CN103606849B - Transmission tower multiple fission conductor live line working lifting device and special mould clamp thereof - Google Patents
Transmission tower multiple fission conductor live line working lifting device and special mould clamp thereof Download PDFInfo
- Publication number
- CN103606849B CN103606849B CN201310595942.4A CN201310595942A CN103606849B CN 103606849 B CN103606849 B CN 103606849B CN 201310595942 A CN201310595942 A CN 201310595942A CN 103606849 B CN103606849 B CN 103606849B
- Authority
- CN
- China
- Prior art keywords
- split
- lifting
- clamp
- special
- live
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Landscapes
- Electric Cable Installation (AREA)
Abstract
输电杆塔多分裂导线带电作业提升装置及其专用卡具,涉及专用于安装、维护、修理或拆卸电缆或电线的方法或设备,包括第一、第二提升机构和专用卡具,两提升机构通过专用卡具,连接到支撑多分裂导线的线夹联板,将线夹联板、悬垂线夹和多分裂导线整体提升,专用卡具由固定板和焊接在固定板底面的联接板组成;提升机构为丝杠螺母机构,通过绝缘牵引索悬挂到杆塔的横担上;提升机构的丝杠伸出端穿过固定板两端的通孔,嵌在专用卡具和线夹联板连接部的空间内,确保多分裂导线带电作业提升装置的金属部件与横担之间保留满足带电操作要求的空气间隙。本装置结构形式简洁,使用方便,结合绝缘工具的使用,能够满足特高压输电线路维护检修带电作业的要求。
The lifting device and its special fixture for live work with multi-split conductors on transmission poles and towers relates to methods or equipment dedicated to installing, maintaining, repairing or dismantling cables or wires, including the first and second lifting mechanisms and special fixtures. The two lifting mechanisms pass through The special fixture is connected to the clamp connecting plate supporting the multi-split wire, and the clamp connecting plate, the suspension clamp and the multi-split wire are lifted as a whole. The special clamp is composed of a fixing plate and a connecting plate welded on the bottom of the fixing plate; lifting The mechanism is a screw nut mechanism, which is suspended to the cross arm of the pole tower through an insulated traction cable; the protruding end of the screw of the lifting mechanism passes through the through holes at both ends of the fixing plate, and is embedded in the space between the special clamp and the connecting part of the clamping plate Inside, ensure that there is an air gap that meets the requirements of live operation between the metal parts of the multi-split wire live operation lifting device and the cross arm. The device has a simple structure and is easy to use. Combined with the use of insulating tools, it can meet the requirements of live work for maintenance and repair of UHV transmission lines.
Description
技术领域technical field
本发明涉及专用于安装、维护、修理或拆卸电缆或电线的方法或设备,尤其涉及一种用于架空线路塔杆的多分裂导线带电作业提升装置及其专用卡具。The present invention relates to a method or equipment specially used for installing, maintaining, repairing or dismantling cables or wires, in particular to a multi-split live wire lifting device for overhead line tower poles and its special fixture.
背景技术Background technique
多分裂导线是超高压输电线路为抑制电晕放电和减少线路电抗所采取的一种导线架设方式。多分裂导线由几根直径较小的分导线组成,各分导线间隔一定距离并按对称多角形排列,而且布置在正多边形的顶点上。目前500KV以上的特高压交直流线路通常采用四分裂、六分裂甚至八分裂导线。多分裂导线驾控线路的维护和维修施工,经常需要同时提升组成多分裂导线的一组分导线,以便更换损伤的耐张力绝缘子串或其他线路金具。中国实用新型专利“一种塔头多分裂导线带电作业提升装置”(实用新型专利号:ZL200720085186.0授权公告号:CN201044342Y)公开了一种塔头多分裂导线带电作业提升装置,该装置包括有两个支撑座,其特征在于两个支撑座之间由可调节长度的丝杠组件连接,两个支撑座上分别装有竖丝杠,竖丝杠的下端可与绝缘吊杆相连接,上部与置于座体上方的丝杠套筒相连接。该实用新型多分裂导线带电作业提升装置与六分裂导线钩配合使用,可将通电导线提起,无需停电便能进行更换绝缘子串的操作。然而该实用新型多分裂导线带电作业提升装置需要与六分裂导线钩配合使用,其连接与操作过程比较复杂,对于架空线路的高空作业而言,仍然属于操作不便。Multi-split wire is a wire erection method adopted by EHV transmission lines to suppress corona discharge and reduce line reactance. The multi-split wire is composed of several sub-wires with smaller diameters, and each sub-wire is arranged at a certain distance and arranged in a symmetrical polygon, and arranged on the vertices of the regular polygon. At present, UHV AC and DC lines above 500KV usually use four-split, six-split or even eight-split conductors. In the maintenance and repair construction of multi-split conductor control lines, it is often necessary to lift a group of conductors that make up the multi-split conductor at the same time, so as to replace damaged tension-resistant insulator strings or other line fittings. The Chinese utility model patent "a hoisting device for live work with multi-split conductors at the tower head" (utility model patent number: ZL200720085186.0 authorized announcement number: CN201044342Y) discloses a hoisting device for live work with multi-split conductors at the tower head. The device includes The two supporting bases are characterized in that the two supporting bases are connected by an adjustable-length lead screw assembly, and the two supporting bases are respectively equipped with vertical screw rods. The lower end of the vertical screw rod can be connected with the insulating suspension rod, and the upper part It is connected with the lead screw sleeve placed above the seat body. The utility model multi-split wire live working hoisting device is used in conjunction with a six-split wire hook, which can lift the energized wire and replace the insulator string without power failure. However, this utility model multi-split wire live working lifting device needs to be used in conjunction with a six-split wire hook, and its connection and operation process is relatively complicated, and it is still inconvenient to operate for overhead lines.
发明内容Contents of the invention
本发明的目的在于提供一种的输电杆塔多分裂导线带电作业提升装置,用于输电杆塔带电作业中,同时提升组成多分裂导线的一组分导线,以便进行调换绝缘子及线路金具等作业。The purpose of the present invention is to provide a lifting device for live work of multi-split conductors of transmission poles and towers, which is used in live work of transmission poles and towers, and simultaneously lifts a group of conductors that form multiple split conductors, so as to perform operations such as replacing insulators and line fittings.
本发明解决上述技术问题所采用的技术方案是:The technical solution adopted by the present invention to solve the problems of the technologies described above is:
一种输电杆塔多分裂导线带电作业提升装置,包括第一提升机构、第二提升机构和专用卡具,其特征在于:A lifting device for live work with multi-split wires on transmission poles and towers, including a first lifting mechanism, a second lifting mechanism and special clamps, characterized in that:
第一提升机构和第二提升机构通过专用卡具,连接到支撑多分裂导线的线夹联板;第一提升机构和第二提升机构提供的提升力,将线夹联板、悬垂线夹和多分裂导线整体提升,耐张力绝缘子串的载荷转移到多分裂导线带电作业提升装置,使耐张力绝缘子串的各绝缘子及线路金具处不受力状态;The first lifting mechanism and the second lifting mechanism are connected to the wire clip connecting plate supporting the multi-split conductor through a special fixture; the lifting force provided by the first lifting mechanism and the second lifting mechanism connects the wire clip connecting plate, the hanging wire clip and The multi-split conductor is lifted as a whole, and the load of the tension-resistant insulator string is transferred to the multi-split conductor live working lifting device, so that the insulators and line fittings of the tension-resistant insulator string are in an unstressed state;
第一提升机构和第二提升机构为丝杠螺母机构;第一提升机构和第二提升机构的上端,分别通过一根绝缘牵引索悬挂到输电杆塔的横担上;The first hoisting mechanism and the second hoisting mechanism are lead screw nut mechanisms; the upper ends of the first hoisting mechanism and the second hoisting mechanism are respectively hung on the cross arm of the power transmission tower through an insulating traction cable;
专用卡具由固定板和焊接在固定板底面的一对联接板组成;第一提升机构和第二提升机构的下端,分别连接到固定板的两端;支撑多分裂导线的线夹联板的上端,夹在两块并列的联接板之间;借助穿过两块联接板和线夹联板的铰接轴孔的螺栓或销轴,所述的专用卡具与支撑多分裂导线的线夹联板形成铰接结构;The special fixture is composed of a fixed plate and a pair of connecting plates welded on the bottom of the fixed plate; the lower ends of the first lifting mechanism and the second lifting mechanism are respectively connected to the two ends of the fixing plate; The upper end is sandwiched between two parallel connecting plates; by means of bolts or pins passing through the hinged shaft holes of the two connecting plates and the clamp connecting plate, the special clamp is connected with the clamp supporting the multi-split wire The plates form a hinged structure;
所述丝杠螺母机构的丝杠伸出端,分别穿过固定板两端的连接通孔,嵌伸到专用卡具和线夹联板连接部的空间内,确保多分裂导线带电作业提升装置的金属部件与输电杆塔的横担之间,保留满足带电操作要求的的空气间隙。The protruding end of the lead screw of the screw nut mechanism passes through the connecting through holes at both ends of the fixing plate respectively, and is inserted into the space between the special clamp and the connecting part of the clamping plate, so as to ensure the safety of the multi-split wire live working lifting device. Between the metal parts and the cross arm of the transmission tower, keep an air gap that meets the requirements of live operation.
本发明的输电杆塔多分裂导线带电作业提升装置的一种技术方案,其特征在于,所述的专用卡具由固定板和两块联接板组成,两块联接板的上端对称竖直焊接在固定板的底面,与横向布置的固定板排列成π形结构。A technical scheme of the lifting device for live work with multi-split wires on transmission poles and towers of the present invention is characterized in that the special fixture is composed of a fixed plate and two connecting plates, and the upper ends of the two connecting plates are welded vertically and symmetrically on the fixed The bottom surface of the plate is arranged in a π-shaped structure with the horizontally arranged fixed plates.
本发明的多分裂导线带电作业提升装置的一种较佳的技术方案,其特征在于所述专用卡具的固定板的两端向下弯折,与两块联接板形成<90°的夹角,以保证连接在固定板两端的第一提升机构和第二提升机构的轴线夹角,与两根绝缘牵引索之间的夹角一致。A preferred technical solution of the multi-split wire live working lifting device of the present invention is characterized in that the two ends of the fixing plate of the special fixture are bent downwards, forming an included angle of <90° with the two connecting plates , to ensure that the angle between the axes of the first lifting mechanism and the second lifting mechanism connected to both ends of the fixing plate is consistent with the angle between the two insulating pull cables.
本发明的有益效果是:The beneficial effects of the present invention are:
本发明的输电杆塔多分裂导线带电作业提升装置,其提升机构的丝杆嵌在夹具内,确保了金属部件与横担间足够的空气间隙,其结构形式简洁,使用方便,结合绝缘工具的使用,能够满足特高压输电线路维护检修带电作业的要求。The lifting device for live work with multi-split wires on transmission poles and towers of the present invention, the screw rod of the lifting mechanism is embedded in the fixture, ensuring a sufficient air gap between the metal parts and the cross-arm, its structure is simple, easy to use, combined with the use of insulating tools , which can meet the requirements of live work for maintenance and repair of UHV transmission lines.
附图说明Description of drawings
图1为本发明的输电杆塔多分裂导线带电作业提升装置的结构示意图;Fig. 1 is the structure schematic diagram of the multi-split wire live working hoisting device of the transmission pole tower of the present invention;
图2为用于本发明的输电杆塔多分裂导线带电作业提升装置的专用卡具的主视图;Fig. 2 is the front view of the special jig used for the lifting device for live work of the multi-split conductor of the transmission pole tower of the present invention;
图3为用于本发明的输电杆塔多分裂导线带电作业提升装置的专用卡具的A-A剖视图;Fig. 3 is the A-A cross-sectional view of the special fixture used for the multi-split wire live working lifting device of the transmission pole tower of the present invention;
图4为本发明的输电杆塔多分裂导线带电作业提升装置用于提升六分裂导线的工作状态示意图。Fig. 4 is a schematic diagram of the working state of the lifting device for live work of multi-split conductors of a transmission pole tower of the present invention for lifting six-split conductors.
以上图中的各部件的标号:1-铁塔横担,2-耐张力绝缘子串,3-悬垂线夹,4-悬垂线夹线夹联板,5-第一提升机构,6-第二提升机构,7-绝缘牵引索,10-专用卡具,11-固定板,12-联接板,13-加固圈,14-螺栓或销轴,15-铰接轴孔,16-连接通孔。The labels of the components in the above figure: 1-iron tower cross arm, 2-tension insulator string, 3-suspension line clamp, 4-suspension line clamp clamping plate, 5-first lifting mechanism, 6-second lifting Mechanism, 7-insulated traction cable, 10-special fixture, 11-fixed plate, 12-joint plate, 13-reinforcing ring, 14-bolt or bearing pin, 15-hinged shaft hole, 16-connection through hole.
具体实施方式Detailed ways
为了能更好地理解本发明的上述技术方案,下面结合附图和实施例进行进一步地详细描述。In order to better understand the above technical solutions of the present invention, a further detailed description will be given below in conjunction with the drawings and embodiments.
本发明的输电杆塔多分裂导线带电作业提升装置的一个实施例如图1所示,用于输电杆塔带电作业中调换绝缘子及线路金具等检修工作,图4所示的实施例中的多分裂导线为六分裂导线,由6根分别夹持在6套悬垂线夹3上的分导线组成,悬垂线夹3按对称六角形布置在线夹联板4上,线夹联板4通过耐张力绝缘子串2悬挂在输电杆塔上;如图1所示,多分裂导线带电作业提升装置包括第一提升机构5、第二提升机构6和专用卡具10;第一提升机构5和第二提升机构6通过专用卡具10,连接到支撑多分裂导线的线夹联板4,第一提升机构5和第二提升机构6提供的提升力,将线夹联板4、悬垂线夹3和多分裂导线整体提升,将耐张力绝缘子串2的载荷转移到多分裂导线带电作业提升装置,使耐张力绝缘子串2的各绝缘子及线路金具处不受力状态;An embodiment of the live work hoisting device for multi-split conductors of transmission pole towers according to the present invention is shown in Figure 1, which is used for maintenance work such as exchanging insulators and line fittings in live work of transmission pole towers, and the multi-split conductors in the embodiment shown in Figure 4 are The six-split conductor is composed of 6 sub-conductors respectively clamped on 6 sets of suspension clamps 3. The suspension clamps 3 are arranged in a symmetrical hexagonal shape on the clamping plate 4, and the clamping plate 4 passes through the tension-resistant insulator string 2. Suspended on the power transmission pole tower; as shown in Figure 1, the multi-split wire live working lifting device includes a first lifting mechanism 5, a second lifting mechanism 6 and a special clamp 10; the first lifting mechanism 5 and the second lifting mechanism 6 pass a special Fixture 10 is connected to the wire clip connecting plate 4 supporting multi-split wires, and the lifting force provided by the first lifting mechanism 5 and the second lifting mechanism 6 will lift the wire clip connecting plate 4, the suspension wire clamp 3 and the multi-split wire as a whole , transferring the load of the tension-resistant insulator string 2 to the multi-split wire live working hoisting device, so that each insulator and line fittings of the tension-resistant insulator string 2 are in an unstressed state;
第一提升机构5和第二提升机构6为丝杠螺母机构;在图1和图4所示的实施例中,第一提升机构5和第二提升机构6采用带手柄的丝杠螺母机构,可以通过转动丝杠螺母上的手柄,带动螺母绕丝杠旋转,驱动丝杠沿轴向上下运动,带动专用卡具10完成多分裂导线的提升作业。第一提升机构5和第二提升机构6的上端,分别通过一根绝缘牵引索7悬挂到输电杆塔的横担1上;The first lifting mechanism 5 and the second lifting mechanism 6 are leading screw nut mechanisms; in the embodiment shown in Fig. 1 and Fig. 4, the first lifting mechanism 5 and the second lifting mechanism 6 adopt the leading screw nut mechanism with handle, By turning the handle on the lead screw nut, the nut is driven to rotate around the lead screw, the lead screw is driven to move up and down in the axial direction, and the special jig 10 is driven to complete the lifting operation of the multi-split wires. The upper ends of the first hoisting mechanism 5 and the second hoisting mechanism 6 are respectively hung on the crossarm 1 of the power transmission tower through an insulating traction cable 7;
专用卡具10由固定板11和焊接在固定板11底面的一对联接板12组成;第一提升机构5和第二提升机构6的下端,分别连接到固定板11的两端,所述丝杠螺母机构的丝杠伸出端,分别穿过固定板11两端的连接通孔16,嵌伸到专用卡具10和线夹联板4连接部的空间内,确保多分裂导线带电作业提升装置的金属部件与横担1之间保留满足带电操作要求的的空气间隙。The special fixture 10 is made up of a fixed plate 11 and a pair of connecting plates 12 welded on the bottom surface of the fixed plate 11; the lower ends of the first lifting mechanism 5 and the second lifting mechanism 6 are respectively connected to the two ends of the fixed plate 11, and the wire The protruding end of the lead screw of the rod nut mechanism respectively passes through the connecting through holes 16 at both ends of the fixing plate 11, and is inserted into the space between the special fixture 10 and the connecting part of the clamp connecting plate 4 to ensure that the multi-split wire live working lifting device An air gap that meets the requirements of live operation is reserved between the metal parts and the cross arm 1.
本发明的多分裂导线提升专用卡具如图2和图3所示,用于图1所示的输电杆塔多分裂导线带电作业提升装置,专用卡具10由固定板11和两块联接板12组成,两块联接板12的上端对称竖直焊接在固定板11的底面,与横向布置的固定板11排列成π形结构;支撑多分裂导线的线夹联板4的上端,置于两块并列的联接板12之间;两块联接板12与和线夹联板4的中线上,设有贯穿两块联接板12和线夹联板4的铰接轴孔15,借助穿过铰接轴孔15的螺栓或销轴14,专用卡具10与支撑多分裂导线的线夹联板4,形成铰接结构。The multi-split wire lifting special jig of the present invention is shown in Figure 2 and Figure 3, and is used for the transmission pole tower multi-split wire live work lifting device shown in Figure 1, and the special jig 10 is composed of a fixed plate 11 and two connecting plates 12 Composition, the upper ends of two connecting plates 12 are symmetrically welded vertically on the bottom surface of the fixing plate 11, and are arranged in a π-shaped structure with the fixing plates 11 arranged horizontally; Between the connecting plates 12 juxtaposed; on the center line of the two connecting plates 12 and the wire clip connecting plates 4, there are hinged shaft holes 15 that run through the two connecting plates 12 and the wire clamping connected plates 4, by passing through the hinged shaft holes 15 bolts or bearing pin 14, special fixture 10 and the wire clip connecting plate 4 that supports many split wires form a hinged structure.
如图1和图2所示,固定板11的两端向下弯折,与两块联接板12形成<90°的夹角,以保证连接在固定板11两端的第一提升机构5和第二提升机构6的轴线夹角,与两根绝缘牵引索7之间的夹角一致。在图1和图2所示的实施例中,两根绝缘牵引索7之间的夹角为20°,因此,固定板11的两端与两块联接板12分别形成一个80°的夹角。As shown in Figures 1 and 2, the two ends of the fixed plate 11 are bent downwards to form an angle of <90° with the two connecting plates 12, so as to ensure that the first lifting mechanism 5 and the second lifting mechanism connected to the two ends of the fixed plate 11 The included angle of the axes of the two hoisting mechanisms 6 is consistent with the included angle between the two insulating traction cables 7 . In the embodiment shown in Fig. 1 and Fig. 2, the included angle between the two insulated traction cables 7 is 20°, therefore, the two ends of the fixed plate 11 and the two connecting plates 12 respectively form an included angle of 80° .
如图2所示,在固定板11两端的连接通孔16的上侧,以及两块联接板12下端的铰接轴孔15的外侧,分别焊接固定一个加固圈13,以增强各通孔边缘部的强度,满足将线夹联板4、悬垂线夹3和多分裂导线整体提升的要求。As shown in Figure 2, on the upper side of the connecting through hole 16 at both ends of the fixing plate 11, and on the outside of the hinge shaft hole 15 at the lower end of the two connecting plates 12, a reinforcement ring 13 is respectively welded and fixed to strengthen the edges of each through hole The strength meets the requirements for overall upgrading of the wire clamp connecting plate 4, the suspension wire clamp 3 and the multi-split wires.
本技术领域中的普通技术人员应当认识到,以上的实施例仅是用来说明本发明的技术方案,而并非用作为对本发明的限定,任何基于本发明的实质精神对以上所述实施例所作的变化、变型,都将落在本发明的权利要求的保护范围内。Those of ordinary skill in the technical field should recognize that the above embodiments are only used to illustrate the technical solutions of the present invention, and are not used as limitations to the present invention. All changes and modifications will fall within the protection scope of the claims of the present invention.
Claims (3)
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201310595942.4A CN103606849B (en) | 2013-11-21 | 2013-11-21 | Transmission tower multiple fission conductor live line working lifting device and special mould clamp thereof |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201310595942.4A CN103606849B (en) | 2013-11-21 | 2013-11-21 | Transmission tower multiple fission conductor live line working lifting device and special mould clamp thereof |
Publications (2)
| Publication Number | Publication Date |
|---|---|
| CN103606849A CN103606849A (en) | 2014-02-26 |
| CN103606849B true CN103606849B (en) | 2015-12-30 |
Family
ID=50125056
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| CN201310595942.4A Active CN103606849B (en) | 2013-11-21 | 2013-11-21 | Transmission tower multiple fission conductor live line working lifting device and special mould clamp thereof |
Country Status (1)
| Country | Link |
|---|---|
| CN (1) | CN103606849B (en) |
Families Citing this family (3)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN108002284A (en) * | 2017-12-25 | 2018-05-08 | 合保电气(芜湖)有限公司 | Aerial cables service material instrument conveying arrangement |
| CN109510105B (en) * | 2018-11-21 | 2024-03-15 | 国网福建省电力有限公司泉州供电公司 | Intelligent repair method for equal potential of transmission line conductors |
| CN116073149B (en) * | 2023-04-06 | 2023-07-28 | 国网山东省电力公司潍坊市寒亭区供电公司 | Wire connection structure of transmission pole |
Citations (5)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| JPH08265946A (en) * | 1995-03-22 | 1996-10-11 | Hitachi Cable Ltd | Frame structure of spacer for multi-conductor transmission line |
| CN201340987Y (en) * | 2008-09-27 | 2009-11-04 | 湖北省电力公司超高压输变电公司 | Extra-high voltage power transmission line separate wire raiser |
| CN202333602U (en) * | 2011-11-21 | 2012-07-11 | 辽宁省电力有限公司朝阳供电公司 | Two-plate tightening fixture |
| CN202930825U (en) * | 2012-10-31 | 2013-05-08 | 杭州市电力局 | Tool for replacing the side fittings on the double split wire side of the strain tower |
| CN203014270U (en) * | 2012-11-30 | 2013-06-19 | 新郑市供电公司 | A triangular connecting plate connector used for a double bundled conductor in a power transmission line |
-
2013
- 2013-11-21 CN CN201310595942.4A patent/CN103606849B/en active Active
Patent Citations (5)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| JPH08265946A (en) * | 1995-03-22 | 1996-10-11 | Hitachi Cable Ltd | Frame structure of spacer for multi-conductor transmission line |
| CN201340987Y (en) * | 2008-09-27 | 2009-11-04 | 湖北省电力公司超高压输变电公司 | Extra-high voltage power transmission line separate wire raiser |
| CN202333602U (en) * | 2011-11-21 | 2012-07-11 | 辽宁省电力有限公司朝阳供电公司 | Two-plate tightening fixture |
| CN202930825U (en) * | 2012-10-31 | 2013-05-08 | 杭州市电力局 | Tool for replacing the side fittings on the double split wire side of the strain tower |
| CN203014270U (en) * | 2012-11-30 | 2013-06-19 | 新郑市供电公司 | A triangular connecting plate connector used for a double bundled conductor in a power transmission line |
Also Published As
| Publication number | Publication date |
|---|---|
| CN103606849A (en) | 2014-02-26 |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| CN103594968B (en) | A kind of transmission tower multiple fission conductor lifting device | |
| WO2012088987A1 (en) | Maintenance tool for insulator of direct current transmission line | |
| CN202059096U (en) | Tool component capable of replacing insulator string electrically | |
| CN103066526B (en) | A kind of ground connection line method and separated earthing instrument for ultra-high-tension power transmission line | |
| CN103606854A (en) | Operating method for replacing tension insulator on super and ultra-high voltage direct current transmission line in electrified mode | |
| CN209434770U (en) | Replacing insulator string device and transmission line maintenance equipment | |
| CN106451214B (en) | A kind of combination tool of charged for replacement extra-high voltage same tower double circuit strain insulator | |
| CN104362544A (en) | Pulley type tower head clamp | |
| CN104037657A (en) | Suspended glass insulator chain lifting clamp | |
| CN103606849A (en) | Multi-bundled live conductor lifting device for transmission tower and special fixture of multi-bundled live conductor lifting device | |
| CN105162028A (en) | Method for replacing linear insulator of 220kV steel pipe tower in live working state | |
| CN204927971U (en) | A embrace pole for electrified insulator chain that changes of transmission line | |
| CN208337014U (en) | A kind of charged for replacement Voltage for Insulators on HV Lines lifting block hanging point heightening device | |
| CN103606848B (en) | A kind of special mould clamp of multiple fission conductor live line working lifting device | |
| CN204361576U (en) | Split-type six-split wire lifter for power failure and live work on transmission lines | |
| CN103746317B (en) | A kind of general utility tool changing straight-line angle tower insulator string | |
| CN111697487A (en) | Voltage-measurable live-line double-insulator-string replacing device and operation method | |
| CN103606847B (en) | A kind of special mould clamp of multiple fission conductor lifting device | |
| CN201674161U (en) | SZ type double-circuit straight line tower live replacement suspension insulator suspension wire fixture assembly | |
| CN206864977U (en) | A kind of grounding wire device | |
| CN206099164U (en) | Change combination tool of extra -high voltage with two dead end insulator of returning of tower with electricity | |
| CN205178388U (en) | Two cluster insulators of straight line are changed and are connected | |
| CN204290154U (en) | A kind of replacing insulator under electrified specific purpose tool | |
| CN204858403U (en) | Change V -arrangement insulator hangs some fixing device to transmission line temporarily with electricity | |
| CN107565484A (en) | Line fixing device more than bypass cable |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| C06 | Publication | ||
| PB01 | Publication | ||
| SE01 | Entry into force of request for substantive examination | ||
| SE01 | Entry into force of request for substantive examination | ||
| C14 | Grant of patent or utility model | ||
| GR01 | Patent grant |