CN105507905B - 露天采矿过背斜期间的内排方法 - Google Patents

露天采矿过背斜期间的内排方法 Download PDF

Info

Publication number
CN105507905B
CN105507905B CN201610075548.1A CN201610075548A CN105507905B CN 105507905 B CN105507905 B CN 105507905B CN 201610075548 A CN201610075548 A CN 201610075548A CN 105507905 B CN105507905 B CN 105507905B
Authority
CN
China
Prior art keywords
anticline
active line
propulsion
discharge method
surface mining
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201610075548.1A
Other languages
English (en)
Other versions
CN105507905A (zh
Inventor
昌珺
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
CINF Engineering Corp Ltd
Original Assignee
CINF Engineering Corp Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by CINF Engineering Corp Ltd filed Critical CINF Engineering Corp Ltd
Priority to CN201610075548.1A priority Critical patent/CN105507905B/zh
Publication of CN105507905A publication Critical patent/CN105507905A/zh
Application granted granted Critical
Publication of CN105507905B publication Critical patent/CN105507905B/zh
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E21EARTH DRILLING; MINING
    • E21CMINING OR QUARRYING
    • E21C41/00Methods of underground or surface mining; Layouts therefor
    • E21C41/26Methods of surface mining; Layouts therefor

Abstract

本发明涉及一种露天采矿过背斜期间的内排方法,工作帮进入背斜区域后,布置L型工作线,其一边为原有采场工作线,另一边沿矿体底板倾向布置,从采场一侧端帮向对侧端帮推进;与此同时,内排土场推进方向旋转后沿矿体倾向布置,与L型工作线沿倾向布置的一边保持跟进,形成新的内排土场。本发明基于过背斜期间工作线横向布置以减少内排土场基底倾角,充分利用内排土空间实现剥离物内排,该方法能有效减少外排占用的土地面积,同时减少了卡车排土运距,节约了矿山生产成本。

Description

露天采矿过背斜期间的内排方法
技术领域
本发明属于露天采矿技术领域,具体涉及一种露天采矿过背斜期间的内排方法。
背景技术
对于内排的露天矿山,工作线推进至背斜区域时,矿体底板倾角往往超过内排土场规定的最大可内排倾角,按照工作帮正常方向推进时,矿体底板倾角过大无法形成内排土平盘,进而无法实现剥离物内排,工作帮进入内排土场之后剥离的废石只能运往外排土场,造成采空区空间的浪费。同时由于背斜构造的影响,矿山的生产剥采比急剧增大,剥离物的量增多,如若外排,势必造成占地面积大,排土成本增大,矿山生产成本增大。
发明内容
针对上述现有技术存在的问题,本发明提供一种露天采矿过背斜期间的内排方法,以充分利用内排空间,降低排土成本。
本发明的技术方案为:一种露天采矿过背斜期间的内排方法,工作帮进入背斜区域后,布置L型工作线,其一边为原有采场工作线,另一边沿矿体底板倾向布置,从采场一侧端帮向对侧端帮推进;与此同时,内排土场推进方向旋转后沿矿体倾向布置,与L型工作线沿倾向布置的一边保持跟进,形成新的内排土场。
原有采场工作线沿背斜区域矿体底板等高线的延伸方向平行推进。工作帮沿矿体底板平行推进进入背斜区域,当采矿台阶进入背斜轴以后,布置L型工作线。
进一步的,L型工作线最下一个台阶沿倾向布置的工作线长度,由背斜轴与背斜区域结束矿体底板等高线间的距离确定,不得小于采掘设备最小工作线长度与背斜影响区域倾向长度两者中的最小值。
进一步的,内排土场工作帮由原有方向旋转90°,在背斜区域处尖灭。
进一步的,新的内排土场与L型工作线最下一个台阶之间留设最小跟进距离。
形成的L型工作线有两个推进方向,原有工作帮推进方向为辅助推进方向,新的工作帮推进方向为主要推进方向。
进一步的,当工作帮L型工作线推进至采场境界处时,工作线恢复至原有推进方向。
本发明的有益效果:本发明基于过背斜期间工作线横向布置(即横采)以减少内排土场基底倾角,充分利用内排土空间实现剥离物内排。排土场与工作帮的最下一个台阶之间保持最小跟进距离,同时在采场原有工作帮处形成新端帮,便于剥离物内排,该方法能有效减少外排占用的土地面积,同时减少了卡车排土运距,节约了矿山生产成本。
附图说明
图1为最下台阶推进至背斜轴时的平面布置示意图。
图2为图1的A-A处采场结构剖面图。
图3为工作帮形成L型工作线平面示意图。
图4为在原有端帮处形成新的内排土场平面示意图。
图5为L型工作线推进至端帮境界后恢复至正常工作线推进图。
图中:1、采场一侧端帮,2、背斜轴,3、背斜区域结束矿体底板等高线,4、采区端帮境界,5、原有工作帮推进方向,6、内排土场工作帮,7、工作帮,8、矿体底板,9、背斜区域矿体底板倾角,10、新的工作帮推进方向,11、L型工作线,12、新的端帮。
具体实施方式
本发明的露天采矿过背斜期间的内排方法,在进入背斜区域后,沿矿体倾向布置L型工作线,内排土场推进方向旋转90°,沿矿体倾向方向布置,在背斜区域处尖灭。当工作帮L型工作线推进至采场境界处时,工作线恢复至正常推进方向。
L型工作线具有相垂直的两边:一边为原有采场工作线,沿背斜区域矿体底板等高线的延伸方向平行推进;另一边沿矿体底板倾向布置,最小长度应满足采掘设备作业要求,从采场一侧端帮向对侧端帮推进。
以下结合附图对于本发明的一个具体实施方式进行详细的说明。
如图1,工作帮7首先按照工作帮正常方向沿矿体底板8平行推进进入背斜区域,内排土场工作帮6位于工作帮7后方。
当采矿台阶进入背斜轴2以后,沿矿体走向方向形成L型工作线11,如图3。L型工作线11最下一个台阶沿倾向布置的工作线长度L0由背斜轴2与背斜区域结束矿体底板等高线3间的距离、采掘设备型号及线性尺寸确定,且不得小于采掘设备最小工作线长度与背斜影响区域倾向长度两者中的最小值。
内排土场工作帮由原有方向旋转90°与L型工作线沿倾向布置一侧保持跟进。原有一侧端帮1处形成新的内排土场。新形成的内排土场与L型工作线11最下一个台阶之间留设最小跟进距离Bmin(一般大于50m),如图4。在工作帮7处形成新的端帮12(与原有端帮相垂直)以保证剥离物顺利内排。
此时,形成的L型工作线有两个推进方向5、10(两个推进方向相垂直),原有工作帮推进方向5为辅助推进方向,新的工作帮推进方向10为主要推进方向。
当L型工作线推进至采区端帮境界4,工作帮恢复至原有推进方向5,如图5。
本发明方法特别适用于背斜区域矿体底板倾角9大于6°的情形。

Claims (9)

1.一种露天采矿过背斜期间的内排方法,其特征在于:
工作帮进入背斜区域后,布置L型工作线,其一边为原有采场工作线,另一边沿矿体底板倾向布置,从采场一侧端帮向对侧端帮推进;
与此同时,内排土场推进方向旋转后沿矿体倾向布置,与L型工作线沿倾向布置的一边保持跟进,形成新的内排土场。
2.根据权利要求1所述的露天采矿过背斜期间的内排方法,其特征在于:工作帮沿矿体底板平行推进进入背斜区域,当采矿台阶进入背斜轴以后,布置L型工作线。
3.根据权利要求1所述的露天采矿过背斜期间的内排方法,其特征在于:原有采场工作线沿背斜区域矿体底板等高线的延伸方向平行推进。
4.根据权利要求1所述的露天采矿过背斜期间的内排方法,其特征在于:L型工作线最下一个台阶沿倾向布置的工作线长度,由背斜轴与背斜区域结束矿体底板等高线间的距离确定,不得小于采掘设备最小工作线长度与背斜影响区域倾向长度两者中的最小值。
5.根据权利要求1所述的露天采矿过背斜期间的内排方法,其特征在于:内排土场工作帮由原有方向旋转90°,在背斜区域处尖灭。
6.根据权利要求1或5所述的露天采矿过背斜期间的内排方法,其特征在于:新的内排土场与L型工作线最下一个台阶之间留设最小跟进距离。
7.根据权利要求1或3所述的露天采矿过背斜期间的内排方法,其特征在于:形成的L型工作线有两个推进方向,原有工作帮推进方向为辅助推进方向,新的工作帮推进方向为主要推进方向。
8.根据权利要求1、2或3所述的露天采矿过背斜期间的内排方法,其特征在于:当工作帮L型工作线推进至采场境界处时,工作线恢复至原有推进方向。
9.根据权利要求1~5之一所述的露天采矿过背斜期间的内排方法,其特征在于:背斜区域矿体底板倾角大于6°。
CN201610075548.1A 2016-02-03 2016-02-03 露天采矿过背斜期间的内排方法 Active CN105507905B (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201610075548.1A CN105507905B (zh) 2016-02-03 2016-02-03 露天采矿过背斜期间的内排方法

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201610075548.1A CN105507905B (zh) 2016-02-03 2016-02-03 露天采矿过背斜期间的内排方法

Publications (2)

Publication Number Publication Date
CN105507905A CN105507905A (zh) 2016-04-20
CN105507905B true CN105507905B (zh) 2017-12-26

Family

ID=55716168

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201610075548.1A Active CN105507905B (zh) 2016-02-03 2016-02-03 露天采矿过背斜期间的内排方法

Country Status (1)

Country Link
CN (1) CN105507905B (zh)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110984991A (zh) * 2019-12-12 2020-04-10 神华准格尔能源有限责任公司 露天采场中间桥移设方法

Families Citing this family (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106194189A (zh) * 2016-07-30 2016-12-07 肖双双 一种倾斜煤层窄长露天矿的开采程序
CN107238863B (zh) * 2017-06-02 2019-01-18 中国石油天然气股份有限公司 一种判断背斜构造真实性的方法及装置
CN109630121B (zh) * 2019-01-30 2020-08-28 新疆天池能源有限责任公司 一种露天矿采区转向开拓运输系统
CN110348645B (zh) * 2019-07-19 2022-01-28 辽宁工程技术大学 一种基于内排空间利用最大化的露天煤矿排土线布置方法
CN112943252B (zh) * 2021-04-22 2023-03-31 辽宁工程技术大学 一种露天矿采区转向接续开采方法
CN113256588B (zh) * 2021-05-31 2023-04-07 西安建筑科技大学 露天矿无人驾驶中的排土场及排土边缘线实时更新方法

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101832138A (zh) * 2010-03-29 2010-09-15 中国矿业大学(北京) 特厚急倾斜煤层仰式反斜开采岩层控制方法
CN102606160A (zh) * 2012-03-23 2012-07-25 中国矿业大学 露天矿易滑区煤炭回收方法
CN103670419A (zh) * 2013-11-20 2014-03-26 中国矿业大学 一种露天煤矿转向期间采区间贯通内排方法
CN104763429A (zh) * 2015-03-11 2015-07-08 中国矿业大学(北京) 一种调节露天煤矿生产剥采比的方法及装置
CN104806244A (zh) * 2015-04-03 2015-07-29 东北大学 一种倾斜中厚矿体充填采矿方法

Family Cites Families (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US8840190B2 (en) * 2008-12-08 2014-09-23 Technological Resources Pty. Limited Method of mining ore

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101832138A (zh) * 2010-03-29 2010-09-15 中国矿业大学(北京) 特厚急倾斜煤层仰式反斜开采岩层控制方法
CN102606160A (zh) * 2012-03-23 2012-07-25 中国矿业大学 露天矿易滑区煤炭回收方法
CN103670419A (zh) * 2013-11-20 2014-03-26 中国矿业大学 一种露天煤矿转向期间采区间贯通内排方法
CN104763429A (zh) * 2015-03-11 2015-07-08 中国矿业大学(北京) 一种调节露天煤矿生产剥采比的方法及装置
CN104806244A (zh) * 2015-04-03 2015-07-29 东北大学 一种倾斜中厚矿体充填采矿方法

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
安家岭露天矿过芦子沟背斜期间开采程序优化;刘峰等;《露天采矿技术》;20120615;第5-8页 *

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110984991A (zh) * 2019-12-12 2020-04-10 神华准格尔能源有限责任公司 露天采场中间桥移设方法
CN110984991B (zh) * 2019-12-12 2021-06-29 神华准格尔能源有限责任公司 露天采场中间桥移设方法

Also Published As

Publication number Publication date
CN105507905A (zh) 2016-04-20

Similar Documents

Publication Publication Date Title
CN105507905B (zh) 露天采矿过背斜期间的内排方法
WO2016206618A1 (zh) 长壁开采n00工法
CN101899976B (zh) 露天煤矿的连续采煤工艺方法
CN103133003B (zh) 露天矿端帮靠帮开采方法
CN105114081B (zh) 一种露天矿的开采方法
CN207004567U (zh) 与沿空留巷相结合的煤矿充填开采巷道
CN110424966B (zh) 一种超高水材料充填工作面矸石泵送留巷无煤柱开采方法
CN105298496B (zh) 设置预留工作面煤柱的全采全充采煤方法
CN104806247B (zh) 露天矿采场中间搭建纵向组合桥运输方法
CN109209379B (zh) 一种矿山采选充+x开采方法
CN102966355A (zh) 一种创造露天矿内排土条件的方法
CN104405437A (zh) 一种固体充填与综采混合式工作面开采方法
CN103216238A (zh) 一种露天煤矿开采工艺
CN102444403B (zh) 缓倾斜矿体无底柱分段崩落法的垂直分区、组合放矿回采方法
CN109630121B (zh) 一种露天矿采区转向开拓运输系统
CN107687342A (zh) 一种露天煤矿拉斗铲工作线分段交替式采区转向方法
CN105715272A (zh) 特厚硬煤下分层的综放回采方法
CN102383794A (zh) 综放工作面后部输送机交叉侧卸布置配套方式与支架结构
US20220243590A1 (en) Dendritic reverse underground mining method for thin coal seam at end slope of strip mine
CN106194186A (zh) 长壁工作面回采巷道超前支护段变形的钻采卸压控制方法
CN106968671A (zh) 煤矿井下采煤工作面回撤通道充填回撤方法
CN111255455B (zh) 一种煤矿井田不划分采区无掘巷无煤柱开采及施工方法
CN204299617U (zh) 一种防刮裂型沿空留巷充填气囊
CN203962014U (zh) 综采充填两用工作面液压支架
CN102808624A (zh) 煤矸同采系统及方法

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant