CN104389606A - 一种基于环境保护的新型矿山开采技术方案 - Google Patents

一种基于环境保护的新型矿山开采技术方案 Download PDF

Info

Publication number
CN104389606A
CN104389606A CN201410489128.9A CN201410489128A CN104389606A CN 104389606 A CN104389606 A CN 104389606A CN 201410489128 A CN201410489128 A CN 201410489128A CN 104389606 A CN104389606 A CN 104389606A
Authority
CN
China
Prior art keywords
mining
main access
scheme
mine
well
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201410489128.9A
Other languages
English (en)
Other versions
CN104389606B (zh
Inventor
赵峡
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Sanmenxia bomao Industrial Co.,Ltd.
Original Assignee
HAIXI BOAO ENGINEERING Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by HAIXI BOAO ENGINEERING Co Ltd filed Critical HAIXI BOAO ENGINEERING Co Ltd
Priority to CN201410489128.9A priority Critical patent/CN104389606B/zh
Publication of CN104389606A publication Critical patent/CN104389606A/zh
Priority to EA201690486A priority patent/EA029617B1/ru
Priority to US15/109,268 priority patent/US9739146B2/en
Priority to PCT/CN2015/084749 priority patent/WO2016045440A1/zh
Priority to CA2929663A priority patent/CA2929663C/en
Priority to AU2015320268A priority patent/AU2015320268B2/en
Priority to DE112015000180.8T priority patent/DE112015000180T5/de
Application granted granted Critical
Publication of CN104389606B publication Critical patent/CN104389606B/zh
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21CMINING OR QUARRYING
    • E21C41/00Methods of underground or surface mining; Layouts therefor
    • E21C41/32Reclamation of surface-mined areas
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21CMINING OR QUARRYING
    • E21C41/00Methods of underground or surface mining; Layouts therefor
    • E21C41/16Methods of underground mining; Layouts therefor
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21CMINING OR QUARRYING
    • E21C41/00Methods of underground or surface mining; Layouts therefor
    • E21C41/26Methods of surface mining; Layouts therefor
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21CMINING OR QUARRYING
    • E21C41/00Methods of underground or surface mining; Layouts therefor
    • E21C41/26Methods of surface mining; Layouts therefor
    • E21C41/28Methods of surface mining; Layouts therefor for brown or hard coal
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21FSAFETY DEVICES, TRANSPORT, FILLING-UP, RESCUE, VENTILATION, OR DRAINING IN OR OF MINES OR TUNNELS
    • E21F15/00Methods or devices for placing filling-up materials in underground workings

Landscapes

  • Engineering & Computer Science (AREA)
  • Mining & Mineral Resources (AREA)
  • Geology (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Geochemistry & Mineralogy (AREA)
  • Remote Sensing (AREA)
  • Pit Excavations, Shoring, Fill Or Stabilisation Of Slopes (AREA)
  • Excavating Of Shafts Or Tunnels (AREA)
  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)
  • Underground Structures, Protecting, Testing And Restoring Foundations (AREA)
  • Operation Control Of Excavators (AREA)
  • Drilling And Exploitation, And Mining Machines And Methods (AREA)
  • Lining And Supports For Tunnels (AREA)

Abstract

本发明涉及煤炭开采技术领域,尤其是一种基于环境保护的新型矿山开采技术方案,其特征在于:采用“拉沟建井—分区开采—轮流回填”相结合的技术方案,集采矿、回填、绿化、恢复地表原貌为一体。此方案有开口小、剥岩少、恢复原始地貌快、回采率高的优势,从根本上消除了传统露天开采所遗留下来的渣山和人工湖的隐患,也为将来过深矿层井工开采创造了有利条件,适用于矿山超过经济剥采比、露天开采不被许可、露天开采向井工开采转型以及井田边界、边角或矿界矿带回收等情况,既可以开采水平露头矿层,也可以开采倾斜、较复杂条件的矿层。

Description

一种基于环境保护的新型矿山开采技术方案
技术领域
本发明涉及煤炭开采技术领域,尤其是一种基于环境保护的新型矿山开采技术方案。
背景技术
青海省天峻县“聚乎更煤矿区”,位于大通河上游的支游哆嗦河一带,行政区划属青海省海西州天峻县木里镇管辖,煤炭资源储量较为丰富。矿区内的各生产企业在前期开发资源的过程中,普遍采用了露天开采方式。这种传统的煤炭开采方式与井工开采相比,其优点是资源利用充分、成本低、回采率高、建矿快、产量大、劳动条件好、生产安全;其缺点是露天煤矿开采受自然赋存条件限制严重,开采过程中不仅侵占大面积良田,而且对开采区生态环境的人为改变相当大,集中表现在地形地貌的破坏、重金属污染、水土流失加重等,加之露天煤矿大多处于干旱、半干旱的生态脆弱地区,使得露天矿区生命支持系统功能丧失,特别是植被系统遭到破坏,加剧了生态环境的脆弱程度和退化速度,矿区生态安全受到严重威胁。
井工开采虽然较为环保,但与露天煤矿相比,开采难度大、作业环境恶劣,对开采设备、作业人员素质和开采工艺等方面都有更高的要求。由于“聚乎更煤矿区”多年冻土广布,其冻土由第四系腐殖土、砂土和部分基岩等组成,厚度达50~98m,容易产生不良的工程地质问题,导致在此矿区内的井工建设周期至少需要5年,且投入成本高。
因此,研发出一种既有利于环境保护,同时又节约成本、操作简便、生产安全的煤矿开采方式成为亟待解决的难题。
HW300露井联合端邦开采系统是美国卡特彼勒(CAT)公司生产的一种采煤设备,起源于上世纪40年代,80年代就已经成功运用于煤炭开采行业,在美国等世界范围内已经成为重要的煤炭开采方式。端邦机开采设备应用井工设备的开采理念,是通过远程遥控技术控制设备开采煤层,采煤、运煤的控制都在巷道外的地面进行,无需人员进巷道工作,巷道内无需顶板支护,无需通风照明及降尘。具有人均出煤量高以及开采运输成本低的特点,是采煤过程中最高效、最安全的技术,可以把对环境的破坏与污染降到最小。
发明内容
本发明的目的是提供一种投入少、见效快、生产成本较低、基于环境保护的新型矿山开采技术方案。
本发明解决的技术问题采用以下技术方案来实现:
一种基于环境保护的新型矿山开采技术方案,其特征在于,包括以下步骤:
a. 确定开采区并将开采区域分成若干区域;
b. 根据分区情况,露天开采第一条出入沟,利用井工开采设备完成第一条出入沟内四周的井采工作;
c. 井采过程中:利用充填技术回填采空区,利用掩护支架做井巷支撑;
d. 采用轮流回填的方式:采完第一条出入沟和井采矿层,建第二条出入沟并重复步骤b、c,开采时产生的岩土和废渣回填第一条出入沟,以此类推直至开采区的全部开采作业完成,回填最后一条出入沟。
所述步骤a中开采区的确定、步骤c中井工开采过程中是否需要增加井巷支护以及步骤b、d中出入沟的大小、形状均根据行业内一般选择规律依开采区地质勘查后的数据确定。
所述步骤b中露天开采的方式、设备以及井采设备,步骤c中充填技术和井巷支护方式均为已有成熟设备和技术,且根据行业的一般选择规律依开采区地质勘查后的数据进行选择。
本发明采用“拉沟建井——分区开采——轮流回填”相结合的技术方案,集采矿、回填、绿化、恢复地表原貌为一体。此方案有开口小、剥岩少、恢复原始地貌快、回采率高的优势,从根本上消除了传统露天开采所遗留下来的渣山和人工湖的隐患,也为将来过深矿层井工开采创造了有利条件,适用于矿山超过经济剥采比、露天开采不被许可、露天开采向井工开采转型以及井田边界、边角或矿界矿带回收的情况,既可以开采水平露头矿层,也可以开采倾斜、较复杂条件的矿层。
附图说明
图1 为本发明的开采区分区作业剖视图;
图2为本发明的开采区分区作业俯视图。
图中:1-出入沟;2-井采矿层。
具体实施方式
下面结合实际和附图对本说明的技术方案作进一步的详细描述:
实施例1
“聚乎更煤矿区”七号井田煤层南北向中间倾斜呈V字型,煤带南北宽1km,东西长5km。
如图1和图2所示,一种基于环境保护的新型矿山开采技术方案,其特征在于,包括以下步骤:
a. 确定开采区并将开采区域分成若干区域,利用挖掘机、矿卡等建一条井采出入沟(600m×600m),占地0.36km²,降深200m,边坡的安全夹角40˚,基坑下宽120m;
b. 利用HW300露井联合端邦开采系统沿出入沟做井下开采:对煤层区上面采120m,下面采600m。可以自上而下分层开采,也可以自下而上分层开采。只采煤不剥岩,沿煤带倾角下采200m,预留30%做安全煤柱。;
c. 膏体充填与柔性掩护支架相结合做井巷端邦回填支撑,保证开采安全;
d. 采用轮流开采的方式:沿煤带依次建10个井采出入沟,采取建二填一、建三填二的方式,以此类推直到全部采煤作业完成,回填最后一个采坑,恢复地表原貌。
实施例2
开采区域矿层水平分布,且分布面积为2km×4km。
如图1和图2所示,一种基于环境保护的新型矿山开采技术方案,其特征在于,包括以下步骤:
a. 确定开采区并将开采区由中心向四周依次分出若干区域;
b. 根据分区情况,在中心处露天开采第一条出入沟,边坡安全夹角不大于40˚,每下降10m建一个10~20m宽的安全平台,将设备安置在待开采端帮的前方,利用井工开采设备完成出入沟内四周矿层的井采工作,井采的具体施工方案根据矿层面积、矿层走向和矿层倾角确定;
c. 井采过程中:将采矿产生的岩土和废渣回填采空区;
d. 采用轮流回填的方式:采完第一条出入沟和井采矿层,重复步骤b、c开采第二条出入沟并将产生的岩土和废渣回填第一条出入沟,以此类推直至开采区的全部开采作业完成,回填最后一条出入沟。
优选的,采完第一条出入沟和井采矿层,依次建其他出入沟时,根据变化的矿产赋存条件决定出入沟内四周矿层的井采施工方案。

Claims (4)

1.一种基于环境保护的新型矿山开采技术方案,其特征在于,包括以下步骤:
a. 确定开采区并将开采区分成若干区域;
b. 根据分区情况,露天开采第一条出入沟,利用井工开采设备对出入沟内四周的矿层进行井采工作;
c. 井采过程中:利用充填技术回填采空区,利用掩护支架做井巷支撑;
d. 采用轮流回填的方式:采完第一条出入沟和井采矿层,建第二条出入沟并重复步骤b、c,开采时产生的岩土和废渣回填第一条出入沟,以此类推直至开采区域的全部开采作业完成,回填最后一条出入沟。
2.根据权利要求1所述的一种基于环境保护的新型矿山开采技术方案,其特征在于:所述步骤a中开采区的确定、步骤c中井工开采过程中是否需要增加井巷支护以及步骤b、d中出入沟的大小、形状均根据开采区地质勘查后的数据确定。
3.根据权利要求2所述的一种基于环境保护的新型矿山开采技术方案,其特征在于:所述步骤b中露天开采和井采工作同时进行,或者先完成露天开采后再进行井采工作。
4.根据权利要求1~3中任一项所述的一种基于环境保护的新型矿山开采技术方案,其特征在于:步骤b、d中所述出入沟的边坡安全夹角不大于40°。
CN201410489128.9A 2014-09-23 2014-09-23 一种基于环境保护的矿山还原式多井联采方法 Active CN104389606B (zh)

Priority Applications (7)

Application Number Priority Date Filing Date Title
CN201410489128.9A CN104389606B (zh) 2014-09-23 2014-09-23 一种基于环境保护的矿山还原式多井联采方法
EA201690486A EA029617B1 (ru) 2014-09-23 2015-07-22 Способ ведения разработки месторождений
US15/109,268 US9739146B2 (en) 2014-09-23 2015-07-22 Mining method
PCT/CN2015/084749 WO2016045440A1 (zh) 2014-09-23 2015-07-22 一种采矿方法
CA2929663A CA2929663C (en) 2014-09-23 2015-07-22 Mining method
AU2015320268A AU2015320268B2 (en) 2014-09-23 2015-07-22 Mining method
DE112015000180.8T DE112015000180T5 (de) 2014-09-23 2015-07-22 Bergbauverfahren

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201410489128.9A CN104389606B (zh) 2014-09-23 2014-09-23 一种基于环境保护的矿山还原式多井联采方法

Publications (2)

Publication Number Publication Date
CN104389606A true CN104389606A (zh) 2015-03-04
CN104389606B CN104389606B (zh) 2015-09-09

Family

ID=52607555

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201410489128.9A Active CN104389606B (zh) 2014-09-23 2014-09-23 一种基于环境保护的矿山还原式多井联采方法

Country Status (7)

Country Link
US (1) US9739146B2 (zh)
CN (1) CN104389606B (zh)
AU (1) AU2015320268B2 (zh)
CA (1) CA2929663C (zh)
DE (1) DE112015000180T5 (zh)
EA (1) EA029617B1 (zh)
WO (1) WO2016045440A1 (zh)

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2016045440A1 (zh) * 2014-09-23 2016-03-31 海西博奥工程有限公司 一种采矿方法
CN107654233A (zh) * 2017-08-25 2018-02-02 张忠成 一种窄采区留梁露天开采工艺
CN108425674A (zh) * 2018-03-27 2018-08-21 中煤科工能源投资有限公司 一种露天煤矿端帮煤的采煤方法
CN111396055A (zh) * 2020-03-24 2020-07-10 中煤科工集团沈阳设计研究院有限公司 一种露天矿边帮压煤开采硐室布置方法
CN113216972A (zh) * 2021-05-07 2021-08-06 北方魏家峁煤电有限责任公司 一种基于埋藏深近水平厚煤层的半露天开采方法
RU2761791C1 (ru) * 2021-04-07 2021-12-13 Федеральное государственное бюджетное образовательное учреждение высшего образования "Уральский государственный горный университет" Способ разработки ограниченных в плане крутопадающих рудных тел
CN113877958A (zh) * 2021-10-08 2022-01-04 中煤科工集团北京土地整治与生态修复科技研究院有限公司 矿区地形重塑分区及修复方法

Families Citing this family (14)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106884676B (zh) * 2017-04-19 2018-08-17 中国矿业大学 一种邻近露天矿的井工塌陷区治理方法
CN107313804B (zh) * 2017-06-29 2019-05-17 中国矿业大学 一种露天煤矿端帮压煤充填综采回收方法
US10960444B2 (en) * 2018-04-06 2021-03-30 Karl William Yost Closure methods for mines
CN108508184B (zh) * 2018-04-09 2023-08-18 山东科技大学 一种复杂条件煤层开采地表沉陷相似模拟试验装置及方法
CN109778825B (zh) * 2019-01-09 2020-09-18 中国矿业大学 一种露天矿内排重构隔水层边界缝合方法
CN110644998B (zh) * 2019-09-03 2020-12-15 中铁十九局集团矿业投资有限公司 一种露天采坑回填治理方法
CN110566207A (zh) * 2019-09-10 2019-12-13 东北大学 一种露天转地下无底柱分段崩落法覆盖层全尾砂堆置方法
RU2715503C1 (ru) * 2019-09-25 2020-02-28 Федеральное государственное автономное образовательное учреждение высшего образования "Северо-Восточный федеральный университет имени М.К.Аммосова" Способ открыто-подземной разработки пологозалегающих пластов
CN111364999A (zh) * 2020-03-30 2020-07-03 中煤能源研究院有限责任公司 一种露天煤矿端帮压煤采充一体化的置换方法
RU2750445C1 (ru) * 2020-11-20 2021-06-28 федеральное государственное бюджетное образовательное учреждение высшего образования "Иркутский национальный исследовательский технический университет" (ФГБОУ ВО "ИРНИТУ") Способ разработки обводненных месторождений полезных ископаемых
CN113323666B (zh) * 2021-06-29 2024-05-03 新疆天池能源有限责任公司 一种季节性冻土区露天煤矿靠帮开采方法
CN114032909A (zh) * 2021-08-17 2022-02-11 国家能源投资集团有限责任公司 一种露天开采生态减损方法
CN113654424A (zh) * 2021-09-02 2021-11-16 攀钢集团矿业有限公司 深凹露天矿新水平开沟方法
CN114320298B (zh) * 2022-01-05 2024-03-01 国家能源集团国源电力有限公司 采煤方法

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101555796A (zh) * 2009-03-15 2009-10-14 赵刚 急倾斜群煤层露天联合开采方法
CN102606160A (zh) * 2012-03-23 2012-07-25 中国矿业大学 露天矿易滑区煤炭回收方法
RU2471988C1 (ru) * 2011-05-05 2013-01-10 Федеральное государственное бюджетное образовательное учреждение высшего профессионального образования "Санкт-Петербургский государственный горный университет" Способ комбинированной разработки месторождений
CN103590830A (zh) * 2013-10-08 2014-02-19 中钢集团马鞍山矿山研究院有限公司 多矿体露天地下时空同步开采方法
CN103696773A (zh) * 2013-12-26 2014-04-02 鞍钢集团矿业公司 近地表矿体的露天和坑内联合开采工艺
CN103726850A (zh) * 2013-10-09 2014-04-16 中国矿业大学 一种层状近水平矿床条区间三角矿量露天开采方法

Family Cites Families (18)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US3775984A (en) 1971-08-18 1973-12-04 C Livingston Mining method and method of land reclamation
US4007965A (en) * 1975-07-18 1977-02-15 Shuttle Jr Anthony J Method of recovering useful minerals from subterranean deposits thereof
US4150853A (en) 1977-05-18 1979-04-24 Mccoy Charles M Method of strip mining
US4219237A (en) * 1977-09-30 1980-08-26 The United States Of America As Represented By The United States Department Of Energy Method for maximizing shale oil recovery from an underground formation
US4453770A (en) 1981-11-16 1984-06-12 Dresser Industries, Inc. Mining method and system
US4589700A (en) * 1984-02-21 1986-05-20 Standard Oil Company (Indiana) Strip-auger method of mining thin seams of hydrocarbonaceous deposits
SU1681001A1 (ru) * 1988-01-04 1991-09-30 Белорусский филиал Всесоюзного научно-исследовательского и проектного института галургии Способ покрыти хвостохранилищ калийного производства
USH1584H (en) * 1995-08-22 1996-08-06 Atlantic Richfield Company Mine tailings replacement
US5782539A (en) 1995-11-16 1998-07-21 Peterson; Randall D. Wall-to-wall surface mining process
RU2213224C1 (ru) 2002-05-17 2003-09-27 Красноярская государственная академия цветных металлов и золота Способ открытой разработки месторождений полезных ископаемых
CN201367917Y (zh) * 2009-03-27 2009-12-23 袁秋新 冲击风压式管道排矸装置
CN102031972B (zh) * 2009-09-25 2013-04-24 中国矿业大学(北京) 露井联采的l型开采方法
RU2442896C1 (ru) * 2010-08-31 2012-02-20 Общество с ограниченной ответственностью "Экостройресурс" ООО "Экостройресурс" Способ восстановления выработанных карьеров
CN102606161A (zh) * 2012-03-26 2012-07-25 中钢集团马鞍山矿山研究院有限公司 倾斜、厚大矿床的露天地下三阶段开采方法
CN102644464B (zh) * 2012-04-12 2014-01-01 东北大学 露天转地下矿山开采嵌入式人工境界矿柱的构建方法
RU2521987C1 (ru) 2013-04-02 2014-07-10 федеральное государственное бюджетное образовательное учреждение высшего профессионального образования "Южно-Российский государственный технический университет (Новочеркасский политехнический институт)" Способ селективной отработки запасов нерабочего борта рабочей зоны карьера нагорных месторождений минерального сырья
CN103790589B (zh) * 2014-01-22 2015-04-01 中钢集团马鞍山矿山研究院有限公司 露天转地下矿山的一种过渡衔接开采方法
CN104389606B (zh) * 2014-09-23 2015-09-09 海西博奥工程有限公司 一种基于环境保护的矿山还原式多井联采方法

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101555796A (zh) * 2009-03-15 2009-10-14 赵刚 急倾斜群煤层露天联合开采方法
RU2471988C1 (ru) * 2011-05-05 2013-01-10 Федеральное государственное бюджетное образовательное учреждение высшего профессионального образования "Санкт-Петербургский государственный горный университет" Способ комбинированной разработки месторождений
CN102606160A (zh) * 2012-03-23 2012-07-25 中国矿业大学 露天矿易滑区煤炭回收方法
CN103590830A (zh) * 2013-10-08 2014-02-19 中钢集团马鞍山矿山研究院有限公司 多矿体露天地下时空同步开采方法
CN103726850A (zh) * 2013-10-09 2014-04-16 中国矿业大学 一种层状近水平矿床条区间三角矿量露天开采方法
CN103696773A (zh) * 2013-12-26 2014-04-02 鞍钢集团矿业公司 近地表矿体的露天和坑内联合开采工艺

Cited By (11)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2016045440A1 (zh) * 2014-09-23 2016-03-31 海西博奥工程有限公司 一种采矿方法
US9739146B2 (en) 2014-09-23 2017-08-22 Xia Zhao Mining method
EA029617B1 (ru) * 2014-09-23 2018-04-30 Хайси Боао Проджект Лимитед Способ ведения разработки месторождений
CN107654233A (zh) * 2017-08-25 2018-02-02 张忠成 一种窄采区留梁露天开采工艺
CN108425674A (zh) * 2018-03-27 2018-08-21 中煤科工能源投资有限公司 一种露天煤矿端帮煤的采煤方法
CN108425674B (zh) * 2018-03-27 2019-11-19 中煤科工能源投资有限公司 一种露天煤矿端帮煤的采煤方法
CN111396055A (zh) * 2020-03-24 2020-07-10 中煤科工集团沈阳设计研究院有限公司 一种露天矿边帮压煤开采硐室布置方法
RU2761791C1 (ru) * 2021-04-07 2021-12-13 Федеральное государственное бюджетное образовательное учреждение высшего образования "Уральский государственный горный университет" Способ разработки ограниченных в плане крутопадающих рудных тел
CN113216972A (zh) * 2021-05-07 2021-08-06 北方魏家峁煤电有限责任公司 一种基于埋藏深近水平厚煤层的半露天开采方法
CN113877958A (zh) * 2021-10-08 2022-01-04 中煤科工集团北京土地整治与生态修复科技研究院有限公司 矿区地形重塑分区及修复方法
CN113877958B (zh) * 2021-10-08 2023-03-03 中煤科工集团北京土地整治与生态修复科技研究院有限公司 矿区地形重塑分区及修复方法

Also Published As

Publication number Publication date
EA029617B1 (ru) 2018-04-30
AU2015320268A1 (en) 2016-06-02
US20160326872A1 (en) 2016-11-10
US9739146B2 (en) 2017-08-22
EA201690486A1 (ru) 2016-08-31
CN104389606B (zh) 2015-09-09
DE112015000180T5 (de) 2016-06-30
WO2016045440A1 (zh) 2016-03-31
CA2929663C (en) 2018-05-01
CA2929663A1 (en) 2016-03-31
AU2015320268B2 (en) 2017-08-31

Similar Documents

Publication Publication Date Title
CN104389606B (zh) 一种基于环境保护的矿山还原式多井联采方法
Zhengfu et al. Environmental issues from coal mining and their solutions
CN109577980B (zh) 一种基于含水层冻结的地下长壁工作面保水采煤方法
CN103498696B (zh) 一种从顶板巷道注浆充填压实采空区充填体的方法
CN105240014A (zh) 一种充填再造护巷煤柱条带回收房式遗留煤柱的方法
Guo et al. Subsidence control and farmland conservation by solid backfilling mining technology
CN106089205A (zh) 一种适用于水体下极薄矿体的房柱法充填采矿方法
Li et al. Innovation for sustainable mining: Integrated planning of underground coal mining and mine reclamation
Shi Mine green mining
CN104453903A (zh) 一种近距煤层群保水开采方法
CN106761902A (zh) 一种适用于软岩保护层开采的立体综合卸压瓦斯抽采方法
Yuan Theories and techniques of coal bed methane control in China
CN108266189A (zh) 一种巷顶完全沿空掘巷采空区隔绝方法
CN102426009B (zh) 煤矿充填开采的岩移观测方法
CN102102518B (zh) 一种水库坝体下厚煤层放顶煤协调开采方法
CN102877846B (zh) 基于单元法的边采边复表土剥离时机确定方法
CN108331580B (zh) 一种清洁高效的采煤方法
Chowdhury Quamruzzaman et al. A Proposal of Open Pit Coal Mine at the Northern Part of Barapukuria Coalfield, Dinajpur, Bangladesh
CN105442621A (zh) 一种复杂地质条件状态下的料场开采方法
CN101158285A (zh) 一种铜矿的地下开采方法
CN101302934B (zh) 一种三下煤炭开采方法
CN107246264B (zh) 一种坚硬顶板条件下的薄煤层走向条带充填开采方法
CN109184784A (zh) 基于减轻采煤塌陷程度的综采煤矸石同步充填系统及方法
Evans et al. The abnormally large “hushes” of Teesdale, North Pennines, England: differentiating mining legacy and natural landforms in glaciated Carboniferous bedrock terrain
Lees et al. The hydrogeology of the Central Highlands in Sri Lanka and its effect on tunnel construction

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
EE01 Entry into force of recordation of patent licensing contract

Application publication date: 20150304

Assignee: XUZHOU CUMT BACKFILL TECHNOLOGY CO., LTD.

Assignor: HAIXI BOAO ENGINEERING CO., LTD.

Contract record no.: 2019630000001

Denomination of invention: Mine restoring type multiwell combined mining method based on environment protection

Granted publication date: 20150909

License type: Common License

Record date: 20190514

EE01 Entry into force of recordation of patent licensing contract
TR01 Transfer of patent right

Effective date of registration: 20210517

Address after: 472000 No.5, 1st floor, building 1, commercial street, Wenming Road, Sanmenxia City, Henan Province

Patentee after: Sanmenxia bomao Industrial Co.,Ltd.

Address before: Room 3294, unit 3, Xianfeng, Xining, Qinghai 810000

Patentee before: Haixi Boao Project Ltd.

TR01 Transfer of patent right