CN202281834U - Artificial verification system - Google Patents

Artificial verification system Download PDF

Info

Publication number
CN202281834U
CN202281834U CN2011202622951U CN201120262295U CN202281834U CN 202281834 U CN202281834 U CN 202281834U CN 2011202622951 U CN2011202622951 U CN 2011202622951U CN 201120262295 U CN201120262295 U CN 201120262295U CN 202281834 U CN202281834 U CN 202281834U
Authority
CN
China
Prior art keywords
electric energy
energy meter
calibrating
verification system
control
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
CN2011202622951U
Other languages
Chinese (zh)
Inventor
姜雪明
王炜
张燕
吴坚
肖涛
周永佳
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
State Grid Zhejiang Electric Power Co Ltd
Zhejiang Electric Power Co
Original Assignee
Zhejiang Electric Power Co
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Zhejiang Electric Power Co filed Critical Zhejiang Electric Power Co
Priority to CN2011202622951U priority Critical patent/CN202281834U/en
Application granted granted Critical
Publication of CN202281834U publication Critical patent/CN202281834U/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Images

Landscapes

  • General Factory Administration (AREA)

Abstract

At present, in an artificial verification process, meters needing to be verified/detected are conveyed to designated areas of various verification device by an automatic conveying way, but processes such as material loading, wire connecting and disconnecting, material unloading, wiring meter cover coating, sealing, certification pasting, packing and so on still need to be performed artificially, i.e., there are a large number of repetitive and mechanical works, thus the present artificial verification process has the disadvantages of high labor intensity, limited efficiency, and untimely supply of productive task. An artificial verification system of the utility model comprises a pressure-resistant device and a verification device, and is characterized in that: the artificial verification system also comprises a conveying line of which one end is used for connecting a warehousing system, a temporary storage platform which is connected with the other end of the conveying line, an automatic guided vehicle used for moving between the temporary storage platform and the various devices in order to convey meter boxes, an automatic sealing and marking device used for automatically sealing and marking the qualified meters, and a production scheduling platform used for unifiedly scheduling and managing the meters. By adopting the automatic control technology, the artificial verification system of the utility model has the advantages of comprehensively raising a verification/detection working efficiency, reducing labor intensity, etc.

Description

Artificial verification system
Technical field
The utility model relates to a kind of artificial verification system.
Background technology
The electric energy metering device of electric system electric energy metrical technical body is examined and determine robotization, the intellectuality that has realized the calibrating overall process in batches at present; But full performance sampling test, supply of material back warehouse-in sampling Detection before the supply of material of electric energy metering device; Its test item is various as requested, test is consuming time, still need be through artificial calibrating; The bug list and the client of electric energy metering device appearance when operation simultaneously have the query table need send laboratory qualification/calibrating back to, and evaluation/verification process needs to analyze while observing, still need be through artificial evaluation/calibrating.Though the table meter that artificial at present calibrating will have been examined and determine/detect through automatic transmission mode is transported to each calibrating installation appointed area; But still need through artificial material loading, connect take out stitches, blanking, lid connection table lid, seal, subsides conformity certification, vanning etc.; Exist a large amount of repetitions, mechanical work; Labour intensity is high, and efficient is restricted.Though simultaneously verification task is assigned through the power marketing infosystem, lacks unified production scheduling platform, production task can not accomplish promptly to need promptly to supply, when plant failure or uncomfortable need of personnel counted Hui Ku once more with the material object table, the work flow rollback.
The utility model content
The technical matters that the utility model will solve and the technical assignment of proposition are that the prior art scheme is improved and improved, and a kind of artificial verification system is provided, to reach the purpose of low-intensity, high-level efficiency detection.For this reason, the utility model is taked following technical scheme.
Artificial verification system; Comprise pressure-resistant apparatus, calibrating installation; It is characterized in that: it comprises that also an end is used for the pipeline that is connected with warehousing system, the temporary storage platform that is connected with the pipeline other end, is used to travel to and fro between temporary storage platform and each device in the automatic guided vehicle of conveying box table and be used for eligible list is sealed up and the sealing up marking device automatically and be used for the production scheduling platform that his-and-hers watches are counted uniform dispatching, management of mark automatically.Temporary storage platform and each pressure-resistant apparatus, calibrating installation are set, seal up route between the mark equipment automatically; Automatic guided vehicle is travelled to and fro between between temporary storage platform and each device by the route that is provided with the case table of each cargo handling operation is carried; Reduce labour intensity, realized automatic charging, blanking.The production scheduling platform of setting up makes production task promptly need promptly to supply, and is convenient to production management; Automatically seal up marking device and reduce a large amount of, repetition, mechanical work.The present technique scheme is improved the distributed artificial calibrating mode of tradition; Adopt centralized arrangement, uniform dispatching, centralized control; Through the production scheduling platform verification task is carried out uniform dispatching, through automatic conveying equipment---automatic guided vehicle is realized promptly needing promptly to supply the real time job process monitoring; Analyze and grasp production status and production production capacity, accomplish that production management becomes more meticulous.Improve electric energy metering device a large amount of repeatability, mechanical manual work in calibrating/testing process simultaneously; Adopt automatic control technology; The realization electric energy metering device is sealed up mark work automatically, has comprehensive raising calibrating, reduces advantages such as labour intensity.
As the further of technique scheme improved and replenish, the utility model also comprises following additional technical feature.
Described pressure-resistant apparatus and calibrating installation be equipped with the band cylinder connect its string-removing mechanism and be used to control connect its string-removing mechanism action connect its string-removing mechanism control module, the described action his-and-hers watches meter of its string-removing mechanism control module through control cylinder that connect connects and takes out stitches.Adopt the automatic connection mode, improve the efficient of artificial calibrating and the security of work.
Described calibrating installation comprises transformer calibrating device, electric energy meter calibrating apparatus, and described pressure-resistant apparatus comprises mutual inductor pressure-resistant apparatus, electric energy meter pressure-resistant apparatus.
Electric energy meter calibrating apparatus comprise be used to install calibrating software with control test equipment and processing and detecting result's computing machine, be used to take place the time clock of constant frequency the standard time clock appearance, be standard electric energy meter and seized electric energy meter the program control source of three-phase that three-phase current and voltage are provided, as the standard electric energy meter with reference to electric energy meter of seized electric energy meter; Be used for according to standard electric energy meter and standard time clock appearance calculate tested electric energy meter error Error Calculator, be used to test the seized consumption of boasting of one's bit of contribution the power consumption test appearance, be used to realize the communication module that the communication between computing machine and equipment, the seized electric energy meter connects; Described standard electric energy meter is for can measure active energy and reactive energy and export the standard electric energy meter of active energy pulse and reactive energy pulse simultaneously simultaneously.Standard electric energy meter is realized practicing thrift the calibrating time simultaneously to the idle synchronous verification of having of electric energy meter for measuring active energy and reactive energy simultaneously and exporting the standard electric energy meter of active energy pulse and reactive energy pulse simultaneously, increases work efficiency.
The shared standard time clock appearance of a plurality of electric energy meter calibrating apparatus; The drive plate that the output terminal connection one of standard time clock appearance is used for high-frequency impulse frequency division and shaping; A plurality of isolation switch boards that are used for electrical isolation that the output terminal of drive plate connects, the delivery outlet of isolating switch boards is connected with calibrating installation after isolating, to give each calibrating installation so that electric energy meter calibrating apparatus is shared a standard time clock appearance with sub-frequency clock signal.The shared standard time clock appearance of electric energy meter calibrating apparatus; Realize the clock system centralized control; Need on every cover calibrating installation, not dispose independent standard clock appearance; Reduce cost of investment and maintenance cost, solved the loaded down with trivial details task that need the standard time clock appearance of each matched with devices be inspected by ready samples one by one every year, only needed censorship one cover standard time clock appearance and supporting drive plate thereof; In the concentrated electric energy meter calibrating apparatus, owing to only need the punctual clock appearance of a station symbol, equipment cost is low, even adopt the high accuracy clock appearance with raising calibrating accuracy, degree of stability, and the corresponding increase of its cost, but whole cost still obviously descends.
Described production scheduling platform is provided with task and arranges module, calibrating or detect operation Coordination module, warehousing and storage activities Coordination module, monitoring management module and query statistic analysis module to realize task arrangement, calibrating or to detect operation coordination, warehousing and storage activities coordination, monitoring management and relevant inquiring function of statistic analysis.
Described pressure-resistant apparatus is provided with control, project test and the unusual control that the withstand voltage test module is used for program control source and reports to the police, described withstand voltage test module be installed in the PC or the PLC single-chip microcomputer in.
Described calibrating installation is provided with control, project test and the unusual control that assay module is used for program control source and reports to the police, described assay module be installed in the PC or the PLC single-chip microcomputer in.
Beneficial effect: be to have adopted to seal up the mark technology automatically 1,, realize sealing up automatically and the junction of the edges of two sheets of paper mark function of calibrating information between seal and watchcase of seal; 2, adopt air pressure connection and ripping to control automatically, realize artificial calibrating operation automatic connection, take out stitches; 3, the shared standard time clock appearance of electric energy meter calibrating apparatus is realized the clock system centralized control, need on every cover calibrating installation, not dispose independent standard clock appearance, has reduced cost of investment and maintenance cost; 4, be to adopt idle synchronous verification is arranged, can effectively practice thrift the calibrating time, increase work efficiency; 5, be to adopt the production scheduling platform,, realize promptly needing promptly to supply, in real time monitoring task process, grasp production status and production production capacity examining and determine operation and warehousing and storage activities united and coordinating.
Description of drawings
Fig. 1 is the theory diagram of the utility model.
Fig. 2 is the process flow diagram of the utility model.
Embodiment
Below in conjunction with Figure of description the technical scheme of the utility model is done further detailed description.
As shown in Figure 1; The utility model comprises that pressure-resistant apparatus, calibrating installation, an end are used for the pipeline that is connected with warehousing system, the temporary storage platform that is connected with the pipeline other end, is used to travel to and fro between temporary storage platform and each device in the automatic guided vehicle of conveying box table and be used for eligible list is sealed up and the sealing up marking device automatically and be used for the production scheduling platform that his-and-hers watches are counted uniform dispatching, management of mark automatically.Wherein, pressure-resistant apparatus and calibrating installation be equipped with the band cylinder connect its string-removing mechanism and be used to control connect its string-removing mechanism action connect its string-removing mechanism control module, connect the action his-and-hers watches meter of its string-removing mechanism control module through control cylinder and connect and take out stitches.Calibrating installation comprises transformer calibrating device, electric energy meter calibrating apparatus, and pressure-resistant apparatus comprises mutual inductor pressure-resistant apparatus, electric energy meter pressure-resistant apparatus.
Electric energy meter calibrating apparatus comprise be used to install calibrating software with control test equipment and processing and detecting result's computing machine, be used to take place the time clock of constant frequency the standard time clock appearance, be standard electric energy meter and seized electric energy meter the program control source of three-phase that three-phase current and voltage are provided, as the standard electric energy meter with reference to electric energy meter of seized electric energy meter; Be used for according to standard electric energy meter and standard time clock appearance calculate tested electric energy meter error Error Calculator, be used to test the seized consumption of boasting of one's bit of contribution the power consumption test appearance, be used to realize the communication module that the communication between computing machine and equipment, the seized electric energy meter connects; Standard electric energy meter is for can measure active energy and reactive energy and export the standard electric energy meter of active energy pulse and reactive energy pulse simultaneously simultaneously.
For reducing cost; The shared standard time clock appearance of a plurality of electric energy meter calibrating apparatus; The drive plate that the output terminal connection one of standard time clock appearance is used for high-frequency impulse frequency division and shaping; A plurality of isolation switch boards that are used for electrical isolation that the output terminal of drive plate connects, the delivery outlet of isolating switch boards is connected with calibrating installation after isolating, to give each calibrating installation so that electric energy meter calibrating apparatus is shared a standard time clock appearance with sub-frequency clock signal.For improving calibration accuracy, the standard time clock appearance adopts 1 * 10 -8The high precision clock source, it exports to the shared clock source of drive plate as a plurality of electric energy meter calibrating apparatus through shielding line.
The production scheduling platform is provided with task and arranges module, calibrating or detect operation Coordination module, warehousing and storage activities Coordination module, monitoring management module and query statistic analysis module to realize task arrangement, calibrating or to detect operation coordination, warehousing and storage activities coordination, monitoring management and relevant inquiring function of statistic analysis.Pressure-resistant apparatus is provided with control, project test and the unusual control that the withstand voltage test module is used for program control source and reports to the police, the withstand voltage test module be installed in the PC or the PLC single-chip microcomputer in.Calibrating installation is provided with control, project test and the unusual control that assay module is used for program control source and reports to the police, assay module be installed in the PC or the PLC single-chip microcomputer in.
The course of work: as shown in Figure 2; The table case that warehousing system will be equipped with electric energy meter to be checked is put in temporary storage platform through pipeline; Table case on the temporary storage platform is delivered to pressure-resistant apparatus through automatic guided vehicle and is got into withstand voltage test; Carry out eligible list vanning and the vanning of defective table successively through the manual sorting after withstand voltage test is accomplished, the qualified case table of withstand voltage test is delivered to calibrating installation again and examines and determine; Carry out eligible list vanning and the vanning of defective table successively through the manual sorting again after calibrating is accomplished, qualified case table is delivered to and seals up marking device automatically, accomplishes sealing up and mark of eligible list meter again.The defective case table of each link is expired after one the case or the not trunkful after whole operation completion is delivered to the warehousing system storage.
Above Fig. 1, the artificial verification system shown in 2 are the specific embodiments of the utility model; The utility model substantive distinguishing features and progress have been embodied; Can be according to the use needs of reality; Under the enlightenment of the utility model, it is carried out the equivalent modifications of aspects such as shape, structure, all at the row of the protection domain of this programme.

Claims (7)

1. artificial verification system; Comprise pressure-resistant apparatus, calibrating installation; It is characterized in that: it comprises that also an end is used for the pipeline that is connected with warehousing system, the temporary storage platform that is connected with the pipeline other end, is used to travel to and fro between temporary storage platform and each device in the automatic guided vehicle of conveying box table and be used for eligible list is sealed up and the sealing up marking device automatically and be used for the production scheduling platform that his-and-hers watches are counted uniform dispatching, management of mark automatically.
2. artificial verification system according to claim 1; It is characterized in that: described pressure-resistant apparatus and calibrating installation be equipped with the band cylinder connect its string-removing mechanism and be used to control connect its string-removing mechanism action connect its string-removing mechanism control module, the described action his-and-hers watches meter of its string-removing mechanism control module through control cylinder that connect connects and takes out stitches.
3. artificial verification system according to claim 2 is characterized in that: described calibrating installation comprises transformer calibrating device, electric energy meter calibrating apparatus, and described pressure-resistant apparatus comprises mutual inductor pressure-resistant apparatus, electric energy meter pressure-resistant apparatus.
4. artificial verification system according to claim 3 is characterized in that: electric energy meter calibrating apparatus comprise be used to install calibrating software with control test equipment and processing and detecting result's computing machine, be used to take place the time clock of constant frequency the standard time clock appearance, be standard electric energy meter and seized electric energy meter the program control source of three-phase that three-phase current and voltage are provided, as the standard electric energy meter with reference to electric energy meter of seized electric energy meter; Be used for according to standard electric energy meter and standard time clock appearance calculate tested electric energy meter error Error Calculator, be used to test the seized consumption of boasting of one's bit of contribution the power consumption test appearance, be used to realize the communication module that the communication between computing machine and equipment, the seized electric energy meter connects; Described standard electric energy meter is for can measure active energy and reactive energy and export the standard electric energy meter of active energy pulse and reactive energy pulse simultaneously simultaneously.
5. artificial verification system according to claim 4; It is characterized in that: the shared standard time clock appearance of a plurality of electric energy meter calibrating apparatus; The drive plate that the output terminal connection one of standard time clock appearance is used for high-frequency impulse frequency division and shaping; A plurality of isolation switch boards that are used for electrical isolation that the output terminal of drive plate connects, the delivery outlet of isolating switch boards is connected with calibrating installation after isolating, to give each calibrating installation so that electric energy meter calibrating apparatus is shared a standard time clock appearance with sub-frequency clock signal.
6. artificial verification system according to claim 1; It is characterized in that: described pressure-resistant apparatus is provided with control, project test and the unusual control that the withstand voltage test module is used for program control source and reports to the police, described withstand voltage test module be installed in the PC or the PLC single-chip microcomputer in.
7. artificial verification system according to claim 1 is characterized in that: described calibrating installation is provided with control, project test and the unusual control that assay module is used for program control source and reports to the police, described assay module be installed in the PC or the PLC single-chip microcomputer in.
CN2011202622951U 2011-07-22 2011-07-22 Artificial verification system Expired - Lifetime CN202281834U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2011202622951U CN202281834U (en) 2011-07-22 2011-07-22 Artificial verification system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2011202622951U CN202281834U (en) 2011-07-22 2011-07-22 Artificial verification system

Publications (1)

Publication Number Publication Date
CN202281834U true CN202281834U (en) 2012-06-20

Family

ID=46227997

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2011202622951U Expired - Lifetime CN202281834U (en) 2011-07-22 2011-07-22 Artificial verification system

Country Status (1)

Country Link
CN (1) CN202281834U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102298135A (en) * 2011-07-22 2011-12-28 浙江省电力公司 Artificial verification system
CN105425191A (en) * 2015-12-16 2016-03-23 国网上海市电力公司 High-voltage transformer detection method and system

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102298135A (en) * 2011-07-22 2011-12-28 浙江省电力公司 Artificial verification system
CN105425191A (en) * 2015-12-16 2016-03-23 国网上海市电力公司 High-voltage transformer detection method and system

Similar Documents

Publication Publication Date Title
CN205177145U (en) Power consumption information acquisition test terminal
CN103064055A (en) Single phase intelligent electric energy meter collector compatibility type automation verification system and method
CN201464517U (en) Positioning and wiring mechanism for electric energy meter
CN102565747A (en) Automatic verification system and method for single-phase intelligent watt-hour meter
AU2011367734B2 (en) Electric quantity collection terminal function tester
CN203044368U (en) Transferring and loading mechanism for automatically sorting electric energy meters
CN102288935A (en) Electric energy meter calibration system
CN102298135A (en) Artificial verification system
CN202886589U (en) A six-position electric energy meter positioning and interfacing device
CN204731406U (en) A kind of intelligent electric energy meter fault sorting check device
CN205718933U (en) A kind of automated production detection equipment
CN111257820B (en) Three-phase intelligent electric meter wiring remote detection method
CN201732472U (en) Automatic testing device of concentrated electric energy meter reading equipment
CN103323686A (en) Smart power grid power quality analyzer
CN202948127U (en) Automatic verification system of intelligent ammeter
CN202281834U (en) Artificial verification system
CN203149108U (en) Single-phase intelligent electric energy meter collector compatible-type automation verification system
CN202886517U (en) Testing device of power distribution terminal
CN104950841A (en) Synergic scheduling method of large-scale intelligent ammeter automatic verification
CN206594266U (en) SIM card test device
CN106970263A (en) The efficiency metering system and metering method of a kind of electric vehicle alternating-current charging pile
CN112636460A (en) Transformer area line loss abnormal interval positioning system based on intelligent study and judgment
CN202066925U (en) Harmonic monitor of electric network
CN107295139A (en) Mainboard ATA automatization test systems
CN203178469U (en) Portable transmitter verification meter

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CX01 Expiry of patent term

Granted publication date: 20120620

CX01 Expiry of patent term