CN104880691B - A kind of evaluation method of Electric Energy Tariff Point Metering Device running status - Google Patents

A kind of evaluation method of Electric Energy Tariff Point Metering Device running status Download PDF

Info

Publication number
CN104880691B
CN104880691B CN201510331287.0A CN201510331287A CN104880691B CN 104880691 B CN104880691 B CN 104880691B CN 201510331287 A CN201510331287 A CN 201510331287A CN 104880691 B CN104880691 B CN 104880691B
Authority
CN
China
Prior art keywords
coefficient
electric energy
metering device
health index
factor
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201510331287.0A
Other languages
Chinese (zh)
Other versions
CN104880691A (en
Inventor
杜卫华
黄锋
王卉
严石
蒋超
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
State Grid Shanghai Electric Power Co Ltd
East China Power Test and Research Institute Co Ltd
Original Assignee
State Grid Shanghai Electric Power Co Ltd
East China Power Test and Research Institute Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by State Grid Shanghai Electric Power Co Ltd, East China Power Test and Research Institute Co Ltd filed Critical State Grid Shanghai Electric Power Co Ltd
Priority to CN201510331287.0A priority Critical patent/CN104880691B/en
Publication of CN104880691A publication Critical patent/CN104880691A/en
Application granted granted Critical
Publication of CN104880691B publication Critical patent/CN104880691B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Testing Of Short-Circuits, Discontinuities, Leakage, Or Incorrect Line Connections (AREA)

Abstract

The present invention relates to a kind of evaluation method of Electric Energy Tariff Point Metering Device running status, it is characterised in that comprises the following steps:1) by the initial data of long-distance metering device on-line monitoring system collection site Electric Energy Tariff Point Metering Device, and initial data is uploaded in the data server of upper PC;2) upper PC is classified to initial data, and according to sorted initial data, establishes the mathematical modeling of Electric Energy Tariff Point Metering Device postitallation evaluation;3) according to the mathematical modeling of the Electric Energy Tariff Point Metering Device postitallation evaluation of foundation, Electric Energy Tariff Point Metering Device is run and carries out running status grade evaluation, energy metering plant running appraisement system is established, the operation trend of Electric Energy Tariff Point Metering Device is predicted according to energy metering plant running appraisement system and carries out early warning.Compared with prior art, the present invention have the advantages that scientific and reasonable, research object specific number is more, involve a wide range of knowledge, architecture, intellectuality.

Description

A kind of evaluation method of Electric Energy Tariff Point Metering Device running status
Technical field
The present invention relates to power domain, more particularly, to a kind of evaluation method of Electric Energy Tariff Point Metering Device running status.
Background technology
Energy metering is the important ring under big marketing system in three collection, five big system, energy metering plant running situation Quality not only embodies managerial skills, and more relation sells power purchase both sides' economic benefit.For fair, just and open, public fuse tube reason dress Put, safeguard the seriousness of metering, it is necessary to running situation is refined and evaluation of classification, for technology it is counter arrange offer science according to According to.
At present, judge that it runs shape mainly by way of periodic calibration for the electric power meter of scene operation State.And periodic calibration is present that workload is big, labor intensive material resources are big, fault discovery not in time, after failure electric quantity compensating according to not The series of malpractice such as abundant.Therefore, the evaluation of running status system for establishing Electric Energy Tariff Point Metering Device be currently there is an urgent need to.
In the past 20 years, for big system and its equipment, the experience of foreign, from scheduled overhaul iterative method to state Maintenance, its practical significance is self-evident, but crucial part, can promptly and accurately grasp the running status situation of equipment.Establish Electric Energy Tariff Point Metering Device postitallation evaluation system is one and incited somebody to action《Electric power meter technical management code》Actual requirement architecture, Information-based work.
At present, domestic and international electric power research institution and enterprise do not form evaluation body to Electric Energy Tariff Point Metering Device running status System, it is most of all to concentrate on single direction or distributing research, preferably at most monitoring system, fundamentally it is only limitted to state research. And the research of the present invention is based on establishing a kind of postitallation evaluation system, it may be said that research of the invention is ground based on the former state Study carefully, but there is own characteristic again simultaneously.
The evaluation of running status system of Electric Energy Tariff Point Metering Device and long-range monitoring scheme research contribute to Utilities Electric Co. pair Scene operation Electric Energy Tariff Point Metering Device state grade have clear judgement, to selling, power purchase both sides the defects of manage duty Duty definitely, scientific basis is provided for electric quantity compensating.
The content of the invention
It is an object of the present invention to overcome the above-mentioned drawbacks of the prior art and provide a kind of scientific and reasonable, research Object specific number is more, involve a wide range of knowledge, architecture, the evaluation method of intelligentized Electric Energy Tariff Point Metering Device running status.
The purpose of the present invention can be achieved through the following technical solutions:
A kind of evaluation method of Electric Energy Tariff Point Metering Device running status, comprises the following steps:
1) by the initial data of long-distance metering device on-line monitoring system collection site Electric Energy Tariff Point Metering Device, and will Initial data is uploaded in the data server of upper PC;
2) upper PC is classified to initial data, and according to sorted initial data, establishes critical point electric energy metrical The mathematical modeling of plant running evaluation;
3) according to the mathematical modeling of the Electric Energy Tariff Point Metering Device postitallation evaluation of foundation, Electric Energy Tariff Point Metering Device is run Running status grade evaluation is carried out, establishes energy metering plant running appraisement system, body is evaluated according to energy metering plant running The operation trend of system's prediction Electric Energy Tariff Point Metering Device simultaneously carries out early warning.
The mathematical modeling of Electric Energy Tariff Point Metering Device postitallation evaluation includes electric energy meter postitallation evaluation in described step 2) Mathematical modeling, the mathematical modeling of current transformer postitallation evaluation, the mathematical modeling of voltage transformer postitallation evaluation and metering device The mathematical modeling of secondary circuit postitallation evaluation.
The foundation of the mathematical modeling of described electric energy meter postitallation evaluation specifically includes following steps:
11) the initial health index HI of electric energy meter operation is obtained1, the initial health index HI of electric energy meter operation1Calculating formula For:
B=B0×fAE×fDE
Wherein, HI0For the initial health index of brand-new electric energy meter, HI10For theoretical aging health index, B is actual aging Constant, Δ T are that electric energy meter runs the time limit, T2To assess time, T1For electric energy meter date of putting into operation, T10For the electric energy meter date of production, B0 For theoretical aging constant, T0For the design service life of electric energy meter, fAEFor electric energy meter installation environment coefficient, fDEFor operation of power networks ring Border coefficient, fSWDFor humiture coefficient, fDCGRFor interference of electromagnetic field coefficient, fKLWFor particle concentration coefficient, fFHXZFor load character Coefficient, fYXDYFor working voltage coefficient, fPLBDFor frequency fluctuation coefficient, fXBFor harmonic constant, fHZPLFor switch combined floodgate frequency system Number, fFHBHFor diversity factor, fJDFDFor static discharge coefficient, fLJFor the coefficient that is struck by lightning, n is the number that coefficient is more than 1, and S is Step-length;
12) the comprehensive correction factor f of electric energy meter operation is obtainedCOM, described comprehensive correction factor fCOMCalculating formula be:
Wherein, fKKFor coefficient of reliability, fLSGZCoefficient, f are recorded for historical failureF1For electric energy meter button coefficient, fF2For table Shield background modulation factor, fF3For remote communication module coefficient, fYXBCTo run coefficient of variation, fJLXNFor metering performance coefficient, fWCFor Error coefficient, fQDFor electric energy meter shunt running coefficient, fBQDFor the not startup coefficient of electric energy meter under underload, fTZStop walking for electric energy meter and be Number, fYQJFor component coefficient, fCLDYFor electric energy meter processing unit coefficient, fNBRJFor in house software coefficient, fBDDFor memory cell table Bottom degree coefficient, fCCDLFor memory cell storing electricity coefficient, fJDQFor control unit relay coefficient, fKXSCControlled for control unit Signal output coefficient, fSCFor output factor, fDCGZBattery failures coefficient, f are shown for liquid crystal displayBIDFor modulation factor of alarming, fTXGZFor Communication failure coefficient, fHEIPTo show blank screen coefficient, fHUAPFor display flower screen coefficient, fLMTo show mess code coefficient, fCHXXFor display Rainbow phenomena coefficient, fCXTWTo show discontinuously display image retention and hangover coefficient, fLYTo show leakage coefficient, fLEDShow for indicator lamp Show coefficient, fWGFor outward appearance coefficient, fBKFor watchcase coefficient, fAJFor button coefficient, fMPFor nameplate coefficient, fFYFor seal coefficient, fJXDZ For binding post coefficient, fYJFor liquid crystal coefficient, fQTGZFor other failure coefficients, fSJCFor time difference coefficient, fSDZHChanged for the period Coefficient, fRNZHFor leap year conversion coefficient, fSBTo burn table coefficient, fDCFor battery coefficient, n is the number that coefficient is more than 1, and S is step-length;
13) according to initial health index HI1With comprehensive correction factor fCOMEstablish the mathematical modeling of electric energy meter postitallation evaluation For:
HI=max (HI1,HIi)×fCOM
The foundation of the mathematical modeling of described current transformer postitallation evaluation specifically includes following steps:
21) the initial health index HI of current transformer operation is obtained1, the initial health index HI of current transformer operation1 Calculating formula be:
B=B0×fAE×fDE
Wherein, HI0For the initial health index of brand-new current transformer, HI10For theoretical aging health index, B is actual Aging constant, Δ T are that current transformer runs the time limit, T2To assess time, T1For current transformer date of putting into operation, T10For electric current The transformer date of production, B0For theoretical aging constant, T0For the design service life of current transformer, fAEPacify for current transformer Fill environmental coefficient, fDEFor operation of power networks environmental coefficient, fSWDFor humiture coefficient, fDCGRFor interference of electromagnetic field coefficient, fKLWFor Grain thing concentration factor, fFHXZFor load character coefficient, fYXDYFor working voltage coefficient, fPLBDFor frequency fluctuation coefficient, fXBFor harmonic wave Coefficient, fHZPLTo switch combined floodgate coefficient of frequency, fFHBHFor diversity factor, fJDFDFor static discharge coefficient, fLJIt is for thunderbolt Number, n are the number that coefficient is more than 1, and S is step-length;
22) the comprehensive correction factor f of current transformer operation is obtainedCOM, comprehensive correction factor fCOMCalculating formula be:
fWJY=max (fWJY1,fWJY2)+(n-1)·S
Wherein, fKKFor coefficient of reliability, fYXBCTo run coefficient of variation, fYXZJFor operation week inspection actual measurement value coefficient, fYXGKFor Operating condition coefficient, fGLYSFor power factor coefficient, fYCSXFor abnormal noise coefficient, fSCYXCoefficient, f are influenceed for remanent magnetismGYLDLFor height Press influence of leakage current coefficient, fMFTo seal property coefficient, fWJYFor external insulation coefficient, fWJY1For external insulation antifouling work level error coefficient, fWJY2For body external insulation surface condition coefficient, fBTWSFor bulk temperature rising coefficient, fDZWSFor connection terminal and drainage thread temperature rise system Number, fWGFor outward appearance coefficient, fWGPFor expander coefficient, fWGDFor base coefficient, fWGEFor secondary terminal box coefficient, fWGYFor drainage thread Coefficient, fWGJFor down conductor coefficient, fQTYLFor SF6Gas pressure coefficient, fJYDZFor winding insulation resistance coefficient, fJZSHBased on Insulation dielectric loss factor coefficient, fZDRLFor main insulated electro capacity coefficient, fMPJYFor end shield insulating coefficient, fYSPFor oil colours pedigree Number, fJBFDFor shelf depreciation coefficient, fWSHLFor SF6Gas micro water content coefficient, n are the number that coefficient is more than 1, and S is step-length;
23) according to initial health index HI1With comprehensive correction factor fCOMEstablish the mathematical modulo of current transformer postitallation evaluation Type is:
HI=max (HI1,HIi)×fCOM
The foundation of the mathematical modeling of described voltage transformer postitallation evaluation specifically includes following steps:
31) the initial health index HI of voltage transformer operation is obtained1, the initial health index HI of voltage transformer operation1 Calculating formula be:
B=B0×fAE×fDE
Wherein, HI0For the initial health index of brand-new voltage transformer, HI10For theoretical aging health index, B is actual Aging constant, Δ T are that voltage transformer runs the time limit, T2To assess time, T1For voltage transformer date of putting into operation, T10For voltage The transformer date of production, B0For theoretical aging constant, T0For the design service life of voltage transformer, fAEPacify for voltage transformer Fill environmental coefficient, fDEFor operation of power networks environmental coefficient, fSWDFor humiture coefficient, fDCGRFor interference of electromagnetic field coefficient, fKLWFor Grain thing concentration factor, fFHXZFor load character coefficient, fYXDYFor working voltage coefficient, fPLBDFor frequency fluctuation coefficient, fXBFor harmonic wave Coefficient, fHZPLTo switch combined floodgate coefficient of frequency, fFHBHFor diversity factor, fJDFDFor static discharge coefficient, fLJIt is for thunderbolt Number, n are the number that coefficient is more than 1, and S is step-length;
32) the comprehensive correction factor f of voltage transformer operation is obtainedCOM, comprehensive correction factor fCOMCalculating formula be:
fWJY=max (fWJY1,fWJY2)+(n-1)·S
Wherein, fKKFor coefficient of reliability, fYXBCTo run coefficient of variation, fYXZJFor operation week inspection actual measurement value coefficient, fYXGKFor Operating condition coefficient, fGLYSFor power factor coefficient, fYCSXFor abnormal noise coefficient, fMFTo seal property coefficient, fWJYFor external insulation Coefficient, fWJY1For external insulation antifouling work level error coefficient, fWJY2For body external insulation surface condition coefficient, fBTWSFor bulk temperature rising Coefficient, fDZWSFor connection terminal and drainage thread temperature rise coefficient, fWGFor outward appearance coefficient, fWGPFor expander coefficient, fWGDFor base system Number, fWGEFor secondary terminal box coefficient, fWGYFor drainage thread coefficient, fWGJFor down conductor coefficient, fJJDZBetween capacitor pole absolutely Edge resistance, fZJBYQFor intermediate transformer secondary winding insulaion resistance coefficient, fFYQJSFor capacitive divider medium consumption factor system Number, fDRLFor capacitive divider electric capacity coefficient of discharge, fQTYLFor SF6Gas pressure coefficient, fJYDZFor winding insulation resistance coefficient, fJZSH For winding insulation medium consumption factor coefficient, fZJJSFor support insulation dissipation factor, fYSPFor oil colours spectral coefficient, fJBFDFor office Portion's discharge coefficient, fWSHLFor SF6Gas micro water content coefficient, n are the number that coefficient is more than 1, and S is step-length;
33) according to initial health index HI1With comprehensive correction factor fCOMEstablish the mathematical modulo of voltage transformer postitallation evaluation Type is:
HI=max (HI1,HIi)×fCOM
The foundation of the mathematical modeling of described metering device secondary circuit postitallation evaluation specifically includes following steps:
41) the initial health index HI of metering device secondary circuit operation is obtained1, at the beginning of the operation of metering device secondary circuit Beginning health index HI1Calculating formula be:
HI1=max (HIDL,HIPTYJ,HIPTFH,HICTFH)
B=B0×fAE×fDE
Wherein, HIPTYJFor PT secondary voltage drop initial health indexes, HIPTFHFor PT secondary load initial health indexes, HICTFH For CT secondary load initial health indexes, HIDLFor cable initial health index, HI0For the first of brand-new metering device secondary circuit Beginning health index, B are actual aging constant, and Δ T is that metering device secondary circuit runs the time limit, T2To assess time, T1For metering Device secondary circuit date of putting into operation, B0For theoretical aging constant, T0For the design service life of metering device secondary circuit, fAEFor Metering device secondary circuit installation environment coefficient, fDEFor operation of power networks environmental coefficient, fSWDFor humiture coefficient, fDCGRFor electromagnetism Field interference coefficient, fKLWFor particle concentration coefficient, fFHXZFor load character coefficient, fYXDYFor working voltage coefficient, fPLBDFor frequency Rate coefficient of variation, fXBFor harmonic constant, fHZPLTo switch combined floodgate coefficient of frequency, fFHBHFor diversity factor, fJDFDPut for electrostatic Electrostrictive coefficient, fLJFor the coefficient that is struck by lightning, n is the number that coefficient is more than 1, and S is step-length;
42) the comprehensive correction factor f of metering device secondary circuit operation is obtainedCOM, comprehensive correction factor fCOMCalculating formula For:
Wherein, fPTYJValue coefficient, f are surveyed for PT secondary voltage drops errorPTFHValue coefficient, f are surveyed for PT secondary loadsCTFHFor CT secondary loads survey value coefficient, fZHWCFor metering device composition error, fCTKLFor CT secondary circuits open circuit coefficient, fCTDLFor CT Secondary loop short circuit coefficient, fPTQXFor PT secondary circuit phase shortage coefficients, fPTDLFor PT secondary loop short circuit coefficients, n is more than for coefficient 1 number, S are step-length;
43) according to initial health index HI1With comprehensive correction factor fCOMEstablish metering device secondary circuit postitallation evaluation Mathematical modeling is:
HI=HI1×fCOM
Compared with prior art, the present invention has advantages below:
First, it is scientific and reasonable:The present invention is advantageous to establish a set of postitallation evaluation system based on Electric Energy Tariff Point Metering Device, real Show the operation conditions to electric energy meter, current transformer, the operation conditions of voltage transformer, the operation conditions of secondary circuit to carry out Scientifically and rationally evaluate, and establish defect management theory, improve the ability that partial power averts risks.
2nd, research object specific number is more, involves a wide range of knowledge:The research object of the present invention is run for Electric Energy Tariff Point Metering Device Situation, field electric energy measurement device remote condition monitoring device is relied on, and combine the letter that actually puts into operation of Electric Energy Tariff Point Metering Device Breath, periodic calibration information etc., obtain more comprehensively evaluating claim, and its coverage includes stock and the critical point electric energy in putting into operation Metering device.
3rd, architecture, intellectuality:By dividing the formulation of detailed rules and regulations, Ke Yijian to Electric Energy Tariff Point Metering Device state grade All kinds of abnormal alarms and early warning mechanism are found, judges whether the operation conditions of current metering device secondary circuit belongs to alarm model according to this Enclose and whether need early warning, realize architecture, the intellectuality of metering device management.
Brief description of the drawings
Fig. 1 is flow chart of the method for the present invention.
Embodiment
The present invention is described in detail with specific embodiment below in conjunction with the accompanying drawings.
Embodiment:
As shown in figure 1, a kind of evaluation method of Electric Energy Tariff Point Metering Device running status, comprises the following steps:
1) by the initial data of long-distance metering device on-line monitoring system collection site Electric Energy Tariff Point Metering Device, and will Initial data is uploaded in the data server of upper PC;
2) upper PC is classified to initial data, and according to sorted initial data, establishes critical point electric energy metrical The mathematical modeling of plant running evaluation, the mathematical modeling of Electric Energy Tariff Point Metering Device postitallation evaluation include electric energy meter postitallation evaluation Mathematical modeling, the mathematical modeling of current transformer postitallation evaluation, the mathematical modeling of voltage transformer postitallation evaluation and metering device The mathematical modeling of secondary circuit postitallation evaluation;
The foundation of the mathematical modeling of electric energy meter postitallation evaluation specifically includes following steps:
11) the initial health index HI of electric energy meter operation is obtained1, the initial health index HI of electric energy meter operation1Calculating formula For:
B=B0×fAE×fDE
Wherein, HI0For the initial health index of brand-new electric energy meter, HI10For theoretical aging health index, B is actual aging Constant, Δ T are that electric energy meter runs the time limit, T2To assess time, T1For electric energy meter date of putting into operation, T10For the electric energy meter date of production, B0 For theoretical aging constant, T0For the design service life of electric energy meter, fAEFor electric energy meter installation environment coefficient, fDEFor operation of power networks ring Border coefficient, fSWDFor humiture coefficient, fDCGRFor interference of electromagnetic field coefficient, fKLWFor particle concentration coefficient, fFHXZFor load character Coefficient, fYXDYFor working voltage coefficient, fPLBDFor frequency fluctuation coefficient, fXBFor harmonic constant, fHZPLFor switch combined floodgate frequency system Number, fFHBHFor diversity factor, fJDFDFor static discharge coefficient, fLJFor the coefficient that is struck by lightning, n is the number that coefficient is more than 1, and S is Step-length;
12) the comprehensive correction factor f of electric energy meter operation is obtainedCOM, comprehensive correction factor fCOMCalculating formula be:
Wherein, fKKFor coefficient of reliability, fLSGZCoefficient, f are recorded for historical failureF1For electric energy meter button coefficient, fF2For table Shield background modulation factor, fF3For remote communication module coefficient, fYXBCTo run coefficient of variation, fJLXNFor metering performance coefficient, fWCFor Error coefficient, fQDFor electric energy meter shunt running coefficient, fBQDFor the not startup coefficient of electric energy meter under underload, fTZStop walking for electric energy meter and be Number, fYQJFor component coefficient, fCLDYFor electric energy meter processing unit coefficient, fNBRJFor in house software coefficient, fBDDFor memory cell table Bottom degree coefficient, fCCDLFor memory cell storing electricity coefficient, fJDQFor control unit relay coefficient, fKXSCControlled for control unit Signal output coefficient, fSCFor output factor, fDCGZBattery failures coefficient, f are shown for liquid crystal displayBIDFor modulation factor of alarming, fTXGZFor Communication failure coefficient, fHEIPTo show blank screen coefficient, fHUAPFor display flower screen coefficient, fLMTo show mess code coefficient, fCHXXFor display Rainbow phenomena coefficient, fCXTWTo show discontinuously display image retention and hangover coefficient, fLYTo show leakage coefficient, fLEDShow for indicator lamp Show coefficient, fWGFor outward appearance coefficient, fBKFor watchcase coefficient, fAJFor button coefficient, fMPFor nameplate coefficient, fFYFor seal coefficient, fJXDZ For binding post coefficient, fYJFor liquid crystal coefficient, fQTGZFor other failure coefficients, fSJCFor time difference coefficient, fSDZHChanged for the period Coefficient, fRNZHFor leap year conversion coefficient, fSBTo burn table coefficient, fDCFor battery coefficient, n is the number that coefficient is more than 1, and S is step-length;
13) according to initial health index HI1With comprehensive correction factor fCOMEstablish the mathematical modeling of electric energy meter postitallation evaluation For:
HI=max (HI1,HIi)×fCOM
The foundation of the mathematical modeling of current transformer postitallation evaluation specifically includes following steps:
21) the initial health index HI of current transformer operation is obtained1, the initial health index HI of current transformer operation1 Calculating formula be:
B=B0×fAE×fDE
Wherein, HI0For the initial health index of brand-new current transformer, HI10For theoretical aging health index, B is actual Aging constant, Δ T are that current transformer runs the time limit, T2To assess time, T1For current transformer date of putting into operation, T10For electric current The transformer date of production, B0For theoretical aging constant, T0For the design service life of current transformer, fAEPacify for current transformer Fill environmental coefficient, fDEFor operation of power networks environmental coefficient, fSWDFor humiture coefficient, fDCGRFor interference of electromagnetic field coefficient, fKLWFor Grain thing concentration factor, fFHXZFor load character coefficient, fYXDYFor working voltage coefficient, fPLBDFor frequency fluctuation coefficient, fXBFor harmonic wave Coefficient, fHZPLTo switch combined floodgate coefficient of frequency, fFHBHFor diversity factor, fJDFDFor static discharge coefficient, fLJIt is for thunderbolt Number, n are the number that coefficient is more than 1, and S is step-length;
22) the comprehensive correction factor f of current transformer operation is obtainedCOM, comprehensive correction factor fCOMCalculating formula be:
fWJY=max (fWJY1,fWJY2)+(n-1)·S
Wherein, fKKFor coefficient of reliability, fYXBCTo run coefficient of variation, fYXZJFor operation week inspection actual measurement value coefficient, fYXGKFor Operating condition coefficient, fGLYSFor power factor coefficient, fYCSXFor abnormal noise coefficient, fSCYXCoefficient, f are influenceed for remanent magnetismGYLDLFor height Press influence of leakage current coefficient, fMFTo seal property coefficient, fWJYFor external insulation coefficient, fWJY1For external insulation antifouling work level error coefficient, fWJY2For body external insulation surface condition coefficient, fBTWSFor bulk temperature rising coefficient, fDZWSFor connection terminal and drainage thread temperature rise system Number, fWGFor outward appearance coefficient, fWGPFor expander coefficient, fWGDFor base coefficient, fWGEFor secondary terminal box coefficient, fWGYFor drainage thread Coefficient, fWGJFor down conductor coefficient, fQTYLFor SF6Gas pressure coefficient, fJYDZFor winding insulation resistance coefficient, fJZSHBased on Insulation dielectric loss factor coefficient, fZDRLFor main insulated electro capacity coefficient, fMPJYFor end shield insulating coefficient, fYSPFor oil colours pedigree Number, fJBFDFor shelf depreciation coefficient, fWSHLFor SF6Gas micro water content coefficient, n are the number that coefficient is more than 1, and S is step-length;
23) according to initial health index HI1With comprehensive correction factor fCOMEstablish the mathematical modulo of current transformer postitallation evaluation Type is:
HI=max (HI1,HIi)×fCOM
The foundation of the mathematical modeling of voltage transformer postitallation evaluation specifically includes following steps:
31) the initial health index HI of voltage transformer operation is obtained1, the initial health index HI of voltage transformer operation1 Calculating formula be:
B=B0×fAE×fDE
Wherein, HI0For the initial health index of brand-new voltage transformer, HI10For theoretical aging health index, B is actual Aging constant, Δ T are that voltage transformer runs the time limit, T2To assess time, T1For voltage transformer date of putting into operation, T10For voltage The transformer date of production, B0For theoretical aging constant, T0For the design service life of voltage transformer, fAEPacify for voltage transformer Fill environmental coefficient, fDEFor operation of power networks environmental coefficient, fSWDFor humiture coefficient, fDCGRFor interference of electromagnetic field coefficient, fKLWFor Grain thing concentration factor, fFHXZFor load character coefficient, fYXDYFor working voltage coefficient, fPLBDFor frequency fluctuation coefficient, fXBFor harmonic wave Coefficient, fHZPLTo switch combined floodgate coefficient of frequency, fFHBHFor diversity factor, fJDFDFor static discharge coefficient, fLJIt is for thunderbolt Number, n are the number that coefficient is more than 1, and S is step-length;
32) the comprehensive correction factor f of voltage transformer operation is obtainedCOM, comprehensive correction factor fCOMCalculating formula be:
fWJY=max (fWJY1,fWJY2)+(n-1)·S
Wherein, fKKFor coefficient of reliability, fYXBCTo run coefficient of variation, fYXZJFor operation week inspection actual measurement value coefficient, fYXGKFor Operating condition coefficient, fGLYSFor power factor coefficient, fYCSXFor abnormal noise coefficient, fMFTo seal property coefficient, fWJYFor external insulation Coefficient, fWJY1For external insulation antifouling work level error coefficient, fWJY2For body external insulation surface condition coefficient, fBTWSFor bulk temperature rising Coefficient, fDZWSFor connection terminal and drainage thread temperature rise coefficient, fWGFor outward appearance coefficient, fWGPFor expander coefficient, fWGDFor base system Number, fWGEFor secondary terminal box coefficient, fWGYFor drainage thread coefficient, fWGJFor down conductor coefficient, fJJDZBetween capacitor pole absolutely Edge resistance, fZJBYQFor intermediate transformer secondary winding insulaion resistance coefficient, fFYQJSFor capacitive divider medium consumption factor system Number, fDRLFor capacitive divider electric capacity coefficient of discharge, fQTYLFor SF6Gas pressure coefficient, fJYDZFor winding insulation resistance coefficient, fJZSH For winding insulation medium consumption factor coefficient, fZJJSFor support insulation dissipation factor, fYSPFor oil colours spectral coefficient, fJBFDFor office Portion's discharge coefficient, fWSHLFor SF6Gas micro water content coefficient, n are the number that coefficient is more than 1, and S is step-length;
33) according to initial health index HI1With comprehensive correction factor fCOMEstablish the mathematical modulo of voltage transformer postitallation evaluation Type is:
HI=max (HI1,HIi)×fCOM
The foundation of the mathematical modeling of metering device secondary circuit postitallation evaluation specifically includes following steps:
41) the initial health index HI of metering device secondary circuit operation is obtained1, at the beginning of the operation of metering device secondary circuit Beginning health index HI1Calculating formula be:
HI1=max (HIDL,HIPTYJ,HIPTFH,HICTFH)
B=B0×fAE×fDE
Wherein, HIPTYJFor PT secondary voltage drop initial health indexes, HIPTFHFor PT secondary load initial health indexes, HICTFH For CT secondary load initial health indexes, HIDLFor cable initial health index, HI0For the first of brand-new metering device secondary circuit Beginning health index, B are actual aging constant, and Δ T is that metering device secondary circuit runs the time limit, T2To assess time, T1For metering Device secondary circuit date of putting into operation, B0For theoretical aging constant, T0For the design service life of metering device secondary circuit, fAEFor Metering device secondary circuit installation environment coefficient, fDEFor operation of power networks environmental coefficient, fSWDFor humiture coefficient, fDCGRFor electromagnetism Field interference coefficient, fKLWFor particle concentration coefficient, fFHXZFor load character coefficient, fYXDYFor working voltage coefficient, fPLBDFor frequency Rate coefficient of variation, fXBFor harmonic constant, fHZPLTo switch combined floodgate coefficient of frequency, fFHBHFor diversity factor, fJDFDPut for electrostatic Electrostrictive coefficient, fLJFor the coefficient that is struck by lightning, n is the number that coefficient is more than 1, and S is step-length;
42) the comprehensive correction factor f of metering device secondary circuit operation is obtainedCOM, comprehensive correction factor fCOMCalculating formula For:
Wherein, fPTYJValue coefficient, f are surveyed for PT secondary voltage drops errorPTFHValue coefficient, f are surveyed for PT secondary loadsCTFHFor CT secondary loads survey value coefficient, fZHWCFor metering device composition error, fCTKLFor CT secondary circuits open circuit coefficient, fCTDLFor CT Secondary loop short circuit coefficient, fPTQXFor PT secondary circuit phase shortage coefficients, fPTDLFor PT secondary loop short circuit coefficients, n is more than for coefficient 1 number, S are step-length;
43) according to initial health index HI1With comprehensive correction factor fCOMEstablish metering device secondary circuit postitallation evaluation Mathematical modeling is:
HI=HI1×fCOM
3) according to the mathematical modeling of the Electric Energy Tariff Point Metering Device postitallation evaluation of foundation, Electric Energy Tariff Point Metering Device is run Running status grade evaluation is carried out, establishes energy metering plant running appraisement system, body is evaluated according to energy metering plant running The operation trend of system's prediction Electric Energy Tariff Point Metering Device simultaneously carries out early warning.
Running status grade classification detailed rules and regulations:
Grade classification detailed rules and regulations are according to evaluation claim, with reference to the concrete operations requirement in code, and more reliable scene Operating experience, divided.Cook up the Operation class of electric power meter.
Electric energy metrical is filled with scope residing for directly affecting the important parameter (fi) of equipment state according to health index (HI) The state grade put is divided into 5 grades, as shown in table 1 below:
Table 1 evaluates state grade division table
Citing is evaluated to the subitem of electric energy meter below:
It is when the year before last health index is distributed as shown in table 2.
The electric energy meter current health index of table 2
Device numbering Electric energy tariff point Date of putting into operation Run the time limit Comprehensive correction factor Final HI
1 Mortise combustion 4172 2011-11-8 2 1.00 0.91
2 High bridge 460 2009-6-3 4 1.00 2.00
3 First 2011-11-8 2 1.30 3.90
4 Second 2011-11-8 2 1.50 5.25
5 Third 2011-11-8 2 1.60 6.40
6 Fourth 2011-11-8 2 1.65 7.43
The health index distribution situation of each electric energy meter as we can see from the figure.It can be seen that, this is several from basic data The time of putting into operation of platform equipment is all shorter, and influence its health index is each important parameter.
The equipment that health index is between 7-8 is fourth, and its date of putting into operation is 2011, runs for two years at present, But be present the problem of bright overproof error, control signal output failure, alarm lamp, button malfunction and binding post damage in it, make It is higher to obtain comprehensive correction factor, so as to cause high health index.
The equipment that health index is between 6-7 is third, and its date of putting into operation is 2011, runs for two years at present, But there is the problem of overproof error, control signal output failure, alarm lamp is bright in it so that its comprehensive correction factor is higher, from And cause health index higher.
The equipment that health index is between 5-6 is second, and its date of putting into operation is 2011, runs for two years at present, But there is the problem of error is overproof in it so that its comprehensive correction factor is also higher, so as to cause health index higher.
The equipment that health index is between 3-4 is first, and its date of putting into operation is 2011, runs for two years at present, Its error is in critical value, therefore health index is relatively low.
Equipment of the health index less than 2 is respectively mortise combustion 4172 and high bridge 460, its date of putting into operation be respectively 2011 and 2009,2 years and 4 years have been separately operable it.Because its running status is good, therefore health index is relatively low.
The equipment that time limit is changed is fourth, and its health index is more than 7.
The equipment of on-site maintenance is respectively third and second.Third health index is more than 5.5, and important parameter be present and be in shape In 2 grades of state grade, therefore its evaluation result is in 2 grades, i.e. on-site maintenance.And although second health index is less than 5.5, it is deposited 2 grades are in the state grade of important parameter, therefore its evaluation result is also at 2 grades, i.e. on-site maintenance.
It is continuing with, the equipment of notice manufacturer/consumer attention is first.
Continue to run with, reduce the inspection time in week fires 4172 and high bridge 460 for mortise.
Certainly, if there is problem of management, then its corresponding result will also be enumerated in a model, such as Shown in table 3.
Problem before the electric energy meter of table 3 puts into operation
Before electric energy meter puts into operation in problem, if there is electric energy meter class of accuracy configuration it is unqualified if, then need Its grade of errors is considered again, and it is as shown in table 4 then to make corresponding result.
Issue handling result before the electric energy meter of table 4 puts into operation
Electric Energy Tariff Point Metering Device postitallation evaluation system and remote condition monitoring project study are that a theory and technology are tight The invention of close combination, postitallation evaluation system specify Electric Energy Tariff Point Metering Device evaluation detailed rules and regulations, and its realization must be by means of long-range Condition Monitoring Technology means.
The evaluation of running status system of electric power meter is by two big portion of system platform software and live on-line monitoring system It is grouped into, the data that system platform software foundation electric power meter evaluation detailed rules and regulations gather to live on-line monitoring system are to electric energy Metering device is evaluated, and both complement each other, indispensable.
System platform is established by the operations control center in electric energy measurement center, remotely existed in the installation of each electric energy tariff point Line monitoring system, gather the parameters of monitored electric power meter in real time by on-line monitoring system, by Ethernet or The data that wireless communication mode collects remote supervision system are transmitted back to system platform.
The present invention establishes the effective metering device postitallation evaluation system of a set of science, to the operating electricity in scene Can the real-time electricity consumption data such as table, transformer and secondary load, secondary voltage drop, active power, reactive power, power factor, phase Measurement and evaluation, be provided simultaneously with analysis judge and warning function, for targetedly, predictably carry out technology it is counter arrange provide ginseng Examine foundation.
Appraisement system achievement includes:The totality of Electric Energy Tariff Point Metering Device postitallation evaluation system and remote condition monitoring scheme Scheme, Electric Energy Tariff Point Metering Device evaluation detailed rules and regulations etc..
The present invention forms energy metering appraisal standards of company level, has studied and defined a series of technical schemes, ensures critical point Metering device runs qualification rate, forms metering appraisal standards of company level, including:Form Electric Energy Tariff Point Metering Device of company level Postitallation evaluation standard, communication port construction scheme, state monitoring apparatus technical scheme, state monitoring apparatus are checked and accepted, installed, O&M With technology is counter arranges embodiment etc., 184 online Electric Energy Tariff Point Metering Devices and large users in the range of District of Shanghai are built in covering Electric power meter, and reserved extension.
The main object of the present invention is electric power meter, is met from metering method, measuring equipment configuration, the condition of putting into operation Property, electric energy meter operation conditions, transformer operation conditions, secondary circuit situation etc. research state evaluation thinking ways, collection basis Data, service data, data etc. are safeguarded, so as to establish state grade division detailed rules and regulations, propose adjunct decision management theory.
Utilize the present invention, it is possible to achieve it is accurate, timely to grasp Electric Energy Tariff Point Metering Device running status, can be targeted Ground timely and effectively analyze and handle.Under conditions of Electric Energy Tariff Point Metering Device postitallation evaluation system is done step-by-step, close The rotational cycle that reason extends metering device is feasible, and necessary, and the expense saved, can be according under Guo Wang companies The electric power meter typical design requirements reached, for improving the configuration level of metering device, are more of practical significance.
The postitallation evaluation directive/guide for the Electric Energy Tariff Point Metering Device that the present invention can be used in shape cost centre, further shape Guide Book is performed into standardization.By application of result and it is generalized to all Electric Energy Tariff Point Metering Devices covered, Landfill covering It is related to critical point, the electric power meter of large user.

Claims (1)

1. a kind of evaluation method of Electric Energy Tariff Point Metering Device running status, it is characterised in that comprise the following steps:
1) by the initial data of long-distance metering device on-line monitoring system collection site Electric Energy Tariff Point Metering Device, and will be original Data are uploaded in the data server of upper PC;
2) upper PC is classified to initial data, and according to sorted initial data, establishes Electric Energy Tariff Point Metering Device The mathematical modeling of postitallation evaluation, the mathematical modeling of Electric Energy Tariff Point Metering Device postitallation evaluation include the mathematics of electric energy meter postitallation evaluation Model, the mathematical modeling of current transformer postitallation evaluation, the mathematical modeling of voltage transformer postitallation evaluation and metering device are secondary The mathematical modeling of loop postitallation evaluation,
The foundation of the mathematical modeling of described electric energy meter postitallation evaluation specifically includes following steps:
11) the initial health index HI of electric energy meter operation is obtained1, the initial health index HI of electric energy meter operation1Calculating formula be:
B=B0×fAE×fDE
Wherein, HI0For the initial health index of brand-new electric energy meter, HI10For theoretical aging health index, B is actual aging constant, Δ T is that electric energy meter runs the time limit, T2To assess time, T1For electric energy meter date of putting into operation, T10For the electric energy meter date of production, B0For reason By aging constant, T0For the design service life of electric energy meter, fAEFor electric energy meter installation environment coefficient, fDEFor operation of power networks environment system Number, fSWDFor humiture coefficient, fDCGRFor interference of electromagnetic field coefficient, fKLWFor particle concentration coefficient, fFHXZFor load character system Number, fYXDYFor working voltage coefficient, fPLBDFor frequency fluctuation coefficient, fXBFor harmonic constant, fHZPLTo switch combined floodgate coefficient of frequency, fFHBHFor diversity factor, fJDFDFor static discharge coefficient, fLJFor the coefficient that is struck by lightning, n is the number that coefficient is more than 1, and S is step It is long;
12) the comprehensive correction factor f of electric energy meter operation is obtainedCOM, described comprehensive correction factor fCOMCalculating formula be:
Wherein, fKKFor coefficient of reliability, fLSGZCoefficient, f are recorded for historical failureF1For electric energy meter button coefficient, fF2Carried on the back for table screen Scape modulation factor, fF3For remote communication module coefficient, fYXBCTo run coefficient of variation, fJLXNFor metering performance coefficient, fWCFor error Coefficient, fQDFor electric energy meter shunt running coefficient, fBQDFor the not startup coefficient of electric energy meter under underload, fTZStop to walk coefficient, f for electric energy meterYQJ For component coefficient, fCLDYFor electric energy meter processing unit coefficient, fNBRJFor in house software coefficient, fBDDFor memory cell table bottom degree system Number, fCCDLFor memory cell storing electricity coefficient, fJDQFor control unit relay coefficient, fKXSCIt is defeated for control unit control signal Go out coefficient, fSCFor output factor, fDCGZBattery failures coefficient, f are shown for liquid crystal displayBIDFor modulation factor of alarming, fTXGZFor communication event Hinder coefficient, fHEIPTo show blank screen coefficient, fHUAPFor display flower screen coefficient, fLMTo show mess code coefficient, fCHXXShow for display rainbow As coefficient, fCXTWTo show discontinuously display image retention and hangover coefficient, fLYTo show leakage coefficient, fLEDCoefficient is shown for indicator lamp, fWGFor outward appearance coefficient, fBKFor watchcase coefficient, fAJFor button coefficient, fMPFor nameplate coefficient, fFYFor seal coefficient, fJXDZFor wiring Terminal coefficient, fYJFor liquid crystal coefficient, fQTGZFor other failure coefficients, fSJCFor time difference coefficient, fSDZHFor period conversion coefficient, fRNZHFor leap year conversion coefficient, fSBTo burn table coefficient, fDCFor battery coefficient, n is the number that coefficient is more than 1, and S is step-length;
13) according to initial health index HI1With comprehensive correction factor fCOMThe mathematical modeling for establishing electric energy meter postitallation evaluation is:
HI=max (HI1,HIi)×fCOM
3) according to the mathematical modeling of the Electric Energy Tariff Point Metering Device postitallation evaluation of foundation, Electric Energy Tariff Point Metering Device is run and carried out Running status grade is evaluated, and establishes energy metering plant running appraisement system, pre- according to energy metering plant running appraisement system Survey the operation trend of Electric Energy Tariff Point Metering Device and carry out early warning;
The foundation of the mathematical modeling of described current transformer postitallation evaluation specifically includes following steps:
21) the initial health index HI of current transformer operation is obtained1, the initial health index HI of current transformer operation1Meter Formula is:
B=B0×fAE×fDE
Wherein, HI0For the initial health index of brand-new current transformer, HI10For theoretical aging health index, B is actual aging Constant, Δ T are that current transformer runs the time limit, T2To assess time, T1For current transformer date of putting into operation, T10For Current Mutual Inductance The device date of production, B0For theoretical aging constant, T0For the design service life of current transformer, fAEFor current transformer mounting ring Border coefficient, fDEFor operation of power networks environmental coefficient, fSWDFor humiture coefficient, fDCGRFor interference of electromagnetic field coefficient, fKLWFor particulate matter Concentration factor, fFHXZFor load character coefficient, fYXDYFor working voltage coefficient, fPLBDFor frequency fluctuation coefficient, fXBFor harmonic series Number, fHZPLTo switch combined floodgate coefficient of frequency, fFHBHFor diversity factor, fJDFDFor static discharge coefficient, fLJFor the coefficient that is struck by lightning, n It is more than 1 number for coefficient, S is step-length;
22) the comprehensive correction factor f of current transformer operation is obtainedCOM, comprehensive correction factor fCOMCalculating formula be:
fWJY=max (fWJY1,fWJY2)+(n-1)·S
Wherein, fKKFor coefficient of reliability, fYXBCTo run coefficient of variation, fYXZJFor operation week inspection actual measurement value coefficient, fYXGKFor operation Application factor, fGLYSFor power factor coefficient, fYCSXFor abnormal noise coefficient, fSCYXCoefficient, f are influenceed for remanent magnetismGYLDLLeaked for high pressure Electric current influences coefficient, fMFTo seal property coefficient, fWJYFor external insulation coefficient, fWJY1For external insulation antifouling work level error coefficient, fWJY2 For body external insulation surface condition coefficient, fBTWSFor bulk temperature rising coefficient, fDZWSFor connection terminal and drainage thread temperature rise coefficient, fWG For outward appearance coefficient, fWGPFor expander coefficient, fWGDFor base coefficient, fWGEFor secondary terminal box coefficient, fWGYFor drainage thread coefficient, fWGJFor down conductor coefficient, fQTYLFor SF6Gas pressure coefficient, fJYDZFor winding insulation resistance coefficient, fJZSHFor major insulation Medium consumption factor coefficient, fZDRLFor main insulated electro capacity coefficient, fMPJYFor end shield insulating coefficient, fYSPFor oil colours spectral coefficient, fJBFDFor shelf depreciation coefficient, fWSHLFor SF6Gas micro water content coefficient, n are the number that coefficient is more than 1, and S is step-length;
23) according to initial health index HI1With comprehensive correction factor fCOMThe mathematical modeling for establishing current transformer postitallation evaluation is:
HI=max (HI1,HIi)×fCOM
The foundation of the mathematical modeling of described voltage transformer postitallation evaluation specifically includes following steps:
31) the initial health index HI of voltage transformer operation is obtained1, the initial health index HI of voltage transformer operation1Meter Formula is:
B=B0×fAE×fDE
Wherein, HI0For the initial health index of brand-new voltage transformer, HI10For theoretical aging health index, B is actual aging Constant, Δ T are that voltage transformer runs the time limit, T2To assess time, T1For voltage transformer date of putting into operation, T10For mutual induction of voltage The device date of production, B0For theoretical aging constant, T0For the design service life of voltage transformer, fAEFor voltage transformer mounting ring Border coefficient, fDEFor operation of power networks environmental coefficient, fSWDFor humiture coefficient, fDCGRFor interference of electromagnetic field coefficient, fKLWFor particulate matter Concentration factor, fFHXZFor load character coefficient, fYXDYFor working voltage coefficient, fPLBDFor frequency fluctuation coefficient, fXBFor harmonic series Number, fHZPLTo switch combined floodgate coefficient of frequency, fFHBHFor diversity factor, fJDFDFor static discharge coefficient, fLJFor the coefficient that is struck by lightning, n It is more than 1 number for coefficient, S is step-length;
32) the comprehensive correction factor f of voltage transformer operation is obtainedCOM, comprehensive correction factor fCOMCalculating formula be:
fWJY=max (fWJY1,fWJY2)+(n-1)·S
Wherein, fKKFor coefficient of reliability, fYXBCTo run coefficient of variation, fYXZJFor operation week inspection actual measurement value coefficient, fYXGKFor operation Application factor, fGLYSFor power factor coefficient, fYCSXFor abnormal noise coefficient, fMFTo seal property coefficient, fWJYFor external insulation system Number, fWJY1For external insulation antifouling work level error coefficient, fWJY2For body external insulation surface condition coefficient, fBTWSFor bulk temperature rising system Number, fDZWSFor connection terminal and drainage thread temperature rise coefficient, fWGFor outward appearance coefficient, fWGPFor expander coefficient, fWGDFor base coefficient, fWGEFor secondary terminal box coefficient, fWGYFor drainage thread coefficient, fWGJFor down conductor coefficient, fJJDZFor capacitor electrode insulation Resistance, fZJBYQFor intermediate transformer secondary winding insulaion resistance coefficient, fFYQJSFor capacitive divider medium consumption factor coefficient, fDRLFor capacitive divider electric capacity coefficient of discharge, fQTYLFor SF6Gas pressure coefficient, fJYDZFor winding insulation resistance coefficient, fJZSHFor Winding insulation medium consumption factor coefficient, fZJJSFor support insulation dissipation factor, fYSPFor oil colours spectral coefficient, fJBFDFor part Discharge coefficient, fWSHLFor SF6Gas micro water content coefficient, n are the number that coefficient is more than 1, and S is step-length;
33) according to initial health index HI1With comprehensive correction factor fCOMThe mathematical modeling for establishing voltage transformer postitallation evaluation is:
HI=max (HI1,HIi)×fCOM
The foundation of the mathematical modeling of described metering device secondary circuit postitallation evaluation specifically includes following steps:
41) the initial health index HI of metering device secondary circuit operation is obtained1, what metering device secondary circuit was run is initially good for Health index HI1Calculating formula be:
HI1=max (HIDL,HIPTYJ,HIPTFH,HICTFH)
B=B0×fAE×fDE
Wherein, HIPTYJFor PT secondary voltage drop initial health indexes, HIPTFHFor PT secondary load initial health indexes, HICTFHFor CT Secondary load initial health index, HIDLFor cable initial health index, HI0For the initial strong of brand-new metering device secondary circuit Health index, B are actual aging constant, and Δ T is that metering device secondary circuit runs the time limit, T2To assess time, T1For metering device Secondary circuit date of putting into operation, B0For theoretical aging constant, T0For the design service life of metering device secondary circuit, fAEFor metering Device secondary circuit installation environment coefficient, fDEFor operation of power networks environmental coefficient, fSWDFor humiture coefficient, fDCGRDone for electromagnetic field Disturb coefficient, fKLWFor particle concentration coefficient, fFHXZFor load character coefficient, fYXDYFor working voltage coefficient, fPLBDFor frequency wave Dynamic coefficient, fXBFor harmonic constant, fHZPLTo switch combined floodgate coefficient of frequency, fFHBHFor diversity factor, fJDFDFor static discharge system Number, fLJFor the coefficient that is struck by lightning, n is the number that coefficient is more than 1, and S is step-length;
42) the comprehensive correction factor f of metering device secondary circuit operation is obtainedCOM, comprehensive correction factor fCOMCalculating formula be:
Wherein, fPTYJValue coefficient, f are surveyed for PT secondary voltage drops errorPTFHValue coefficient, f are surveyed for PT secondary loadsCTFHFor CT bis- Secondary load measurement value coefficient, fZHWCFor metering device composition error, fCTKLFor CT secondary circuits open circuit coefficient, fCTDLFor CT bis- times Loop short cut factor, fPTQXFor PT secondary circuit phase shortage coefficients, fPTDLFor PT secondary loop short circuit coefficients, n is coefficient more than 1 Number, S are step-length;
43) according to initial health index HI1With comprehensive correction factor fCOMEstablish the mathematics of metering device secondary circuit postitallation evaluation Model is:
HI=HI1×fCOM
CN201510331287.0A 2015-06-15 2015-06-15 A kind of evaluation method of Electric Energy Tariff Point Metering Device running status Active CN104880691B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201510331287.0A CN104880691B (en) 2015-06-15 2015-06-15 A kind of evaluation method of Electric Energy Tariff Point Metering Device running status

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201510331287.0A CN104880691B (en) 2015-06-15 2015-06-15 A kind of evaluation method of Electric Energy Tariff Point Metering Device running status

Publications (2)

Publication Number Publication Date
CN104880691A CN104880691A (en) 2015-09-02
CN104880691B true CN104880691B (en) 2018-04-03

Family

ID=53948257

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201510331287.0A Active CN104880691B (en) 2015-06-15 2015-06-15 A kind of evaluation method of Electric Energy Tariff Point Metering Device running status

Country Status (1)

Country Link
CN (1) CN104880691B (en)

Families Citing this family (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106680759A (en) * 2017-01-05 2017-05-17 云南电网有限责任公司电力科学研究院 Operational monitoring estimation method and apparatus for gateway metering equipment
CN111239516A (en) * 2020-01-19 2020-06-05 广东电网有限责任公司计量中心 Method and device for predicting service life of mutual inductor
CN112485514A (en) * 2020-11-14 2021-03-12 国网江苏省电力有限公司营销服务中心 Method for evaluating uncertainty of power consumption of electric balance
CN114280528B (en) * 2021-12-23 2022-11-15 国网河北省电力有限公司营销服务中心 Misalignment online replacement system applied to gateway meter

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102914761A (en) * 2012-11-14 2013-02-06 浙江省电力公司电力科学研究院 System and method for monitoring quality of intelligent electric energy meter
CN203149108U (en) * 2013-01-08 2013-08-21 上海市电力公司 Single-phase intelligent electric energy meter collector compatible-type automation verification system
EP2720063A1 (en) * 2012-10-12 2014-04-16 ALSTOM Transport SA Automatic calibration of energy meter central unit
CN104267373A (en) * 2014-10-17 2015-01-07 成都思晗科技有限公司 Gateway meter assessment device
CN104597426A (en) * 2014-12-17 2015-05-06 浙江涵普电力科技有限公司 Remote online monitoring method of energy measurement device
CN104678348A (en) * 2012-10-29 2015-06-03 江苏省电力公司常州供电公司 Remote monitoring and diagnosing method for electric energy metering device with high efficiency

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
EP2720063A1 (en) * 2012-10-12 2014-04-16 ALSTOM Transport SA Automatic calibration of energy meter central unit
CN104678348A (en) * 2012-10-29 2015-06-03 江苏省电力公司常州供电公司 Remote monitoring and diagnosing method for electric energy metering device with high efficiency
CN102914761A (en) * 2012-11-14 2013-02-06 浙江省电力公司电力科学研究院 System and method for monitoring quality of intelligent electric energy meter
CN203149108U (en) * 2013-01-08 2013-08-21 上海市电力公司 Single-phase intelligent electric energy meter collector compatible-type automation verification system
CN104267373A (en) * 2014-10-17 2015-01-07 成都思晗科技有限公司 Gateway meter assessment device
CN104597426A (en) * 2014-12-17 2015-05-06 浙江涵普电力科技有限公司 Remote online monitoring method of energy measurement device

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
电能计量装置运行评价方法研究;黄俐萍,王卉,杜卫华;《华东电力》;20141124;第42卷(第11期);第2322页第1-3段,第2324页第3部分第1段-2326页第5部分最后一段 *

Also Published As

Publication number Publication date
CN104880691A (en) 2015-09-02

Similar Documents

Publication Publication Date Title
US10209288B2 (en) Transformer monitoring and data analysis systems and methods
US12019125B2 (en) Monitoring and data analysis systems and methods
US20210116517A1 (en) Fire mitigation and downed conductor detection systems and methods
CN104914394B (en) A kind of evaluation method of current transformer operation
Honrubia‐Escribano et al. Power quality surveys of photovoltaic power plants: characterisation and analysis of grid‐code requirements
US8285500B2 (en) System and method for providing power distribution system information
US10852362B2 (en) Transformer monitoring and data analysis systems and methods
CN104880691B (en) A kind of evaluation method of Electric Energy Tariff Point Metering Device running status
CN104991223A (en) Watt-hour meter state assessment index selection and quantization method
CN110146840A (en) A kind of recent life-span prediction method of batch electric energy meter based on more stress influences
US11243268B2 (en) Systems and methods for monitoring transformers and performing actions based on the monitoring
CN104880690B (en) A kind of evaluation method of electric energy meter operation
CA3113745A1 (en) Fire mitigation and downed conductor detection systems and methods
Akintola Reliability evaluation of secondary distribution system in nigeria: a case study of Ayetoro 1 substation, Aguda, Lagos State
CN108038569A (en) A kind of grid-connected power predicating method of distributed photovoltaic and system
WO2022098365A1 (en) Fire mitigation and downed conductor detection systems and methods
Moldoveanu et al. Requirements of a real time monitoring and analysis system of power losses in electrical transmission and distribution systems
Jiangming et al. Life Prediction of Electric Energy Meter Based on Electric Power Big Data
CN104898082B (en) A kind of evaluation method of voltage transformer operation
Schenkman et al. Electrical energy storage data submission guidelines
Browne et al. Monitoring intelligent distribution power systems—A power quality plan
Raja et al. Practices in Power System Management in India
Salman Microgrid in future distribution electrical grids
Salman Micronät i framtida distributionsnät
Salim et al. Experience in online power quality monitoring through VPN

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
EXSB Decision made by sipo to initiate substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant