CN102561382B - 一种钢管桩 - Google Patents

一种钢管桩 Download PDF

Info

Publication number
CN102561382B
CN102561382B CN201010578658.2A CN201010578658A CN102561382B CN 102561382 B CN102561382 B CN 102561382B CN 201010578658 A CN201010578658 A CN 201010578658A CN 102561382 B CN102561382 B CN 102561382B
Authority
CN
China
Prior art keywords
pile
pipe
flange
pile pipe
steel pipe
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201010578658.2A
Other languages
English (en)
Other versions
CN102561382A (zh
Inventor
沈求良
卢慧清
周辉
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shanghai Nangong Electrical Design Co ltd
State Grid Corp of China SGCC
Shanghai Municipal Electric Power Co
Original Assignee
SHANGHAI SOUTH POWER SUPPLY DESIGN CO Ltd
State Grid Corp of China SGCC
Shanghai Municipal Electric Power Co
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by SHANGHAI SOUTH POWER SUPPLY DESIGN CO Ltd, State Grid Corp of China SGCC, Shanghai Municipal Electric Power Co filed Critical SHANGHAI SOUTH POWER SUPPLY DESIGN CO Ltd
Priority to CN201010578658.2A priority Critical patent/CN102561382B/zh
Publication of CN102561382A publication Critical patent/CN102561382A/zh
Application granted granted Critical
Publication of CN102561382B publication Critical patent/CN102561382B/zh
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Piles And Underground Anchors (AREA)

Abstract

本发明公开了一种钢管桩,包括埋于土里的桩管以及与该桩管固定的杆体,述的桩管通过静压力压入泥土中,它是由90°转角钢管构成正十二边形管,桩管的顶端设置有第一法兰,桩管的上部呈棱台,该棱台是桩管顶端自桩管顶端下一米的位置开始、沿桩管十二条棱的方向等比例向内收敛而成,所述的第一法兰与所述的棱台之间垂直且均布有若干个第一加固筋板;所述的杆体的底部固定有第二法兰,该第二法兰与第一法兰的大小相等。本发明能够大大缩小施工时间,节能环保。

Description

一种钢管桩
技术领域
本发明涉及电力设备领域,尤其涉及一种钢管桩。
背景技术
稳固电线杆通常使用斜拉索,但使用斜拉索往往会妨碍人行道的畅通与整洁,同时也影响路人的正常行走,在科技技术发达的今天,并非唯有斜拉索才能稳固电线杆,目前通常使用的是杆体和桩管的组合来替代这种斜拉索结构。但在施工过程中,存在以下两大问题:
1.对杆体而言,拆除杆体时,无法将杆体从桩管中拔起,只得采取切割的方法将杆体割断后拆除,而拆除后的杆体已经无法进行再次利用,这对于使用寿命可达30年的钢的杆体而言,无疑是巨大的浪费,违背了节能环保的理念。
2.对桩管而言,需要进行土方开挖,会使用大量的混凝土,而泥土的外运会给周边环境造成影响,同时,由于施工中需浇筑混凝土,养护时间一般为15至28天,将极大地影响施工进度,对工期较紧的工程而言,钢管桩无疑成了影响施工进度的第一大难题,这会大大降低施工的效率。
发明内容
本发明的目的在于克服现有技术的缺陷而提供一种钢管桩,它能够大大缩小施工时间,节能环保。
实现上述目的的技术方案是:一种钢管桩,包括埋于土里的桩管以及与该桩管固定的杆体,其中,
所述的桩管通过静压力压入泥土中,它是由90°转角钢管构成正十二边形管,桩管的顶端设置有第一法兰,桩管的上部呈棱台,该棱台是所述桩管顶端自下一米的位置、沿桩管十二条棱的方向等比例向内收敛而成,所述的第一法兰与所述的棱台之间垂直且均布有若干个第一加固筋板;
所述的杆体的底部固定有第二法兰,该第二法兰与第一法兰的大小相等。
上述的钢管桩,其中,所述的第二法兰与杆体之间还固定有若干个第二加固筋板。
上述的钢管桩,其中,所述的第一法兰和第二法兰之间通过螺栓固定。
上述的钢管桩,其中,所述的第一加固筋板为三角形板,其一条边与所述棱台的棱相贴,该条边的对边与所述的第一法兰所在的平面的夹角为87°。
本发明的有益效果是:本发明的杆体与桩管之间通过法兰连接,当需要拆卸杆体时,无需再进行切割,可以反复使用,保持了杆体的完整性,更具有环保效果,并且施工简单,经过试验,施工时间平均为2小时10分钟,另一方面,由于杆体能够再次利用,可以大大节省成本,减少了在此运输杆体的成本,原先施工时,需要混凝土、开挖机以及土方车,费用大约为6200元/次,而本发明中,该费用可以全部节省下来。通过这种法兰式的连接方式,避免了土方开挖、泥土运输队道路环境及人们出行安全与舒适度的影响,节约了生产钢管所需的材料和能源;由于桩管不需要土方开挖,混凝土浇筑,因此可以做到即时开工,施工中也不再需要考虑混凝土的养护期,为工程的按期竣工提供了保障。
附图说明
图1是本发明的一种钢管桩的结构示意图;
图2是本发明中的第一加固筋板的结构示意图。
具体实施方式
下面将结合附图对本发明作进一步说明。
请参阅图1和图2,图中示出了本发明的一种钢管桩,包括埋于土里的桩管1以及与该桩管1固定的杆体2,其中,
桩管1通过静压力压入泥土中,它是由90°转角钢管构成正十二边形管,桩管1的顶端设置有第一法兰11,桩管1的上部呈棱台12,该棱台12是桩管1顶端自下一米的位置、沿桩管1十二条棱的方向等比例向内收敛而成,第一法兰11与棱台12之间垂直且均布有若干个第一加固筋板13;
杆体2的底部固定有第二法兰21,该第二法兰21与第一法兰11的大小相等,第二法兰21与杆体2之间还固定有若干个第二加固筋板22。
第一法兰11和第二法兰21之间通过螺栓(图中未示出)固定。
第一加固筋板13为三角形板,其一条边与棱台12的棱相贴,该条边的对边与第一法兰11所在的平面的夹角a为87°,该角度也是为了进一步加强桩管1的抗颠覆能力。
桩管1的棱台12是在距桩管1的关口沿十二边形的棱先切割成12等分,随后再将各部分内收,这样可以确保同心率。
通过设置的第一加固筋板13,可以确保管口收缩后的机械抗弯强度。
设置的棱台12是为了加强桩管1的抗颠覆能力。
本发明中,桩管1和杆体2可直接实现对接,操作简单。
以上实施例仅供说明本发明之用,而非对本发明的限制,有关技术领域的技术人员,在不脱离本发明的精神和范围的情况下,还可以作出各种变换或变型,因此所有等同的技术方案也应该属于本发明的范畴,应由各权利要求所限定。

Claims (4)

1.一种钢管桩,包括埋于土里的桩管以及与该桩管固定的杆体,其特征在于,
所述的桩管通过静压力压入泥土中,它是由90°转角钢管构成正十二边形管,桩管的顶端设置有第一法兰,桩管的上部呈棱台,该棱台是桩管顶端自桩管顶端下一米的位置开始、沿桩管十二条棱的方向等比例向内收敛而成,所述的第一法兰与所述的棱台之间垂直且均布有若干个第一加固筋板;
所述的杆体的底部固定有第二法兰,该第二法兰与第一法兰的大小相等。
2.根据权利要求1所述的钢管桩,其特征在于,所述的第二法兰与杆体之间还固定有若干个第二加固筋板。
3.根据权利要求1所述的钢管桩,其特征在于,所述的第一法兰和第二法兰之间通过螺栓固定。
4.根据权利要求1所述的钢管桩,其特征在于,所述的第一加固筋板为三角形板,其一条边与所述棱台的棱相贴,该条边的对边与所述的第一法兰所在的平面的夹角为87°。
CN201010578658.2A 2010-12-08 2010-12-08 一种钢管桩 Expired - Fee Related CN102561382B (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201010578658.2A CN102561382B (zh) 2010-12-08 2010-12-08 一种钢管桩

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201010578658.2A CN102561382B (zh) 2010-12-08 2010-12-08 一种钢管桩

Publications (2)

Publication Number Publication Date
CN102561382A CN102561382A (zh) 2012-07-11
CN102561382B true CN102561382B (zh) 2014-01-08

Family

ID=46407862

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201010578658.2A Expired - Fee Related CN102561382B (zh) 2010-12-08 2010-12-08 一种钢管桩

Country Status (1)

Country Link
CN (1) CN102561382B (zh)

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113089667B (zh) * 2021-04-14 2023-03-14 中冶建工集团有限公司 钢护筒的沉放施工方法

Citations (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2000345570A (ja) * 1999-06-07 2000-12-12 Nippon Chiko Co Ltd 鋼管くい基礎
JP2004019332A (ja) * 2002-06-19 2004-01-22 Jfe Steel Kk 鋼管柱と鋼管杭の接合構造および工法
JP2004084267A (ja) * 2002-08-27 2004-03-18 Asahi Tec Corp 柱状物補強装置
DE202005004739U1 (de) * 2005-03-21 2005-06-02 Grabe, Jürgen Gründungspfahl
CN2725367Y (zh) * 2004-06-03 2005-09-14 田俊如 电力杆塔管桩基础
JP2006214226A (ja) * 2005-02-07 2006-08-17 Omtec:Kk 無線用アンテナ支柱と基礎杭との接合方法及びその構造
GB2462090A (en) * 2008-07-22 2010-01-27 Hutchinson Engineering Ltd A mast foundation with a plate and rods around a tube.
KR20100084315A (ko) * 2009-01-16 2010-07-26 주식회사태헌 강관주 고정구조
CN101787705A (zh) * 2010-02-10 2010-07-28 李呈祥 一种钢制防旋转角塔架基础及制作方法
CN201915396U (zh) * 2010-12-08 2011-08-03 上海金炫建设工程有限公司 一种钢管桩

Patent Citations (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2000345570A (ja) * 1999-06-07 2000-12-12 Nippon Chiko Co Ltd 鋼管くい基礎
JP2004019332A (ja) * 2002-06-19 2004-01-22 Jfe Steel Kk 鋼管柱と鋼管杭の接合構造および工法
JP2004084267A (ja) * 2002-08-27 2004-03-18 Asahi Tec Corp 柱状物補強装置
CN2725367Y (zh) * 2004-06-03 2005-09-14 田俊如 电力杆塔管桩基础
JP2006214226A (ja) * 2005-02-07 2006-08-17 Omtec:Kk 無線用アンテナ支柱と基礎杭との接合方法及びその構造
DE202005004739U1 (de) * 2005-03-21 2005-06-02 Grabe, Jürgen Gründungspfahl
GB2462090A (en) * 2008-07-22 2010-01-27 Hutchinson Engineering Ltd A mast foundation with a plate and rods around a tube.
KR20100084315A (ko) * 2009-01-16 2010-07-26 주식회사태헌 강관주 고정구조
CN101787705A (zh) * 2010-02-10 2010-07-28 李呈祥 一种钢制防旋转角塔架基础及制作方法
CN201915396U (zh) * 2010-12-08 2011-08-03 上海金炫建设工程有限公司 一种钢管桩

Also Published As

Publication number Publication date
CN102561382A (zh) 2012-07-11

Similar Documents

Publication Publication Date Title
CN105822313A (zh) 基于横向通道对盾构区间内障碍性异物进行移除的方法及装置
CN202645584U (zh) 复合式隧道衬砌结构
CN204326566U (zh) 一种利用碳纤维加固钢筋混凝土柱的结构
CN108832563A (zh) 一种预制电缆排管及其施工方法
CN103643672A (zh) 一种真空预压地基处理施工方法
CN110080801A (zh) 一种隧道破损管片的修补结构及其施工方法
CN102561382B (zh) 一种钢管桩
CN113073656B (zh) 一种支护桩桩间土防护结构及其施工方法
CN201915396U (zh) 一种钢管桩
CN111005381A (zh) 兜底式振动锤型钢拔桩机及其拔桩方法
CN105220809B (zh) 一种拱形顶板与牛腿桩的连接结构及其施工方法
CN205387716U (zh) 一种通信铁塔管桩基础
CN204097889U (zh) 一种补桩与增大台帽组合加固已建桥台结构
CN206706484U (zh) 模数化可循环的预制硬装地面板
CN202925564U (zh) 既有地下室结构的无工作井盾构接收构造
CN103422499A (zh) 一种冻土区桩基内外护筒施工方法
CN206385532U (zh) 一种用于cfg桩的补桩模板
CN108755721A (zh) 一种新型过水河道内管廊施工的围堰支护方法
CN205259049U (zh) 一种用于栈桥施工的装配型桥面板
CN205012299U (zh) 压力钢管安装型钢轨道装置
CN112095580B (zh) 一种受氯离子腐蚀的地区的预制桩以及预制桩的制备方法和消减预制桩负摩阻力施工方法
CN103397661A (zh) 型钢-混凝土地下组合外墙结构的施工工艺
CN208690872U (zh) 一种预制电缆排管
CN103088829B (zh) 一种基坑中砼支撑的施工方法
CN207143845U (zh) 一种拆装便捷的拦水坝单元及拦水坝

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
ASS Succession or assignment of patent right

Owner name: SHANGHAI MUNICIPAL ELECTRIC POWER COMPANY STATE EL

Free format text: FORMER OWNER: SHANGHAI MUNICIPAL ELECTRIC POWER COMPANY

Effective date: 20121022

C41 Transfer of patent application or patent right or utility model
TA01 Transfer of patent application right

Effective date of registration: 20121022

Address after: 200233 No. 222, Qin Jiang Road, Shanghai, Xuhui District

Applicant after: Shanghai Nangong Electrical Design Co.,Ltd.

Applicant after: SHANGHAI MUNICIPAL ELECTRIC POWER Co.

Applicant after: State Grid Corporation of China

Address before: 200233 No. 222, Qin Jiang Road, Shanghai, Xuhui District

Applicant before: Shanghai Nangong Electrical Design Co.,Ltd.

Applicant before: SHANGHAI MUNICIPAL ELECTRIC POWER Co.

C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20140108

CF01 Termination of patent right due to non-payment of annual fee