CN203149108U - Single-phase intelligent electric energy meter collector compatible-type automation verification system - Google Patents

Single-phase intelligent electric energy meter collector compatible-type automation verification system Download PDF

Info

Publication number
CN203149108U
CN203149108U CN 201320007987 CN201320007987U CN203149108U CN 203149108 U CN203149108 U CN 203149108U CN 201320007987 CN201320007987 CN 201320007987 CN 201320007987 U CN201320007987 U CN 201320007987U CN 203149108 U CN203149108 U CN 203149108U
Authority
CN
China
Prior art keywords
module
campatible
industrial computer
compatible
calibrating
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
CN 201320007987
Other languages
Chinese (zh)
Inventor
张晓颖
庄葛巍
周珺
范宗奇
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
State Grid Corp of China SGCC
Shanghai Municipal Electric Power Co
Shenzhen Clou Electronics Co Ltd
Original Assignee
State Grid Corp of China SGCC
Shanghai Municipal Electric Power Co
Shenzhen Clou Electronics Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by State Grid Corp of China SGCC, Shanghai Municipal Electric Power Co, Shenzhen Clou Electronics Co Ltd filed Critical State Grid Corp of China SGCC
Priority to CN 201320007987 priority Critical patent/CN203149108U/en
Application granted granted Critical
Publication of CN203149108U publication Critical patent/CN203149108U/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Images

Landscapes

  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)

Abstract

The utility model relates to a single-phase intelligent electric energy meter collector compatible-type automation verification system. The verification system comprises a PLC, and a roller conveyor line, a six degrees of freedom robot, a compatible-type verification conveyor line, a compatible-type identity identification module, a compatible-type high-voltage insulation test module, a compatible-type appearance inspection module, a compatible-type error and function verification module, a seal module, a compatible-type certification sticking module, and a sorting module connected with the PLC. The roller conveyor line, the six degrees of freedom robot, and the compatible-type verification conveyor line are connected in sequence. The compatible-type verification conveyor line is respectively connected with the compatible-type identity identification module, the compatible-type high-voltage insulation test module, the compatible-type appearance inspection module, the compatible-type error and function verification module, the seal module, the compatible-type certification sticking module, and the sorting module. Compared with the prior art, the system is advantaged by being compatible simultaneously to automatic verification of a single-phase intelligent electric energy meter and a collector, and improving working efficiency, etc.

Description

Single-phase intelligent electric energy meter collector Campatible automatic calibration system
Technical field
The utility model relates to a kind of electric system instrument automation verification system, especially relates to a kind of single-phase intelligent electric energy meter collector Campatible automatic calibration system.
Background technology
Still adopt traditional calibrating installation to examine and determine respectively mostly to the calibrating of electric energy meter, collector both at home and abroad, by manually finishing electric energy meter, collector information conforms, visual examination, voltage-withstand test, pocket watch and tearing table, error calibrating/functional test, subsides conformity certification open, calibrating efficient is low, labour intensity is big, the input cost height.
Continuous propelling along with Utilities Electric Co.'s intelligent grid " informationization; robotization; interactive " construction, State Grid Corporation of China has unified intelligent electric energy meter, the surface structure of collector, the size model, calibrating index and standard, and since 2009, intelligent electric energy meter, collector is by State Grid Corporation of China's centralized purchasing, economize measurement centre of net company by each then and unify storage, calibrating and dispensing, existing single-phase intelligent electric energy meter, collector calibrating mode can not adapt to the needs of intelligent grid fast development, and the efficient that solves in the calibrating of single-phase intelligent electric energy meter calibration and collector is low, the problem that labour intensity is big has expedited the emergence of the single-phase intelligent electric energy meter, the demand of collector automatic calibration.
Summary of the invention
The purpose of this utility model is exactly the single-phase intelligent electric energy meter collector Campatible automatic calibration system that provides a kind of compatible single-phase intelligent electric energy meter simultaneously and collector automatic Verification for the defective that overcomes above-mentioned prior art existence, increases work efficiency.
The purpose of this utility model can be achieved through the following technical solutions:
A kind of single-phase intelligent electric energy meter collector Campatible automatic calibration system, be connected with the main website server, comprise PLC and the drum conveying line that is connected with PLC respectively, the 6DOF robot, Campatible calibrating pipeline, the Campatible identification module, Campatible voltage-withstand test module, Campatible visual examination module, Campatible error and function assay module, the seal module, Campatible pastes conformity certification module and letter sorting module, described drum conveying line, the 6DOF robot is connected successively with Campatible calibrating pipeline, and described Campatible calibrating pipeline connects the Campatible identification module respectively, Campatible voltage-withstand test module, Campatible visual examination module, Campatible error and function assay module, the seal module, Campatible pastes conformity certification module and letter sorting module.
Described Campatible identification module comprises identification industrial computer, bar code scanner and RFID recognizer, and described identification industrial computer connects bar code scanner and RFID recognizer respectively;
Described Campatible voltage-withstand test module comprises voltage-withstand test industrial computer and the Hi-pot Tester that is connected with the voltage-withstand test industrial computer and leakage current tester;
Described Campatible visual examination module comprises visual examination industrial computer and second plug into mechanism, image acquisition device, voltage source and second alarm lamp that is connected with the visual examination industrial computer respectively;
Described Campatible error and function assay module comprise error and function calibrating industrial computer and the 3rd plug into mechanism, power source, standard scale, time reference source, multipath server and the 3rd alarm lamp of examining and determine that industrial computer is connected with error and function respectively;
Described seal module comprises seal industrial computer and first mechanical arm that is connected.
Described main website server via Ethernet is connected with PLC, identification industrial computer, voltage-withstand test industrial computer, visual examination industrial computer, error and function calibrating industrial computer, seal industrial computer and the communication of subsides conformity certification industrial computer respectively, and described identification industrial computer, voltage-withstand test industrial computer, visual examination industrial computer, error and function calibrating industrial computer, seal industrial computer and subsides conformity certification industrial computer all are connected with PLC.
The beneficial effect that the utility model compared with prior art brings is:
1, the utility model can be finished the single-phase intelligent electric energy meter, collector is transported to calibrating pallet, identification, voltage-withstand test, visual examination, error and function calibrating, seal, subsides conformity certification, letter sorting, vanning automatic calibration, the automatic calibration of compatible single-phase electric energy meter, collector simultaneously;
2, the abundant combination of the utility model collection automatic technology, Robotics, under the control of main website server, finish the calibrating of single-phase intelligent electric energy meter, collector automatically, need not manually-operated, increase work efficiency, reliability, reduce labour intensity greatly, reduce the cost.
Description of drawings
Fig. 1 is the structured flowchart of the utility model system;
Fig. 2 is drum conveying line structured flowchart of the present utility model;
Fig. 3 is 6DOF robot architecture block diagram of the present utility model;
Fig. 4 is Campatible calibrating pipeline structured flowchart of the present utility model;
Fig. 5 is Campatible identification module structured flowchart of the present utility model;
Fig. 6 is Campatible voltage-withstand test modular structure block diagram of the present utility model;
Fig. 7 is Campatible visual examination modular structure block diagram of the present utility model;
Fig. 8 is Campatible error of the present utility model and function assay module structured flowchart;
Fig. 9 is seal modular structure block diagram of the present utility model;
Figure 10 is that Campatible of the present utility model pastes conformity certification modular structure block diagram;
Figure 11 is letter sorting modular structure block diagram of the present utility model.
Embodiment
Below in conjunction with the drawings and specific embodiments the utility model is elaborated.Present embodiment is that prerequisite is implemented with technical solutions of the utility model, provided detailed embodiment and concrete operating process, but protection domain of the present utility model is not limited to following embodiment.
Embodiment
Single-phase intelligent electric energy meter collector Campatible automatic calibration system as shown in Figure 1, be connected with main website server 12, comprise: PLC1 and the drum conveying line 2 that is connected with PLC1 respectively, 6DOF robot 3, Campatible calibrating pipeline 4, Campatible identification module 5, Campatible voltage-withstand test module 6, Campatible visual examination module 7, Campatible error and function assay module 8, seal module 9, Campatible paste conformity certification module 10 and letter sorting module 11; At PLC1, drum conveying line 2,6DOF robot 3, Campatible calibrating pipeline 4, Campatible identification module 5, Campatible voltage-withstand test module 6, Campatible visual examination module 7, Campatible error and function assay module 8, seal module 9, Campatible pastes conformity certification module 10, finish table to be checked under the cooperation of letter sorting module 11 and be transported to the calibrating pallet, identification, voltage-withstand test, visual examination, error and function calibrating, seal, paste conformity certification, letter sorting, the automatic calibration of vanning.Table to be checked is single-phase intelligent electric energy meter or collector.
Be illustrated in figure 2 as the structured flowchart of drum conveying line 2, comprise: first carries motor 21, conveying cylinder 22, first automatic catch to stop device 23 and the first jacking transfer machine 24; Drum conveying line starts the hopper of carrying motor will be loaded with intelligent electric energy meter to be checked, collector according to PLC instruction and is transported to the 6DOF robot and gets the epi-position retaining and stop, locate, get table for the 6DOF robot, the 6DOF robot is after hopper is filled in the vanning position simultaneously, sent instructions to PLC by the main website server, PLC index drum pipeline is carried Hui Ku with trunkful hopper jacking transfer.
Be illustrated in figure 3 as the structured flowchart of 6DOF robot 3, the 6DOF robot comprises: mounting seat 31, robot 32 and mechanical paw 33; The main website server is finished intelligent electric energy meter according to the calibrating of PLC, the ready information of collector calibrating pallet, sending instruction carries out intelligent electric energy meter for the 6DOF robot, the collector vanning, 6DOF robot control mechanical paw will be examined and determine the intelligent electric energy meter in the pallet, collector is transported to table hopper to be installed, simultaneously according to the to be checked intelligent electric energy meter of main website server according to PLC, the ready information of collector hopper, send instruction and get table for the 6DOF robot, 6DOF robot control mechanical paw is with the intelligent electric energy meter to be checked in the hopper, collector is transported to the calibrating pallet; The main website server is concentrated vanning according to defective table cache Data Control 6DOF robot with the defective table in defective table cache district.
Be illustrated in figure 4 as the structured flowchart of Campatible calibrating pipeline 4, comprise: second carries motor 41, conveying flat chain 42, Campatible pallet 43, second automatic catch to stop device 44 and the second jacking transfer machine 45; The main website server sends instruction according to the ready information of Campatible identification module, Campatible voltage-withstand test module, Campatible visual examination module, Campatible error and function assay module, seal module, subsides conformity certification module, letter sorting module and gives PLC, PLC starts calibrating pipeline conveying motor according to the instruction of main website server, and the calibrating pallet that will be loaded with intelligent electric energy meter, collector by conveying flat chain, jacking transfer is transported to designated module, keeps off and stop the location.
Be illustrated in figure 5 as the structured flowchart of Campatible identification module 5, comprise identification industrial computer 51, Campatible support 52, bar code scanner 53 and RFID recognizer 54; PLC control Campatible calibrating pipeline will examine and determine pallet and be transported to Campatible identification module retaining and stop locating, and will locate ready information and submit to the main website server, the main website server sends instruction according to ready information and gives identification industrial computer 51, industrial computer is identified intelligent electric energy meter to be checked by control software control bar code scanner, the collector bar code, RFID recognizer identification calibrating pallet, simultaneously with intelligent electric energy meter to be checked, the bar code number of collector, data relationship is set up with the RFID numbering of calibrating pallet in the position, and submits data message to the main website server.
Be illustrated in figure 6 as the structured flowchart of Campatible voltage-withstand test module 6, Campatible voltage-withstand test module comprises voltage-withstand test industrial computer 61, first cylinder 62, first plug into mechanism 63, Hi-pot Tester 64, leakage current tester 65 and first alarm lamp 66; PLC control Campatible calibrating pipeline will examine and determine pallet and be transported to Campatible voltage-withstand test module and keep off and stopping, the jacking location, controlling first mechanism that plugs into simultaneously plugs into automatically, and the ready information of will plugging into is submitted to the main website server, the main website server sends instruction according to ready information and gives the voltage-withstand test industrial computer, industrial computer is by control software startup Hi-pot Tester, the leakage current tester is to intelligent electric energy meter to be checked, collector carries out voltage-withstand test, control the state indication of first alarm lamp simultaneously, after voltage-withstand test is finished with test data according to intelligent electric energy meter, collector is preserved with the data message of calibrating pallet, and submits data message to the main website server.
Be illustrated in figure 7 as the structured flowchart of Campatible visual examination module 7, Campatible visual examination module comprises visual examination industrial computer 71, second cylinder 72, second plug into mechanism 73, voltage source 74, image acquisition device 75, second alarm lamp 76; PLC control Campatible calibrating pipeline will examine and determine pallet and be transported to Campatible visual examination module and keep off and stopping, the jacking location, controlling second mechanism that plugs into simultaneously plugs into automatically, and the ready information of will plugging into is submitted to the main website server, the main website server sends instruction according to ready information and gives the visual examination industrial computer, industrial computer is by controlling the software startup voltage source to intelligent electric energy meter, collector powers on, start image acquisition device to intelligent electric energy meter to be checked, collector liquid crystal stroke demonstration integrality is carried out image acquisition, and the image that will gather in real time carries out comparing with standard picture after the Region Segmentation, judge intelligent electric energy meter to be checked according to the visual examination scheme, collector visual examination result, control the state indication of second alarm lamp simultaneously, after visual examination is finished with the visual examination findings data according to intelligent electric energy meter, collector is preserved with the data message of calibrating pallet, and submits data message to the main website server.
Be illustrated in figure 8 as the structured flowchart of Campatible error and function assay module 8, Campatible error and function assay module comprise error and function calibrating industrial computer 81, the 3rd cylinder 82, the 3rd plug into mechanism 83, power source 84, Campatible signal shifter 85, time reference source 86, multipath server 87 and the 3rd alarm lamp 88; PLC control Campatible calibrating pipeline will examine and determine pallet and be transported to Campatible error and function assay module and keep off and stopping, the jacking location, controlling the 3rd mechanism that plugs into simultaneously plugs into automatically, and the ready information of will plugging into is submitted to the main website server, the main website server sends instruction to error and function calibrating industrial computer according to ready information, industrial computer is by control software startup power source, standard scale, the time reference source, multipath server is to intelligent electric energy meter, collector carries out error and function calibrating according to the calibrating scheme, control the state indication of the 3rd alarm lamp simultaneously, after error and function calibrating are finished error and function are examined and determine conclusion according to intelligent electric energy meter, collector is preserved with the data message of calibrating pallet, and submits data message to the main website server.
Be illustrated in figure 9 as the structured flowchart of seal module 9, the seal module comprises seal industrial computer 91, vibrating disk 92, first mechanical arm 93 and barcode scanner 94; PLC control Campatible calibrating pipeline will examine and determine pallet and be transported to the seal module and keep off and stopping, the jacking location, and will locate ready information and submit to the main website server, the main website server sends instruction according to ready information and gives the seal industrial computer, industrial computer is by the barcode scanner scanning 94 of control software startup and vibrating disk 95, starting first mechanical arm according to seal loam cake bar code gets the seal loam cake from vibrating disk and is installed on the seal base, simultaneously with seal loam cake barcode number and intelligent electric energy meter, the collector barcode number is set up data association message, submits the seal data association message to the main website server simultaneously.
Paste the structured flowchart of conformity certification module 10 as shown in figure 10 for Campatible, Campatible pastes the conformity certification module and comprises subsides conformity certification industrial computer 101, vacuum cup 102, second mechanical arm 103, four-cylinder 104 and coder 105; PLC control Campatible calibrating pipeline will examine and determine pallet and be transported to Campatible and paste that conformity certification module retaining stops, jacking is located, and will locate ready information and submit to the main website server, the main website server sends instruction according to ready information and gives subsides conformity certification industrial computer, the carrying of industrial computer control software startup second mechanical arm treats that decals intelligent electric energy meter, collector are to the decals position, start vacuum cup and draw conformity certification labeling subsides conformity certification, start coder and print conformity certification information according to the calibrating information that control software provides, submit the QED one-tenth information of applying lattice to the main website server simultaneously.
Be the structured flowchart of letter sorting module 11 as shown in figure 11, the letter sorting module comprises inductor 111, the 3rd mechanical arm 112 and support 113; PLC control Campatible calibrating pipeline will examine and determine pallet and be transported to the letter sorting module and keep off and stopping, the jacking location, the intelligent electric energy meter to be sorted that provides according to the main website server, the data message of collector calibrating pallet is controlled the 3rd mechanical arm with defective intelligent electric energy meter, collector is transported to defective table cache district, and the eligible list buffer area data message that provides according to the main website server fills the calibrating pallet from eligible list buffer area carrying eligible list, the information of will finishing is submitted the main website server to, sets up calibrating pallet and intelligent electric energy meter by the main website server, the data association message of collector.
Main website server 12 is connected with PLC1, identification industrial computer 51, voltage-withstand test industrial computer 61, visual examination industrial computer 71, error and function calibrating industrial computer 81, seal industrial computer 91 and 101 communications of subsides conformity certification industrial computer respectively by Ethernet, and described identification industrial computer 51, voltage-withstand test industrial computer 61, visual examination industrial computer 71, error and function calibrating industrial computer 81, seal industrial computer 91 and subsides conformity certification industrial computer 101 all are connected with PLC1.
Concrete steps during above-mentioned single-phase intelligent electric energy meter collector Campatible automatic calibration system calibrating comprise:
1) the main website server via Ethernet passes to PLC with verification task, and the Turnover Box that PLC index drum pipeline will be equipped with table to be checked is transported to gets table position to be checked and location;
2) the 6DOF robot gets table to be checked according to the main website server instruction getting table position to be checked, and it is transported to calibrating pallet on the Campatible calibrating pipeline, uploads to get table and finish information and give the main website server;
3) the main website server will be got table and finish information and issue PLC, and PLC control Campatible calibrating pipeline will be examined and determine pallet and flow to the Campatible identification module;
4) the identification industrial computer is gathered table bar code to be checked by instruction mode control bar code scanner, control RFID recognizer identification calibrating pallet simultaneously, and bar code and calibrating pallet set up corresponding relation, then submit table to be checked calibrating data message to, send identification to PLC and finish information to the main website server;
5) PLC finishes information control Campatible calibrating pipeline according to identification and will examine and determine pallet and flow to Campatible voltage-withstand test module, Campatible voltage-withstand test module starts Hi-pot Tester according to table calibrating data message to be checked and the leakage current tester carries out voltage-withstand test to table to be checked, the voltage-withstand test industrial computer was submitted the voltage-withstand test data to the main website server after voltage-withstand test was finished, and sent voltage-withstand test to PLC simultaneously and finished information;
6) PLC finishes information control Campatible calibrating pipeline according to voltage-withstand test and will examine and determine pallet and flow to Campatible visual examination module, Campatible visual examination module is judged the liquid crystal display image of table to be checked according to the table calibrating data message to be checked that the main website server provides, simultaneously the result is uploaded the main website server, and information is finished in visual examination issued PLC;
The liquid crystal display image of table to be checked judged is specially:
61) PLC starts the visual examination industrial computer, and visual examination industrial computer control second is plugged into mechanism automatically and Campatible calibrating pipeline is plugged into;
62) plug into finish after, visual examination industrial computer trigger voltage source powers on to table to be checked, starts image acquisition device simultaneously the liquid crystal display image of table to be checked is gathered, and the image of gathering is in real time carried out comparing with standard picture after the Region Segmentation;
63) after comparison was finished, the visual examination industrial computer was uploaded comparison result, controlled the state indication of second alarm lamp simultaneously according to comparison result;
7) PLC finishes information control Campatible calibrating pipeline according to visual examination table calibrating pallet to be checked is flowed to Campatible error and function assay module, Campatible error and function assay module are carried out error, function calibrating operation according to the table calibrating data message to be checked that the main website server provides to table to be checked, calibrating is uploaded the main website server with verification result when finishing, and information is finished in error and function calibrating issued PLC;
Table to be checked is carried out error, function calibrating operation to be specially: PLC starts error and function calibrating industrial computer, and error and function calibrating industrial computer are controlled the 3rd mechanism that plugs into and examined and determine pipeline with Campatible automatically and plug into; Plug into finish after, error and function calibrating industrial computer starting power source, standard scale, time reference source, multipath server carry out error and function calibrating to table to be checked according to verification task;
8) PLC according to error and function calibrating finish information control Campatible calibrating pipeline table calibrating pallet to be checked flowed to the seal module, the seal module is carried out the seal operation according to the table calibrating data message to be checked that the main website server provides to table to be checked, simultaneously the seal result is uploaded the main website server, and seal is finished information issue PLC;
Table to be checked is carried out the seal operation to be specially: PLC starts the seal industrial computer, the operation that seal industrial computer control mechanical arm is installed the seal base, scanned seal loam cake bar code, the seal loam cake is installed, is set up table bar code to be checked and seal bar code corresponding relation table to be checked;
9) PLC finishes information control Campatible calibrating pipeline according to seal and will examine and determine pallet and flow to Campatible subsides conformity certification module, Campatible pastes the conformity certification module and according to the table calibrating data message to be checked that the main website server provides table to be checked is pasted conformity certification, prints the calibrating information operating, to paste the conformity certification result simultaneously and upload the main website server, and the QED one-tenth information of applying lattice will be issued PLC;
10) PLC flows to the letter sorting module according to the QED one-tenth information control of applying lattice Campatible calibrating pipeline with table calibrating pallet to be checked, the letter sorting module sorts table to be checked according to the table calibrating data message to be checked that the main website server provides, simultaneously the result is uploaded the main website server, and information is finished in letter sorting issued PLC;
Table to be checked sorted be specially: the letter sorting module judges whether post conformity certification on the table to be checked, if then should put into the eligible list cache location by table to be checked, if not, then should put into defective cache lines by table to be checked, and eligible list is carried to eligible list fills the calibrating pallet;
11) PLC finishes information control Campatible calibrating pipeline according to letter sorting table calibrating pallet to be checked is flowed to the vanning position, the table calibrating data message to be checked that the 6DOF robot provides according to PLC instruction and main website server will sort eligible list that module sorts out and be transported to Turnover Box and case, and set up Turnover Box and table corresponding data to be checked relation, simultaneously the result is uploaded the main website server, vanning is finished information and is issued PLC, finishes the automatic calibration of table to be checked.

Claims (3)

1. single-phase intelligent electric energy meter collector Campatible automatic calibration system, be connected with the main website server, it is characterized in that, comprise PLC and the drum conveying line that is connected with PLC respectively, the 6DOF robot, Campatible calibrating pipeline, the Campatible identification module, Campatible voltage-withstand test module, Campatible visual examination module, Campatible error and function assay module, the seal module, Campatible pastes conformity certification module and letter sorting module, described drum conveying line, the 6DOF robot is connected successively with Campatible calibrating pipeline, and described Campatible calibrating pipeline connects the Campatible identification module respectively, Campatible voltage-withstand test module, Campatible visual examination module, Campatible error and function assay module, the seal module, Campatible pastes conformity certification module and letter sorting module.
2. a kind of single-phase intelligent electric energy meter collector Campatible automatic calibration according to claim 1 system, it is characterized in that, described Campatible identification module comprises identification industrial computer, bar code scanner and RFID recognizer, and described identification industrial computer connects bar code scanner and RFID recognizer respectively;
Described Campatible voltage-withstand test module comprises voltage-withstand test industrial computer and the Hi-pot Tester that is connected with the voltage-withstand test industrial computer and leakage current tester;
Described Campatible visual examination module comprises visual examination industrial computer and second plug into mechanism, image acquisition device, voltage source and second alarm lamp that is connected with the visual examination industrial computer respectively;
Described Campatible error and function assay module comprise error and function calibrating industrial computer and the 3rd plug into mechanism, power source, standard scale, time reference source, multipath server and the 3rd alarm lamp of examining and determine that industrial computer is connected with error and function respectively;
Described seal module comprises seal industrial computer and first mechanical arm that is connected;
Described Campatible pastes the conformity certification module and comprises subsides conformity certification industrial computer.
3. a kind of single-phase intelligent electric energy meter collector Campatible automatic calibration according to claim 2 system, it is characterized in that, described main website server via Ethernet is connected with PLC, identification industrial computer, voltage-withstand test industrial computer, visual examination industrial computer, error and function calibrating industrial computer, seal industrial computer and the communication of subsides conformity certification industrial computer respectively, and described identification industrial computer, voltage-withstand test industrial computer, visual examination industrial computer, error and function calibrating industrial computer, seal industrial computer and subsides conformity certification industrial computer all are connected with PLC.
CN 201320007987 2013-01-08 2013-01-08 Single-phase intelligent electric energy meter collector compatible-type automation verification system Expired - Lifetime CN203149108U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN 201320007987 CN203149108U (en) 2013-01-08 2013-01-08 Single-phase intelligent electric energy meter collector compatible-type automation verification system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN 201320007987 CN203149108U (en) 2013-01-08 2013-01-08 Single-phase intelligent electric energy meter collector compatible-type automation verification system

Publications (1)

Publication Number Publication Date
CN203149108U true CN203149108U (en) 2013-08-21

Family

ID=48976624

Family Applications (1)

Application Number Title Priority Date Filing Date
CN 201320007987 Expired - Lifetime CN203149108U (en) 2013-01-08 2013-01-08 Single-phase intelligent electric energy meter collector compatible-type automation verification system

Country Status (1)

Country Link
CN (1) CN203149108U (en)

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104880691A (en) * 2015-06-15 2015-09-02 国网上海市电力公司 Method for evaluating operation state of gateway electrical energy metering device
CN104880690A (en) * 2015-06-15 2015-09-02 国网上海市电力公司 Method for evaluating operation of electric energy meter
CN104898082A (en) * 2015-06-15 2015-09-09 国网上海市电力公司 Method for evaluating voltage transformer operation
CN106774061A (en) * 2016-12-09 2017-05-31 国网北京市电力公司 The information processing system of calibrating installation
CN112946561A (en) * 2021-02-03 2021-06-11 中电装备山东电子有限公司 Electric energy meter testing device and system

Cited By (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104880691A (en) * 2015-06-15 2015-09-02 国网上海市电力公司 Method for evaluating operation state of gateway electrical energy metering device
CN104880690A (en) * 2015-06-15 2015-09-02 国网上海市电力公司 Method for evaluating operation of electric energy meter
CN104898082A (en) * 2015-06-15 2015-09-09 国网上海市电力公司 Method for evaluating voltage transformer operation
CN104880690B (en) * 2015-06-15 2018-04-03 国网上海市电力公司 A kind of evaluation method of electric energy meter operation
CN104880691B (en) * 2015-06-15 2018-04-03 国网上海市电力公司 A kind of evaluation method of Electric Energy Tariff Point Metering Device running status
CN104898082B (en) * 2015-06-15 2018-07-20 国网上海市电力公司 A kind of evaluation method of voltage transformer operation
CN106774061A (en) * 2016-12-09 2017-05-31 国网北京市电力公司 The information processing system of calibrating installation
CN112946561A (en) * 2021-02-03 2021-06-11 中电装备山东电子有限公司 Electric energy meter testing device and system
CN112946561B (en) * 2021-02-03 2024-05-17 中电装备山东电子有限公司 Electric energy meter testing device and testing system

Similar Documents

Publication Publication Date Title
CN103064055A (en) Single phase intelligent electric energy meter collector compatibility type automation verification system and method
CN102565747A (en) Automatic verification system and method for single-phase intelligent watt-hour meter
CN203149108U (en) Single-phase intelligent electric energy meter collector compatible-type automation verification system
CN102288935B (en) Electric energy meter calibration system
CN202177694U (en) Electric energy meter verification unit
CN110492906A (en) A kind of HPLC carrier module performance fast automatic detecting method
WO2018227857A1 (en) Internet of things technology-based measuring instrument recycling and sorting system
CN102944863A (en) Automatic verification system and method for intelligent electric energy meters
CN101718854B (en) Management method for ammeter in concentrator
CN109212460B (en) Communication unit detection tool and detection method
CN204832316U (en) Electricity core testing arrangement
CN203845123U (en) Label sealing device for qualified electric energy meters
CN202975216U (en) Automatic collector test tool system
CN104216328A (en) Sensor automatic test system
CN102608562B (en) Integrated detection production line of electric energy meter, terminal and concentrator
CN111983546B (en) Ammeter detection configuration device and method
CN202041636U (en) Electric energy meter delivery automation detection system
CN108132456A (en) A kind of three-phase intelligent electric-energy meter failure sorts check device
CN102565748B (en) Intelligent electric energy meter automatic seal device and method
CN102298135A (en) Artificial verification system
CN206578842U (en) A kind of robot for safety check
CN104002303B (en) A kind of mutual inductor automation calibrating streamline loading and unloading six degree of freedom robot
CN205520352U (en) Full automatization motormeter index cap head suppression system
CN107876437A (en) A kind of automated detection method and system for power line carrier module
CN205246860U (en) Buttress system of electric energy meter case group based on RFID radio frequency identification

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CX01 Expiry of patent term
CX01 Expiry of patent term

Granted publication date: 20130821