CN102605783A - 锚杆静压桩施加预应力的施工方法 - Google Patents

锚杆静压桩施加预应力的施工方法 Download PDF

Info

Publication number
CN102605783A
CN102605783A CN2012100064767A CN201210006476A CN102605783A CN 102605783 A CN102605783 A CN 102605783A CN 2012100064767 A CN2012100064767 A CN 2012100064767A CN 201210006476 A CN201210006476 A CN 201210006476A CN 102605783 A CN102605783 A CN 102605783A
Authority
CN
China
Prior art keywords
stake
pile
anchor
foundation
piles
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN2012100064767A
Other languages
English (en)
Inventor
葛培中
孙海
程远锁
李凯
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN2012100064767A priority Critical patent/CN102605783A/zh
Publication of CN102605783A publication Critical patent/CN102605783A/zh
Pending legal-status Critical Current

Links

Images

Abstract

本发明涉及一种锚杆静压桩施加预应力的施工方法,其特征在于进行锚杆静压桩施工时,先按常规的锚杆静压桩施工方法,对既有房屋的基础进行开孔、埋设锚杆、立桩架并将桩一节一节压入基础,然后拆下桩架,将传力架放入桩孔,安装托架,托架由锚杆和锚杆上的紧固螺母固定,通过拧紧紧固螺母,使托架顶紧传力架,从而使桩获得向下的压力,而基础则获得向上的顶升力,最后采用钢筋混凝土封桩。该施工方法所采用设备简单,操作简便,可以充分利用锚杆静压桩沉降小承载力高的特性,最大程度发挥桩基的性能,因此节省压桩数量,降低工程成本。同时可非常有效地减少基础加固以后的沉降,甚至可局部抬升基础。适合基础加固、托换和纠偏工程。

Description

锚杆静压桩施加预应力的施工方法
[技术领域]
本发明涉及一种桩基加固地基基础的技术领域,具体地说是一种锚杆静压桩压入地基以后,再对桩基施加预压应力的方法。
[背景技术]
锚杆静压桩加固既有房屋地基或对既有房屋进行托换、纠偏的技术已得到广泛应用,主要优点是设备简单,需要的操作空间小,对既有建筑物及周边环境影响小,造价低廉等。国家技术规范或行业标准对锚杆静压桩的设计与施工均有具体的规定和要求。目前,锚杆静压桩的施工方法为:先在既有建筑物基础上开孔、埋设锚杆、立桩架、将预制混凝土桩或钢管桩一节一节地压入地基,然后拆下桩架,焊接交叉钢筋浇筑封桩混凝土。
大量的资料表明,锚杆静压桩压入地基以后直接封桩的施工方法,主要存在以下缺点:
a、只有通过基础进一步沉降时,桩基才可参与工作,因此对基础的沉降变形控制效果有限。
b、不能充分发挥桩基承载力高的性能。
c、不能对基础产生顶升力,尤其对纠偏工程效果不理想。
此外,也有一些对锚杆静压桩施加预应力的方法,如在压桩过程中千斤顶拆除以前,先打入钢管顶住桩头,或封桩之前交叉筋焊好以后,塞入钢管顶住交叉筋和桩头等,均因应力损失大施加压力小,且无法控制施加应力的量值等原因而得不到广泛应用和认可。
[发明内容]
本发明的目的就是为了克服常规锚杆静压桩施工时,对地基沉降变形控制效果有限、桩基性能发挥少的缺点,提供一种锚杆静压桩施加预应力的施工方法,本方法所采用设备简单,操作简便,由于在封桩之前已对桩施加了压应力,因此可显著减少基础加固以后的沉降,节省材料,降低工程成本。
本发明解决这些技术问题所采用的技术方案是:
a、按常规锚杆静压桩的施工方法在钢筋混凝土基础上开凿桩孔,桩孔周边埋设锚杆,利用锚杆固定桩架,将预制好的混凝土桩或钢管桩一节一节地压到基础之下,然后拆下桩架。
b、将预先加工好的传力架放入桩孔中,传力架下端置于桩顶,上端高出桩孔并顶紧托架。
c、托架由桩孔周边的锚杆固定,拧紧锚杆上的紧固螺母,使托架获得向下的压力,压力通过传力架传到桩上,这样桩就获得了一定的压应力,同时基础获得了向上的顶升力。
d、使用高强混凝土封桩,待封桩混凝土达到一定强度后拆下托架,焊接交叉钢筋浇筑上部封桩混凝土。
本发明具有以下优点:可以充分利用锚杆静压桩沉降小承载力高的特性,最大程度发挥桩基的性能,因此节省压桩数量,降低工程成本;可非常有效地减少基础加固以后的沉降,甚至可进行局部抬升基础。
[附图说明]
图1为本发明锚杆静压桩的压桩工艺示图。
图2为本发明压桩完成后的桩位图。
图3为本发明对桩基施加预压应力图。
指定图3为摘要附图。
图中:1.钢筋混凝土基础,2.桩孔,3.锚杆,4.桩架,5.液压千斤顶,6.桩,7.传力架,8.托架,9.紧固螺母。
[具体实施方式]
下面结合附图对本发明进一步说明,这种施工方法对从事地基或基础加固专业的人来说是非常清楚的。
a、将桩(6)压入钢筋混凝土基础(1)如图1:
先在被加固的钢筋混凝土基础(1)上开凿桩孔(2),桩孔(2)也可以是预留孔,桩孔(2)应上小下大,然后在桩孔(2)的周边埋设锚杆(3),锚杆(3)的上部带有丝纹,通过锚杆(3)和紧固螺母(9)固定桩架(4),启动液压千斤顶(5)将桩(6)一节一节压入钢筋混凝土基础(1)。桩(6)采用预制桩或钢管桩,桩接头采用焊接连接。
b、当压桩长度和桩顶标高达到设计要求后,拆下桩架,如图2。
c、施加压应力,如图3:
将传力架(7)放入桩孔(2),传力架(7)的下端对准桩(6)的中心上端高出桩孔(2),然后安装托架(8),由锚杆(3)和紧固螺母(9)固定托架(8),通过拧紧紧固螺母(9)使托架(8)对传力架(7)产生压力,进而桩(6)获得向下的压力,同时钢筋混凝土基础(1)获得向上的顶升力。可通过扭力扳手测得单根紧固螺母(9)的压力,进而推算出对桩(6)的压力值。
d、封桩,如图3
封桩分两步,首先将高强度微膨胀混凝土灌入桩孔(2),待混凝土达到一定强度后拆下和托架(8),利用锚杆(3)焊接交叉钢筋,支模板浇筑上部封桩混凝土。
本发明对于锚杆静压桩加固地基基础、房屋纠偏及基础托换有明显效果。

Claims (4)

1.一种锚杆静压桩的施工方法,其特征在于:钢筋混凝土基础上开有桩孔,在桩孔的周边埋设锚杆,利用锚杆固定桩架,将桩一节一节地压入基础,然后拆下桩架,安装传力架和托架,通过托架和传力架使桩获得一定的压力之后,采用钢筋混凝土封桩。
2.根据权利要求1所述的锚杆静压桩施加预应力的施工方法,其特征在于利用锚杆和锚杆上的紧固螺母固定托架,通过不断拧紧紧固螺母,使托架顶紧传力架产生向下的推力。
3.根据权利要求1所述的锚杆静压桩施加预应力的施工方法,其特征在于将桩压入基础以后,在桩孔中放入传力架,传力架下端置于桩顶,上端抵住托架,并将托架的压力传递到桩上。
4.根据权利要求1所述的锚杆静压桩施加预应力的施工方法,其特征在于先对桩施加一定的预压力,之后浇注封桩混凝土,待混凝土达到一定强度后再拆除托架。
CN2012100064767A 2012-01-10 2012-01-10 锚杆静压桩施加预应力的施工方法 Pending CN102605783A (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2012100064767A CN102605783A (zh) 2012-01-10 2012-01-10 锚杆静压桩施加预应力的施工方法

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2012100064767A CN102605783A (zh) 2012-01-10 2012-01-10 锚杆静压桩施加预应力的施工方法

Publications (1)

Publication Number Publication Date
CN102605783A true CN102605783A (zh) 2012-07-25

Family

ID=46523516

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2012100064767A Pending CN102605783A (zh) 2012-01-10 2012-01-10 锚杆静压桩施加预应力的施工方法

Country Status (1)

Country Link
CN (1) CN102605783A (zh)

Cited By (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103306285A (zh) * 2013-06-09 2013-09-18 中国十七冶集团有限公司 用于补强基础承载力的锚杆静压桩施工系统
CN106032668A (zh) * 2015-03-18 2016-10-19 中天建设集团有限公司 一种锚杆静压桩不卸载封桩方法及装置
CN107059870A (zh) * 2017-06-15 2017-08-18 广州市胜特建筑科技开发有限公司 一种建筑物特殊地基加固的处理方法和系统
CN107090860A (zh) * 2017-05-09 2017-08-25 广东省建筑科学研究院集团股份有限公司 一种浅基础建筑物纠偏加固结构及其施工方法
CN108425386A (zh) * 2018-05-24 2018-08-21 山东建筑大学 框架结构建筑物提升纠倾法
CN109183867A (zh) * 2018-11-12 2019-01-11 中铁西北科学研究院有限公司 一种非扰动可调节快速止倾方法
CN110453609A (zh) * 2019-08-28 2019-11-15 中铁建大桥工程局集团第一工程有限公司 一种简便钢管桩支架堆载预压结构及方法
CN113914316A (zh) * 2021-11-08 2022-01-11 山东元琅建设工程有限公司 一种数控精密机床的基础压桩工艺流程

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1177048A (zh) * 1997-07-23 1998-03-25 夏强 倾斜建筑物可控纠偏施工方法及装置
NL1028382C2 (nl) * 2005-02-23 2006-08-29 Josrie Funderingstechnieken V Werkwijze voor het funderen van een bestaand gebouw.
CN101240533A (zh) * 2007-12-28 2008-08-13 吴如军 桩基加固预应力锁桩方法
CN101397796A (zh) * 2008-09-12 2009-04-01 葛培中 预应力锚杆静压桩的施工方法
CN101793098A (zh) * 2010-03-13 2010-08-04 中铁西北科学研究院有限公司 一种协调互动组合纠倾方法

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1177048A (zh) * 1997-07-23 1998-03-25 夏强 倾斜建筑物可控纠偏施工方法及装置
NL1028382C2 (nl) * 2005-02-23 2006-08-29 Josrie Funderingstechnieken V Werkwijze voor het funderen van een bestaand gebouw.
CN101240533A (zh) * 2007-12-28 2008-08-13 吴如军 桩基加固预应力锁桩方法
CN101397796A (zh) * 2008-09-12 2009-04-01 葛培中 预应力锚杆静压桩的施工方法
CN101793098A (zh) * 2010-03-13 2010-08-04 中铁西北科学研究院有限公司 一种协调互动组合纠倾方法

Cited By (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103306285A (zh) * 2013-06-09 2013-09-18 中国十七冶集团有限公司 用于补强基础承载力的锚杆静压桩施工系统
CN106032668A (zh) * 2015-03-18 2016-10-19 中天建设集团有限公司 一种锚杆静压桩不卸载封桩方法及装置
CN107090860A (zh) * 2017-05-09 2017-08-25 广东省建筑科学研究院集团股份有限公司 一种浅基础建筑物纠偏加固结构及其施工方法
CN107090860B (zh) * 2017-05-09 2023-07-28 广东建科建筑工程技术开发有限公司 一种浅基础建筑物纠偏加固结构及其施工方法
CN107059870A (zh) * 2017-06-15 2017-08-18 广州市胜特建筑科技开发有限公司 一种建筑物特殊地基加固的处理方法和系统
CN108425386A (zh) * 2018-05-24 2018-08-21 山东建筑大学 框架结构建筑物提升纠倾法
CN109183867A (zh) * 2018-11-12 2019-01-11 中铁西北科学研究院有限公司 一种非扰动可调节快速止倾方法
CN110453609A (zh) * 2019-08-28 2019-11-15 中铁建大桥工程局集团第一工程有限公司 一种简便钢管桩支架堆载预压结构及方法
CN110453609B (zh) * 2019-08-28 2020-12-11 中铁建大桥工程局集团第一工程有限公司 一种简便钢管桩支架堆载预压结构及方法
CN113914316A (zh) * 2021-11-08 2022-01-11 山东元琅建设工程有限公司 一种数控精密机床的基础压桩工艺流程

Similar Documents

Publication Publication Date Title
CN102605783A (zh) 锚杆静压桩施加预应力的施工方法
CN101397796A (zh) 预应力锚杆静压桩的施工方法
CN102162258B (zh) 一种塔吊钢管混凝土高桩塔基结构及构建方法
CN103774854A (zh) 一种重型超高钢构件的吊装施工方法
CN107119917A (zh) 条形基础房屋后增地下室结构的施工方法
US11365523B2 (en) Methods for constructing tensionless concrete pier foundations and foundations constructed thereby
CN102644284A (zh) 桩底后注浆方法及装置
CN106759448A (zh) 一种下沉式农业大棚光伏支架基础结构及其施工方法
CN102864777A (zh) 一种快速预应力锚杆结构及施工方法
CN102605785A (zh) 锚杆静压桩预加压力封桩装置
CN204898672U (zh) 一种废弃桩基的拔除装置
CN201172830Y (zh) 塔式起重机锚杆静压桩基础
CN103410144B (zh) 预应力钢筋嵌岩灌注桩及施工方法
JP4973621B2 (ja) 構造物の水平高さ修正工法およびその工法に用いられる機具並びに構造物の支持力補強工法
CN105113492A (zh) 一种适用于粘性土、砂土、粉土地基的组合桩施工方法
CN210263111U (zh) 一种土木工程施工用空心桩体
CN208235562U (zh) 一种用于加固湿陷性黄土的静压桩结构
CN202577307U (zh) 桩底后注浆装置
CN204849759U (zh) 一种作为主体结构立柱的捆绑式锚索复合桩结构
CN105002906B (zh) 一种作为主体结构立柱的捆绑式锚索复合桩结构及其施工方法
CN104895058B (zh) 全液压静压双管复合扩底桩机及其施工方法
CN105064355B (zh) 一种作为主体结构立柱的锚索复合桩结构及其施工方法
CN102226343A (zh) 锚杆静压组合桩
CN204112325U (zh) 一种用于锚杆静压桩压桩装置
CN106351269A (zh) 一种适用于输电杆塔基础纠偏的静力压桩装置及操作方法

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
DD01 Delivery of document by public notice

Addressee: Ge Peizhong

Document name: Notification that Application Deemed to be Withdrawn

C02 Deemed withdrawal of patent application after publication (patent law 2001)
WD01 Invention patent application deemed withdrawn after publication

Application publication date: 20120725