CN201387482Y - Automatic holographic management system integrating electric energy meter verification and storage management - Google Patents
Automatic holographic management system integrating electric energy meter verification and storage management Download PDFInfo
- Publication number
- CN201387482Y CN201387482Y CN200920117943U CN200920117943U CN201387482Y CN 201387482 Y CN201387482 Y CN 201387482Y CN 200920117943 U CN200920117943 U CN 200920117943U CN 200920117943 U CN200920117943 U CN 200920117943U CN 201387482 Y CN201387482 Y CN 201387482Y
- Authority
- CN
- China
- Prior art keywords
- electric energy
- energy meter
- conveying belt
- automatic
- belt
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Lifetime
Links
Images
Landscapes
- Testing Electric Properties And Detecting Electric Faults (AREA)
Abstract
The utility model discloses an automatic holographic management system integrating electric energy meter verification and storage management, which comprises an electric energy meter verification automation production line standard device, a case unpacking machine, a case packing machine and a three-dimensional data base. The three-dimensional data base is respectively connected with the case packing machine and the case unpacking machine, and the case packing machine and the case unpacking machine are respectively connected with the electric energy meter verification automation production line standard device through conveying belts. The automatic holographic management system changes large quantities of repeated and mechanical manual modes during a total electric energy meter operation process, and has automation functions of automatic stock removal, distribution, feeding, location, wire connection, image identification, temperature monitoring and control, wire removal, discharge, case packing, disc grouping and storage.
Description
Technical field
The utility model relates to the automatic holographic management system of a kind of electric energy meter calibration, warehousing management and one.
Background technology
In the electric system scope, city-level electric energy metering verification mechanism has realized the management mode of concentrated calibrating, but at present, going out to put in storage aspect the warehousing management, after the electric energy meter calibration task is assigned, need manually to be dispensed in every traditional electric energy meter standard set-up, then by artificial material loading calibrating by artificial outbound.And in electric energy meter calibration/context of detection, traditional electric energy meter standard set-up adopts intelligent program control type calibrating pattern, realization project calibrating/detection robotization.But before carrying out calibrating/detection, at first need every electric energy meter to be got from hopper on the electric energy meter standard set-up table top by manual mode, again by manual mode with every electric energy meter locate, wiring, wait to finish above-mentioned work after, carry out electric energy meter calibration/detection.In calibrating/testing process, need manually the image of every electric energy meter LCD to be maked an inspection tour to differentiate; In addition, aspect the reliability that is electrically connected at electric energy meter and electric energy meter standard set-up, also there is not effective heating temp detection means.Calibrating/detection finishes, and manually takes out stitches, unloads table, and is qualified, manually by the order of the packing list certified products hopper of packing into; Underproof, the unacceptable product hopper of manually packing into.Need by the blanking of manually taking out stitches after calibrating finishes, the man power encasement manually organizes pallet, manually puts in storage again.Because electric energy meter outbound in the whole process, allot, links such as material loading, location, wiring, scanning office number, liquid crystal are differentiated, taken out stitches, vanning, blanking, group dish, warehouse-in all adopt artificial mode, exist a large amount of repeatability, mechanical work, the labour intensity height, efficient is restricted.Simultaneously, do not have effective detection means aspect the reliability being electrically connected, occur the heating of electric energy meter or electric energy meter standard set-up sometimes and damage.
The utility model content
The utility model is meant the automatic holographic management system of electric energy meter calibration, warehousing management and one, purpose be in the whole electric energy operation process, change repeat in a large number, mechanical artificial mode, have automatic withdrawing, allocation automatically, automatic charging, location, automatic connection, automatic image identification, automatic temperature-adjusting monitoring, automatic clearing, automatic blanking, automatic boxing, group dish, the automation function of putting in storage automatically automatically automatically.
In order to achieve the above object, the technical solution of the utility model is:
The automatic holographic management system of a kind of electric energy meter calibration, warehousing management and one comprises automatic assembly line standard apparatus for electric energy meter calibration and three-dimensional table storehouse; Wherein automatic assembly line standard apparatus for electric energy meter calibration is connected with three-dimensional table storehouse.
Described three-dimensional table storehouse comprises piler, fluctuating orbit, pallet fork, first conveying belt, second conveying belt, the 3rd conveying belt, the 4th conveying belt, the 5th conveying belt, the 6th conveying belt, first lifter, second lifter, rail, day rail, tear pallet machine, group pallet machine and delivery platform open; Wherein day rail and ground rail are installed in the wall top and the ground of one deck building respectively, it rail and ground are equipped with fluctuating orbit between the rail, be movably installed with piler on the fluctuating orbit, be movably installed with pallet fork on the piler, delivery platform links to each other with first conveying belt, is equipped with on the first conveying belt end and tears the pallet machine open, tears the pallet machine open and is connected with second conveying belt, second conveying belt is connected with first lifter, and first lifter links to each other with the automatic assembly line standard apparatus for electric energy meter calibration entrance point; The endpiece of automatic assembly line standard apparatus for electric energy meter calibration is connected with the 4th conveying belt, the 4th conveying belt is connected with second lifter, second lifter is connected with the 5th conveying belt, the 5th conveying belt is connected with group pallet machine, group pallet machine is connected with the 6th conveying belt, and the 6th conveying belt is connected with delivery platform.
Described automatic assembly line standard apparatus for electric energy meter calibration comprises the platform of getting in stocks, material loading loop line belt and the automatic standard set-up of electric energy meter; On the entrance point of automatic assembly line standard apparatus for electric energy meter calibration the platform of getting in stocks is installed, the platform of getting in stocks connects the material loading loop line belt, and reclaimer robot and bar-code reader are installed on the material loading loop line belt; The material loading loop line belt connects the automatic standard set-up of electric energy meter, on the automatic standard set-up of electric energy meter the liquid crystal recognition device is installed, input calibrating buffer strip, upper and lower material mechanical arm, air pressure connection and ripping device, liquid crystal image recognition device, infrared temperature measurement apparatus, the translation catching robot; The automatic standard set-up of electric energy meter connects blanking conveying loop line belt simultaneously, and boxing manipulator, bar-code reader are installed on the blanking conveying loop line belt; Boxing manipulator links to each other with the electric energy meter hopper; The electric energy meter hopper links to each other with the 4th conveying belt; Also offer the unacceptable product outlet on the blanking conveying loop line belt; Whole device is controlled the whole streamline course of work by computer program by the streamline switch board, and electric energy meter calibration is controlled electric energy meter calibration/detection by the computing machine calibrating procedure by the calibrating switch board.
The automatic standard set-up of described electric energy meter comprises mainframe, the mainframe top is parallel to be equipped with two tracks, the mainframe both sides are separately installed with electric energy meter error processing module and electric energy meter voltage, electric current output module, mainframe one end is equipped with the electric energy meter calibration buffer strip, and the two ends of mainframe are separately installed with feeding manipulator and blanking mechanical arm; Article two, be separately installed with mobile infrared temperature probe on the track, the liquid crystal identification probe; The mainframe middle part is equipped with dragging track, and the transfer dolly is installed on the dragging track; Article two, be movably installed with the translation catching robot respectively on the track; On the mainframe of dragging track both sides electric energy meter air pressure connection and ripping device is installed; Be connected with electric energy meter on the electric energy meter air pressure connection and ripping device.
Described electric energy meter air pressure connection and ripping device is that a unit combination is arranged setting with 2-100 electric energy meter.
After adopting said structure, good result of the present utility model has: the one, adopt automatic control technology, and realize electric energy meter automatic charging, autoscan, automatic location, automatic boxing; The 2nd, adopt the electric energy meter air pressure termination, realize that electric energy meter connects automatically, takes out stitches, thereby change consuming time, mechanical, repetitive work, improve calibrating comprehensively, obviously reduce labour intensity; The 3rd, adopt conical connecting terminal of electric energy meter and the holder of electric energy meter taper connection table, contacting between realization face and the face makes that to be electrically connected surface of contact big, and contact resistance reduces, and is electrically connected reliable, safety, satisfies big electric current calibrating/test etc.; The 4th, adopt the liquid crystal image recognition system, by servo track, make an inspection tour the image of the LCD of every electric energy meter of identification, guaranteed the correctness of identification, guaranteed work quality; The 5th, adopt infrared temperature measurement apparatus, by servo track, make an inspection tour the temperature of the electric connecting member that detects every connection box of electric energy meter terminal, guaranteed the reliability and the security that are electrically connected; The 6th, adopt three-dimensional table storehouse and automatic assembly line standard apparatus for electric energy meter calibration integrated, realization is examined and determine the electric energy meter automatic withdrawing, allots automatically, is put in storage automatically.Characteristics such as have high efficiency, production cost is low, and labour intensity is little, and is safe, and work quality is good.
Description of drawings
Fig. 1 is a structural representation of the present utility model;
Fig. 2 is the structural representation of automatic assembly line standard apparatus for electric energy meter calibration of the present utility model;
Fig. 3 is the structural representation of the automatic standard set-up of electric energy meter of the present utility model.
Embodiment
Present embodiment is a kind of electric energy meter storage calibrating automated system, as shown in Figure 1 to Figure 3, comprises automatic assembly line standard apparatus for electric energy meter calibration 1A and three-dimensional table storehouse 2A; Wherein automatic assembly line standard apparatus for electric energy meter calibration 1A is connected with three-dimensional table storehouse 2A.
Three-dimensional table storehouse 2A comprises piler 22A, fluctuating orbit 23A, pallet fork 24A, the first conveying belt 25A, the second conveying belt 34A, the 3rd conveying belt 33A, the 4th conveying belt 32A, the 5th conveying belt 35A, the 6th conveying belt 36A, the first lifter 26A, the second lifter 31A, rail 27A, day rail 28, tear pallet machine 29A, group pallet machine 30A and delivery platform 37A open; Wherein day rail 28 and ground rail 27A are installed in the roof and the ground of building respectively, between it rail 28 and the ground rail 27A fluctuating orbit 23A is installed, be movably installed with piler 22A on the fluctuating orbit 23A, be movably installed with pallet fork 24A on the piler 22A, delivery platform 37A links to each other with the first conveying belt 25A, be equipped with on the first conveying belt 25A end and tear pallet machine 29A open, tearing pallet machine 29A open is connected with the second conveying belt 34A, the second conveying belt 34A is connected with the first lifter 26A, and the first lifter 26A links to each other with automatic assembly line standard apparatus for electric energy meter calibration 1A entrance point by the 3rd conveying belt 33A; The endpiece of automatic assembly line standard apparatus for electric energy meter calibration 1A is connected with the 4th conveying belt 32A, the 4th conveying belt 32A is connected with the second lifter 31A, the second lifter 31A is connected with the 5th conveying belt 35A, the 5th conveying belt 35A is connected with group pallet machine 30A, group pallet machine 30A is connected with the 6th conveying belt 36A, and the 6th conveying belt 36A is connected with delivery platform 37A.
Automatic assembly line standard apparatus for electric energy meter calibration comprises the automatic standard set-up 9 of the platform 2 of getting in stocks, material loading loop line belt 5 and electric energy meter; The platform 2 of getting in stocks is installed on the entrance point of automatic assembly line standard apparatus for electric energy meter calibration 1A, and the platform 2 of getting in stocks connects material loading loop line belt 5, and reclaimer robot 4 and bar-code reader 51 are installed on the material loading loop line belt 5; Material loading loop line belt 5 connects the automatic standard set-up 9 of electric energy meter, on the automatic standard set-up 9 of electric energy meter liquid crystal recognition device 92 is installed, input calibrating buffer strip 34, upper and lower material mechanical arm 35, air pressure connection and ripping device 1, liquid crystal image recognition device 37, infrared temperature measurement apparatus 40, translation catching robot 39; The automatic standard set-up 9 of electric energy meter connects blanking conveying loop line belt 7 simultaneously, and boxing manipulator 81, bar-code reader 71 are installed on the blanking conveying loop line belt 7; Boxing manipulator 81 links to each other with electric energy meter hopper 8; Electric energy meter hopper 8 links to each other with the 4th conveying belt 32A; Also offer unacceptable product outlet 82 on the blanking conveying loop line belt 7; By the whole streamline course of work of streamline switch board 54 controls, electric energy meter calibration is controlled electric energy meter calibration/detections by the computing machine calibrating procedure by calibrating switch board 53 to whole device by computer program.The automatic standard set-up 9 of electric energy meter is provided with two.
The automatic standard set-up 9 of electric energy meter comprises mainframe 3, mainframe 3 tops are parallel to be equipped with two tracks 33, mainframe 3 both sides are separately installed with electric energy meter error processing module 31 and electric energy meter voltage, electric current output module 32, mainframe 3 one ends are equipped with electric energy meter calibration buffer strip 34, and the two ends of mainframe 3 are separately installed with feeding manipulator 35 and blanking mechanical arm 36; Article two, be movably installed with infrared temperature probe 40 respectively on the track 33, liquid crystal identification probe 37; Mainframe 3 middle parts are equipped with dragging track 41, and transfer dolly 38 is installed on the dragging track 41; Article two, be movably installed with translation catching robot 39 respectively on the track 33; On the mainframe 3 of dragging track 41 both sides electric energy meter air pressure connection and ripping device 1 is installed; Be connected with electric energy meter 11 on the electric energy meter air pressure connection and ripping device 1.Electric energy meter air pressure connection and ripping device is that a unit combination is arranged setting with 10 electric energy meters.
During work, fluctuating orbit 23A on the three-dimensional table storehouse 2A moves horizontally on sky rail 28 and ground rail 27A, move to the horizontal level of the electric energy meter pallet 211A that will get on the shelf 21A, simultaneously by piler 22A vertical moving on fluctuating orbit 23A, making pallet fork 24A on the piler 22A accurately be positioned at electric energy meter pallet 211A can be with the position of its taking-up; Wherein electric energy meter pallet 211A contains 10 electric energy meter hoppers, and each electric energy meter hopper contains 16 electric energy meters.Pallet fork 24A takes out electric energy meter pallet 211A, be transported to the tray position of putting of delivery platform 37A by piler 22A, be delivered to by the first conveying belt 25A then and tear pallet machine 29A open, tear the pallet mechanical arm open the hopper in the electric energy meter pallet 211A is split into 10 independently hoppers 8, successively with each independently hopper 8 put into the second conveying belt 34A, after being delivered to the first lifter 26A, be promoted to the 3rd transport tape 33A of a floor, the 3rd transport tape 33A is delivered to the platform 2 of getting in stocks with single hopper 8, by reclaimer robot 4 single electric energy meter 11 is taken out from hopper 8, by reclaimer robot 4 single electric energy meter 11 is put into material loading transfer rings tape 5 then, pass through moving of material loading transfer rings tape 5 then, drive current potential table 11 enters the electric energy meter calibration buffer strip 34 on the automatic standard set-up 9 of electric energy meter, and feeding manipulator 35 grasps electric energy meters 11 and puts into transfer dolly 38.
Claims (5)
1, the automatic holographic management system of a kind of electric energy meter calibration, warehousing management and one is characterized in that: comprise automatic assembly line standard apparatus for electric energy meter calibration (1A) and three-dimensional table storehouse (2A); Wherein automatic assembly line standard apparatus for electric energy meter calibration (1A) is connected with three-dimensional table storehouse (2A).
2, a kind of electric energy meter calibration as claimed in claim 1, the automatic holographic management system of warehousing management and one, it is characterized in that: described three-dimensional table storehouse (2A) comprises piler (22A), fluctuating orbit (23A), pallet fork (24A), first conveying belt (25A), second conveying belt (34A), the 3rd conveying belt (33A), the 4th conveying belt (32A), the 5th conveying belt (35A), the 6th conveying belt (36A), first lifter (26A), second lifter (31A), ground rail (27A), it rail (28), tear pallet machine (29A) open, group pallet machine (30A) and delivery platform (37A); Wherein between day rail (28) and the ground rail (27A) fluctuating orbit (23A) is installed, be movably installed with piler (22A) on the fluctuating orbit (23A), be movably installed with pallet fork (24A) on the piler (22A), delivery platform (37A) links to each other with first conveying belt (25A), the pallet machine (29A) of tearing open is installed on first conveying belt (25A) end, tearing pallet machine (29A) open is connected with second conveying belt (34A), second conveying belt (34A) is connected with first lifter (26A), and first lifter (26A) links to each other with automatic assembly line standard apparatus for electric energy meter calibration (1A) entrance point; The endpiece of automatic assembly line standard apparatus for electric energy meter calibration (1A) is connected with the 4th conveying belt (32A), the 4th conveying belt (32A) is connected with second lifter (31A), second lifter (31A) is connected with the 5th conveying belt (35A), the 5th conveying belt (35A) is connected with group pallet machine (30A), group pallet machine (30A) is connected with the 6th conveying belt (36A), and the 6th conveying belt (36A) is connected with delivery platform (37A).
3, the automatic holographic management system of electric energy meter calibration as claimed in claim 1, warehousing management and one is characterized in that: described automatic assembly line standard apparatus for electric energy meter calibration (1A) comprises the platform of getting in stocks (2), material loading loop line belt (5) and the automatic standard set-up of electric energy meter (9); The platform of getting in stocks (2) is installed on the entrance point of automatic assembly line standard apparatus for electric energy meter calibration (1A), and the platform of getting in stocks (2) connects material loading loop line belt (5), and reclaimer robot (4) and bar-code reader (51) are installed on the material loading loop line belt (5); Material loading loop line belt (5) connects the automatic standard set-up of electric energy meter (9), liquid crystal recognition device (92) is installed on the automatic standard set-up of electric energy meter (9), input calibrating buffer strip (34), upper and lower material mechanical arm (35), air pressure connection and ripping device (1), liquid crystal image recognition device (37), infrared temperature measurement apparatus (40), translation catching robot (39); The automatic standard set-up of electric energy meter (9) connects blanking conveying loop line belt (7) simultaneously, and blanking conveying loop line belt (7) goes up installs boxing manipulator (81), bar-code reader (71); Boxing manipulator (81) links to each other with electric energy meter hopper (8); Electric energy meter hopper (8) links to each other with the 4th conveying belt (32A); Also offer unacceptable product outlet (82) on the blanking conveying loop line belt (7); By the whole streamline course of work of streamline switch board (54) control, electric energy meter calibration is controlled electric energy meter calibration/detection by the computing machine calibrating procedure by calibrating switch board (53) to whole device by computer program.
4, the automatic holographic management system of electric energy meter calibration as claimed in claim 3, warehousing management and one, it is characterized in that: the automatic standard set-up of described electric energy meter (9) comprises mainframe (3), parallel two tracks (33) that are equipped with in mainframe (3) top, mainframe (3) both sides are separately installed with electric energy meter error processing module (31) and electric energy meter voltage, electric current output module (32), mainframe (3) one ends are equipped with electric energy meter calibration buffer strip (34), and the two ends of mainframe (3) are separately installed with feeding manipulator (35) and blanking mechanical arm (36); Article two, be movably installed with infrared temperature probe (40) respectively on the track (33), liquid crystal identification probe (37); Mainframe (3) middle part is equipped with dragging track (41), and transfer dolly (38) is installed on the dragging track (41); Article two, be separately installed with activity translation catching robot (39) on the track (33); On the mainframe (3) of dragging track (41) both sides electric energy meter air pressure connection and ripping device (1) is installed; Be connected with electric energy meter (11) on the electric energy meter air pressure connection and ripping device (1).
5, the automatic holographic management system of electric energy meter calibration as claimed in claim 4, warehousing management and one is characterized in that: described electric energy meter air pressure connection and ripping device is that a unit combination is arranged setting with 2-100 electric energy meter.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN200920117943U CN201387482Y (en) | 2009-04-16 | 2009-04-16 | Automatic holographic management system integrating electric energy meter verification and storage management |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN200920117943U CN201387482Y (en) | 2009-04-16 | 2009-04-16 | Automatic holographic management system integrating electric energy meter verification and storage management |
Publications (1)
Publication Number | Publication Date |
---|---|
CN201387482Y true CN201387482Y (en) | 2010-01-20 |
Family
ID=41580018
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN200920117943U Expired - Lifetime CN201387482Y (en) | 2009-04-16 | 2009-04-16 | Automatic holographic management system integrating electric energy meter verification and storage management |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN201387482Y (en) |
Cited By (9)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN101819266A (en) * | 2010-04-01 | 2010-09-01 | 宁波三星电气股份有限公司 | Detecting and setting device on production line of electric energy meters |
CN101539617B (en) * | 2009-04-16 | 2011-04-20 | 绍兴电力局 | Automatic holographic management system integrating detection of electric energy meter and warehousing management |
CN102243483A (en) * | 2011-04-14 | 2011-11-16 | 东莞技研新阳电子有限公司 | Automatic processing system for material checking-accepting information |
CN102565750A (en) * | 2012-01-12 | 2012-07-11 | 华北电网有限公司计量中心 | Detecting method and system for electric energy meter work bin information |
CN102565749A (en) * | 2012-01-11 | 2012-07-11 | 重庆市电力公司电力科学研究院 | Flexible automatic verification system and method for watt-hour meter |
CN103434850A (en) * | 2013-07-10 | 2013-12-11 | 青岛科捷自动化设备有限公司 | Tire carrying and destacking-stacking system and tire warehousing stacking method |
CN104443602A (en) * | 2014-10-20 | 2015-03-25 | 国网重庆市电力公司电力科学研究院 | Automatic unpacking system and method of electric energy meter |
CN106111553A (en) * | 2016-06-24 | 2016-11-16 | 珠海市广浩捷精密机械有限公司 | A kind of photographic head module full-automatic testing streamline |
CN107340491A (en) * | 2017-05-23 | 2017-11-10 | 国网山东省电力公司电力科学研究院 | A kind of the storehouse system of four line one and automatic calibration method |
-
2009
- 2009-04-16 CN CN200920117943U patent/CN201387482Y/en not_active Expired - Lifetime
Cited By (13)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN101539617B (en) * | 2009-04-16 | 2011-04-20 | 绍兴电力局 | Automatic holographic management system integrating detection of electric energy meter and warehousing management |
CN101819266B (en) * | 2010-04-01 | 2012-11-28 | 宁波三星电气股份有限公司 | Detecting and setting device on production line of electric energy meters |
CN101819266A (en) * | 2010-04-01 | 2010-09-01 | 宁波三星电气股份有限公司 | Detecting and setting device on production line of electric energy meters |
CN102243483A (en) * | 2011-04-14 | 2011-11-16 | 东莞技研新阳电子有限公司 | Automatic processing system for material checking-accepting information |
CN102565749B (en) * | 2012-01-11 | 2014-11-05 | 重庆市电力公司电力科学研究院 | Flexible automatic verification system and method for watt-hour meter |
CN102565749A (en) * | 2012-01-11 | 2012-07-11 | 重庆市电力公司电力科学研究院 | Flexible automatic verification system and method for watt-hour meter |
CN102565750A (en) * | 2012-01-12 | 2012-07-11 | 华北电网有限公司计量中心 | Detecting method and system for electric energy meter work bin information |
CN103434850A (en) * | 2013-07-10 | 2013-12-11 | 青岛科捷自动化设备有限公司 | Tire carrying and destacking-stacking system and tire warehousing stacking method |
CN103434850B (en) * | 2013-07-10 | 2015-12-02 | 青岛科捷自动化设备有限公司 | The palletizing method of palletizing system and tire warehouse-in is torn in tire carrying open |
CN104443602A (en) * | 2014-10-20 | 2015-03-25 | 国网重庆市电力公司电力科学研究院 | Automatic unpacking system and method of electric energy meter |
CN106111553A (en) * | 2016-06-24 | 2016-11-16 | 珠海市广浩捷精密机械有限公司 | A kind of photographic head module full-automatic testing streamline |
CN106111553B (en) * | 2016-06-24 | 2019-06-18 | 珠海市广浩捷精密机械有限公司 | A kind of camera module full-automatic testing assembly line |
CN107340491A (en) * | 2017-05-23 | 2017-11-10 | 国网山东省电力公司电力科学研究院 | A kind of the storehouse system of four line one and automatic calibration method |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN101539617B (en) | Automatic holographic management system integrating detection of electric energy meter and warehousing management | |
CN201387482Y (en) | Automatic holographic management system integrating electric energy meter verification and storage management | |
US9207302B2 (en) | Fully-automatic verification system for intelligent electric energy meters | |
CN102288935B (en) | Electric energy meter calibration system | |
CN101464504B (en) | Automatic assembly line standard apparatus for electric energy meter calibration | |
CN201322792Y (en) | Electric energy meter automatic standard apparatus for detecting production lines | |
CN201235348Y (en) | Electronic component detection packing machine | |
CN202400540U (en) | Electric energy meter work-bin detection transport system | |
CN111175524A (en) | Full-automatic intelligent concrete maintenance detection system and method | |
CN105510357A (en) | Smart chip defect inspection machine | |
CN109677867B (en) | Sorting device for preventing error in assembling of driving shaft retaining rings | |
CN207507844U (en) | Soft package lithium battery automatic measuring thickness machine | |
CN102565749A (en) | Flexible automatic verification system and method for watt-hour meter | |
CN102944863A (en) | Automatic verification system and method for intelligent electric energy meters | |
CN109975628B (en) | Automatic matching power distribution automatic terminal continuous detection platform and method | |
CN109975729B (en) | Full-automatic power distribution automation terminal comprehensive detection system and method | |
CN202177942U (en) | Energy meter verification system | |
CN113894062B (en) | Automatic test equipment of detector | |
CN108161389A (en) | Instrument dial plate assembly system | |
CN204086496U (en) | A kind of battery automatically testing sorting equipment | |
CN209815112U (en) | Regulation and control system and detection production line | |
CN114690111A (en) | Online quality check backflow self-checking method for three-phase electric energy meter | |
CN216402854U (en) | Get and put material device and be equipped with two-way fortune material formula test equipment who gets blowing device | |
CN207832924U (en) | The short-circuit detecting and voltage detecting system of pcb board on a kind of assembly line | |
CN108802032A (en) | A kind of automatic test production line |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
CX01 | Expiry of patent term | ||
CX01 | Expiry of patent term |
Granted publication date: 20100120 |