CN102535875A - 输电线铁塔倾斜修正装置及修正方法 - Google Patents
输电线铁塔倾斜修正装置及修正方法 Download PDFInfo
- Publication number
- CN102535875A CN102535875A CN2010106050487A CN201010605048A CN102535875A CN 102535875 A CN102535875 A CN 102535875A CN 2010106050487 A CN2010106050487 A CN 2010106050487A CN 201010605048 A CN201010605048 A CN 201010605048A CN 102535875 A CN102535875 A CN 102535875A
- Authority
- CN
- China
- Prior art keywords
- electric power
- power line
- steel tower
- clamping plate
- line steel
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Images
Landscapes
- Suspension Of Electric Lines Or Cables (AREA)
Abstract
本发明涉及一种电力设备维修装置,特别是一种输电线铁塔倾斜修正装置及方法。该装置是在两相配的“L”形夹紧板上开有沿“L”形夹紧板长度方向均布的螺栓孔,在其中一个“L”形夹紧板的外侧面固定有与“L”形夹紧板外侧面垂直的抬升臂Ⅰ,在另一个“L”形夹紧板的内侧面固定有与“L”形夹紧板内侧面垂直的抬升臂Ⅱ。当输电线铁塔出现倾斜时,将本装置安装在输电线铁塔主支撑角钢上,通过两相配的“L”形夹紧板将主支撑角钢夹紧,利用两千斤顶从两侧将输电线铁塔主支撑角钢抬起,将合适厚度的垫铁安装在固定输电线铁塔的地脚螺栓周围,就可完成输电线铁塔倾斜的修正。本装置具有结构简单、使用方便,在不停电的情况下,就可迅速修复铁塔的倾斜。
Description
技术领域
本发明涉及一种电力设备维修装置,特别是一种输电线铁塔倾斜修正装置及修正方法。
背景技术
输电线铁塔是输电线路中的重要组成部分,它主要是由角钢组焊成的四棱锥形的塔状结构。由于地质条件和铁塔地基的变化,会造成输电线铁塔的倾斜,给输电线路的安全带来了很大的安全隐患。由于输电线铁塔的重量较大,且塔上连接有高压输电线,这就给输电线铁塔的倾斜修正工作带来了极大的难度,如何能够及时、快速的对输电线铁塔的倾斜进行修正,成为消除输电线路安全的难点之一。
发明内容
本发明的目的是提供一种可快速、方便的对输电线铁塔倾斜进行修正的装置及修正方法。
为实现上述目的的技术方案是:一种输电线铁塔倾斜修正方法,该倾斜修正方法是在需要抬起的垂直的输电线铁塔主支撑角钢上安装有输电线铁塔倾斜修正装置,将与上述主支撑角钢相连的地脚螺栓上的螺母松开,利用千斤顶将主支撑角钢抬起,然后在地脚螺栓周围放置垫铁,将千斤顶放下,测量输电线铁塔的垂直位置,调整垫铁的厚度,达到要求上紧地脚螺栓上的螺母。
上述垫铁的厚度大于计算厚度。
一种输电线铁塔倾斜修正装置,其特征在于在两相配的“L”形夹紧板上开有沿“L”形夹紧板长度方向均布的螺栓孔,在其中一个“L”形夹紧板的外侧面固定有与“L”形夹紧板外侧面垂直的抬升臂Ⅰ,在另一个“L”形夹紧板的内侧面固定有与“L”形夹紧板内侧面垂直的抬升臂Ⅱ。
在上述抬升臂的下端面上固定有与千斤顶顶端相配的定位环。
上述“L”形夹紧板的宽度大于输电线铁塔主支撑角钢的宽度。
上述螺栓孔的中心线与相邻“L”形夹紧板内侧面之间的距离大于输电线铁塔主支撑角钢的宽度。
当输电线铁塔出现倾斜时,将本装置安装在需要抬起的垂直的输电线铁塔主支撑角钢上,通过两相配的“L”形夹紧板将主支撑角钢夹紧,利用两千斤顶从两侧将输电线铁塔主支撑角钢抬起,将合适厚度的垫铁安装在固定输电线铁塔的地脚螺栓周围,进行输电线铁塔倾斜的修正。本装置具有结构简单、使用方便,可以在不停电的情况下,迅速修复输电线铁塔的倾斜。
附图说明
附图1为本发明的结构示意图;
附图2为本发明附图1的俯视图;
附图3为本发明部件1的结构示意图;
附图4为本发明部件2的结构示意图;
附图5为本发明附图3的俯视图;
附图6为本发明附图4的俯视图。
具体实施方式
附图3、4为本装置的部件1,附图5、6为本装置的部件2。附图1、2为本装置部件1、2的组装图。部件1是由开口向右的“L”形夹紧板3和固定在“L”形夹紧板的左侧面上即外侧面的与“L”形夹紧板左侧面垂直的抬升臂Ⅰ2组成,在“L”形夹紧板的两个侧板上开有垂直分布的螺栓孔9,为使千斤顶与部件1的定位准确和牢固,在抬升臂Ⅰ下端面上固定有与千斤顶顶端相配的定位环1。部件2是由开口向右的“L”形夹紧板6和固定在“L”形夹紧板的右侧面即内侧面上的与“L”形夹紧板右侧面垂直的抬升臂Ⅱ7组成,在“L”形夹紧板的两个侧板上开有垂直分布的螺栓孔9,为使千斤顶与部件2的定位准确和牢固,在抬升臂Ⅱ下端面上固定有与千斤顶顶端相配的定位环8。
使用时,将部件1放置在垂直的输电线铁塔主支撑角钢5的外侧面即左侧面上,将部件2放置在垂直的输电线铁塔主支撑角钢5的内侧面即右侧面上,通过固定螺栓4将部件1、2与主支撑角钢5连接,通过两相配的“L”形夹紧板将主支撑角钢5夹紧,在部件1、2的定位环下端相应位置分别放置两千斤顶,将主支撑角钢5与地基相连的地脚螺栓上的螺母松开,通过两千斤顶将主支撑角钢抬起到合适位置,在地脚螺栓周围放置合适厚度的垫铁,垫铁的厚度要大于计算厚度,因为要考虑垫铁之间的间隙和垫铁与基础之间的间隙。测量输电线铁塔的垂直位置,调整垫铁的厚度,达到要求后上紧地脚螺栓上的螺母,就完成了输电线铁塔倾斜的修正。
Claims (6)
1. 一种输电线铁塔倾斜修正方法,该倾斜修正方法是在需要抬起的垂直的输电线铁塔主支撑角钢(5)上安装有输电线铁塔倾斜修正装置,将与上述主支撑角钢相连的地脚螺栓上的螺母松开,利用千斤顶将主支撑角钢(5)抬起,然后在地脚螺栓周围放置垫铁,将千斤顶放下,测量输电线铁塔的垂直位置,调整垫铁的厚度,达到要求后上紧地脚螺栓上的螺母。
2. 根据权利要求1所述的输电线铁塔倾斜修正方法,其特征在于上述垫铁的厚度大于计算厚度。
3. 一种输电线铁塔倾斜修正装置,其特征在于在两相配的“L”形夹紧板上开有沿“L”形夹紧板长度方向均布的螺栓孔(9),在其中一个“L”形夹紧板(3)的外侧面固定有与“L”形夹紧板(3)外侧面垂直的抬升臂Ⅰ(2),在另一个“L”形夹紧板(3)的内侧面固定有与“L”形夹紧板(3)内侧面垂直的抬升臂Ⅱ(7)。
4. 根据权利要求1所述的输电线铁塔倾斜修正装置,其特征在于在上述抬升臂的下端面上固定有与千斤顶顶端相配的定位环。
5. 根据权利要求2所述的输电线铁塔倾斜修正装置,其特征在于上述“L”形夹紧板的宽度大于输电线铁塔主支撑角钢的宽度。
6. 根据权利要求3所述的输电线铁塔倾斜修正装置,其特征在于上述螺栓孔(9)的中心线与相邻“L”形夹紧板内侧面之间的距离大于输电线铁塔主支撑角钢的宽度。
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN2010106050487A CN102535875A (zh) | 2010-12-26 | 2010-12-26 | 输电线铁塔倾斜修正装置及修正方法 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN2010106050487A CN102535875A (zh) | 2010-12-26 | 2010-12-26 | 输电线铁塔倾斜修正装置及修正方法 |
Publications (1)
Publication Number | Publication Date |
---|---|
CN102535875A true CN102535875A (zh) | 2012-07-04 |
Family
ID=46343767
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN2010106050487A Pending CN102535875A (zh) | 2010-12-26 | 2010-12-26 | 输电线铁塔倾斜修正装置及修正方法 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN102535875A (zh) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN105937914A (zh) * | 2016-06-02 | 2016-09-14 | 中国电力科学研究院 | 一种用于输电线路杆塔倾斜监测装置校准的系统及方法 |
Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
EP0474204A1 (de) * | 1990-09-06 | 1992-03-11 | Günther Karl | Verfahren zur Kompensation der Neigung von schiefen Türmen |
CN201362979Y (zh) * | 2009-01-16 | 2009-12-16 | 天津市电力公司 | 输电铁塔的加固机构 |
CN201649769U (zh) * | 2010-03-05 | 2010-11-24 | 北京智安邦科技有限公司 | 用于高压输电线路铁塔上的监控系统固定的固定基座 |
CN201933834U (zh) * | 2010-12-26 | 2011-08-17 | 宁夏电力公司吴忠供电局 | 输电线铁塔倾斜修正装置 |
-
2010
- 2010-12-26 CN CN2010106050487A patent/CN102535875A/zh active Pending
Patent Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
EP0474204A1 (de) * | 1990-09-06 | 1992-03-11 | Günther Karl | Verfahren zur Kompensation der Neigung von schiefen Türmen |
CN201362979Y (zh) * | 2009-01-16 | 2009-12-16 | 天津市电力公司 | 输电铁塔的加固机构 |
CN201649769U (zh) * | 2010-03-05 | 2010-11-24 | 北京智安邦科技有限公司 | 用于高压输电线路铁塔上的监控系统固定的固定基座 |
CN201933834U (zh) * | 2010-12-26 | 2011-08-17 | 宁夏电力公司吴忠供电局 | 输电线铁塔倾斜修正装置 |
Non-Patent Citations (1)
Title |
---|
毛吉贵: "输电线路运行直线塔微倾治理技术探索与实践", 《水电能源科学》 * |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN105937914A (zh) * | 2016-06-02 | 2016-09-14 | 中国电力科学研究院 | 一种用于输电线路杆塔倾斜监测装置校准的系统及方法 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN203747356U (zh) | 一种应用于电缆隧道的全方位转动支架 | |
CN110789685A (zh) | 一种船舶上重型设备安装至基座的方法 | |
CN102305338A (zh) | 可调式转接件 | |
CN103643667A (zh) | 一种升船机螺母柱安装辅助调节方法 | |
CN203569552U (zh) | 用于齿轮齿条爬升式垂直升船机齿条高效安装的辅助调节装置 | |
CN110900082A (zh) | 一种大型工字梁焊接平台及焊接方法 | |
CN202899731U (zh) | 输电线路铁塔倾斜调整提升装置 | |
CN211162644U (zh) | 一种大型工字梁焊接平台 | |
CN104675179B (zh) | 自升式钢塔安装用吊架装置及钢塔施工方法 | |
CN102927409A (zh) | 用于固定汽车生产线设备的可调式地脚装置 | |
CN201664829U (zh) | 一种起重臂装焊夹具 | |
CN203900775U (zh) | 可调式焊接试件固定装置 | |
CN201933834U (zh) | 输电线铁塔倾斜修正装置 | |
CN102996585B (zh) | 采用抱箍的变压器台架装配方法 | |
CN102720371B (zh) | 钢结构模块多立柱对接方法 | |
CN102166695B (zh) | 母线壳体法兰孔同轴度校形工装及校正方法 | |
CN102535875A (zh) | 输电线铁塔倾斜修正装置及修正方法 | |
CN104790567A (zh) | 一种柔性连接系统、外墙板及外墙板安装节点 | |
KR20150025134A (ko) | 리프팅 러그용 하중 테스트 장치 | |
CN103791200A (zh) | 设备安装压浆法施工方法 | |
CN103240559A (zh) | 夹紧定位装置 | |
KR102045025B1 (ko) | 해양구조물용 대형 원통 구조물의 진원도 유지 장치 및 그 제작방법 | |
CN105569351A (zh) | 一种钢结构钢柱的安装施工工艺 | |
CN211548063U (zh) | 一种锥形桅杆制作的可调胎架 | |
CN103616280B (zh) | 一种适用于卧式拉力试验机的升降台 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
C02 | Deemed withdrawal of patent application after publication (patent law 2001) | ||
WD01 | Invention patent application deemed withdrawn after publication |
Application publication date: 20120704 |