plate. The side plate, the left side plate and the right side plate are arranged in parallel, and the left side plate and the right side plate are respectively provided with bolt holes, and the bolts pass through the bolt holes of the left side plate and the right side plate and are fixed by nuts.
所述左侧板和右侧板之间的间隔大于三角联板提升装置的绝缘拉板的厚度,所述左侧板、右侧板和三角联板提升装置的绝缘拉板由螺帽与螺栓固定在一起。 The interval between the left side plate and the right side plate is greater than the thickness of the insulating pull plate of the triangular plate lifting device, and the left side plate, the right side plate and the insulating pull plate of the triangular plate lifting device are composed of nuts and bolts. fixed together.
所述“U”型板托架、左侧板和右侧板均有绝缘板加工而成。 The "U"-shaped board bracket, the left side board and the right side board are all processed by insulating boards.
本实用新型的积极有益效果如下: The positive beneficial effects of the utility model are as follows:
在检修或更换线路绝缘子时,先将三角联板提升装置的绝缘拉板固定在铁塔横担挂线点处的绝缘金具上,绝缘拉板的另一端插入到本实用新型左侧板和右侧板的间隔位置,通过螺栓和螺帽固定在一起;再将双层“U”型板托架底部连接块的底部螺栓打开,将三角联板夹住后,通过底部螺栓将双层“U”型板托架与三角联板固定在一起,在本实用新型“U”型板托架的作用下,绝缘子串能够保持松弛状态,将销锁拔出,使三角联板与线路绝缘子分离,从而方便的对绝缘子串进行检修或更换,可实现带电间接操作检修或更换线路绝缘子的目的。 When repairing or replacing line insulators, first fix the insulating pull plate of the triangular plate lifting device on the insulating fittings at the hanging point of the iron tower cross arm, and insert the other end of the insulating pull plate into the left side plate and the right side of the utility model. The interval position of the plates is fixed together by bolts and nuts; then the bottom bolts of the bottom connecting block of the double-layer "U" plate bracket are opened, and after the triangular joint plate is clamped, the double-layer "U" is fixed by the bottom bolts. The type plate bracket and the triangular connecting plate are fixed together. Under the action of the “U” type plate bracket of the utility model, the insulator string can maintain a loose state, and the pin lock can be pulled out to separate the triangular connecting plate from the line insulator, thereby It is convenient to overhaul or replace the insulator string, and can realize the purpose of live indirect operation overhaul or replacement of line insulators.
本实用新型设计合理,结构简单,使得检修或更换线路绝缘子的空间更大,从而可以提高工作效率。 The utility model has reasonable design and simple structure, so that the space for repairing or replacing line insulators is larger, so that the work efficiency can be improved.
附图说明: Description of drawings:
图1为本实用新型的结构示意图; Fig. 1 is the structural representation of the utility model;
图2为本实用新型的使用状态参考图。 Fig. 2 is a reference diagram of the use state of the utility model.
具体实施方式: Detailed ways:
下面结合附图对本实用新型作进一步的说明: Below in conjunction with accompanying drawing, the utility model is further described:
参见图1和图2,一种输电线路双分裂导线用三角联板接头,包括“U”型板托架1,“U”型板托架1为具有一定间隔的双层结构,“U”型板托架1底部为平面结构2,平面结构2下端设置有连接块3,连接块3通过底部螺栓4将双层结构固定连接在一起;在“U”型板托架1顶部两侧分别设置有左侧板5和右侧板6,左侧板5和右侧板6平行设置,在左侧板5和右侧板6上均对应设置有螺栓孔,螺栓8穿过左侧板5和右侧板6的螺栓孔由螺帽7固定,左侧板5和右侧板6之间的间隔大于三角联板提升装置的绝缘拉板11的厚度,左侧板5、右侧板6和三角联板提升装置的绝缘拉板11由螺帽7与螺栓8固定在一起。其中, “U”型板托架1、左侧板5和右侧板6均有绝缘板加工而成。
Referring to Fig. 1 and Fig. 2, a triangular plate connector for a double-split conductor of a transmission line, including a "U"-
在检修或更换输电线路双分裂导线12的绝缘子时,先将三角联板10提升装置的绝缘拉板11固定在铁塔横担挂线点处的绝缘金具上,绝缘拉板11的另一端插入到本实用新型左侧板5和右侧板6的间隔位置,通过螺栓8和螺帽7固定在一起;再将双层“U”型板托架1底部连接块3的底部螺栓4打开,将三角联板10夹住后,通过底部螺栓4将双层“U”型板托架1与三角联板10固定在一起,在本实用新型“U”型板托架的作用下,绝线路缘子9能够保持松弛状态,将销锁拔出,使三角联板10与线路绝缘子9分离,从而方便的对绝缘子串进行检修或更换,可实现带电间接操作检修或更换线路绝缘子的目的。
When overhauling or replacing the insulators of the double-
Claims (3)
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN 201220648914 CN203014270U (en) | 2012-11-30 | 2012-11-30 | A triangular connecting plate connector used for a double bundled conductor in a power transmission line |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN 201220648914 CN203014270U (en) | 2012-11-30 | 2012-11-30 | A triangular connecting plate connector used for a double bundled conductor in a power transmission line |
Publications (1)
| Publication Number | Publication Date |
|---|---|
| CN203014270U true CN203014270U (en) | 2013-06-19 |
Family
ID=48605827
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| CN 201220648914 Expired - Fee Related CN203014270U (en) | 2012-11-30 | 2012-11-30 | A triangular connecting plate connector used for a double bundled conductor in a power transmission line |
Country Status (1)
| Country | Link |
|---|---|
| CN (1) | CN203014270U (en) |
Cited By (4)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN103401182A (en) * | 2013-07-22 | 2013-11-20 | 国家电网公司 | Double bundle conductor connection plate carrying device |
| CN103606848A (en) * | 2013-11-21 | 2014-02-26 | 国网上海市电力公司 | Special clamp for multiple divided conductor hot-line work lifting device |
| CN103606849A (en) * | 2013-11-21 | 2014-02-26 | 国网上海市电力公司 | Multi-bundled live conductor lifting device for transmission tower and special fixture of multi-bundled live conductor lifting device |
| CN103606847A (en) * | 2013-11-21 | 2014-02-26 | 国网上海市电力公司 | Special clamp for multiple divided conductor lifting device |
-
2012
- 2012-11-30 CN CN 201220648914 patent/CN203014270U/en not_active Expired - Fee Related
Cited By (7)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN103401182A (en) * | 2013-07-22 | 2013-11-20 | 国家电网公司 | Double bundle conductor connection plate carrying device |
| CN103606848A (en) * | 2013-11-21 | 2014-02-26 | 国网上海市电力公司 | Special clamp for multiple divided conductor hot-line work lifting device |
| CN103606849A (en) * | 2013-11-21 | 2014-02-26 | 国网上海市电力公司 | Multi-bundled live conductor lifting device for transmission tower and special fixture of multi-bundled live conductor lifting device |
| CN103606847A (en) * | 2013-11-21 | 2014-02-26 | 国网上海市电力公司 | Special clamp for multiple divided conductor lifting device |
| CN103606847B (en) * | 2013-11-21 | 2015-12-30 | 国网上海市电力公司 | A kind of special mould clamp of multiple fission conductor lifting device |
| CN103606849B (en) * | 2013-11-21 | 2015-12-30 | 国网上海市电力公司 | Transmission tower multiple fission conductor live line working lifting device and special mould clamp thereof |
| CN103606848B (en) * | 2013-11-21 | 2016-01-20 | 国网上海市电力公司 | A kind of special mould clamp of multiple fission conductor live line working lifting device |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| CN105514877B (en) | Common-tower double-return steel pipe pole replacement insulation subjob cross-arm fixture | |
| CN202997080U (en) | Plug-in type equipment wire clamp of distribution transformer | |
| CN203014270U (en) | A triangular connecting plate connector used for a double bundled conductor in a power transmission line | |
| CN203674624U (en) | A sleeve-type combination tool for fastening and draining wire clips | |
| CN202353093U (en) | Wire lifter for replacing insulator strings | |
| CN203466513U (en) | Device for fixing line of electric transmission and distribution circuit | |
| CN103368110A (en) | Electric mounting and dismounting construction method for non-bearing-force connection wire clamp | |
| CN204885990U (en) | Transmission line yoke plate hoisting device | |
| CN101814707B (en) | Tool for live replacement of 220kV line 'V' string insulator and method | |
| CN205565511U (en) | Change insulators cross arm fixture for operation with two steel pipe poles that return of tower | |
| CN202534977U (en) | V-shaped clamping apparatus for transposing double insulator strings of power transmission line | |
| CN204046060U (en) | One does not have a power failure and changes strain insulator string combination tool | |
| CN203119413U (en) | V-shaped string for prevention of wind deflection | |
| CN202602171U (en) | A tool for power-on replacing multi-loop double split conductor insulator of 220kV line | |
| CN104253394B (en) | A kind of replacing instrument of strain insulator string | |
| CN204809744U (en) | Wire end broadsword type load support fixture and insulator chain change device | |
| CN206099164U (en) | Change combination tool of extra -high voltage with two dead end insulator of returning of tower with electricity | |
| CN205178388U (en) | Two cluster insulators of straight line are changed and are connected | |
| CN207490436U (en) | The double models for hanging V-type composite insulator string replacing options of ± 500kV DC power transmission lines duplex | |
| CN203747295U (en) | Special tool used for changing tension insulator of a 10kV power supply circuit in live-line state | |
| CN204464865U (en) | A kind of instrument changing 110kV strain insulator list insulator string | |
| CN202633732U (en) | Auxiliary safety device for mounting and dismounting of grounding wires | |
| CN202586164U (en) | Head clamp of concrete-pole cross arm | |
| CN203150740U (en) | Ground wire clamp | |
| CN204030448U (en) | A kind of electrified fastening pin type insulator nut tool |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| C14 | Grant of patent or utility model | ||
| GR01 | Patent grant | ||
| CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20130619 Termination date: 20141130 |
|
| EXPY | Termination of patent right or utility model |