CN202177942U - Energy meter verification system - Google Patents

Energy meter verification system Download PDF

Info

Publication number
CN202177942U
CN202177942U CN2011202632188U CN201120263218U CN202177942U CN 202177942 U CN202177942 U CN 202177942U CN 2011202632188 U CN2011202632188 U CN 2011202632188U CN 201120263218 U CN201120263218 U CN 201120263218U CN 202177942 U CN202177942 U CN 202177942U
Authority
CN
China
Prior art keywords
energy meter
electric energy
calibrating
pipeline
blanking
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Withdrawn - After Issue
Application number
CN2011202632188U
Other languages
Chinese (zh)
Inventor
姜雪明
王炜
张燕
黄金娟
严华江
肖涛
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
State Grid Zhejiang Electric Power Co Ltd
Zhejiang Electric Power Co
Original Assignee
Zhejiang Electric Power Co
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Zhejiang Electric Power Co filed Critical Zhejiang Electric Power Co
Priority to CN2011202632188U priority Critical patent/CN202177942U/en
Application granted granted Critical
Publication of CN202177942U publication Critical patent/CN202177942U/en
Anticipated expiration legal-status Critical
Withdrawn - After Issue legal-status Critical Current

Links

Images

Abstract

The utility model discloses an energy meter verification system which relates to a verification system for singe-phase and three-phase energy meters. At present, in the energy meter verification process, an automatic verification system is not provided and a plurality of artificial detection stations are mainly provided, so that the method has the defects of large labor intensity, artificial error, slow integral verification speed and the like. The energy meter verification system comprises a plurality of verification units which are used for the automatic verification of energy meters, a main conveying line which is used for connecting the verification units and a verification management system which is used for coordinating the work of the verification units; and the main conveying line is divided into an upper conveying line which is used for conveying meter boxes with energy meters to be verified to the verification units and a lower conveying line which is used for conveying the meter boxes with verified energy meters back to a warehouse. The energy meter verification system provided by the utility model has the advantages of high work efficiency, low production cost, low labor intensity, high security and high work quality.

Description

Electric energy meter detecting system
Technical field
The utility model relates to a kind of single, three-phase electric energy meter verification system.
Background technology
At present, in the electric energy meter calibration process, the verification system of a robotization is not mainly many group manual detection stage bodies and forms, and this kind method has labour intensity big, has human error, and whole calibrating speed waits shortcoming slowly.
The utility model content
The technical matters that the utility model will solve and the technical assignment of proposition are that the prior art scheme is improved, and a kind of electric energy meter detecting system is provided, to reach full-automatic calibrating, the purpose of the accuracy of effectively raising the efficiency and examining and determine.For this reason, the utility model is taked following technical scheme.
Electric energy meter detecting system; It is characterized in that; The calibrating management systems that it comprises a plurality of calibrating unit that are used for the electric energy meter automatic Verification, is used to connect the main conveyor line of each calibrating unit and is used to coordinate respectively to examine and determine cell operation, described main conveyor line are divided into and are used to transport table case that electric energy meter to be checked is housed to the last pipeline of calibrating unit and be used to transport the following pipeline that the table case of examining electric energy meter goes back to the warehouse is housed.Realize that by the calibrating management system download of electric energy meter calibration task, execution, scheduling, balanced operation, the request of electric energy meter table case, transmission, bar code read judgement, the shunting of table case, task execution feedback; And the information acquisition of main conveyor line and calibrating unit (comprising system exception information); Make main conveyor line, automatic stereowarehouse, calibrating unit efficiently integrated, realize full-automatic unmanned operation; Thereby change consuming time, machinery, repetitive work, improve calibrating comprehensively, obviously reduce labour intensity.Because the equipment scale of single three-phase verification system is huge; Can solve a large amount of numerous and diverse data and the too much problem of operating point control in a lot of systems through total system control; Adopt centralized control to reach the effect of getting twice the result with half the effort, have high efficiency, production cost is low, labour intensity is little, safe, advantage that work quality is high.
As the further of technique scheme improved and replenish, the utility model also comprises following additional technical feature.
The porch of described main conveyor line is provided with the pan feeding table case buffer area that is used for the scratch list case, is used to read table case bar code to judge that whether the table case readable and that carried of bar code belongs to the table case bar code fetch equipment of current verification task, shows the case buffer area in table case buffer area so that satisfactory table case is got into material before the described table case bar code fetch equipment.
The shunting device that the porch of described calibrating unit is provided with the last pipeline connection of sending with the defeated line of master branches to the corresponding charge gauge case buffer area of examining and determine the unit and being used for the cache table case with the table case that electric energy meter to be checked is housed that will be positioned at pipeline, and the exit of described calibrating unit is provided with the merging equipment that is connected with the following pipeline of main conveyor line and collaborates pipeline extremely down so that the table case of having examined electric energy meter will be housed.
Described shunting device is provided with and is used to read bar code is adjusted the operating type of calibrating unit in judgement table type shunting bar code fetch equipment.
Described calibrating management system comprises that being used to control the warehouse fails the input and output material control module that line coordination transmits with the master; Be used for distribution module to the shunting and the interflow control of single calibrating unit; The top control module that is used for job scheduling and information monitoring is assigned to realize the electric energy meter calibration task; Carry out; Scheduling; Balanced operation; The request of table case; The transmission of table case; Table case bar code reads judgement; Task is carried out feedback; And the integrated main conveyor line of information collection function of main conveyor line and calibrating unit; The warehouse reaches full-automatic unmanned operation purpose with the calibrating unit.
Described electric energy meter calibration unit comprises and is connected the logistics pipeline that is used to carry Turnover Box with main conveyor line; Be positioned at the other feeding device that is used for moving to the electric energy meter that is positioned at logistics pipeline material loading station the calibrating pipeline of logistics pipeline material loading station; Be used for electric energy meter is moved to the calibrating pipeline that respectively installs corresponding station; Be used for electric energy meter is carried out the pressure resistant testing device that high voltage detects; Be used for the program switch flip flop equipment by program switch is renovated and pressed to electric energy meter; Be used for calibrating installation that electric energy meter project to be checked is examined and determine one by one; Be used for the qualified electric energy meter lead sealing and the lead sealing and the laser mark printing device of imprinting identification information; Be positioned at the electric energy meter that other being used for of logistics pipeline blanking station will detect completion and transfer to the blanking device of logistics pipeline from detecting pipeline; The calibrating Single Component Management module that is used to control co-ordination between each device, logistics pipeline, the calibrating pipeline and electric energy meter is accurately sorted according to the feedback information of pressure resistant testing device, calibrating installation; Described feeding device, pressure resistant testing device, program switch flip flop equipment, calibrating installation, lead sealing and laser mark printing device, blanking device are arranged successively by the working direction of calibrating pipeline and are established.Coordinative operation between logistics pipeline, calibrating pipeline, each device; On the calibrating pipeline, directly accomplish calibrating, realize the full-automatic calibrating of electric energy meter, efficient is high; Avoid the manual detection error; Improve the letter sorting accuracy, the mode by the traditional subsides conformity certification of laser marking replacement is beneficial to management, the use of electric energy meter.
Described electric energy meter calibration unit also comprises expense control parameter setting apparatus, be used for to electric energy meter outward appearance and display screen take pictures and the appearance inspection device handled, be used between blanking device and the calibrating installation buffer memory detect the electric energy meter that finishes with the blanking buffer area of realizing the control of streamline beat, at the material loading buffer area that is used for buffer memory electric energy meter to be checked between pressure resistant testing device and the calibrating installation, between feeding device and blanking device, be used for the empty Turnover Box that is positioned at the material loading station is delivered to the Turnover Box buffer area of blanking station and buffer memory, described Turnover Box buffer area is provided with Turnover Box pipeline and Turnover Box protection mechanism; Described expense control parameter setting apparatus comprises from the main control module of moving card, can insert the analog card of seized electric energy meter draw-in groove, is connected with analog card be used to drive analog card move up and down with the analog card driving mechanism, the card reading module that is used to read seized electric energy meter information that realize the analog card plug, be used for that analog card according to Card Reader information judgement analog card contact information contacts judge module and be used for that control single chip computer changes card move the card control module certainly; Described program switch trigger element be included as the power supply of electric energy meter power supply, the plate mechanism and being used to of uncapping that is used to open the electric energy meter cover plate push program switch by program switch mechanism; Described Turnover Box buffer area is provided with Turnover Box pipeline and Turnover Box protection mechanism; Described appearance inspection device is located on the station at pressure resistant testing device or calibrating installation place.But well whether expense control parameter setting apparatus quick check analog card contact with electric energy meter, move card certainly, guarantees the reliability of electric energy meter plug-in card, and electric energy meter can normally carry out the full-automatic plug-in card of calibration, increases work efficiency, and reduces misoperation.
Described calibrating pipeline comprises support body, be located at the drive motor, the belt line that is connected with the drive motor rotation axis that are used for the driving belt reach on the support body, be located at being used on the support body accurately keeps off the retaining stop mechanism that stops frock plate on the belt line, is located at counter that being used on the support body count electric energy meter, is located at the barcode scanner that is used for typing electric energy meter information on the support body and is used for the mechanism for sorting that electric energy meter sorts; One electric energy meter calibration unit is provided with a plurality of calibrating branch roads side by side; The calibrating branch road is provided with a plurality of calibrating installations; Described calibrating pipeline top and end join; The calibrating pipeline is provided with and examines and determine the frock plate that is used to carry electric energy meter that pipeline matches electric energy meter is delivered to successively the station at pressure resistant testing device, calibrating installation and lead sealing and laser mark printing device place, accomplishes the in-line calibration of electric energy meter all events and carries task; Calibrating pipeline between blanking device and the feeding device is provided with the frock plate buffer area that the is used for buffer memory frock plate material loading demand with timely response feeding device.
Described feeding device comprises and being used for being positioned at that electric energy meter to be checked on the logistics pipeline accurately is placed on the calibrating pipeline frock plate and the flow material hopper is grasped to the blanking conveying line so that it is transported to the material loading robot of blanking station, and described material loading robot is provided with the material loading mechanical hand, be used to control the controller that machine manually does, the last material clamp that can be connected with the mechanical arm lower end; Described blanking device comprises that the seized electric energy meter that is used on the calibrating pipeline frock plate is placed in the flow material hopper; And the flow material hopper grasped the blanking robot to the logistics pipeline, described blanking robot is provided with the blanking mechanical hand, be used to control the controller that machine manually does, the following material clamp that can be connected with the subordinate end of blanking machine; Described material loading robot is provided with and is used for the pinpoint locating platform of electric energy meter, and the material loading mechanical hand is picked up from the logistics pipeline and picked up once more and put on the frock plate that is positioned at the calibrating pipeline after electric energy meter is put into the locating platform location.
The connection terminal that can vertically move that described pressure-resistant apparatus and calibrating installation include support body, be located at vertical crimping driving mechanism on the support body, is connected with vertical crimping driving mechanism, being used to of being connected with vertical crimping driving mechanism are controlled the drive control module that vertical crimping driving mechanism moves and reach the test module that is connected with connection terminal; Described connection terminal comprises the terminal base that is connected with vertical crimping driving mechanism, the plurality of probes that is arranged in terminal base, and described probe comprises the strong, weak electricity contact pin that is used to connect electric energy meter; Pressure-resistant apparatus be provided be connected with electric energy meter strong and weak electricity wiring core the program control source of high pressure that is used to provide high voltage output, with fixing withstand voltage of support body, vertical crimping driving mechanism of pressure-resistant apparatus is located on the withstand voltage platform.
Beneficial effect: realize that by the calibrating management system download of electric energy meter calibration task, execution, scheduling, balanced operation, the request of electric energy meter table case, transmission, bar code read judgement, the shunting of table case, task execution feedback; And the information acquisition of main conveyor line and calibrating unit (comprising system exception information); Make main conveyor line, automatic stereowarehouse, calibrating unit efficiently integrated, realize full-automatic unmanned operation; Thereby change consuming time, machinery, repetitive work, improve calibrating comprehensively, obviously reduce labour intensity.Because the equipment scale of single three-phase verification system is huge; Can solve a large amount of numerous and diverse data and the too much problem of operating point control in a lot of systems through total system control; Adopt centralized control to reach the effect of getting twice the result with half the effort, have high efficiency, production cost is low, labour intensity is little, safe, advantage that work quality is high.
Description of drawings
Fig. 1 is a single-phase electric energy meter verification system structural representation.
Fig. 2 is a three-phase electric energy meter verification system structural representation.
Fig. 3 is a single-phase electric energy meter calibrating cellular construction synoptic diagram.
Fig. 4 is a three-phase electric energy meter calibrating cellular construction synoptic diagram.
Among the figure: 1-logistics pipeline, 2-feeding device, 3-pressure resistant testing device, 4-program switch flip flop equipment; 5-examines and determine pipeline, 6-material loading buffer area, 7-calibrating installation; 8-blanking buffer area, 9-lead sealing and laser mark printing device, 10-take the control parameter setting apparatus; The 11-blanking device, the 12-main conveyor line, 13-pan feeding table case buffer area, 14-examine and determine the unit.
Embodiment
Below in conjunction with Figure of description the technical scheme of the utility model is done further detailed description.
Like Fig. 1, shown in 2; The calibrating management systems that the utility model comprises a plurality of calibrating unit 14 that are used for the electric energy meter automatic Verification, is used to connect the main conveyor line 12 of each calibrating unit 14 and is used to coordinate respectively to examine and determine unit 14 work, described main conveyor line 12 are divided into and are used to transport table case that electric energy meter to be checked is housed to the last pipeline of calibrating unit 14 and be used to transport the following pipeline that the table case of examining electric energy meter goes back to the warehouse is housed.The porch of described main conveyor line 12 is provided with the pan feeding table case buffer area 13 that is used for the scratch list case, is used to read table case bar code to judge that whether the table case readable and that carried of bar code belongs to the table case bar code fetch equipment of current verification task, shows case buffer area 13 in table case buffer area so that satisfactory table case is got into material before the described table case bar code fetch equipment.The shunting device that the porch of described calibrating unit 14 is provided with the last pipeline connection of sending with the defeated line of master branches to the corresponding charge gauge case buffer area of examining and determine unit 14 and being used for the cache table case with the table case that electric energy meter to be checked is housed that will be positioned at pipeline, and the exit of described calibrating unit 14 is provided with the merging equipment that is connected with the following pipeline of main conveyor line 12 and collaborates pipeline extremely down so that the table case of having examined electric energy meter will be housed.Described shunting device is provided with and is used to read bar code is adjusted the operating type of calibrating unit 14 in judgement table type shunting bar code fetch equipment.Described calibrating management system comprises that being used to control the warehouse fails the input and output material control module that line coordination transmits with the master; Be used for distribution module to the shunting and the interflow control of single calibrating unit 14; The top control module that is used for job scheduling and information monitoring is assigned to realize the electric energy meter calibration task; Carry out; Scheduling; Balanced operation; The request of table case; The transmission of table case; Table case bar code reads judgement; Task is carried out feedback; And the integrated main conveyor line 12 of information collection function of main conveyor line 12 and calibrating unit 14; The warehouse reaches full-automatic unmanned operation purpose with calibrating unit 14.
Like Fig. 3, shown in 4, described electric energy meter calibration unit 14 comprises and is connected the logistics pipeline 1 that is used to carry Turnover Box with main conveyor line 12; Be positioned at the other feeding device 2 that is used for moving to the electric energy meter that is positioned at logistics pipeline 1 material loading station calibrating pipeline 5 of logistics pipeline 1 material loading station; Be used for electric energy meter is moved to the calibrating pipeline 5 that respectively installs corresponding station; Be used for electric energy meter is carried out the pressure resistant testing device 3 that high voltage detects; Be used for the anti-flip flop equipment of anti-program switch the 4 by program switch is renovated and pressed to electric energy meter; Be used for calibrating installation 7 that electric energy meter project to be checked is examined and determine one by one; Be used for lead sealing and laser mark printing device 9 to qualified electric energy meter lead sealing and imprinting identification information; Be positioned at the electric energy meter that other being used for of logistics pipeline 1 blanking station will detect completion and transfer to the blanking device 11 of logistics pipeline 1 from detecting pipeline; Calibrating unit 14 administration modules that are used to control co-ordination between each device, logistics pipeline 1, the calibrating pipeline 5 and electric energy meter accurately sorted according to the feedback information of pressure resistant testing device 3, calibrating installation 7; Described feeding device 2, pressure resistant testing device 3, the anti-flip flop equipment of anti-program switch the 4, calibrating installation 7, lead sealing and laser mark printing device 9, blanking device 11 are arranged successively by the working direction of calibrating pipeline 5 and are established.
Be the round Realization robotization; Control streamline beat; Electric energy meter calibration unit 14 also comprises expense control parameter setting apparatus 10, be used for to electric energy meter outward appearance and display screen take pictures and the appearance inspection device handled, be used between blanking device 11 and the calibrating installation 7 buffer memory detect the electric energy meter that finishes with the blanking buffer area 8 realizing the streamline beat and control, at the material loading buffer area 6 that is used for buffer memory electric energy meter to be checked between pressure resistant testing device 3 and the calibrating installation 7, between feeding device 2 and blanking device 11, be used for the empty Turnover Box that is positioned at the material loading station is delivered to the Turnover Box buffer area of blanking station and buffer memory, described Turnover Box buffer area is provided with Turnover Box pipeline and Turnover Box protection mechanism; Described expense control parameter setting apparatus 10 comprises from the main control module of moving card, can insert the analog card of seized electric energy meter draw-in groove, is connected with analog card be used to drive analog card move up and down with the analog card driving mechanism, the card reading module that is used to read seized electric energy meter information that realize the analog card plug, be used for that analog card according to Card Reader information judgement analog card contact information contacts judge module and be used for that control single chip computer changes card move the card control module certainly; Described program switch trigger element be included as the power supply of electric energy meter power supply, the plate mechanism and being used to of uncapping that is used to open the electric energy meter cover plate push program switch by program switch mechanism; Described Turnover Box buffer area is provided with Turnover Box pipeline and Turnover Box protection mechanism; Described appearance inspection device is located on the station at pressure resistant testing device 3 or calibrating installation 7 places.Described calibrating pipeline 5 comprises support body, be located at the drive motor, the belt line that is connected with the drive motor rotation axis that are used for the driving belt reach on the support body, be located at being used on the support body accurately keeps off the retaining stop mechanism that stops frock plate on the belt line, is located at counter that being used on the support body count electric energy meter, is located at the barcode scanner that is used for typing electric energy meter information on the support body and is used for the mechanism for sorting that electric energy meter sorts.
For improving calibrating efficient, an electric energy meter calibration unit 14 is provided with a plurality of calibrating branch roads side by side; The electric energy meter branch of calibrating on the pipeline 5 flows into the calibrating branch road, and the calibrating branch road is provided with a plurality of calibrating installations 7, can be simultaneously examines and determine being positioned on a plurality of calibrating branch roads electric energy meter; Described calibrating pipeline 5 tops and end join; Calibrating pipeline 5 is provided with and examines and determine the frock plate that is used to carry electric energy meter that pipeline 5 matches electric energy meter is delivered to successively the station at pressure resistant testing device 3, calibrating installation 7 and lead sealing and laser mark printing device 9 places, accomplishes the in-line calibration of electric energy meter all events and carries task; Calibrating pipeline 5 between blanking device 11 and the feeding device 2 is provided with the frock plate buffer area that the is used for buffer memory frock plate material loading demand with timely response feeding device 2.Described feeding device 2 comprises and is used for its electric energy meter to be checked that is transported to the blanking station accurately being placed on the calibrating pipeline 5 frock plates and with the flow material hopper grasp the material loading robot to the blanking conveying line with being positioned at, and described material loading robot is provided with the material loading mechanical hand, be used to control the controller that machine manually does, the last material clamp that can be connected with the mechanical arm lower end; Described blanking device 11 comprises that the seized electric energy meter that is used on the calibrating pipeline 5 frock plates is placed in the flow material hopper; And the flow material hopper grasped the blanking robot to the logistics pipeline 1, described blanking robot is provided with the blanking mechanical hand, be used to control the controller that machine manually does, the following material clamp that can be connected with the subordinate end of blanking machine; Described material loading robot is provided with and is used for the pinpoint locating platform of electric energy meter, and the material loading mechanical hand is picked up from logistics pipeline 1 and picked up once more and put on the frock plate that is positioned at calibrating pipeline 5 after electric energy meter is put into the locating platform location.The connection terminal that can vertically move that described pressure-resistant apparatus and calibrating installation 7 include support body, be located at vertical crimping driving mechanism on the support body, is connected with vertical crimping driving mechanism, being used to of being connected with vertical crimping driving mechanism are controlled the drive control module that vertical crimping driving mechanism moves and reach the test module that is connected with connection terminal; Described connection terminal comprises the terminal base that is connected with vertical crimping driving mechanism, the plurality of probes that is arranged in terminal base, and described probe comprises the strong, weak electricity contact pin that is used to connect electric energy meter; Pressure-resistant apparatus be provided be connected with electric energy meter strong and weak electricity wiring core the program control source of high pressure that is used to provide high voltage output, with fixing withstand voltage of support body, vertical crimping driving mechanism of pressure-resistant apparatus is located on the withstand voltage platform.
Because the weight and the volume of three-phase electric energy meter are big than single-phase electric energy meter; So on a frock plate, establish two three-phase electric energy meters or six single-phase electric energy meters; For reducing the floor area of the full-automatic calibrating of electric energy meter unit 14, as shown in Figure 3, single-phase electric energy meter is automatically examined and determine the annular calibrating branch road of employing " U " shape; Three-phase electric energy meter is automatically examined and determine the calibrating branch road of employing " " shape, and is as shown in Figure 4.
The electric energy meter detecting system course of work:
After electric energy meter to be checked is seen off by the warehouse; Get into the pan feeding buffer area and temporarily deposit, after the demand of last transmission line body proposition feed, the electric energy meter to be checked of buffer area is delivered on the pipeline by the roller line; By last pipeline it is transported to each detecting unit; After the end to be detected, examined and the electric energy meter of casing is transported to pipeline down by each detecting unit, electric energy meter has been transported go back to the warehouse by pipeline down.

Claims (10)

1. electric energy meter detecting system; It is characterized in that; The calibrating management systems that it comprises a plurality of calibrating unit (14) that are used for the electric energy meter automatic Verification, is used to connect the main conveyor line (12) of each calibrating unit (14) and is used for coordinating respectively to examine and determine unit (14) work, described main conveyor line (12) be divided into be used to transport electric energy meter to be checked is housed the table case to the last pipeline of examining and determine unit (14) and be used to transport the following pipeline that the table case of examining electric energy meter goes back to the warehouse is housed.
2. electric energy meter detecting system according to claim 1; It is characterized in that: the porch of described main conveyor line (12) is provided with the pan feeding table case buffer area (13) that is used for the scratch list case, is used to read table case bar code to judge that whether the table case readable and that carried of bar code belongs to the table case bar code fetch equipment of current verification task, shows case buffer area (13) in table case buffer area so that satisfactory table case is got into material before the described table case bar code fetch equipment.
3. electric energy meter detecting system according to claim 2; It is characterized in that: the shunting device that the porch of described calibrating unit (14) is provided with the last pipeline connection of sending with the defeated line of master branches to the corresponding charge gauge case buffer area of examining and determine unit (14) and being used for the cache table case with the table case that electric energy meter to be checked is housed that will be positioned at pipeline, and the exit of described calibrating unit (14) is provided with the merging equipment that is connected with the following pipeline of main conveyor line (12) and collaborates pipeline extremely down so that the table case of having examined electric energy meter will be housed.
4. electric energy meter detecting system according to claim 3 is characterized in that: described shunting device is provided with and is used to read bar code is adjusted the operating type of calibrating unit (14) in judgement table type shunting bar code fetch equipment.
5. electric energy meter detecting system according to claim 4 is characterized in that: described calibrating management system comprises the input and output material control module that is used to control warehouse and main defeated line coordination transmission, be used for to the shunting of single calibrating unit (14) and interflow control distribution module, be used for job scheduling and information monitoring top control module with realize that the electric energy meter calibration task is assigned, carried out, judgements read in scheduling, balanced operation, the request of table case, the transmission of table case, table case bar code, task is carried out feedback, and main conveyor line (12) and the integrated main conveyor line of information collection function (12), warehouse and calibrating unit (14) of examining and determine unit (14) reach full-automatic unmanned operation purpose.
6. according to the described electric energy meter detecting system of the arbitrary claim of claim 1-5, it is characterized in that: described electric energy meter calibration unit (14) comprises and is connected the logistics pipeline (1) that is used to carry Turnover Box with main conveyor line (12); Be positioned at the other feeding device (2) that is used for moving to the electric energy meter that is positioned at logistics pipeline (1) material loading station calibrating pipeline (5) of logistics pipeline (1) material loading station; Be used for electric energy meter is moved to the calibrating pipeline (5) that respectively installs corresponding station; Be used for electric energy meter is carried out the pressure resistant testing device (3) that high voltage detects; Be used for the flip flop equipment of anti-program switch the (4) by program switch is renovated and pressed to electric energy meter; Be used for calibrating installation (7) that electric energy meter project to be checked is examined and determine one by one; Be used for lead sealing and laser mark printing device (9) to qualified electric energy meter lead sealing and imprinting identification information; Be positioned at the electric energy meter that other being used for of logistics pipeline (1) blanking station will detect completion and transfer to the blanking device (11) of logistics pipeline (1) from detecting pipeline; Calibrating unit (14) administration module that is used for co-ordination between each device of control, logistics pipeline (1), the calibrating pipeline (5) and electric energy meter is accurately sorted according to the feedback information of pressure resistant testing device (3), calibrating installation (7); Described feeding device (2), pressure resistant testing device (3), the flip flop equipment of anti-program switch the (4), calibrating installation (7), lead sealing and laser mark printing device (9), blanking device (11) are arranged successively by the working direction of calibrating pipeline (5) and are established.
7. electric energy meter detecting system according to claim 6; It is characterized in that: described electric energy meter calibration unit (14) also comprises expense control parameter setting apparatus (10), be used for to electric energy meter outward appearance and display screen take pictures and the appearance inspection device handled, be positioned at be used between blanking device (11) and the calibrating installation (7) buffer memory detect the electric energy meter that finishes with the blanking buffer area (8) realizing the streamline beat and control, be positioned at the material loading buffer area (6) that is used for buffer memory electric energy meter to be checked between pressure resistant testing device (3) and the calibrating installation (7), be positioned at the Turnover Box buffer area that is used for the empty Turnover Box that is positioned at the material loading station is delivered to blanking station and buffer memory between feeding device (2) and the blanking device (11), described Turnover Box buffer area is provided with Turnover Box pipeline and Turnover Box protection mechanism; Described expense control parameter setting apparatus (10) comprises from the main control module of moving card, can insert the analog card of seized electric energy meter draw-in groove, is connected with analog card be used to drive analog card move up and down with the analog card driving mechanism, the card reading module that is used to read seized electric energy meter information that realize the analog card plug, be used for that analog card according to Card Reader information judgement analog card contact information contacts judge module and be used for that control single chip computer changes card move the card control module certainly; Described program switch trigger element be included as the power supply of electric energy meter power supply, the plate mechanism and being used to of uncapping that is used to open the electric energy meter cover plate push program switch by program switch mechanism; Described Turnover Box buffer area is provided with Turnover Box pipeline and Turnover Box protection mechanism; Described appearance inspection device is located on the station at pressure resistant testing device (3) or calibrating installation (7) place.
8. electric energy meter detecting system according to claim 6 is characterized in that: described calibrating pipeline (5) comprises support body, be located at the drive motor, the belt line that is connected with the drive motor rotation axis that are used for the driving belt reach on the support body, be located at being used on the support body accurately keeps off the retaining stop mechanism that stops frock plate on the belt line, is located at counter that being used on the support body count electric energy meter, is located at the barcode scanner that is used for typing electric energy meter information on the support body and is used for the mechanism for sorting that electric energy meter sorts; One electric energy meter calibration unit (14) is provided with a plurality of calibrating branch roads side by side; The calibrating branch road is provided with a plurality of calibrating installations (7); Described calibrating pipeline (5) top and end join; Calibrating pipeline (5) is provided with and examines and determine the frock plate that is used to carry electric energy meter that pipeline (5) matches electric energy meter is delivered to successively the station at pressure resistant testing device (3), calibrating installation (7) and lead sealing and laser mark printing device (9) place, the in-line calibration conveying task of completion electric energy meter all events; Calibrating pipeline (5) between blanking device (11) and the feeding device (2) is provided with the frock plate buffer area that the is used for buffer memory frock plate material loading demand with timely response feeding device (2).
9. electric energy meter detecting system according to claim 6; It is characterized in that: described feeding device (2) comprises and being used for being positioned at that electric energy meter to be checked on the logistics pipeline (1) accurately is placed on calibrating pipeline (5) the frock plate and the flow material hopper is grasped to the blanking conveying line so that it is transported to the material loading robot of blanking station, and described material loading robot is provided with the material loading mechanical hand, be used to control the controller that machine manually does, the last material clamp that can be connected with the mechanical arm lower end; Described blanking device (11) comprises that the seized electric energy meter that is used on calibrating pipeline (5) the frock plate is placed in the flow material hopper; And the flow material hopper grasped the blanking robot to the logistics pipeline (1), described blanking robot is provided with the blanking mechanical hand, be used to control the controller that machine manually does, the following material clamp that can be connected with the subordinate end of blanking machine; Described material loading robot is provided with and is used for the pinpoint locating platform of electric energy meter, and the material loading mechanical hand is picked up from logistics pipeline (1) and picked up once more and put on the frock plate that is positioned at calibrating pipeline (5) after electric energy meter is put into the locating platform location.
10. electric energy meter detecting system according to claim 6 is characterized in that: the connection terminal that can vertically move that described pressure-resistant apparatus and calibrating installation (7) include support body, be located at vertical crimping driving mechanism on the support body, is connected with vertical crimping driving mechanism, being used to of being connected with vertical crimping driving mechanism are controlled the drive control module that vertical crimping driving mechanism moves and reach the test module that is connected with connection terminal; Described connection terminal comprises the terminal base that is connected with vertical crimping driving mechanism, the plurality of probes that is arranged in terminal base, and described probe comprises the strong, weak electricity contact pin that is used to connect electric energy meter; Pressure-resistant apparatus be provided be connected with electric energy meter strong and weak electricity wiring core the program control source of high pressure that is used to provide high voltage output, with fixing withstand voltage of support body, vertical crimping driving mechanism of pressure-resistant apparatus is located on the withstand voltage platform.
CN2011202632188U 2011-07-22 2011-07-22 Energy meter verification system Withdrawn - After Issue CN202177942U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2011202632188U CN202177942U (en) 2011-07-22 2011-07-22 Energy meter verification system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2011202632188U CN202177942U (en) 2011-07-22 2011-07-22 Energy meter verification system

Publications (1)

Publication Number Publication Date
CN202177942U true CN202177942U (en) 2012-03-28

Family

ID=45867814

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2011202632188U Withdrawn - After Issue CN202177942U (en) 2011-07-22 2011-07-22 Energy meter verification system

Country Status (1)

Country Link
CN (1) CN202177942U (en)

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102288935A (en) * 2011-07-22 2011-12-21 浙江省电力公司 Electric energy meter calibration system
CN102955882A (en) * 2012-11-08 2013-03-06 江苏省电力公司电力科学研究院 Automatic detection simulation analog system of ultra-large intelligent electric energy meter
CN103495562A (en) * 2013-09-17 2014-01-08 华立仪表集团股份有限公司 Equipment and method for detecting panels of electric energy meters
US9207302B2 (en) 2011-01-30 2015-12-08 Xueming Jiang Fully-automatic verification system for intelligent electric energy meters
CN104020436B (en) * 2014-06-16 2017-01-11 国网上海市电力公司 Speed chain electricity meter detecting assembly line

Cited By (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US9207302B2 (en) 2011-01-30 2015-12-08 Xueming Jiang Fully-automatic verification system for intelligent electric energy meters
CN102288935A (en) * 2011-07-22 2011-12-21 浙江省电力公司 Electric energy meter calibration system
CN102288935B (en) * 2011-07-22 2014-06-18 浙江省电力公司 Electric energy meter calibration system
CN102955882A (en) * 2012-11-08 2013-03-06 江苏省电力公司电力科学研究院 Automatic detection simulation analog system of ultra-large intelligent electric energy meter
CN102955882B (en) * 2012-11-08 2014-02-26 江苏省电力公司电力科学研究院 Automatic detection simulation analog system of ultra-large intelligent electric energy meter
CN103495562A (en) * 2013-09-17 2014-01-08 华立仪表集团股份有限公司 Equipment and method for detecting panels of electric energy meters
CN103495562B (en) * 2013-09-17 2016-02-24 华立科技股份有限公司 A kind of electric energy meter panel detection Apparatus for () and method therefor
CN104020436B (en) * 2014-06-16 2017-01-11 国网上海市电力公司 Speed chain electricity meter detecting assembly line

Similar Documents

Publication Publication Date Title
CN102288935B (en) Electric energy meter calibration system
CN202177694U (en) Electric energy meter verification unit
CN102323564B (en) Electric energy meter verification unit and working method thereof
CN102944863B (en) Automatic verification system and method for intelligent electric energy meters
US9207302B2 (en) Fully-automatic verification system for intelligent electric energy meters
CN101539617B (en) Automatic holographic management system integrating detection of electric energy meter and warehousing management
CN103716620B (en) Automatic function testing machine for camera modules
CN202177942U (en) Energy meter verification system
CN102565747A (en) Automatic verification system and method for single-phase intelligent watt-hour meter
CN205103383U (en) Quick detecting system of cylinder lithium ion battery comprehensive properties
WO2018227857A1 (en) Internet of things technology-based measuring instrument recycling and sorting system
CN202939302U (en) Automated electric energy meter verification system
CN102721940A (en) Fully compatible three-phase intelligent electricity meter full-automatic verification system
CN108318853A (en) A kind of detection method for sorting and device for tearing back electric energy meter open
CN103064055A (en) Single phase intelligent electric energy meter collector compatibility type automation verification system and method
CN202886589U (en) A six-position electric energy meter positioning and interfacing device
CN203044368U (en) Transferring and loading mechanism for automatically sorting electric energy meters
CN201387482Y (en) Automatic holographic management system integrating electric energy meter verification and storage management
CN110523647B (en) Communication module automatic detection assembly line system and working method thereof
CN111352062A (en) Fully-compatible automatic verification system and method for metering products
CN202948127U (en) Automatic verification system of intelligent ammeter
CN203149108U (en) Single-phase intelligent electric energy meter collector compatible-type automation verification system
CN115061078A (en) Cloud platform based electric energy meter online automatic detection system and detection method thereof
CN109975729B (en) Full-automatic power distribution automation terminal comprehensive detection system and method
CN101923151B (en) Locating and wiring system for pipeline electric energy meters

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
AV01 Patent right actively abandoned

Granted publication date: 20120328

Effective date of abandoning: 20140618

RGAV Abandon patent right to avoid regrant