CN102606160A - 露天矿易滑区煤炭回收方法 - Google Patents
露天矿易滑区煤炭回收方法 Download PDFInfo
- Publication number
- CN102606160A CN102606160A CN2012100793682A CN201210079368A CN102606160A CN 102606160 A CN102606160 A CN 102606160A CN 2012100793682 A CN2012100793682 A CN 2012100793682A CN 201210079368 A CN201210079368 A CN 201210079368A CN 102606160 A CN102606160 A CN 102606160A
- Authority
- CN
- China
- Prior art keywords
- exploitation
- mining
- coal
- band
- slope
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Images
Landscapes
- Processing Of Solid Wastes (AREA)
Abstract
一种露天矿易滑区煤炭回收方法,最适用于存在明显滑动面的易滑区边帮的煤炭回收。在露天开采的过程中,对于易滑区边帮,内部存在滑动面,在开采易滑区煤炭时,滑动面下部位于采动范围内。为防止滑动面暴露长度过大,将易滑区边帮按走向划分为若干开采条带进行开采,开采条带的宽度为所用电铲工作半径的2倍。首先开采第一开采条带,开采条带垂直边坡走向或沿着边坡走向推进,内排土场及时跟进,采完上一开采条带之后继续开采下一开采条带,内排土场依次覆盖上一开采条带开采到界后的暴露面,周而复始,直至完成所有开采条带。本发明可用于减小易滑区滑动面的暴露长度,保证边坡稳定,提高边坡角度,回收煤炭、降低剥采比。
Description
技术领域
本发明涉及露天矿煤炭回收方法,尤其是一种适用于回收易滑区残煤、降低剥采比,提高效益的露天矿易滑区煤炭的回收方法。
背景技术
在露天矿的生产作业中,由于地质条件的限制及开采作业的影响,形成了很多危险的易滑区域,易滑区按照横向整体推进,内排土场无法及时跟进造成坑底宽度变大,滑动面滑出端暴露的长度也随之增大,进而引发边帮滑坡,危及人员、设备安全。易滑区的加固成本较高,且效果不明显,加固之后的边坡无法继续开采,经济效益不明显,易滑区下面大量的压煤,造成了露天矿煤炭资源浪费严重,剥采比较高,矿区整体效益低下。
发明内容
本发明的目的是克服已有技术中的不足之处,提供一种方法简单、保证易滑区稳定、回收煤炭资源、降低剥采比提高整体效益的露天矿易滑区煤炭回收方法。
本发明的露天矿易滑区煤炭回收方法:
a、将易滑区边帮按走向划分为若干开采条带;
b、从易滑区边帮的一侧开始,先剥离第一开采条带的岩体,然后沿着垂直边坡走向推进或沿着边坡走向推进回收第一开采条带的煤炭,内排土场及时跟进;
c、采完第一开采条带之后,剥离第二开采条带的岩体,回收第二开采条带的煤炭,内排土场跟进并覆盖第一开采条带开采到界后的暴露面;
d、对第二开采条带之后的所有开采条带逐一进行开采,先剥离岩体,再回收煤炭,内排土场依次覆盖上一开采条带开采到界后的暴露面,周而复始,直至完成所有开采条带。
所述若干开采条带的宽度均为所用电铲工作半径的2倍。
有益效果:由于采用了上述技术方案,将易滑区边帮划分成若干开采条带进行开采,由于每次只暴露一个开采条带宽度的滑动面,这样能够保证易滑区边帮稳定,回收煤炭、降低剥采比。其方法简单、操作方便、成本低、经济效果好,具有广泛的实用性。本发明的主要优点:可用于减小易滑区滑动面的暴露长度,在保证易滑区稳定的前提下回收煤炭,提高边坡角度,降低剥采比,回收煤炭效果好。
附图说明
图1为本发明的易滑区边帮断面图。
图2为本发明的垂直易滑区边帮开采条带开采示意图。
图3为本发明的垂直易滑区边帮开采条带开采推进过程示意图。
图4为本发明的沿着易滑区边帮开采条带开采示意图。
图5为本发明的沿着易滑区边帮开采条带开采推进过程示意图。
图中:1-易滑区边帮,2-滑动面,3-煤炭,4-岩体,5-内排土场,6-第一开采条带,7-第二开采条带,8-暴露面。
具体实施方式
下面将结合附图对本发明的实施例作进一步的描述:
如图1所示,本发明的露天矿易滑区煤炭回收方法,在露天开采的过程中,对于易滑区边帮1且内部存在滑动面2的采区,在开采易滑区煤炭3时,需要剥离岩体4,滑动面2下部位于剥离岩体4之后形成的采动范围内;所述滑动面2的宽度为整个易滑区边帮1的走向长度。
实施例一、如图2、3所示:将易滑区边帮1按走向划分为若干开采条带,每个开采条带的宽度均为电铲工作半径的2倍;从易滑区边帮1的一侧开始,先剥离第一开采条带6的岩体4,然后沿着垂直边坡走向进行推进回收第一开采条带6的煤炭3,内排土场5及时跟进,对剥离的岩体4物料及时清理移运到内排土场5排弃,并通过运输设备将回收第一开采条带6的煤炭3运出;采完第一开采条带6之后,剥离第二开采条带7的岩体4,回收第二开采条带7的煤炭3,内排土场5跟进,将剥离的岩体4物料覆盖到第一开采条带6内,直至覆盖完开采到界后的暴露面8;对第二开采条带7之后的所有开采条带逐一进行开采,先剥离岩体4,再回收煤炭3,依次将剥离的岩体4物料及时清理移运到内排土场5,覆盖上一开采条带开采到界后的暴露面8,并依次通过运输设备将回收的所有开采条带的煤炭3运出,周而复始,直至完成所有开采条带。
实施例二、与实施例一基本相同,如图4、5所示:将易滑区边帮1按走向划分为若干开采条带,每个开采条带的宽度均为电铲工作半径的2倍;从易滑区边帮1的一侧开始,先剥离第一开采条带6的岩体4,然后沿着边坡走向推进回收第一开采条带6的煤炭3,内排土场5及时跟进;采完第一开采条带6之后,剥离第二开采条带7的岩体4,回收第二开采条带7的煤炭3,内排土场5跟进并覆盖第一开采条带6开采到界后的暴露面8;对第二开采条带7之后的所有开采条带逐一进行开采,先剥离岩体4,再回收煤炭3,内排土场5依次覆盖上一开采条带开采到界后的暴露面8,周而复始,直至完成所有开采条带。
Claims (2)
1.一种露天矿易滑区煤炭回收方法,其特征是:
a、将易滑区边帮(1)按走向划分为若干开采条带;
b、从易滑区边帮(1)的一侧开始,先剥离第一开采条带(6)的岩体(4),然后沿着垂直边坡走向推进或沿着边坡走向推进回收第一开采条带(6)的煤炭(3),内排土场(5)及时跟进;
c、采完第一开采条带(6)之后,剥离第二开采条带(7)的岩体(4),回收第二开采条带(7)的煤炭(3),内排土场(5)跟进并覆盖第一开采条带(6)开采到界后的暴露面(8);
d、对第二开采条带(7)之后的所有开采条带逐一进行开采,先剥离岩体(4),再回收煤炭(3),内排土场(5)依次覆盖上一开采条带开采到界后的暴露面(8),周而复始,直至完成所有开采条带。
2.露天矿易滑区煤炭回收方法,其特征是:所述若干开采条带的宽度均为所用电铲工作半径的2倍。
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN2012100793682A CN102606160A (zh) | 2012-03-23 | 2012-03-23 | 露天矿易滑区煤炭回收方法 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN2012100793682A CN102606160A (zh) | 2012-03-23 | 2012-03-23 | 露天矿易滑区煤炭回收方法 |
Publications (1)
Publication Number | Publication Date |
---|---|
CN102606160A true CN102606160A (zh) | 2012-07-25 |
Family
ID=46523880
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN2012100793682A Pending CN102606160A (zh) | 2012-03-23 | 2012-03-23 | 露天矿易滑区煤炭回收方法 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN102606160A (zh) |
Cited By (12)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102777184A (zh) * | 2012-08-08 | 2012-11-14 | 中联重科物料输送设备有限公司 | 矿山的开采系统和方法 |
CN103133003A (zh) * | 2013-02-25 | 2013-06-05 | 中国矿业大学 | 露天矿端帮靠帮开采方法 |
CN103470262A (zh) * | 2013-09-12 | 2013-12-25 | 中国矿业大学 | 一种露天煤田近水平矿床倒堆内排的开采方法 |
CN103670419A (zh) * | 2013-11-20 | 2014-03-26 | 中国矿业大学 | 一种露天煤矿转向期间采区间贯通内排方法 |
CN104389606A (zh) * | 2014-09-23 | 2015-03-04 | 海西博奥工程有限公司 | 一种基于环境保护的新型矿山开采技术方案 |
CN104564077A (zh) * | 2014-12-22 | 2015-04-29 | 中国神华能源股份有限公司 | 一种露天煤矿煤炭开采运输工艺 |
CN105114081A (zh) * | 2015-09-29 | 2015-12-02 | 长沙有色冶金设计研究院有限公司 | 一种露天矿的开采方法 |
WO2016033634A1 (en) * | 2014-09-01 | 2016-03-10 | Opti-Minez Pty Ltd | Method of moving material |
CN105507905A (zh) * | 2016-02-03 | 2016-04-20 | 长沙有色冶金设计研究院有限公司 | 露天采矿过背斜期间的内排方法 |
CN106194189A (zh) * | 2016-07-30 | 2016-12-07 | 肖双双 | 一种倾斜煤层窄长露天矿的开采程序 |
CN108756875A (zh) * | 2018-03-30 | 2018-11-06 | 中国矿业大学 | 一种内排露天煤矿中厚煤层连续开采装置及方法 |
CN113756812A (zh) * | 2021-08-20 | 2021-12-07 | 云南端田矿业科技开发有限公司 | 一种分区开采的露天矿端帮压煤回收方法 |
Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US5140907A (en) * | 1991-11-25 | 1992-08-25 | Atlantic Richfield Company | Method for surface mining with dragline and blast casting |
CN1178284A (zh) * | 1997-10-23 | 1998-04-08 | 北京矿冶研究总院 | 一种露天高台阶采矿方法 |
CN1421592A (zh) * | 2002-12-11 | 2003-06-04 | 南昌有色冶金设计研究院 | 垂直间隔采掘工艺 |
DE102005026582A1 (de) * | 2005-06-08 | 2006-12-21 | John, Hans-Jürgen, Dr. Dipl.-Ing. | Verfahren zum Umlagern von zumindest einem Teil einer Massenansammlung |
CN101793150A (zh) * | 2009-11-20 | 2010-08-04 | 灵宝市金源矿业有限责任公司 | 一种开采滑坡体下矿体的方法 |
-
2012
- 2012-03-23 CN CN2012100793682A patent/CN102606160A/zh active Pending
Patent Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US5140907A (en) * | 1991-11-25 | 1992-08-25 | Atlantic Richfield Company | Method for surface mining with dragline and blast casting |
CN1178284A (zh) * | 1997-10-23 | 1998-04-08 | 北京矿冶研究总院 | 一种露天高台阶采矿方法 |
CN1421592A (zh) * | 2002-12-11 | 2003-06-04 | 南昌有色冶金设计研究院 | 垂直间隔采掘工艺 |
DE102005026582A1 (de) * | 2005-06-08 | 2006-12-21 | John, Hans-Jürgen, Dr. Dipl.-Ing. | Verfahren zum Umlagern von zumindest einem Teil einer Massenansammlung |
CN101793150A (zh) * | 2009-11-20 | 2010-08-04 | 灵宝市金源矿业有限责任公司 | 一种开采滑坡体下矿体的方法 |
Non-Patent Citations (3)
Title |
---|
朱新平等: "露天矿边坡失稳条件下的控制开采", 《采矿工程》, no. 5, 31 October 2006 (2006-10-31) * |
李忠等: "大冶铁矿象鼻山北帮滑坡体下采矿实践", 《金属矿山》, no. 3, 31 March 2005 (2005-03-31), pages 22 - 25 * |
杨峰: "露天开采下盘无台阶采矿法", 《化工矿山技术》, vol. 22, no. 4, 31 December 1993 (1993-12-31), pages 8 - 12 * |
Cited By (23)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102777184B (zh) * | 2012-08-08 | 2015-12-09 | 中联重科物料输送设备有限公司 | 矿山的开采系统和方法 |
CN102777184A (zh) * | 2012-08-08 | 2012-11-14 | 中联重科物料输送设备有限公司 | 矿山的开采系统和方法 |
CN103133003A (zh) * | 2013-02-25 | 2013-06-05 | 中国矿业大学 | 露天矿端帮靠帮开采方法 |
CN103133003B (zh) * | 2013-02-25 | 2015-10-21 | 中国矿业大学 | 露天矿端帮靠帮开采方法 |
CN103470262A (zh) * | 2013-09-12 | 2013-12-25 | 中国矿业大学 | 一种露天煤田近水平矿床倒堆内排的开采方法 |
CN103670419A (zh) * | 2013-11-20 | 2014-03-26 | 中国矿业大学 | 一种露天煤矿转向期间采区间贯通内排方法 |
US10689981B2 (en) | 2014-09-01 | 2020-06-23 | Opti-Minez Pty Ltd | Method of moving material |
AU2015311597B2 (en) * | 2014-09-01 | 2019-10-24 | Opti-Minez Pty Ltd | Method of moving material |
WO2016033634A1 (en) * | 2014-09-01 | 2016-03-10 | Opti-Minez Pty Ltd | Method of moving material |
US9739146B2 (en) | 2014-09-23 | 2017-08-22 | Xia Zhao | Mining method |
CN104389606B (zh) * | 2014-09-23 | 2015-09-09 | 海西博奥工程有限公司 | 一种基于环境保护的矿山还原式多井联采方法 |
WO2016045440A1 (zh) * | 2014-09-23 | 2016-03-31 | 海西博奥工程有限公司 | 一种采矿方法 |
CN104389606A (zh) * | 2014-09-23 | 2015-03-04 | 海西博奥工程有限公司 | 一种基于环境保护的新型矿山开采技术方案 |
EA029617B1 (ru) * | 2014-09-23 | 2018-04-30 | Хайси Боао Проджект Лимитед | Способ ведения разработки месторождений |
CN104564077A (zh) * | 2014-12-22 | 2015-04-29 | 中国神华能源股份有限公司 | 一种露天煤矿煤炭开采运输工艺 |
CN104564077B (zh) * | 2014-12-22 | 2016-07-06 | 中国神华能源股份有限公司 | 一种露天煤矿煤炭开采运输工艺 |
CN105114081A (zh) * | 2015-09-29 | 2015-12-02 | 长沙有色冶金设计研究院有限公司 | 一种露天矿的开采方法 |
CN105507905B (zh) * | 2016-02-03 | 2017-12-26 | 长沙有色冶金设计研究院有限公司 | 露天采矿过背斜期间的内排方法 |
CN105507905A (zh) * | 2016-02-03 | 2016-04-20 | 长沙有色冶金设计研究院有限公司 | 露天采矿过背斜期间的内排方法 |
CN106194189A (zh) * | 2016-07-30 | 2016-12-07 | 肖双双 | 一种倾斜煤层窄长露天矿的开采程序 |
CN108756875A (zh) * | 2018-03-30 | 2018-11-06 | 中国矿业大学 | 一种内排露天煤矿中厚煤层连续开采装置及方法 |
CN113756812A (zh) * | 2021-08-20 | 2021-12-07 | 云南端田矿业科技开发有限公司 | 一种分区开采的露天矿端帮压煤回收方法 |
CN113756812B (zh) * | 2021-08-20 | 2023-10-13 | 云南端田矿业科技开发有限公司 | 一种分区开采的露天矿端帮压煤回收方法 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN102606160A (zh) | 露天矿易滑区煤炭回收方法 | |
CN101899976B (zh) | 露天煤矿的连续采煤工艺方法 | |
CN107869349B (zh) | 一种缓倾斜中厚矿体的机械化采矿方法 | |
RU2645694C2 (ru) | Способ раздельной разработки и транспортировки мощных угольных пластов с пустой породой и закладки выработанного пространства пустой породой | |
CN102155260B (zh) | 一种急倾斜煤层采空区充填方法 | |
CN101967973B (zh) | 空场—崩落组合采矿方法 | |
CN101307692B (zh) | 急倾斜煤层的开采方法 | |
CN107313804B (zh) | 一种露天煤矿端帮压煤充填综采回收方法 | |
CN103470262A (zh) | 一种露天煤田近水平矿床倒堆内排的开采方法 | |
CN103590830B (zh) | 多矿体露天地下时空同步开采方法 | |
CN101942999A (zh) | 一种急倾斜薄煤层采煤方法 | |
CN103939102A (zh) | 一种固体充填回收露天矿终帮下压煤的采煤方法 | |
CN105114081B (zh) | 一种露天矿的开采方法 | |
CN103133003A (zh) | 露天矿端帮靠帮开采方法 | |
CN107975373B (zh) | 一种液气相变诱导下机械化连续采掘硬岩矿方法 | |
CN104612693A (zh) | 一种露天矿连续式采煤工艺方法 | |
CN103790589A (zh) | 露天转地下矿山的一种过渡衔接开采技术 | |
CN102587960A (zh) | 一种高瓦斯煤层回采工作面巷道的布置方法 | |
CN108756875B (zh) | 一种内排露天煤矿中厚煤层连续开采装置及方法 | |
CN110410076A (zh) | 一种用于老房柱采空区遗留煤柱回收的充填开采方法 | |
CN108425674B (zh) | 一种露天煤矿端帮煤的采煤方法 | |
CN108952725A (zh) | 一种适用于缓倾斜薄矿体的低贫化采矿方法 | |
CN101586461A (zh) | 单滚筒采煤机短壁综合机械化煤柱回收方法 | |
CN111997614B (zh) | 前进式综采工作面绕行薄煤带的方法 | |
CN104612690A (zh) | 急倾斜薄煤层条带钻式采煤法 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
C12 | Rejection of a patent application after its publication | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20120725 |