CN202534972U - Over-current clamping device - Google Patents

Over-current clamping device Download PDF

Info

Publication number
CN202534972U
CN202534972U CN 201220128161 CN201220128161U CN202534972U CN 202534972 U CN202534972 U CN 202534972U CN 201220128161 CN201220128161 CN 201220128161 CN 201220128161 U CN201220128161 U CN 201220128161U CN 202534972 U CN202534972 U CN 202534972U
Authority
CN
China
Prior art keywords
fixture
hook body
lead screw
light
hole
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
CN 201220128161
Other languages
Chinese (zh)
Inventor
张森
张琳
王峰
赵宏凯
计海森
刘卓
丁冠西
王玉波
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Liaoyang Power Supply Co of State Grid Liaoning Electric Power Co Ltd
State Grid Corp of China
Original Assignee
Liaoyang Power Supply Co of State Grid Liaoning Electric Power Co Ltd
State Grid Corp of China
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Liaoyang Power Supply Co of State Grid Liaoning Electric Power Co Ltd, State Grid Corp of China filed Critical Liaoyang Power Supply Co of State Grid Liaoning Electric Power Co Ltd
Priority to CN 201220128161 priority Critical patent/CN202534972U/en
Application granted granted Critical
Publication of CN202534972U publication Critical patent/CN202534972U/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Images

Landscapes

  • Suspension Of Electric Lines Or Cables (AREA)

Abstract

本实用新型涉及一种过流卡具,它包括有卡具重型端和卡具轻型端,卡具重型端与卡具轻型端之间通过铜线连接,所述的卡具重型端与卡具轻型端均是由钩体、金属托和丝杠组成的,钩体的底端开有孔,孔内设置有螺纹,丝杠的顶端穿过孔后与金属托固定连接在一起,金属托在丝杠的带动下沿着钩体的内壁做上下运动,钩体的顶端安装有铁环。本实用新型可用绝缘操作杆地电位安装及拆卸,免去等电位人员进入强电场安装,作业安全性高、操作简单方便。

Figure 201220128161

The utility model relates to an over-current fixture, which includes a heavy-duty end of the fixture and a light-duty end of the fixture. The heavy-duty end of the fixture is connected to the light-duty end of the fixture through a copper wire. The light end is composed of a hook body, a metal bracket and a lead screw. There is a hole at the bottom of the hook body, and a thread is arranged in the hole. The top of the lead screw passes through the hole and is fixedly connected with the metal bracket. Driven by the lead screw, it moves up and down along the inner wall of the hook body, and an iron ring is installed on the top of the hook body. The utility model can be installed and disassembled by the ground potential of the insulating operating rod, which avoids the need for personnel with equal potentials to enter the strong electric field for installation, and has high operating safety and simple and convenient operation.

Figure 201220128161

Description

过流卡具Overcurrent fixture

技术领域 technical field

本实用新型涉及一种适合66KV地电位压接管连板带电断接引流方法使用的过流卡具。 The utility model relates to an overcurrent jig suitable for a 66KV ground potential crimping pipe connection plate live disconnection drainage method.

背景技术 Background technique

传统的66kV压接管连板带电断接引工作均采用硬梯挂在带电导线上,等电位人员携带过流滑车及消弧绳等工具进入强电场,首先在压接管上安装带有消弧绳的过流滑车,然后拆除连板螺丝,接着退出强电场等待被断引流完全断开后。因消弧绳与被断引流仍在连接状态,所以等电位操作人员必须再次进人强电场,取下过流滑车及消弧绳,拆卸过流滑车及消弧绳后再次退出强电场,完成其中一相的断引工作。传统方法因等电位操作人员需连续进、出两次强电场才可完成一相的断引工作,对于要求作业安全性极高的带电作业领域,此方法存在诸多安全隐患,因此急需一种能够代替绝缘消弧绳的工具。 The traditional 66kV crimping tube connection plate live disconnection work uses a hard ladder to hang on the live wire. The equipotential personnel carry tools such as over-current tackle and arc suppression rope to enter the strong electric field. The overcurrent pulley, and then remove the connecting plate screws, and then withdraw from the strong electric field and wait for the broken drainage to be completely disconnected. Because the arc-suppression rope and the broken drainage are still connected, the equipotential operator must enter the strong electric field again, remove the over-current block and arc-suppression rope, and then exit the strong electric field again after removing the over-current block and arc-suppression rope. One of the phase disconnection work. In the traditional method, because the equipotential operator needs to enter and exit the strong electric field twice in a row to complete the disconnection work of one phase, this method has many potential safety hazards for the field of live work that requires extremely high operating safety, so there is an urgent need for a method that can A tool that replaces the insulated arc suppression rope.

实用新型内容 Utility model content

本实用新型要解决的技术问题是提供一种过流卡具,该过流卡具具有作业安全性高、操作简单方便的特点。 The technical problem to be solved by the utility model is to provide a flow-through clamp, which has the characteristics of high operation safety and simple and convenient operation.

为了解决现有技术存在的问题,本实用新型采用的技术方案是: In order to solve the problems existing in the prior art, the technical solution adopted by the utility model is:

过流卡具,包括有卡具重型端和卡具轻型端,卡具重型端与卡具轻型端之间通过铜线连接,所述的卡具重型端与卡具轻型端均是由钩体、金属托和丝杠组成的,钩体的底端开有孔,孔内设置有螺纹,丝杠的顶端穿过孔后与金属托固定连接在一起,金属托在丝杠的带动下沿着钩体的内壁做上下运动,钩体的顶端安装有铁环。 The over-current fixture includes a heavy-duty end and a light end of the fixture. The heavy-duty end of the fixture and the light-duty end of the fixture are connected by copper wires. The heavy-duty end of the fixture and the light-duty end of the fixture are both made of , a metal bracket and a lead screw, the bottom of the hook body has a hole, the hole is provided with a thread, the top of the screw goes through the hole and is fixedly connected with the metal bracket, and the metal bracket is driven by the screw along the The inner wall of the hook body moves up and down, and an iron ring is installed on the top of the hook body.

本实用新型所具有的优点与效果是: The advantages and effects that the utility model has are:

本实用新型由于包括有卡具重型端与卡具轻型端,作业人员可以站在距断引部位安全距离以外的铁塔上,用绝缘挑钩杆把卡具重型端挂在压接管上,再用绝缘挑钩杆把底部丝杠拧紧,然后同样把卡具轻型端拧紧在引流线的连板根部,等待断引结束后,再用绝缘挑钩杆把卡具重型端连同引流线一起拉至铁塔接地后绑扎牢固,最后取下过流卡具结束,本实用新型可用绝缘操作杆地电位安装及拆卸,免去等电位人员进入强电场安装,作业安全性高、操作简单方便。 Because the utility model includes the heavy-duty end of the fixture and the light-duty end of the fixture, the operator can stand on the iron tower at a safe distance from the disconnection part, hang the heavy-duty end of the fixture on the crimping pipe with an insulating hook rod, and then use the Tighten the bottom lead screw with the insulated hook rod, and then tighten the light end of the clamp to the root of the connecting plate of the drain wire. After the disconnection is completed, use the insulated hook rod to pull the heavy end of the clamp together with the drain wire to the iron tower After grounding, it is bound firmly, and finally the overcurrent fixture is removed. The utility model can be installed and disassembled by the ground potential of the insulating operating rod, eliminating the need for equipotential personnel to enter the strong electric field for installation. The operation is safe and the operation is simple and convenient.

附图说明 Description of drawings

图1为本实用新型的整体结构示意图。 Figure 1 is a schematic diagram of the overall structure of the utility model.

图中:卡具重型端1、卡具轻型端2、铜线3、钩体11、金属托12、丝杠13、孔14、铁环15、钩体21、金属托22、丝杠23、孔24、铁环25。 In the figure: clamp heavy end 1, clamp light end 2, copper wire 3, hook body 11, metal bracket 12, lead screw 13, hole 14, iron ring 15, hook body 21, metal bracket 22, lead screw 23, Hole 24, hoop 25.

具体实施方式 Detailed ways

下面结合附图对本实用新型作进一步详述: Below in conjunction with accompanying drawing, the utility model is described in further detail:

如图1所示,本实用新型过流卡具包括有卡具重型端1和卡具轻型端2,卡具重型端1与卡具轻型端2之间通过16mm2长400mm铜线3可靠连接,卡具重型端1与卡具轻型端2的结构相同,只是大小不同。卡具重型端1是由钩体11、金属托12和丝杠13组成的,钩体11的底端开有孔14,孔14内设置有螺纹,丝杠13的顶端穿过孔14后与金属托12固定连接在一起,丝杠13可以沿着孔14内的螺纹上下运动,金属托12在丝杠13的带动下沿着钩体11的内壁做上下运动,钩体11的顶端安装有铁环15。卡具轻型端2是由钩体21、金属托22和丝杠23组成的,钩体21的底端开有孔24,孔24内设置有螺纹,丝杠23的顶端穿过孔24后与金属托22固定连接在一起,丝杠23可以沿着孔24内的螺纹上下运动,金属托22在丝杠23的带动下沿着钩体21的内壁做上下运动,钩体21的顶端安装有铁环25。卡具重型端1可用绝缘操作杆拧紧在压接管上,卡具轻型端2可用绝缘操作杆拧紧在引流线上,起到疏导电流的作用。 As shown in Figure 1, the utility model overcurrent fixture includes a fixture heavy-duty end 1 and a fixture light-duty end 2, and the fixture heavy-duty end 1 and fixture light-duty end 2 are reliably connected by a 16mm2 long 400mm copper wire 3, The structure of the heavy-duty end 1 of the fixture is the same as that of the light-duty end 2 of the fixture, but the size is different. The heavy-duty end 1 of the fixture is composed of a hook body 11, a metal bracket 12 and a lead screw 13. The bottom end of the hook body 11 has a hole 14, and a thread is arranged in the hole 14. After passing through the hole 14, the top end of the lead screw 13 is connected to the The metal holder 12 is fixedly connected together, the lead screw 13 can move up and down along the screw thread in the hole 14, the metal holder 12 moves up and down along the inner wall of the hook body 11 under the drive of the lead screw 13, and the top of the hook body 11 is installed with hoop15. Fixture light end 2 is made up of hook body 21, metal holder 22 and lead screw 23, and the bottom end of hook body 21 has hole 24, and thread is arranged in hole 24, and the top end of lead screw 23 passes through hole 24 and connects with The metal holder 22 is fixedly connected together, and the lead screw 23 can move up and down along the screw thread in the hole 24. The metal holder 22 moves up and down along the inner wall of the hook body 21 under the drive of the lead screw 23. The top of the hook body 21 is equipped with hoop 25. The heavy-duty end 1 of the fixture can be tightened on the crimping tube with an insulating operating rod, and the light-duty end 2 of the fixture can be tightened on the drain wire with an insulating operating rod to play a role in dredging the current.

本实用新型的使用方法如下: The using method of the present utility model is as follows:

作业人员站在距断引部位安全距离以外的铁塔上,首先用绝缘挑钩杆把卡具重型端1挂在压接管上,再用绝缘挑钩杆把底部丝杠13拧紧,然后同样把卡具轻型端2拧紧在引流线的连板根部,等待断引结束后,再用绝缘挑钩杆把卡具重型端1连同引流线一起拉至铁塔接地后绑扎牢固,最后直接用手取下过流卡具结束。 The operator stands on the iron tower which is beyond the safe distance from the lead-off part, first hangs the heavy-duty end 1 of the fixture on the crimping pipe with the insulating hook lever, then tightens the bottom lead screw 13 with the insulating hook lever, and then similarly tightens the clamp The light-duty end 2 of the fixture is tightened at the root of the connecting plate of the drain wire, and after the disconnection is completed, the heavy-duty end 1 of the fixture and the drain wire are pulled together to the tower grounding with the insulated hook rod, then tied firmly, and finally the over-current is directly removed by hand. The fixture is over.

Claims (1)

1.过流卡具,其特征在于包括有卡具重型端和卡具轻型端,卡具重型端与卡具轻型端之间通过铜线连接,所述的卡具重型端与卡具轻型端均是由钩体、金属托和丝杠组成的,钩体的底端开有孔,丝杠的顶端穿过孔后与金属托固定连接在一起,金属托在丝杠的带动下沿着钩体的内壁做上下运动,钩体的顶端安装有铁环。 1. The overcurrent fixture is characterized in that it includes a heavy-duty end of the fixture and a light-duty end of the fixture. The heavy-duty end of the fixture and the light-duty end of the fixture are connected by copper wires. The heavy-duty end of the fixture and the light-duty end of the fixture They are all composed of a hook body, a metal bracket and a lead screw. There is a hole at the bottom of the hook body. The top of the lead screw passes through the hole and is fixedly connected with the metal bracket. The inner wall of the hook body moves up and down, and an iron ring is installed on the top of the hook body.
CN 201220128161 2012-03-30 2012-03-30 Over-current clamping device Expired - Lifetime CN202534972U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN 201220128161 CN202534972U (en) 2012-03-30 2012-03-30 Over-current clamping device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN 201220128161 CN202534972U (en) 2012-03-30 2012-03-30 Over-current clamping device

Publications (1)

Publication Number Publication Date
CN202534972U true CN202534972U (en) 2012-11-14

Family

ID=47136130

Family Applications (1)

Application Number Title Priority Date Filing Date
CN 201220128161 Expired - Lifetime CN202534972U (en) 2012-03-30 2012-03-30 Over-current clamping device

Country Status (1)

Country Link
CN (1) CN202534972U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105870844A (en) * 2016-04-01 2016-08-17 云南电网有限责任公司临沧供电局 Arc extinction apparatus used for drainage wire electrified disconnection-connection operation of 35kV substation equipment and use method
CN110890715A (en) * 2019-12-19 2020-03-17 国网山东省电力公司烟台供电公司 Bypass drainage tool for live-line installation of power transmission line ground potential method and defect handling operation method thereof

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105870844A (en) * 2016-04-01 2016-08-17 云南电网有限责任公司临沧供电局 Arc extinction apparatus used for drainage wire electrified disconnection-connection operation of 35kV substation equipment and use method
CN105870844B (en) * 2016-04-01 2018-09-28 云南电网有限责任公司临沧供电局 The operational method of the arc-extinction device of disconnecting operation is charged for 35kV substation equipment drainage threads
CN110890715A (en) * 2019-12-19 2020-03-17 国网山东省电力公司烟台供电公司 Bypass drainage tool for live-line installation of power transmission line ground potential method and defect handling operation method thereof

Similar Documents

Publication Publication Date Title
CN201504054U (en) 10KV live working multifunctional insulation operating rod
CN106129666B (en) A kind of earthing clamp device
CN104505766B (en) The instrument and method of a kind of charged for replacement transformer station 500kV strain insulator strings
CN204651649U (en) Portable grounding wire device
CN202797769U (en) Tool for live replacement of insulator on portal pole side phase of 110kV line
CN102185267B (en) 66KV ground potential hot-line make-and-break bypassing method
CN204577993U (en) Cable drawing head
CN203732572U (en) Telescopic high-altitude wire clamp
CN207134729U (en) A kind of parallel groove clamp installation tool
CN104538890B (en) Method for electrified lead connection
CN201369505Y (en) 220KV isolating switch electrification direct-connection short jumper device
CN102916372B (en) 10kV multi-circuit lines on the same pole mesophase spherule wire lifting instrument
CN202712745U (en) Universal straight-line clamp for steel pipe pole tower head
CN205248698U (en) Join in marriage special fast -assembling fastener of net live working
CN103367944A (en) Power transmission overhead line steering grounding device
CN203339323U (en) Power transmission overhead line turning and grounding device
CN204834927U (en) Transmission line live working divides streamline temporarily
CN203406589U (en) Concrete pole grounding lead wire protecting apparatus
CN203398349U (en) Auxiliary device of ground wire installation
CN201904450U (en) Grounding wire device operated by long handle
CN201639196U (en) Insulating tool set
CN204497668U (en) Distribution line foreign matter insulation remover
CN204257856U (en) A kind of improvement type Universal grounding device
CN204391606U (en) The manual pulling ling making device in a kind of high-altitude
CN104201611B (en) UHVDC Transmission Lines change tangent tower wire clamp tool

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CX01 Expiry of patent term
CX01 Expiry of patent term

Granted publication date: 20121114