CN102644284A - 桩底后注浆方法及装置 - Google Patents

桩底后注浆方法及装置 Download PDF

Info

Publication number
CN102644284A
CN102644284A CN2012101054495A CN201210105449A CN102644284A CN 102644284 A CN102644284 A CN 102644284A CN 2012101054495 A CN2012101054495 A CN 2012101054495A CN 201210105449 A CN201210105449 A CN 201210105449A CN 102644284 A CN102644284 A CN 102644284A
Authority
CN
China
Prior art keywords
pile
grouting
grouting pipe
colligation
pipe
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN2012101054495A
Other languages
English (en)
Inventor
曾庆辉
张丙吉
汪智慧
顾亮
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shenyang Zhongjian Dongshe Geotechnical Engineering Co Ltd
China Northeast Architectural Design and Research Institute Co Ltd
Original Assignee
Shenyang Zhongjian Dongshe Geotechnical Engineering Co Ltd
China Northeast Architectural Design and Research Institute Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shenyang Zhongjian Dongshe Geotechnical Engineering Co Ltd, China Northeast Architectural Design and Research Institute Co Ltd filed Critical Shenyang Zhongjian Dongshe Geotechnical Engineering Co Ltd
Priority to CN2012101054495A priority Critical patent/CN102644284A/zh
Publication of CN102644284A publication Critical patent/CN102644284A/zh
Pending legal-status Critical Current

Links

Images

Abstract

为解决桩由于种种原因其承载力不能满足设计要求这一技术问题,本发明公开一种桩底后注浆方法及装置,在桩基的钢筋笼预埋注浆导管,在桩基的底部设置后注浆管阀,注浆导管与后注浆管阀连接,注浆管须伸出地面0.3-1.0m,注浆导管上端预先封堵;在桩体形成24小时后,由桩端和桩侧的预埋注浆导管及后注浆管阀压入水泥浆,通过浆液的渗透、劈裂压密等方式,加固泥皮和桩底沉渣,改善桩土界面,并使桩周一定范围内的土体得到加固,土体强度增加,增大桩侧摩阻力和端承力,从而大幅度地提高单桩极限承载力和减少沉降量。

Description

桩底后注浆方法及装置
技术领域
本发明涉及建筑领域,具体说是一种桩底后注浆方法及实现该方法的装置。
背景技术
在桩基工程的施工中,往往会有少量桩由于种种原因其承载力不能满足设计要求。如何对这些桩采用后压浆技术进行补救,现有的方法是采用钻孔,然后注浆的方法,该方法不仅施工复杂,工程造价高,更重要的是减小了桩基的强度,带来质量隐患。
发明内容
为解决该技术问题,本发明的目的是提供一种桩底后注浆方法及实现该方法的装置,具体方案如下:
一种桩底后注浆方法,在桩基的钢筋笼预埋注浆导管,在桩基的底部设置后注浆管阀,注浆导管与后注浆管阀连接,注浆管须伸出地面0.3-1.0m,注浆导管上端预先封堵;在桩体形成24小时后,由桩端和桩侧的预埋注浆导管及后注浆管阀压入水泥浆,通过浆液的渗透、劈裂压密等方式,加固泥皮和桩底沉渣,改善桩土界面,并使桩周一定范围内的土体得到加固,土体强度增加,增大桩侧摩阻力和端承力,从而大幅度地提高单桩极限承载力和减少沉降量。
注浆导管与钢筋笼固定采用铁丝十字绑扎固定方法,绑扎应牢固,均匀;桩端注浆管绑扎于加劲箍内侧,与钢筋笼主筋靠紧绑扎固定,绑扎点为每一道加筋箍处;桩侧注浆导管绑扎于螺旋箍筋外侧,绑扎点间距为1.0m。
所述注浆导管的上端高于桩施工作业地坪300-1000mm;桩端注浆导管下端口距钢筋笼底端200-250mm,钢筋笼最下一道加劲箍应调至纵筋底端之上300-400mm处。
包括注浆导管、后注浆管阀,所述注浆导管固定于桩基的钢筋笼;所述后注浆管阀包括阀体,所述阀体一端设置接口与注浆导管连接,所述阀体的另一端为底封口,所述阀体内设置单向压力活塞,所述单向压力活塞与螺杆固定,所述螺杆通过调节压力螺母固定在阀体内的下底固定板上,在螺杆的外侧、单向压力活塞与下固定板间设置压力弹簧;与所述单向压力活塞与下固定板相对应的阀体部位设置压浆孔,所述压浆孔的外侧设置单向控制装置。
所述单向压力活塞与接口间的距离L1为50-100mm,所述单向压力活塞与下底固定板间的距离L2为50-200mm,所述下底固定板与底封口间的距离L3为50-100mm,所述阀体的直径D为25.4-50.5mm。
所述单向控制装置为具有弹性的橡胶,所述橡胶缠绕在所述压浆孔的位置。
本发明的优点是:
通过浆液的渗透、劈裂压密等方式,加固泥皮和桩底沉渣的固有缺陷,改善桩土界面,并使桩周一定范围内的土体得到加固,土体强度增加,增大桩侧摩阻力和端承力,从而大幅度地提高单桩极限承载力和减少沉降量。桩端后压浆可明显改善桩端持力层和桩周条件,提高桩端阻力和桩侧摩阻力,改善荷载的传递性能,大幅提高单桩承载力和减少沉降量,且适用于各种土层,技术工艺简单,施工方法灵活,压浆设备简单,便于普及推广。能够降低工程造价,同时缩短施工工期,具有显著的经济效益。大幅度提高了单桩承载力,减少了钻孔桩工程质量隐患,可比传统技术减少用桩量,节约基础工程投资。
附图说明
图1为本发明的原理图;
图2为实现本发明的方法是装置的结构示意图。
具体实施方式
本发明的原理如图1所示,在桩基40的钢筋笼预埋注浆导管10,在桩基的底部设置后注浆管阀20,注浆导管10与后注浆管阀20连接,注浆管须伸出地面0.3-1.0m,注浆导管10上端预先封堵;在桩体形成24小时后,由桩端和桩侧的预埋注浆导管10及后注浆管阀20压入水泥浆,通过浆液的渗透、劈裂压密等方式,加固泥皮和桩底沉渣,改善桩土界面,并使桩周一定范围内的土体得到加固,土体强度增加,增大桩侧摩阻力和端承力,从而大幅度地提高单桩极限承载力和减少沉降量;图1中序号30为水泥浆的流动方向。
注浆导管与钢筋笼固定采用铁丝十字绑扎固定方法,绑扎应牢固,均匀;桩端注浆管绑扎于加劲箍内侧,与钢筋笼主筋靠紧绑扎固定,绑扎点为每一道加筋箍处;桩侧注浆导管绑扎于螺旋箍筋外侧,绑扎点间距为1.0m。
所述注浆导管的上端高于桩施工作业地坪300-1000mm;桩端注浆导管下端口距钢筋笼底端200-250mm,钢筋笼最下一道加劲箍应调至纵筋底端之上300-400mm处。
如图2所示,本发明的实现装置包括注浆导管10、后注浆管阀20,所述注浆导管10固定于桩基的钢筋笼;所述后注浆管阀20包括阀体,所述阀体一端设置接口1与注浆导管20连接,所述阀体的另一端为底封口9,所述阀体内设置单向压力活塞2,所述单向压力活塞2与螺杆6固定,所述螺杆6通过调节压力螺母7固定在阀体内的下底固定板5上,在螺杆6的外侧、单向压力活塞2与下固定板5间设置压力弹簧3;与所述单向压力活塞2与下固定板5相对应的阀体部位设置压浆孔4,所述压浆孔4的外侧设置单向控制装置8。
所述单向压力活塞与接口间的距离L1为50-100mm,所述单向压力活塞与下底固定板间的距离L2为50-200mm,所述下底固定板与底封口间的距离L3为50-100mm,所述阀体的直径D为25.4-50.5mm。
所述单向控制装置8为具有弹性的橡胶,所述橡胶缠绕在所述压浆孔的位置。
本发明的原理是:在桩体形成24小时后,由桩端和桩侧的预埋注浆导管及后注浆管阀压入水泥浆,泥浆推动单向压力活塞向阀体底部运动,水泥浆从压浆孔溢出,流入桩基底部周围;在未压浆时,由于单向控制装置及弹簧的作用,桩基外部的物体无法进入桩体内。

Claims (5)

1.一种桩底后注浆方法,其特征在于:在桩基的钢筋笼预埋注浆导管,在桩基的底部设置后注浆管阀,注浆导管与后注浆管阀连接,注浆管须伸出地面0.3-1.0m,注浆导管上端预先封堵;在桩体形成24小时后,由桩端和桩侧的预埋注浆导管及后注浆管阀压入水泥浆,通过浆液的渗透、劈裂压密等方式,加固泥皮和桩底沉渣,改善桩土界面,并使桩周一定范围内的土体得到加固,土体强度增加,增大桩侧摩阻力和端承力,从而大幅度地提高单桩极限承载力和减少沉降量;
注浆导管与钢筋笼固定采用铁丝十字绑扎固定方法,绑扎应牢固,均匀;桩端注浆管绑扎于加劲箍内侧,与钢筋笼主筋靠紧绑扎固定,绑扎点为每一道加筋箍处;桩侧注浆导管绑扎于螺旋箍筋外侧,绑扎点间距为1.0m。
2.根据权利要求1所述的桩底后注浆方法,其特征在于:所述注浆导管的上端高于桩施工作业地坪300-1000mm;桩端注浆导管下端口距钢筋笼底端200-250mm,钢筋笼最下一道加劲箍应调至纵筋底端之上300-400mm处。
3.一种实现权利要求1所述方法的装置,其特征在于:包括注浆导管、后注浆管阀,所述注浆导管固定于桩基的钢筋笼;所述后注浆管阀包括阀体,所述阀体一端设置接口与注浆导管连接,所述阀体的另一端为底封口,所述阀体内设置单向压力活塞,所述单向压力活塞与螺杆固定,所述螺杆通过调节压力螺母固定在阀体内的下底固定板上,在螺杆的外侧、单向压力活塞与下固定板间设置压力弹簧;与所述单向压力活塞与下固定板相对应的阀体部位设置压浆孔,所述压浆孔的外侧设置单向控制装置。
4.根据权利要求3所述的装置,其特征在于:所述单向压力活塞与接口间的距离为50-100mm,所述单向压力活塞与下底固定板间的距离为50-200mm,所述下底固定板与底封口间的距离为50-100mm,所述阀体的直径为25.4-50.5mm。
5.根据权利要求3所述的装置,其特征在于:所述单向控制装置为具有弹性的橡胶,所述橡胶缠绕在所述压浆孔的位置。
CN2012101054495A 2012-04-11 2012-04-11 桩底后注浆方法及装置 Pending CN102644284A (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2012101054495A CN102644284A (zh) 2012-04-11 2012-04-11 桩底后注浆方法及装置

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2012101054495A CN102644284A (zh) 2012-04-11 2012-04-11 桩底后注浆方法及装置

Publications (1)

Publication Number Publication Date
CN102644284A true CN102644284A (zh) 2012-08-22

Family

ID=46657347

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2012101054495A Pending CN102644284A (zh) 2012-04-11 2012-04-11 桩底后注浆方法及装置

Country Status (1)

Country Link
CN (1) CN102644284A (zh)

Cited By (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103184738A (zh) * 2012-10-20 2013-07-03 二十二冶集团第一建设有限公司 注浆导管约束环安装结构和约束环安装注浆导管的方法
CN103195062A (zh) * 2013-03-27 2013-07-10 上海市机械施工有限公司 桩底注浆的方法
CN104213563A (zh) * 2014-09-29 2014-12-17 中国建筑一局(集团)有限公司 桩芯承压水封堵器及其施工方法
CN105003285A (zh) * 2015-06-12 2015-10-28 中国水利水电第三工程局有限公司 雀巢聚音式钢筋混凝土工程灌浆预埋装置
CN105625303A (zh) * 2014-11-28 2016-06-01 大连市市政设计研究院有限责任公司 一种钻孔灌注桩后压浆工艺
CN105714827A (zh) * 2016-03-04 2016-06-29 安徽同济建设集团有限责任公司 钻孔灌注桩后注浆施工方法
CN106638607A (zh) * 2016-11-24 2017-05-10 中航勘察设计研究院有限公司 一种桩基后压浆施工中注浆管与钢筋笼的连接方法
CN107034877A (zh) * 2017-05-17 2017-08-11 东南大学 灌注桩桩端桩侧组合后压浆装置及其施工方法
CN107882020A (zh) * 2017-11-24 2018-04-06 苏州枫石堂工程科技有限公司 一种小直径树根桩施工方法及清洗注浆装置

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1319701A (zh) * 2000-02-18 2001-10-31 中国建筑科学研究院地基基础研究所 灌注桩桩侧后注浆装置及工艺
CN100577924C (zh) * 2008-08-26 2010-01-06 江苏南通二建集团有限公司 桩底后注浆方法
CN201425108Y (zh) * 2008-10-13 2010-03-17 刘振党 灌注桩注浆逆止阀
CN201665871U (zh) * 2010-03-25 2010-12-08 北京中岩大地工程技术有限公司 长螺旋钻孔灌注桩后压浆技术装置
KR20110054925A (ko) * 2009-11-19 2011-05-25 한국건설기술연구원 맴브레인 가압을 이용한 설계 지지력 발현 확인 및 선단지지력 즉시 발현 가능 현장타설 말뚝 시공방법

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1319701A (zh) * 2000-02-18 2001-10-31 中国建筑科学研究院地基基础研究所 灌注桩桩侧后注浆装置及工艺
CN100577924C (zh) * 2008-08-26 2010-01-06 江苏南通二建集团有限公司 桩底后注浆方法
CN201425108Y (zh) * 2008-10-13 2010-03-17 刘振党 灌注桩注浆逆止阀
KR20110054925A (ko) * 2009-11-19 2011-05-25 한국건설기술연구원 맴브레인 가압을 이용한 설계 지지력 발현 확인 및 선단지지력 즉시 발현 가능 현장타설 말뚝 시공방법
CN201665871U (zh) * 2010-03-25 2010-12-08 北京中岩大地工程技术有限公司 长螺旋钻孔灌注桩后压浆技术装置

Cited By (13)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103184738A (zh) * 2012-10-20 2013-07-03 二十二冶集团第一建设有限公司 注浆导管约束环安装结构和约束环安装注浆导管的方法
CN103184738B (zh) * 2012-10-20 2015-02-04 二十二冶集团第一建设有限公司 注浆导管约束环安装结构和约束环安装注浆导管的方法
CN103195062B (zh) * 2013-03-27 2015-12-23 上海市机械施工集团有限公司 桩底注浆的方法
CN103195062A (zh) * 2013-03-27 2013-07-10 上海市机械施工有限公司 桩底注浆的方法
CN104213563B (zh) * 2014-09-29 2016-01-20 中国建筑一局(集团)有限公司 桩芯承压水封堵器及其施工方法
CN104213563A (zh) * 2014-09-29 2014-12-17 中国建筑一局(集团)有限公司 桩芯承压水封堵器及其施工方法
CN105625303A (zh) * 2014-11-28 2016-06-01 大连市市政设计研究院有限责任公司 一种钻孔灌注桩后压浆工艺
CN105003285A (zh) * 2015-06-12 2015-10-28 中国水利水电第三工程局有限公司 雀巢聚音式钢筋混凝土工程灌浆预埋装置
CN105714827A (zh) * 2016-03-04 2016-06-29 安徽同济建设集团有限责任公司 钻孔灌注桩后注浆施工方法
CN106638607A (zh) * 2016-11-24 2017-05-10 中航勘察设计研究院有限公司 一种桩基后压浆施工中注浆管与钢筋笼的连接方法
CN107034877A (zh) * 2017-05-17 2017-08-11 东南大学 灌注桩桩端桩侧组合后压浆装置及其施工方法
CN107034877B (zh) * 2017-05-17 2019-06-18 东南大学 灌注桩桩端桩侧组合后压浆装置及其施工方法
CN107882020A (zh) * 2017-11-24 2018-04-06 苏州枫石堂工程科技有限公司 一种小直径树根桩施工方法及清洗注浆装置

Similar Documents

Publication Publication Date Title
CN102644284A (zh) 桩底后注浆方法及装置
CN102587358A (zh) 一种高聚物材料后注浆挤扩灌注桩技术
CN203924140U (zh) 承压水基坑地下连续墙接缝渗漏水封堵装置
CN102605783A (zh) 锚杆静压桩施加预应力的施工方法
CN202577307U (zh) 桩底后注浆装置
CN104294823B (zh) 一种预应力管桩抗浮桩筏结构的施工方法
CN105951872A (zh) 一种软土地基中排水管道基础及其施工方法
CN103195060A (zh) 软土地基预应力锚杆加固结构及其用途
CN202559355U (zh) 一种用于锚杆静压桩预压封桩装置
CN203270584U (zh) 一种注浆用的单向截流注浆头
CN204311454U (zh) 一种用于基础施工的桩端注浆装置
CN204081064U (zh) 一种地下室夹层结构
CN104452746A (zh) 一种钻孔灌注桩的施工方法
CN203821381U (zh) 矩形预应力灌注桩
CN103452115B (zh) 一种利用套管式底送后插管后注浆装置进行施工的施工方法
CN203403431U (zh) 具有预制基础的快装塔结构
CN202467152U (zh) 一种型钢悬挑脚手架夹具式预埋件结构
CN201746830U (zh) 长螺旋灌注桩后插笼工具
CN102155015A (zh) 一种带刺的植入式钢管锚杆
CN201062393Y (zh) 圆形或弧形建筑的混凝土空心砌块
CN204023569U (zh) 一种囊式扩大头锚杆承载体
CN102937028A (zh) 一种煤矿巷道底板加固方法及对中装置
CN103572760A (zh) 钻孔压灌桩全桩长振捣施工方法及装置
CN204112325U (zh) 一种用于锚杆静压桩压桩装置
CN101892665A (zh) 一种注浆振冲碎石桩复合地基的施工方法

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C02 Deemed withdrawal of patent application after publication (patent law 2001)
WD01 Invention patent application deemed withdrawn after publication

Application publication date: 20120822