CN102298135A - Artificial verification system - Google Patents

Artificial verification system Download PDF

Info

Publication number
CN102298135A
CN102298135A CN2011102072212A CN201110207221A CN102298135A CN 102298135 A CN102298135 A CN 102298135A CN 2011102072212 A CN2011102072212 A CN 2011102072212A CN 201110207221 A CN201110207221 A CN 201110207221A CN 102298135 A CN102298135 A CN 102298135A
Authority
CN
China
Prior art keywords
electric energy
energy meter
calibrating
module
control
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN2011102072212A
Other languages
Chinese (zh)
Inventor
姜雪明
王炜
张燕
吴坚
肖涛
周永佳
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
State Grid Corp of China SGCC
Zhejiang Electric Power Co
Original Assignee
Zhejiang Electric Power Co
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Zhejiang Electric Power Co filed Critical Zhejiang Electric Power Co
Priority to CN2011102072212A priority Critical patent/CN102298135A/en
Publication of CN102298135A publication Critical patent/CN102298135A/en
Pending legal-status Critical Current

Links

Images

Landscapes

  • Testing And Monitoring For Control Systems (AREA)

Abstract

The invention discloses an artificial verification system. In the current artificial verification, meters to be verified/detected are conveyed to various verification device appointed regions in an automatic transmission manner, but feeding, line connection and disconnection, blanking, wiring list cover covering, sealing, certification sticking, boxing and the like, can be finished by virtue of manpower; a lot of repetitive and mechanical works exists; the labour intensity is high; the efficiency is restricted; and the production task cannot realize supply while needing. The system disclosed by the invention comprises a pressure resistant device and a verification device. The system is characterized by further comprising a conveying line, one end of which is connected with a warehousing system, a temporary storage platform connected with the other end of the conveying line, an automatic guided vehicle travelling to and from the temporary storage platform and various devices so as to convey box meters, an automatic sealing and marking device for automatically sealing and marking the qualified meters, and a production dispatching platform for uniformly dispatching and managing the meters. An automatic control technology is adopted. The verification/detection working efficiency can be increased integrally. The labour intensity is reduced, and the like.

Description

Artificial verification system
Technical field
The present invention relates to a kind of artificial verification system.
Background technology
The electric energy metering device of electric system electric energy metrical technical body is examined and determine robotization, the intellectuality that has realized the calibrating overall process in batches at present, but full performance sampling test, supply of material back warehouse-in sampling Detection before the supply of material of electric energy metering device, its test item is various as requested, test is consuming time, still need be by artificial calibrating; The bug list and the client of electric energy metering device appearance when operation simultaneously have the query table need send laboratory qualification/calibrating back to, and evaluation/verification process needs to analyze while observing, still need be by artificial evaluation/calibrating.Though the table meter that artificial at present calibrating will have been examined and determine/detect by automatic transmission mode is transported to each calibrating installation appointed area, but still need by artificial material loading, connect take out stitches, blanking, lid connection table lid, seal, subsides conformity certification, vanning etc., exist a large amount of repetitions, mechanical work, the labour intensity height, efficient is restricted.Though simultaneously verification task is assigned by the power marketing infosystem, lacks unified production scheduling platform, production task promptly need can not accomplish i.e. confession, when plant failure or uncomfortable need of personnel be counted Hui Ku once more with the material object table, the work flow rollback.
Summary of the invention
The technical assignment of the technical problem to be solved in the present invention and proposition is that the prior art scheme is improved and improved, and a kind of artificial verification system is provided, to reach the purpose of low-intensity, high-level efficiency detection.For this reason, the present invention takes following technical scheme.
Artificial verification system, comprise pressure-resistant apparatus, calibrating installation, it is characterized in that: it comprises that also an end is used for the pipeline that is connected with warehousing system, the temporary storage platform that is connected with the pipeline other end, is used to travel to and fro between temporary storage platform and each device in the automatic guided vehicle of conveying box table and be used for eligible list is sealed up and the sealing up marking device automatically and be used for the production scheduling platform that his-and-hers watches are counted uniform dispatching, management of mark automatically.Temporary storage platform and each pressure-resistant apparatus, calibrating installation are set, seal up route between the mark equipment automatically, automatic guided vehicle is travelled to and fro between between temporary storage platform and each device by the route that is provided with the case table of each cargo handling operation is carried, reduce labour intensity, realized automatic charging, blanking.The production scheduling platform of setting up makes production task promptly need i.e. confession, is convenient to production management; Automatically seal up marking device and reduce a large amount of, repetition, mechanical work.The technical program is improved the distributed artificial calibrating mode of tradition, adopt centralized arrangement, uniform dispatching, centralized control, by the production scheduling platform verification task is carried out uniform dispatching, through automatic conveying equipment---automatic guided vehicle is realized promptly need promptly supplying, the real time job process monitoring, analyze and grasp production status and production production capacity, accomplish that production management becomes more meticulous.Improve electric energy metering device a large amount of repeatability, mechanical manual work in calibrating/testing process simultaneously, adopt automatic control technology, the realization electric energy metering device is sealed up mark work automatically, has comprehensive raising calibrating, reduces advantages such as labour intensity.
As the further of technique scheme improved and replenish, the present invention also comprises following additional technical feature.
Described pressure-resistant apparatus and calibrating installation be equipped with the band cylinder connect its string-removing mechanism and be used to control connect its string-removing mechanism action connect its string-removing mechanism control module, the described action his-and-hers watches meter of its string-removing mechanism control module by control cylinder that connect connects and takes out stitches.Adopt the automatic connection mode, improve the efficient of artificial calibrating and the security of work.
Described calibrating installation comprises transformer calibrating device, electric energy meter calibrating apparatus, and described pressure-resistant apparatus comprises mutual inductor pressure-resistant apparatus, electric energy meter pressure-resistant apparatus.
Electric energy meter calibrating apparatus comprise be used to install calibrating software with control test equipment and handle testing result computing machine, be used to take place the time clock of constant frequency the standard time clock instrument, be standard electric energy meter and tested electric energy meter the program control source of three-phase that three-phase current and voltage are provided, as the standard electric energy meter with reference to electric energy meter of tested electric energy meter; Be used for according to standard electric energy meter and standard time clock instrument calculate tested electric energy meter error Error Calculator, be used to test the tested consumption of boasting of one's bit of contribution the power consumption test instrument, be used to realize the communication module that communicates to connect between computing machine and equipment, the tested electric energy meter; Described standard electric energy meter is for measuring active energy and reactive energy simultaneously and exporting the standard electric energy meter of active energy pulse and reactive energy pulse simultaneously.Standard electric energy meter is realized saving the calibrating time simultaneously to the idle synchronous verification of having of electric energy meter for measuring active energy and reactive energy simultaneously and exporting the standard electric energy meter of active energy pulse and reactive energy pulse simultaneously, increases work efficiency.
The shared standard time clock instrument of a plurality of electric energy meter calibrating apparatus, the output terminal of standard time clock instrument connects a drive plate that is used for high-frequency impulse frequency division and shaping, a plurality of isolation switch boards that are used for electrical isolation that the output terminal of drive plate connects, the delivery outlet of isolating switch boards is connected with calibrating installation to give each calibrating installation so that electric energy meter calibrating apparatus is shared a standard time clock instrument after isolating with sub-frequency clock signal.The shared standard time clock instrument of electric energy meter calibrating apparatus, realize the clock system centralized control, need on every cover calibrating installation, not dispose independent standard clock instrument, cost of investment and maintenance cost have been reduced, solve the annual loaded down with trivial details task that the standard time clock instrument of each matched with devices need be inspected by ready samples one by one, only needed censorship one cover standard time clock instrument and supporting drive plate thereof; In the concentrated electric energy meter calibrating apparatus, owing to only need the punctual clock instrument of a station symbol, equipment cost is low, even adopt the high accuracy clock instrument with raising calibrating accuracy, degree of stability, and the corresponding increase of its cost, but whole cost still obviously descends.
 
Described production scheduling platform is provided with task and arranges module, calibrating or detect operation Coordination module, warehousing and storage activities Coordination module, monitoring management module and query statistic analysis module to realize task arrangement, calibrating or to detect operation coordination, warehousing and storage activities coordination, monitoring management and relevant inquiring function of statistic analysis.
Described pressure-resistant apparatus is provided with control, project test and the unusual control that the withstand voltage test module is used for program control source and reports to the police, described withstand voltage test module be installed in the PC or the PLC single-chip microcomputer in.
Described calibrating installation is provided with control, project test and the unusual control that assay module is used for program control source and reports to the police, described assay module be installed in the PC or the PLC single-chip microcomputer in.
Beneficial effect: be to have adopted to seal up the mark technology automatically 1,, realize sealing up automatically and the junction of the edges of two sheets of paper mark function of calibrating information between seal and watchcase of seal; 2, adopt air pressure connection and ripping to control automatically, realize artificial calibrating operation automatic connection, take out stitches; 3, the shared standard time clock instrument of electric energy meter calibrating apparatus is realized the clock system centralized control, need not dispose independent standard clock instrument on every cover calibrating installation, has reduced cost of investment and maintenance cost; 4, be to adopt idle synchronous verification is arranged, can effectively save the calibrating time, increase work efficiency; 5, be employing production scheduling platform, to calibrating operation and warehousing and storage activities united and coordinating, promptly needing realize i.e. confession, in real time monitoring task process, grasp production status and production production capacity.
Description of drawings
Fig. 1 is a theory diagram of the present invention.
Fig. 2 is a process flow diagram of the present invention.
Embodiment
Below in conjunction with Figure of description technical scheme of the present invention is described in further detail.
As shown in Figure 1, the present invention includes pressure-resistant apparatus, calibrating installation, an end and be used for the pipeline that is connected with warehousing system, the temporary storage platform that is connected with the pipeline other end, be used to travel to and fro between temporary storage platform and each device in the automatic guided vehicle of conveying box table and be used for eligible list is sealed up and the sealing up marking device automatically and be used for the production scheduling platform that his-and-hers watches are counted uniform dispatching, management of mark automatically.Wherein, pressure-resistant apparatus and calibrating installation be equipped with the band cylinder connect its string-removing mechanism and be used to control connect its string-removing mechanism action connect its string-removing mechanism control module, connect the action his-and-hers watches meter of its string-removing mechanism control module by control cylinder and connect and take out stitches.Calibrating installation comprises transformer calibrating device, electric energy meter calibrating apparatus, and pressure-resistant apparatus comprises mutual inductor pressure-resistant apparatus, electric energy meter pressure-resistant apparatus.
Electric energy meter calibrating apparatus comprise be used to install calibrating software with control test equipment and handle testing result computing machine, be used to take place the time clock of constant frequency the standard time clock instrument, be standard electric energy meter and tested electric energy meter the program control source of three-phase that three-phase current and voltage are provided, as the standard electric energy meter with reference to electric energy meter of tested electric energy meter; Be used for according to standard electric energy meter and standard time clock instrument calculate tested electric energy meter error Error Calculator, be used to test the tested consumption of boasting of one's bit of contribution the power consumption test instrument, be used to realize the communication module that communicates to connect between computing machine and equipment, the tested electric energy meter; Standard electric energy meter is for measuring active energy and reactive energy simultaneously and exporting the standard electric energy meter of active energy pulse and reactive energy pulse simultaneously.
For reducing cost, the shared standard time clock instrument of a plurality of electric energy meter calibrating apparatus, the output terminal of standard time clock instrument connects a drive plate that is used for high-frequency impulse frequency division and shaping, a plurality of isolation switch boards that are used for electrical isolation that the output terminal of drive plate connects, the delivery outlet of isolating switch boards is connected with calibrating installation to give each calibrating installation so that electric energy meter calibrating apparatus is shared a standard time clock instrument after isolating with sub-frequency clock signal.For improving calibration accuracy, the standard time clock instrument adopts 1 * 10 -8The high precision clock source, it exports to the shared clock source of drive plate as a plurality of electric energy meter calibrating apparatus by shielding line.
The production scheduling platform is provided with task and arranges module, calibrating or detect operation Coordination module, warehousing and storage activities Coordination module, monitoring management module and query statistic analysis module to realize task arrangement, calibrating or to detect operation coordination, warehousing and storage activities coordination, monitoring management and relevant inquiring function of statistic analysis.Pressure-resistant apparatus is provided with control, project test and the unusual control that the withstand voltage test module is used for program control source and reports to the police, the withstand voltage test module be installed in the PC or the PLC single-chip microcomputer in.Calibrating installation is provided with control, project test and the unusual control that assay module is used for program control source and reports to the police, assay module be installed in the PC or the PLC single-chip microcomputer in.
The course of work: as shown in Figure 2, the table case that warehousing system will be equipped with electric energy meter to be checked is put in temporary storage platform by pipeline, table case on the temporary storage platform is delivered to pressure-resistant apparatus through automatic guided vehicle and is entered withstand voltage test, carry out eligible list vanning and the vanning of defective table successively by the manual sorting after withstand voltage test is finished, the qualified case table of withstand voltage test is delivered to calibrating installation again and examines and determine; Carry out eligible list vanning and the vanning of defective table successively by the manual sorting again after calibrating is finished, qualified case table is delivered to and seals up marking device automatically, finishes sealing up and mark of eligible list meter again.Behind full one case of the defective case table of each link or the not trunkful after all operation is finished be delivered to warehousing system and store.

Claims (8)

1. artificial verification system, comprise pressure-resistant apparatus, calibrating installation, it is characterized in that: it comprises that also an end is used for the pipeline that is connected with warehousing system, the temporary storage platform that is connected with the pipeline other end, is used to travel to and fro between temporary storage platform and each device in the automatic guided vehicle of conveying box table and be used for eligible list is sealed up and the sealing up marking device automatically and be used for the production scheduling platform that his-and-hers watches are counted uniform dispatching, management of mark automatically.
2. artificial verification system according to claim 1, it is characterized in that: described pressure-resistant apparatus and calibrating installation be equipped with the band cylinder connect its string-removing mechanism and be used to control connect its string-removing mechanism action connect its string-removing mechanism control module, the described action his-and-hers watches meter of its string-removing mechanism control module by control cylinder that connect connects and takes out stitches.
3. artificial verification system according to claim 2 is characterized in that: described calibrating installation comprises transformer calibrating device, electric energy meter calibrating apparatus, and described pressure-resistant apparatus comprises mutual inductor pressure-resistant apparatus, electric energy meter pressure-resistant apparatus.
4. artificial verification system according to claim 3 is characterized in that: electric energy meter calibrating apparatus comprise be used to install calibrating software with control test equipment and handle testing result computing machine, be used to take place the time clock of constant frequency the standard time clock instrument, be standard electric energy meter and tested electric energy meter the program control source of three-phase that three-phase current and voltage are provided, as the standard electric energy meter with reference to electric energy meter of tested electric energy meter; Be used for according to standard electric energy meter and standard time clock instrument calculate tested electric energy meter error Error Calculator, be used to test the tested consumption of boasting of one's bit of contribution the power consumption test instrument, be used to realize the communication module that communicates to connect between computing machine and equipment, the tested electric energy meter; Described standard electric energy meter is for measuring active energy and reactive energy simultaneously and exporting the standard electric energy meter of active energy pulse and reactive energy pulse simultaneously.
5. artificial verification system according to claim 4, it is characterized in that: the shared standard time clock instrument of a plurality of electric energy meter calibrating apparatus, the output terminal of standard time clock instrument connects a drive plate that is used for high-frequency impulse frequency division and shaping, a plurality of isolation switch boards that are used for electrical isolation that the output terminal of drive plate connects, the delivery outlet of isolating switch boards is connected with calibrating installation to give each calibrating installation so that electric energy meter calibrating apparatus is shared a standard time clock instrument after isolating with sub-frequency clock signal.
6. artificial verification system according to claim 1 is characterized in that: described production scheduling platform is provided with task and arranges module, calibrating or detect operation Coordination module, warehousing and storage activities Coordination module, monitoring management module and query statistic analysis module to realize task arrangement, calibrating or to detect operation coordination, warehousing and storage activities coordination, monitoring management and relevant inquiring function of statistic analysis.
7. artificial verification system according to claim 1, it is characterized in that: described pressure-resistant apparatus is provided with control, project test and the unusual control that the withstand voltage test module is used for program control source and reports to the police, described withstand voltage test module be installed in the PC or the PLC single-chip microcomputer in.
8. artificial verification system according to claim 1 is characterized in that: described calibrating installation is provided with control, project test and the unusual control that assay module is used for program control source and reports to the police, described assay module be installed in the PC or the PLC single-chip microcomputer in.
CN2011102072212A 2011-07-22 2011-07-22 Artificial verification system Pending CN102298135A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2011102072212A CN102298135A (en) 2011-07-22 2011-07-22 Artificial verification system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2011102072212A CN102298135A (en) 2011-07-22 2011-07-22 Artificial verification system

Publications (1)

Publication Number Publication Date
CN102298135A true CN102298135A (en) 2011-12-28

Family

ID=45358689

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2011102072212A Pending CN102298135A (en) 2011-07-22 2011-07-22 Artificial verification system

Country Status (1)

Country Link
CN (1) CN102298135A (en)

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102565748A (en) * 2012-01-11 2012-07-11 深圳市科陆电子科技股份有限公司 Automatic seal device and method for intelligent watt-hour meter
CN102565747A (en) * 2012-01-10 2012-07-11 深圳市科陆电子科技股份有限公司 Automatic verification system and method for single-phase intelligent watt-hour meter
CN104049155A (en) * 2014-02-19 2014-09-17 上海思创电器设备有限公司 Electrical equipment detection line and detection method based on automatic guidance carrier vehicle
CN104062520A (en) * 2014-02-19 2014-09-24 上海思创电器设备有限公司 Application of automatic guide transporter in production line for detecting power equipment
CN105807248A (en) * 2015-09-06 2016-07-27 江苏盛德电子仪表有限公司 Electric energy meter function test tool

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101539617A (en) * 2009-04-16 2009-09-23 绍兴电力局 Automatic holographic management system integrating detection of electric energy meter and warehousing management
CN101592717A (en) * 2009-06-30 2009-12-02 深圳市科陆电子科技股份有限公司 The method of automatically calibrating electrical instrument and system thereof
CN102081153A (en) * 2011-01-31 2011-06-01 浙江省电力公司 Clock system standard source and work method
CN202281834U (en) * 2011-07-22 2012-06-20 浙江省电力公司 Artificial verification system

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101539617A (en) * 2009-04-16 2009-09-23 绍兴电力局 Automatic holographic management system integrating detection of electric energy meter and warehousing management
CN101592717A (en) * 2009-06-30 2009-12-02 深圳市科陆电子科技股份有限公司 The method of automatically calibrating electrical instrument and system thereof
CN102081153A (en) * 2011-01-31 2011-06-01 浙江省电力公司 Clock system standard source and work method
CN202281834U (en) * 2011-07-22 2012-06-20 浙江省电力公司 Artificial verification system

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
张燕 等: "电能表智能化检定流水线系统的研究与应用", 《电测与仪表》 *

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102565747A (en) * 2012-01-10 2012-07-11 深圳市科陆电子科技股份有限公司 Automatic verification system and method for single-phase intelligent watt-hour meter
CN102565748A (en) * 2012-01-11 2012-07-11 深圳市科陆电子科技股份有限公司 Automatic seal device and method for intelligent watt-hour meter
CN102565748B (en) * 2012-01-11 2017-05-31 深圳市科陆电子科技股份有限公司 Intelligent electric energy meter automatic seal device and method
CN104049155A (en) * 2014-02-19 2014-09-17 上海思创电器设备有限公司 Electrical equipment detection line and detection method based on automatic guidance carrier vehicle
CN104062520A (en) * 2014-02-19 2014-09-24 上海思创电器设备有限公司 Application of automatic guide transporter in production line for detecting power equipment
CN105807248A (en) * 2015-09-06 2016-07-27 江苏盛德电子仪表有限公司 Electric energy meter function test tool

Similar Documents

Publication Publication Date Title
CN102298135A (en) Artificial verification system
CN103064055A (en) Single phase intelligent electric energy meter collector compatibility type automation verification system and method
CN205177145U (en) Power consumption information acquisition test terminal
CN203044368U (en) Transferring and loading mechanism for automatically sorting electric energy meters
CN202886589U (en) A six-position electric energy meter positioning and interfacing device
CN204731406U (en) A kind of intelligent electric energy meter fault sorting check device
CN109212460B (en) Communication unit detection tool and detection method
CN102608562B (en) Integrated detection production line of electric energy meter, terminal and concentrator
CN201732472U (en) Automatic testing device of concentrated electric energy meter reading equipment
CN103323686A (en) Smart power grid power quality analyzer
CN202281834U (en) Artificial verification system
CN104950841B (en) A kind of coordinated dispatching method of extensive Intelligent electric energy meter automation detecting
CN106970263A (en) The efficiency metering system and metering method of a kind of electric vehicle alternating-current charging pile
CN107295139A (en) Mainboard ATA automatization test systems
CN203178469U (en) Portable transmitter verification meter
AU2014100711A4 (en) A patrol verification experimental system of power transmission and transformation state maintenance test equipment
CN114325550B (en) Automatic diagnosis system and method for abnormal meter positions of electric energy meter verification assembly line
CN202524168U (en) Power quality data monitoring device
CN203486411U (en) Oil tank truck transport detection system
CN106527413B (en) On-site fault diagnosis system
CN201438215U (en) Pipelined electric energy meter locating wiring system
CN202693781U (en) Intelligent electric energy meter calibrating device for power grid
Li et al. Research on intelligent operation and maintenance platform based on automatic calibration system of electric energy meter
CN107085139A (en) The efficiency metering system and metering method of a kind of electric automobile direct-current charging post
CN209417170U (en) A kind of omnipotent detection station of power equipment quality based on modularized design

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
ASS Succession or assignment of patent right

Owner name: STATE ELECTRIC NET CROP.

Effective date: 20130117

C41 Transfer of patent application or patent right or utility model
TA01 Transfer of patent application right

Effective date of registration: 20130117

Address after: 310007 Huanglong Road, Hangzhou, Zhejiang, No. 8, No.

Applicant after: Zhejiang Electric Power Company

Applicant after: State Grid Corporation of China

Address before: 310007 Huanglong Road, Hangzhou, Zhejiang, No. 8, No.

Applicant before: Zhejiang Electric Power Company

C12 Rejection of a patent application after its publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20111228