CN102561522A - 一种钢结构新老结构的连接方法 - Google Patents

一种钢结构新老结构的连接方法 Download PDF

Info

Publication number
CN102561522A
CN102561522A CN2011103744236A CN201110374423A CN102561522A CN 102561522 A CN102561522 A CN 102561522A CN 2011103744236 A CN2011103744236 A CN 2011103744236A CN 201110374423 A CN201110374423 A CN 201110374423A CN 102561522 A CN102561522 A CN 102561522A
Authority
CN
China
Prior art keywords
old
steel
original
newly
new
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN2011103744236A
Other languages
English (en)
Other versions
CN102561522B (zh
Inventor
龚顺风
程鹏
程江敏
许峰
邱鹤
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Zhejiang University ZJU
Original Assignee
Zhejiang University ZJU
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Zhejiang University ZJU filed Critical Zhejiang University ZJU
Priority to CN201110374423.6A priority Critical patent/CN102561522B/zh
Publication of CN102561522A publication Critical patent/CN102561522A/zh
Application granted granted Critical
Publication of CN102561522B publication Critical patent/CN102561522B/zh
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Abstract

本发明公开了一种钢结构新老结构连接的施工方法。对原有结构卸载后,直接对焊拼接新老钢柱,等焊缝冷却,再在梁柱构件内外侧设置闭合的加劲板,以有效传递荷载,实现新老结构及梁柱节点承载力的提高。该技术不用拆除原有结构,通过设置加劲板,能有效加强新老结构连接,可以保证新老结构连接节点有效传力。

Description

一种钢结构新老结构的连接方法
技术领域
本发明涉及钢结构工程扩建领域,尤其涉及一种适用于新老结构节点连接的施工方法。
背景技术
钢结构工程,特别是工业厂房,由于改变或者增加生产工艺,既有建筑不能满足更多的要求,常常需要在既有工程基础上扩建项目。一般而言,既有生产线往往不能停产,这意味着在原有结构承受荷载的基础上进行改扩建施工。
由于改变、新增生产工艺,结构计算图形可能会发生改变,扩建部分和既有结构互相交错,扩建部分和既有结构的连接主要三种,一是在既有结构基础上新增结构;二是新增结构穿越既有结构;三是既有结构穿越新增结构。第一种做法适用于新老结构连接处,被广泛采纳应用,也是改扩建工程施工的关键环节,因此,提出一种安全可靠的新老结构连接节点施工方法具有很大的实际意义。
发明内容
本发明的目的在于针对现有技术的不足,提供一种钢结构新老结构连接的施工方法。
本发明的目的是通过以下技术方案来实现的:一种钢结构新老结构连接的施工方法,该方法包括以下步骤:
(1)对需要新增结构的原有钢梁进行卸荷:通过拆除结构上部设备或者通过安装千斤顶等卸载设备,支撑原有结构;
(2)直接吊装新增钢柱,对焊拼接新增钢柱和原有钢梁;
(3)等焊缝冷却之后,再在新增钢柱、原有钢柱和原有钢梁内外侧设置闭合的加劲板;
(4)待焊缝冷却之后,再逐级安装结构上部结构和设备。
本发明的有益效果是,本发明对承受设备的结构提供新的扩建技术,使得原有结构无需拆除或截断,新增钢柱直接拼接在原有结构之上,并设置加劲板加强构件。扩建后结构能承受新增荷载作用,是一种可以广泛应用于钢结构扩建的施工技术,具有广阔的应用前景。
 
附图说明
图1为本发明新老结构连接的示意图;
图2为图1的A-A剖视图;
图3为图1的B-B剖视图;
图4为图3的B-B剖视图;
图中,原有钢柱1,新增钢柱2,闭合加劲板3,原有钢梁4。
具体实施方式
如图1-4所示,本发明钢结构新老结构连接的施工方法,包括以下步骤:
1、对需要扩建的原有钢梁4进行卸荷。
所需卸荷的大小按照《钢结构加固技术规范》(CECS_77-96)计算确定。常见的卸荷方法主要有拆除结构上部设备,或者通过千斤顶等卸载设备,支撑原有结构。
2、安装新增钢柱2。
直接吊装新增钢柱2,对焊拼接新增钢柱2和原有钢柱1。
3、设置加劲板3。
等焊缝冷却之后,在新增钢柱2、原有钢柱1和原有钢梁3内外侧焊接加劲板3。有限元分析证明,通过这种处理措施,梁柱连接处的能有效传力,加劲板3能有效发挥作用。
4、待焊缝冷却之后,完成钢结构新老结构的连接。
本发明在既有结构上新增结构,不用拆除或者截断既有结构,直接对接焊接新老钢柱的翼缘和腹板,由于原有结构是焊接结构,为了避免焊缝集中,同时在梁柱节点外围设置封闭的纵横向加劲板,增强钢柱翼缘和梁翼缘的连接及新老柱子腹板轴向力的传递,以保证新立柱底部的稳定、安全、可靠。
本发明对承受设备的结构提供新的扩建技术,使得原有结构无需拆除或截断,新增钢柱直接拼接在原有结构之上,并设置加劲板加强构件。扩建后结构能承受新增荷载作用,是一种可以广泛应用于钢结构扩建的施工技术,具有广阔的应用前景。

Claims (1)

1.一种钢结构新老结构连接的施工方法,其特征在于,该方法包括以下步骤:
(1)对需要新增结构的原有钢梁(4)进行卸荷:通过拆除结构上部设备或者通过安装千斤顶等卸载设备,支撑原有结构;
(2)直接吊装新增钢柱(2),对焊拼接新增钢柱(2)和原有钢柱(1);
(3)等焊缝冷却之后,再在新增钢柱(2)、原有钢柱(1)和原有钢梁(4)内外侧焊接闭合的加劲板;
(4)待焊缝冷却,即完成钢结构新老结构的连接。
CN201110374423.6A 2012-04-09 2012-04-09 一种钢结构新老结构的连接方法 Expired - Fee Related CN102561522B (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201110374423.6A CN102561522B (zh) 2012-04-09 2012-04-09 一种钢结构新老结构的连接方法

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201110374423.6A CN102561522B (zh) 2012-04-09 2012-04-09 一种钢结构新老结构的连接方法

Publications (2)

Publication Number Publication Date
CN102561522A true CN102561522A (zh) 2012-07-11
CN102561522B CN102561522B (zh) 2014-02-19

Family

ID=46407997

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201110374423.6A Expired - Fee Related CN102561522B (zh) 2012-04-09 2012-04-09 一种钢结构新老结构的连接方法

Country Status (1)

Country Link
CN (1) CN102561522B (zh)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107859356A (zh) * 2017-11-30 2018-03-30 河南省电力勘测设计院 一种纯弯h型钢梁冷连接加固方法

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2003049482A (ja) * 2001-08-03 2003-02-21 Nkk Corp 柱と梁の接合構造、その接合方法及びこれに使用するスプライスプレート
CN101368407A (zh) * 2008-09-19 2009-02-18 清华大学 钢结构高延性抗震节点
CN102352694A (zh) * 2011-09-13 2012-02-15 浙江大学 一种钢结构柱的加固方法
CN102383611A (zh) * 2012-01-11 2012-03-21 浙江大学 一种钢结构梁穿柱的施工方法

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2003049482A (ja) * 2001-08-03 2003-02-21 Nkk Corp 柱と梁の接合構造、その接合方法及びこれに使用するスプライスプレート
CN101368407A (zh) * 2008-09-19 2009-02-18 清华大学 钢结构高延性抗震节点
CN102352694A (zh) * 2011-09-13 2012-02-15 浙江大学 一种钢结构柱的加固方法
CN102383611A (zh) * 2012-01-11 2012-03-21 浙江大学 一种钢结构梁穿柱的施工方法

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107859356A (zh) * 2017-11-30 2018-03-30 河南省电力勘测设计院 一种纯弯h型钢梁冷连接加固方法

Also Published As

Publication number Publication date
CN102561522B (zh) 2014-02-19

Similar Documents

Publication Publication Date Title
US11079177B2 (en) Skid-mounted cold box and its prefabricated structure and assembly method
CN108240069A (zh) 一种大跨度多截面组合式桁架屋面结构体系及其施工方法
CN204609000U (zh) 一种用于建筑结构的装配式节点及其装配式框架
CN104947850B (zh) 屋盖梭形桁架及其施工方法
CN105625585A (zh) 屈曲约束钢结构梁柱连接节点和钢结构建筑
CN102352694B (zh) 一种钢结构柱的加固方法
CN104179256A (zh) 矩形钢管混凝土柱与钢梁单边螺栓连接节点及其施工方法
CN105525686A (zh) 采用螺栓的预制混凝土叠合楼板与h型钢梁的连接结构
CN102943546A (zh) 一种用于锅炉钢架上的大板梁
CN102493553B (zh) 钢筋混凝土梁与钢梁连接节点的构件施工方法
CN204850048U (zh) 辅助高层钢梁快速吊装的搭接结构
CN102561522A (zh) 一种钢结构新老结构的连接方法
CN205348415U (zh) 一种钢框架结构h型梁柱节点
CN102383611B (zh) 一种钢结构梁穿柱的施工方法
CN102392491A (zh) 锅炉钢架箱型截面梁、柱、斜撑的连接节点及施工方法
CN102031832A (zh) 一种加强层钢管混凝土柱节点
CN108457374A (zh) 一种箱型梁与柱连接装配式节点制备工艺及其节点
CN205421961U (zh) 一种用于钢梁安装的可转动夹板
CN204850047U (zh) 双肩双吊柱与行车梁连接结构
CN203866979U (zh) 大截面h型钢与小截面h型钢的刚接连接节点
CN207376809U (zh) 一种大悬挑钢结构高空无支撑安装临时加固装置
CN105019556A (zh) 辅助高层钢梁快速吊装的搭接结构及其应用
CN103790241B (zh) 一种h型实腹式梁与格构式钢柱的角钢连接方法
CN205777643U (zh) 一种钢梁腹板开洞的补强节点
CN219638481U (zh) 在已有钢柱新增管道梁的节点结构

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20140219