CN102608562A - Integrated detection production line of electric energy meter, terminal and concentrator - Google Patents

Integrated detection production line of electric energy meter, terminal and concentrator Download PDF

Info

Publication number
CN102608562A
CN102608562A CN2012101032405A CN201210103240A CN102608562A CN 102608562 A CN102608562 A CN 102608562A CN 2012101032405 A CN2012101032405 A CN 2012101032405A CN 201210103240 A CN201210103240 A CN 201210103240A CN 102608562 A CN102608562 A CN 102608562A
Authority
CN
China
Prior art keywords
terminal
pallet
electric energy
energy meter
concentrator
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN2012101032405A
Other languages
Chinese (zh)
Other versions
CN102608562B (en
Inventor
李建忠
黄洋界
刘水
王爱民
赵震宇
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
State Grid Corp of China SGCC
Electric Power Research Institute of State Grid Jiangxi Electric Power Co Ltd
Original Assignee
Electric Power Research Institute of State Grid Jiangxi Electric Power Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Electric Power Research Institute of State Grid Jiangxi Electric Power Co Ltd filed Critical Electric Power Research Institute of State Grid Jiangxi Electric Power Co Ltd
Priority to CN 201210103240 priority Critical patent/CN102608562B/en
Publication of CN102608562A publication Critical patent/CN102608562A/en
Application granted granted Critical
Publication of CN102608562B publication Critical patent/CN102608562B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Investigating Or Analyzing Materials By The Use Of Electric Means (AREA)
  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)

Abstract

The invention discloses an integrated detection production line of an electric energy meter, a terminal and a concentrator, wherein construction members of an automatic verification production line of a three-phase electric energy meter, an automatic verification production line of the terminal and an automatic verification production line of the concentrator are integrated into a whole, and construction member main bodies of a verification production line are shared, such as the components of a feeding machine, a mechanical drive conveying machine, a material discharge machine, an image recognition seal device, a labeling machine, a power source, and a standard meter. An appliance tray provided by the invention consists of a tray (1), a tray auxiliary terminal (a functional terminal) wiring column (2), a tray pressing and fastening mechanism (3), a positioning and fastening piece (4) and a wiring column of tray main wiring (5). According to the appliance tray special for the electric energy meter, the terminal and the concentrator provided by the invention, elastic wiring columns which are fit with the wiring terminals of the electric energy meter, the terminal and the concentrator are respectively arranged at wiring sides of each tray, and fastening pieces are arranged at the opposite side of a tray wiring box. The integrated detection production line of the electric energy meter, the terminal and the concentrator provided by the invention is suitable for being used for the integrated detection production line of the electric energy meter, the terminal and the concentrator.

Description

Electric energy meter, terminal, the integrated detection streamline of concentrator
 
Technical field
The present invention relates to electric energy meter, terminal, the integrated detection streamline of concentrator, belong to the electric-power metering technical field.
Background technology
State Grid Corporation of China carries out " big marketing " system construction, and each electric energy meter, terminal, concentrator of netting province company all will concentrate on the employing automatic Verification streamline calibrating of each province measurement centre; Arrival to be checked with examine and determine the measurement instruments such as electric energy meter that finish and will realize intelligent storage; The whole province's measurement instrument will be carried out unified dispensing, and each is netted province company and is all implementing this work.The perform region of respectively netting province measurement centre at present is divided into several sections: the one, and the production scheduling control zone; The 2nd, the intelligent storage district, be used to store in a warehouse with the intelligent management arrival to be checked with examined and determine the measurement instruments such as electric energy meter that finish.The 3rd, the calibrating district is used for the calibrating of measurement instruments such as the whole province's electric energy meter, terminal and concentrator.
The calibrating district is divided into again: (1) single-phase electric energy meter automatic Verification streamline; (2) three-phase electric energy meter automatic Verification streamline; (3) terminal automatic Verification streamline; (4) several operating areas independently separately such as concentrator automatic Verification streamline, because measurement instrument adopts the whole province to concentrate calibrating, quantity is bigger, therefore above each regional floor area all needs more than 600 square metres; The investment of every automatic Verification streamline is all more than ten million yuan.Though the object that every automatic Verification streamline in calibrating district is detected is different with function; Single-phase electric energy meter automatic Verification streamline is different with the power source of three-phase electric energy meter automatic Verification streamline; But the member body of three-phase electric energy meter automatic Verification streamline, terminal automatic Verification streamline, concentrator automatic Verification streamline; As the composition members such as power source of each feed mechanism, mechanical drive conveying, cutting agency, image recognition seal, decals and unit all are, connection terminal, wiring footnote and the wiring of component portion branch different just electric energy meter, terminal and concentrators are different.Also have the calibrating flow process of each bar automatic Verification streamline also to be basically identical, specific as follows:
Corresponding automatic transmission facilities has been installed in each automatic calibration district, can electric energy meter to be detected, terminal, concentrator be put into the calibrating pipeline from the hopper taking-up automatically and expect hopper; Press the job requirements of automatic calibration, electric energy meter, terminal, concentrator are carried to next operating area from the zone that has fulfiled assignment; Automatic connection is carried out in electric energy meter, terminal, concentrator and connection table holder and taken out stitches through automation equipment; Carry out accuracy requirement test, measuring repeatability test and functional test according to national metrological verification regulations and State Grid Corporation of China's calibrating standard; Also can accomplish plug-in card process with CPU card or radio-frequency card insertion electric energy meter deck; The electric energy meter programming that the electric energy meter parameter is provided with through communication modes such as infrared or RS485; The calibrating streamline also has image identification function can be through industrial camera to the electric energy meter sampling of taking pictures; And utilize computing machine that image is handled, analyzes, compared and understands, whether meet the requirements to judge electric energy meter outward appearance, nameplate sign and liquid crystal, pilot lamp; The calibrating streamline also has seal, decals function, for preventing that unauthorized people from programming to electric energy meter or the game clock operation, utilizes robotization to seal up equipment, and the his-and-hers watches meter is sealed up automatically.Utilize automation equipment that the conformity certification of printing is pasted on electric energy meter automatically.Because electric energy meter, terminal, concentrator be arrival simultaneously not generally, three-phase electric energy meter automatic Verification streamline, terminal automatic Verification streamline, concentrator automatic Verification streamline be oepration at full load simultaneously.
By on can know that the member body of three-phase electric energy meter automatic Verification streamline, terminal automatic Verification streamline, concentrator automatic Verification streamline is a basically identical, workflow is also totally similar.If these three automatic Verification streamlines are synthesized one, the member body of shared calibrating streamline is like assemblies such as feeder, mechanical drive conveyor, blanking machine, image recognition Sealing stamper, labelling machine and power sources.Examine and determine different measurement instruments and call the Different software control function.Can save floor occupying area like this more than at least 1200 square metres, practice thrift investment above 30,000,000 yuan.Can improve simultaneously the calibrating efficient of automatic Verification streamline greatly.
Summary of the invention
The objective of the invention is; A kind of electric energy meter, terminal, the integrated detection streamline of concentrator are disclosed; The member of three-phase electric energy meter automatic Verification streamline, terminal automatic Verification streamline, concentrator automatic Verification streamline is synthesized one, and the member body of shared calibrating streamline also comprises assemblies such as feeder, mechanical drive conveyor, blanking machine, image recognition Sealing stamper, labelling machine, power source and standard scale.The automatic Verification streamline can be tested and functional test each item that electric energy meter, terminal, concentrator carry out requirement according to national metrological verification regulations and State Grid Corporation of China's calibrating standard.
Technical scheme of the present invention is; A kind of electric energy meter of the present invention, terminal, the integrated detection streamline of concentrator; Comprise assemblies such as feeder, mechanical drive conveyor, blanking machine, image recognition Sealing stamper, labelling machine, power source and standard scale; What said detection streamline loaded measured object electric energy meter, terminal, concentrator is a kind of special implement pallet; Detect streamline through adopting this special implement pallet, can the member of three-phase electric energy meter automatic Verification streamline, terminal automatic Verification streamline, concentrator automatic Verification streamline be synthesized one.
Utensil pallet of the present invention is made up of pallet 1, pallet auxiliary terminal (function terminal) binding post 2, pallet pressurization retention mechanism 3, location securing member 4, pallet main electrical scheme binding post 5; Electric energy meter (or terminal, concentrator) is placed at pallet middle part, by around location securing member and pallet pressurization retention mechanism electric energy meter (or terminal, concentrator) is fixed.After feeder is placed on electric energy meter, terminal, concentrator in the corresponding pallet; Its main and auxiliary connection terminal respectively with pallet on each main and auxiliary binding post corresponding; Pallet pressurization retention mechanism pressurizes the measurement instrument in the pallet to binding post, make the wiring contact more well, more reliable.
The profile of electric energy meter, terminal, concentrator is approaching; But connection terminal etc. still have difference; The present invention designs the pallet of electric energy meter, terminal, concentrator respectively; Various pallet connection sides are furnished with the elastic force binding post that matches with electric energy meter, terminal, concentrator connection terminal respectively, and pallet terminal box offside is furnished with securing member.After feeder is placed on electric energy meter, terminal or concentrator in the corresponding pallet; Main and auxiliary connection terminal on it respectively with pallet on each main and auxiliary binding post corresponding; The securing member of pallet pressurizes the measurement instrument in the pallet to binding post; Make wiring contact more well, more reliable, simultaneously the measurement instrument position is fixed.
The size of electric energy meter, terminal, concentrator basically identical on length and width; Therefore the external structure of these several kinds of pallets must be adapted at examining and determine transportation and operation on the streamline, but inside dimension must match with electric energy meter, terminal, concentrator size, location and placement respectively; Main electrical scheme (pressure-wire, electric current line) external interface through mutual inductor access type and direct access type pallet must be consistent, and the switching of circuit should realize in pallet; The weak electric signal line of pallet, 485 connections, pulse collection line etc. can adopt different interfaces to connect with the streamline body.
The beneficial effect of the present invention and prior art comparison is, can save floor occupying area more than at least 1200 square metres, practices thrift investment above 30,000,000 yuan.Can improve simultaneously the calibrating efficient of automatic Verification streamline greatly.
The present invention is applicable to that electric energy meter, terminal, the integrated detection streamline of concentrator use.
Description of drawings
Fig. 1 is a support holder structure synoptic diagram of the present invention;
Picture in picture number: the 1st, pallet; The 2nd, pallet auxiliary terminal (function terminal) binding post; The 3rd, pallet pressurization retention mechanism; The 4th, electric energy meter on the pallet (or terminal, concentrator) location securing member; The 5th, pallet main electrical scheme binding post; The 6th, seized electric energy meter (or seized terminal, concentrator);
Fig. 2 is the direct access type measurement instrument of a three-phase and four-line of the present invention pallet main wiring diagram;
Fig. 3 is that three-phase and four-line of the present invention is through voltage transformer (VT), current transformer measurement instrument pallet main wiring diagram;
Fig. 4 is that phase three-wire three of the present invention is through voltage transformer (VT), current transformer measurement instrument pallet main wiring diagram;
Fig. 5 is electric energy meter pallet auxiliary terminal of the present invention (function terminal) wiring diagram;
Fig. 6 is terminal tray auxiliary terminal of the present invention (function terminal) wiring diagram;
Fig. 7 is concentrator pallet auxiliary terminal of the present invention (function terminal) wiring diagram.
Embodiment
The specific embodiment of the invention is shown in accompanying drawing.
Shown in Figure 1 is the structural representation of embodiment of the invention utensil pallet, and the utensil pallet is made up of pallet 1, pallet auxiliary terminal (function terminal) binding post 2, pallet pressurization retention mechanism 3, location securing member 4, pallet main electrical scheme binding post 5; Electric energy meter (or terminal, concentrator) is placed at pallet middle part, by around location securing member and pallet pressurization retention mechanism electric energy meter (or terminal, concentrator) is fixed.After feeder is placed on electric energy meter, terminal, concentrator in the corresponding pallet; Its connection terminal respectively with pallet on each binding post corresponding; Pallet pressurization retention mechanism pressurizes the measurement instrument in the pallet to binding post, make the wiring contact more well, more reliable.
The embodiment of the invention comprises three types of measurement instrument pallet main electrical scheme terminal structures and pallet auxiliary terminal structure; The wherein wiring diagram of three types of measurement instrument pallet main electrical scheme terminals such as Fig. 2 ~ shown in Figure 4, mainly contain the direct access type measurement instrument of three-phase and four-line pallet main electrical scheme, three-phase and four-line through voltage transformer (VT), current transformer measurement instrument pallet main electrical scheme, phase three-wire three through voltage transformer (VT), current transformer measurement instrument pallet main electrical scheme; Each all comprises electric energy meter, terminal, concentrator in these three types of measurement instruments.The wiring diagram of three appliances pallet auxiliary terminals (function terminal) such as Fig. 5 ~ shown in Figure 7, mainly contain electric energy meter pallet auxiliary terminal (function terminal) wiring, terminal tray auxiliary terminal (function terminal) wiring, concentrator pallet auxiliary terminal (function terminal) wiring.
The electric energy meter of the embodiment of the invention, terminal, the integrated detection streamline of concentrator divide 20 unit, and 20 epi-positions in each unit are totally 400 epi-positions.Each unit can be carried out the different detection task simultaneously, carries out electric energy meter such as first module and detects; Unit second carries out the terminal simultaneously and detects; Unit the 3rd carries out the detection of concentrator simultaneously
During detection, management software is issued to each detecting unit and each associated mechanisms with various tasks respectively, and mechanical arm is in place according to the pallet of each detection task with correspondence; Feeder is placed and is fixed on electric energy meter, terminal, concentrator on the corresponding pallet respectively again; Conveyer is transported to corresponding detecting unit with each pallet, and mechanical arm was connected the outlet connector of pallet after each pallet put in place with the streamline body, and each detecting unit can carry out detection test separately respectively.

Claims (2)

1. an electric energy meter, terminal, the integrated detection streamline of concentrator; Comprise feeder, mechanical drive conveyor, blanking machine, image recognition Sealing stamper, labelling machine, power source and standard scale assembly; It is characterized in that; What said detection streamline loaded measured object electric energy meter, terminal, concentrator is a kind of special implement pallet; Detect streamline through adopting this special implement pallet, can the member of three-phase electric energy meter automatic Verification streamline, terminal automatic Verification streamline, concentrator automatic Verification streamline be synthesized one;
Said special implement pallet is made up of tested article location securing member (4), pallet main electrical scheme binding post (5) on pallet (1), pallet auxiliary terminal (2), pallet pressurization retention mechanism (3), the pallet; Connection side is furnished with the elastic force binding post that matches with electric energy meter, terminal or concentrator connection terminal respectively, and pallet terminal box offside is furnished with securing member; After feeder is placed on electric energy meter, terminal or concentrator in the corresponding pallet; Main and auxiliary connection terminal on it respectively with pallet on each main and auxiliary binding post corresponding; The securing member of pallet pressurizes the measurement instrument in the pallet to binding post; Make wiring contact more well, more reliable, simultaneously the measurement instrument position is fixed.
2. a kind of electric energy meter according to claim 1, terminal, the integrated detection streamline of concentrator; It is characterized in that; The external structure of said pallet must be adapted at examining and determine transportation and operation on the streamline, but inside dimension must match with electric energy meter, terminal, concentrator size, location and placement respectively; Pressure-wire, electric current line external interface through mutual inductor access type and direct access type pallet must be consistent, and the switching of circuit should realize in pallet; The weak electric signal line of pallet, 485 connections, pulse collection line etc. can adopt different interfaces to connect with the streamline body.
CN 201210103240 2012-04-11 2012-04-11 Integrated detection production line of electric energy meter, terminal and concentrator Active CN102608562B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN 201210103240 CN102608562B (en) 2012-04-11 2012-04-11 Integrated detection production line of electric energy meter, terminal and concentrator

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN 201210103240 CN102608562B (en) 2012-04-11 2012-04-11 Integrated detection production line of electric energy meter, terminal and concentrator

Publications (2)

Publication Number Publication Date
CN102608562A true CN102608562A (en) 2012-07-25
CN102608562B CN102608562B (en) 2013-12-25

Family

ID=46526075

Family Applications (1)

Application Number Title Priority Date Filing Date
CN 201210103240 Active CN102608562B (en) 2012-04-11 2012-04-11 Integrated detection production line of electric energy meter, terminal and concentrator

Country Status (1)

Country Link
CN (1) CN102608562B (en)

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102955146A (en) * 2012-11-20 2013-03-06 辽宁省电力有限公司电力科学研究院 Device for measuring metering accuracy of intelligent meter in salt spray test box
CN103064055A (en) * 2013-01-08 2013-04-24 上海市电力公司 Single phase intelligent electric energy meter collector compatibility type automation verification system and method
CN103558575A (en) * 2013-10-29 2014-02-05 国家电网公司 Method for automatic verification system compatible with three-phase electric energy meters and electric information collection terminals
CN103950612A (en) * 2014-05-15 2014-07-30 国网上海市电力公司 Workpiece tray of two-size compatible terminal
CN104135405A (en) * 2014-07-31 2014-11-05 国家电网公司 A testing method for a special transformer III communication module dedicated to automatic verification system
CN104134341A (en) * 2014-07-31 2014-11-05 国家电网公司 Concentrator uplink channel detection method special for automated verification system
CN107167761A (en) * 2017-07-21 2017-09-15 威胜集团有限公司 A kind of special fixture tested for embedded electric energy meter

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
GB1454918A (en) * 1974-03-27 1976-11-10 Post Office Electrical connectors
JP2010038767A (en) * 2008-08-06 2010-02-18 Nippon Denki Keiki Kenteisho Automatic wire connection device for electric instrument
CN201532458U (en) * 2009-10-15 2010-07-21 郑州三晖电气股份有限公司 Electric energy meter tray
CN101923149A (en) * 2009-06-12 2010-12-22 郑州三晖电气股份有限公司 Positioning and wiring mechanism of electric energy meter
CN201796139U (en) * 2010-07-15 2011-04-13 刘军海 Meter connecting seat for three-phase electric energy meter calibrating device

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
GB1454918A (en) * 1974-03-27 1976-11-10 Post Office Electrical connectors
JP2010038767A (en) * 2008-08-06 2010-02-18 Nippon Denki Keiki Kenteisho Automatic wire connection device for electric instrument
CN101923149A (en) * 2009-06-12 2010-12-22 郑州三晖电气股份有限公司 Positioning and wiring mechanism of electric energy meter
CN201532458U (en) * 2009-10-15 2010-07-21 郑州三晖电气股份有限公司 Electric energy meter tray
CN201796139U (en) * 2010-07-15 2011-04-13 刘军海 Meter connecting seat for three-phase electric energy meter calibrating device

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
刘水 等: "电力负荷管理终端及电能表一体化检测装置的研究", 《电测与仪表》, vol. 46, no. 523, 25 July 2009 (2009-07-25) *

Cited By (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102955146A (en) * 2012-11-20 2013-03-06 辽宁省电力有限公司电力科学研究院 Device for measuring metering accuracy of intelligent meter in salt spray test box
CN103064055A (en) * 2013-01-08 2013-04-24 上海市电力公司 Single phase intelligent electric energy meter collector compatibility type automation verification system and method
CN103558575A (en) * 2013-10-29 2014-02-05 国家电网公司 Method for automatic verification system compatible with three-phase electric energy meters and electric information collection terminals
CN103950612A (en) * 2014-05-15 2014-07-30 国网上海市电力公司 Workpiece tray of two-size compatible terminal
CN103950612B (en) * 2014-05-15 2016-08-31 国网上海市电力公司 A kind of tray for work pieces of compatible two kinds of size terminal
CN104135405A (en) * 2014-07-31 2014-11-05 国家电网公司 A testing method for a special transformer III communication module dedicated to automatic verification system
CN104134341A (en) * 2014-07-31 2014-11-05 国家电网公司 Concentrator uplink channel detection method special for automated verification system
CN104135405B (en) * 2014-07-31 2017-07-28 国家电网公司 A kind of special communication module method of testing of special change III of automatic calibration system
CN107167761A (en) * 2017-07-21 2017-09-15 威胜集团有限公司 A kind of special fixture tested for embedded electric energy meter

Also Published As

Publication number Publication date
CN102608562B (en) 2013-12-25

Similar Documents

Publication Publication Date Title
CN102608562B (en) Integrated detection production line of electric energy meter, terminal and concentrator
CN103344895A (en) Automatic verification system of low-voltage current transformer
CN102721940A (en) Fully compatible three-phase intelligent electricity meter full-automatic verification system
CN103064055A (en) Single phase intelligent electric energy meter collector compatibility type automation verification system and method
CN201387482Y (en) Automatic holographic management system integrating electric energy meter verification and storage management
CN109212460B (en) Communication unit detection tool and detection method
CN104216328A (en) Sensor automatic test system
CN107561474B (en) Metering equipment detecting system
CN203849400U (en) Intelligent ammeter carrier wave communication module dynamic power consumption detector
CN203149108U (en) Single-phase intelligent electric energy meter collector compatible-type automation verification system
CN202501914U (en) Airport baggage measuring device
CN109683120A (en) A kind of single-phase cost-control intelligent table and its method of calibration with remote verification module
CN102298135A (en) Artificial verification system
CN202995022U (en) Electric energy meter wiring and disconnecting device
CN204726783U (en) A kind of device based on detecting labelling machine leakage labeling
CN109212390B (en) Withstand voltage test sorting device of rectifier bridge
CN207281268U (en) Measuring equipment detecting system
CN201417296Y (en) Indicator integrated circuit test device
CN207198269U (en) Reactor on-line checking automation equipment
CN202713800U (en) Bulk material automatic chip-mounting tool used for spacecraft electronic products
CN206531951U (en) Single-phase electric energy meter with fault simulating function
CN204882850U (en) A 0. 02 grade of miniature standard electric energy meter that is used for single -phase intelligent ammeter verification system repeatability experimental
CN202281834U (en) Artificial verification system
CN207752060U (en) A kind of electric energy meter multi-epitope meter adapting-seat
CN206740957U (en) A kind of laser positioning ammeter compatibility connecting device

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
ASS Succession or assignment of patent right

Owner name: STATE GRID CORPORATION OF CHINA

Effective date: 20121207

C41 Transfer of patent application or patent right or utility model
TA01 Transfer of patent application right

Effective date of registration: 20121207

Address after: 330009 No. 88 min Qiang Road, private science and Technology Park, Jiangxi, Nanchang

Applicant after: JIANGXI ELECTRIC POWER SCIENCE Research Institute

Applicant after: State Grid Corporation of China

Address before: 330009 No. 88 min Qiang Road, private science and Technology Park, Jiangxi, Nanchang

Applicant before: JIANGXI ELECTRIC POWER SCIENCE Research Institute

C14 Grant of patent or utility model
GR01 Patent grant
ASS Succession or assignment of patent right

Owner name: STATE GRID CORPORATION OF CHINA

Free format text: FORMER OWNER: STATE GRID JIANGXI ELECTRIC POWER RESEARCH INSTITUTE

Effective date: 20140902

Owner name: STATE GRID JIANGXI ELECTRIC POWER RESEARCH INSTITU

Free format text: FORMER OWNER: STATE GRID CORPORATION OF CHINA

Effective date: 20140902

C41 Transfer of patent application or patent right or utility model
C56 Change in the name or address of the patentee

Owner name: STATE GRID JIANGXI ELECTRIC POWER RESEARCH INSTITU

Free format text: FORMER NAME: JIANGXI ELECTRIC POWER SCIENCE ACADEMY

COR Change of bibliographic data

Free format text: CORRECT: ADDRESS; FROM: 330009 NANCHANG, JIANGXI PROVINCE TO: 100761 DONGCHENG, BEIJING

CP01 Change in the name or title of a patent holder

Address after: 330009 No. 88 min Qiang Road, private science and Technology Park, Jiangxi, Nanchang

Patentee after: JIANGXI ELECTRIC POWER SCIENCE Research Institute

Patentee after: State Grid Corporation of China

Address before: 330009 No. 88 min Qiang Road, private science and Technology Park, Jiangxi, Nanchang

Patentee before: JIANGXI ELECTRIC POWER SCIENCE Research Institute

Patentee before: State Grid Corporation of China

TR01 Transfer of patent right

Effective date of registration: 20140902

Address after: 100761 West Chang'an Avenue, Beijing, No. 86

Patentee after: State Grid Corporation of China

Patentee after: JIANGXI ELECTRIC POWER SCIENCE Research Institute

Address before: 330009 No. 88 min Qiang Road, private science and Technology Park, Jiangxi, Nanchang

Patentee before: JIANGXI ELECTRIC POWER SCIENCE Research Institute

Patentee before: State Grid Corporation of China

TR01 Transfer of patent right

Effective date of registration: 20180724

Address after: 330096 No. 88, min Qiang Road, private science and Technology Park, Nanchang, Jiangxi

Co-patentee after: State Grid Corporation of China

Patentee after: STATE GRID JIANGXI ELECTRIC POWER COMPANY LIMITED Research Institute

Address before: No. 86, West Chang'an Avenue, Beijing City, Beijing

Co-patentee before: JIANGXI ELECTRIC POWER SCIENCE Research Institute

Patentee before: State Grid Corporation of China

TR01 Transfer of patent right