CN105569351A - 一种钢结构钢柱的安装施工工艺 - Google Patents
一种钢结构钢柱的安装施工工艺 Download PDFInfo
- Publication number
- CN105569351A CN105569351A CN201510953157.0A CN201510953157A CN105569351A CN 105569351 A CN105569351 A CN 105569351A CN 201510953157 A CN201510953157 A CN 201510953157A CN 105569351 A CN105569351 A CN 105569351A
- Authority
- CN
- China
- Prior art keywords
- steel column
- steel
- column
- bolt
- absolute altitude
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
- 229910000831 Steel Inorganic materials 0.000 title claims abstract description 94
- 239000010959 steel Substances 0.000 title claims abstract description 94
- 238000010276 construction Methods 0.000 title claims abstract description 13
- 238000005516 engineering process Methods 0.000 title abstract description 5
- 239000004575 stone Substances 0.000 claims description 11
- 238000000034 method Methods 0.000 claims description 9
- 238000004873 anchoring Methods 0.000 claims description 6
- 238000005259 measurement Methods 0.000 claims description 4
- 210000004209 hair Anatomy 0.000 claims description 3
- 230000001737 promoting effect Effects 0.000 claims description 3
- 239000000725 suspension Substances 0.000 claims description 3
- 238000003466 welding Methods 0.000 abstract description 2
- 238000009434 installation Methods 0.000 description 6
- 239000000463 material Substances 0.000 description 2
- 230000009286 beneficial effect Effects 0.000 description 1
- 230000001681 protective effect Effects 0.000 description 1
- 238000005096 rolling process Methods 0.000 description 1
- 239000013589 supplement Substances 0.000 description 1
Classifications
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04G—SCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
- E04G21/00—Preparing, conveying, or working-up building materials or building elements in situ; Other devices or measures for constructional work
- E04G21/14—Conveying or assembling building elements
Landscapes
- Engineering & Computer Science (AREA)
- Architecture (AREA)
- Mechanical Engineering (AREA)
- Civil Engineering (AREA)
- Structural Engineering (AREA)
- Conveying And Assembling Of Building Elements In Situ (AREA)
Abstract
本发明公开一种钢结构钢柱的安装施工工艺,包括以下步骤:测量钢柱牛腿面的标高,确定柱脚和基础支撑面标高,调整支撑面;安装地脚螺栓预埋;汽车吊将钢柱的顶端吊住,钢柱顶端上升和回转直至钢柱呈竖直状态,停止提升,汽车吊向下运动,钢柱的底部对准地脚螺栓;钢柱用汽车吊吊装到位后,将钢柱底板穿入地脚螺栓,放置在螺帽上,调整柱脚,将钢柱的四面中心线对准基础十字线,用仪器测量钢柱柱身的垂直度,钢柱校正后拧紧螺栓焊接固定。本发明钢结构钢柱的安装施工工艺步骤合理,操作简单,安装速度快,安装精度高,工程质量安全可靠。
Description
技术领域
本发明涉及钢结构安装领域,具体是一种钢结构钢柱的安装施工工艺。
背景技术
钢材的特点是强度高、自重轻、整体刚性好、变形能力强,故用于建造大跨度和超高、超重型的建筑物特别适宜;材料匀质性和各向同性好,属理想弹性体,最符合一般工程力学的基本假定;材料塑性、韧性好,可有较大变形,能很好地承受动力荷载;建筑工期短;其工业化程度高,可进行机械化程度高的专业化生产。钢结构应研究高强度钢材,大大提高其屈服点强度;此外要轧制新品种的型钢,例如H型钢和T形钢以及压型钢板等以适应大跨度结构和超高层建筑的需要。钢结构安装中,钢柱的安装是安装的重点。
发明内容
本发明的目的在于提供一种钢结构钢柱的安装施工工艺。
本发明的目的可以通过以下技术方案实现:
一种钢结构钢柱的安装施工工艺,其特征在于,包括以下步骤:
(1)测量钢柱牛腿面的标高,确定柱脚和基础支撑面标高,调整支撑面;
(2)安装地脚螺栓预埋,找准预埋地脚螺栓上边四根固定角钢的纵横向中心线,与测量定位的基准线吻合,用水准仪测出预埋地脚螺栓顶面标高,完成地脚螺栓的预埋;
(3)汽车吊将钢柱的顶端吊住,钢柱顶端上升和回转直至钢柱呈竖直状态,停止提升,汽车吊向下运动,钢柱的底部对准地脚螺栓;
(4)钢柱用汽车吊吊装到位后,将钢柱底板插入地脚螺栓且距离支撑面40-100mm,调整柱底与基础十字线达到准确位置,汽车吊下降就位,用仪器测量钢柱柱身的垂直度,钢柱校正后拧紧螺栓焊接固定。
作为进一步地优选,本发明所述步骤(3)钢柱校正后的误差为±1mm。
作为进一步地优选,本发明所述步骤(3)钢柱校正为:先校正标高、再校正钢柱柱脚中心线,最后校正垂直度。
本发明的有益效果:本发明钢结构钢柱的安装施工工艺步骤合理,操作简单,安装速度快,安装精度高,工程质量安全可靠。
具体实施方式
实施例1
一种钢结构钢柱的安装施工工艺,包括以下步骤:
1、测量钢柱牛腿面的标高,确定柱脚和基础支撑面标高,调整支撑面,保证混凝土表面在同一标高上,误差不超过2mm。
2、安装地脚螺栓预埋,找准预埋地脚螺栓上边四根固定角钢的纵横向中心线,与测量定位的基准线吻合,用水准仪测出预埋地脚螺栓顶面标高,完成地脚螺栓的预埋。
3、汽车吊将钢柱的顶端吊住,钢柱顶端上升和回转直至钢柱呈竖直状态,停止提升,汽车吊向下运动,钢柱的底部对准地脚螺栓。
吊装前将所需的钢结构构件运至现场,放在垫木上,尽量不要叠放避免钢构件被压坏或构件变形。
钢柱吊装前,地脚螺栓用锥形保护套进行保护,防止螺纹损伤。
4、钢柱用汽车吊吊装到位后,将钢柱底板插入地脚螺栓且距离支撑面40-100mm,调整柱底与基础十字线达到准确位置,汽车吊下降就位,用仪器测量钢柱柱身的垂直度,钢柱校正后拧紧螺栓焊接固定,钢柱校正后的误差为±1mm。
钢柱校正为:先校正标高、再校正钢柱柱脚中心线,最后校正垂直度。
钢柱吊装吊入地脚螺栓就位后,钢柱校正工作主要是对垂直度和平面位置进行校正:它的校正方法可采用缆风绳、千斤顶、正反螺纹撑杆、大型撬杠,对钢柱施加拉、顶、撑或撬的垂直力和侧向力的同时松紧柱底板螺母或钢垫板,使钢柱垂直度误差在规范允许范围以内;垂直度调整与钢柱平面位置同时进行。钢柱垂直度调整所用仪器要求:用经纬仪二台从相互垂直方向同时进行测量,测量基准可选用钢柱的一侧面进行测量,要求尽量从柱顶往柱底进行通长测量。在柱底板与基础调整校正后用双螺母固定,最后按图纸要求将上垫板与钢柱底板电焊围焊。
在钢柱安装完成后,进行柱底灌浆。
以上内容仅仅是对本发明结构所作的举例和说明,所属本技术领域的技术人员对所描述的具体实施例做各种各样的修改或补充或采用类似的方式替代,只要不偏离发明的结构或者超越本权利要求书所定义的范围,均应属于本发明的保护范围。
Claims (3)
1.一种钢结构钢柱的安装施工工艺,其特征在于,包括以下步骤:
(1)测量钢柱牛腿面的标高,确定柱脚和基础支撑面标高,调整支撑面;
(2)安装地脚螺栓预埋,找准预埋地脚螺栓上边四根固定角钢的纵横向中心线,与测量定位的基准线吻合,用水准仪测出预埋地脚螺栓顶面标高,完成地脚螺栓的预埋;
(3)汽车吊将钢柱的顶端吊住,钢柱顶端上升和回转直至钢柱呈竖直状态,停止提升,汽车吊向下运动,钢柱的底部对准地脚螺栓;
(4)钢柱用汽车吊吊装到位后,将钢柱底板插入地脚螺栓且距离支撑面40-100mm,调整柱底与基础十字线达到准确位置,汽车吊下降就位,用仪器测量钢柱柱身的垂直度,钢柱校正后拧紧螺栓焊接固定。
2.根据权利要求1所述的一种钢结构钢柱的安装施工工艺,其特征在于,所述步骤(3)钢柱校正后的误差为±1mm。
3.根据权利要求1所述的一种钢结构钢柱的安装施工工艺,其特征在于,所述步骤(3)钢柱校正为:先校正标高、再校正钢柱柱脚中心线,最后校正垂直度。
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201510953157.0A CN105569351A (zh) | 2015-12-20 | 2015-12-20 | 一种钢结构钢柱的安装施工工艺 |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201510953157.0A CN105569351A (zh) | 2015-12-20 | 2015-12-20 | 一种钢结构钢柱的安装施工工艺 |
Publications (1)
| Publication Number | Publication Date |
|---|---|
| CN105569351A true CN105569351A (zh) | 2016-05-11 |
Family
ID=55879921
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| CN201510953157.0A Pending CN105569351A (zh) | 2015-12-20 | 2015-12-20 | 一种钢结构钢柱的安装施工工艺 |
Country Status (1)
| Country | Link |
|---|---|
| CN (1) | CN105569351A (zh) |
Cited By (5)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN107060068A (zh) * | 2017-05-10 | 2017-08-18 | 五冶集团上海有限公司 | 一种单层钢结构及其安装方法 |
| CN107190990A (zh) * | 2017-06-02 | 2017-09-22 | 北京首钢建设集团有限公司 | 一种局限空间下厂房钢柱安装方法 |
| CN108301563A (zh) * | 2018-03-22 | 2018-07-20 | 中建二局第三建筑工程有限公司 | 一种地下室劲性柱结构及其施工方法 |
| CN116657920A (zh) * | 2023-01-17 | 2023-08-29 | 中国二十二冶集团有限公司 | 首节型钢混凝土柱安装方法 |
| CN117738473A (zh) * | 2023-12-19 | 2024-03-22 | 中铁建大桥工程局集团第五工程有限公司 | 一种钢骨柱的安装施工方法 |
Citations (6)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| JPH0742369A (ja) * | 1993-07-29 | 1995-02-10 | Shimizu Corp | 鉄骨柱の建て込み方法 |
| CN101691815A (zh) * | 2009-09-03 | 2010-04-07 | 中国建筑第四工程局有限公司 | 一种大型钢架快速吊装对正方法及钢架底座结构 |
| CN102400558A (zh) * | 2010-09-13 | 2012-04-04 | 五冶集团上海有限公司 | 苯加氢钢结构安装工程中工艺钢平台钢柱安装方法 |
| CN103774854A (zh) * | 2014-01-15 | 2014-05-07 | 浙江东驰钢结构有限公司 | 一种重型超高钢构件的吊装施工方法 |
| CN103806669A (zh) * | 2013-12-24 | 2014-05-21 | 大立建设集团有限公司 | 十字形断面h型钢劲性柱施工方法 |
| CN103806660A (zh) * | 2014-01-17 | 2014-05-21 | 永升建设集团有限公司 | 劲性混凝土结构梁-柱节点施工方法 |
-
2015
- 2015-12-20 CN CN201510953157.0A patent/CN105569351A/zh active Pending
Patent Citations (6)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| JPH0742369A (ja) * | 1993-07-29 | 1995-02-10 | Shimizu Corp | 鉄骨柱の建て込み方法 |
| CN101691815A (zh) * | 2009-09-03 | 2010-04-07 | 中国建筑第四工程局有限公司 | 一种大型钢架快速吊装对正方法及钢架底座结构 |
| CN102400558A (zh) * | 2010-09-13 | 2012-04-04 | 五冶集团上海有限公司 | 苯加氢钢结构安装工程中工艺钢平台钢柱安装方法 |
| CN103806669A (zh) * | 2013-12-24 | 2014-05-21 | 大立建设集团有限公司 | 十字形断面h型钢劲性柱施工方法 |
| CN103774854A (zh) * | 2014-01-15 | 2014-05-07 | 浙江东驰钢结构有限公司 | 一种重型超高钢构件的吊装施工方法 |
| CN103806660A (zh) * | 2014-01-17 | 2014-05-21 | 永升建设集团有限公司 | 劲性混凝土结构梁-柱节点施工方法 |
Non-Patent Citations (1)
| Title |
|---|
| 李金声等: "污泥干燥车间钢结构柱的安装要点", 《市政技术》 * |
Cited By (6)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN107060068A (zh) * | 2017-05-10 | 2017-08-18 | 五冶集团上海有限公司 | 一种单层钢结构及其安装方法 |
| CN107190990A (zh) * | 2017-06-02 | 2017-09-22 | 北京首钢建设集团有限公司 | 一种局限空间下厂房钢柱安装方法 |
| CN108301563A (zh) * | 2018-03-22 | 2018-07-20 | 中建二局第三建筑工程有限公司 | 一种地下室劲性柱结构及其施工方法 |
| CN108301563B (zh) * | 2018-03-22 | 2023-10-27 | 中建二局第三建筑工程有限公司 | 一种地下室劲性钢柱及其施工方法 |
| CN116657920A (zh) * | 2023-01-17 | 2023-08-29 | 中国二十二冶集团有限公司 | 首节型钢混凝土柱安装方法 |
| CN117738473A (zh) * | 2023-12-19 | 2024-03-22 | 中铁建大桥工程局集团第五工程有限公司 | 一种钢骨柱的安装施工方法 |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| CN106120559B (zh) | 一种桥梁少支架施工方法以及桥梁 | |
| CN105569351A (zh) | 一种钢结构钢柱的安装施工工艺 | |
| CN102434003B (zh) | 一种重型双肢钢柱施工工艺 | |
| CN102561712B (zh) | 大型钢柱、设备基础固定螺栓精确定位架及其施工方法 | |
| CN101266011B (zh) | 用于预埋高精度大直径地脚螺栓的安装装置及使用该装置的安装方法 | |
| CN111851565A (zh) | 一种带杯口型基础钢结构立柱找正结构及其施工方法 | |
| CN102493471B (zh) | 结构地脚锚栓悬空安装施工工艺方法 | |
| CN203270600U (zh) | 高精度设备预埋螺栓安装用固定支架 | |
| CN107178091B (zh) | 罐式煅烧炉钢结构支柱地脚螺栓预埋精确定位的方法 | |
| CN106006404A (zh) | 一种超高层外挂动臂塔吊爬升支撑装置 | |
| CN203625921U (zh) | 地脚螺栓预埋安装精度控制装置 | |
| CN203404564U (zh) | 一种用于设备安装找正、找平的校准装置 | |
| CN207227968U (zh) | T梁梁底钢板调坡装置 | |
| CN111502120A (zh) | 站台钢立柱吊装的施工方法 | |
| CN107354874A (zh) | T梁梁底钢板调坡装置 | |
| CN109138456A (zh) | 一种用于调节厂房钢柱标高的调整装置 | |
| CN102528418B (zh) | 高精度、大直径法兰钢管隔段、变轨安装方法 | |
| CN106351246A (zh) | T型螺栓直径≤48mm的整体式套筒安装方法 | |
| CN103061249A (zh) | 一种桥梁钢管立柱快速定位施工装置及施工方法 | |
| CN207392771U (zh) | 一种导向式钢柱定位器 | |
| CN212742614U (zh) | 一种基础内立柱定位安装结构 | |
| CN216272860U (zh) | 一种系梁盖梁施工可调铰式千斤顶 | |
| CN113323404A (zh) | 一种集成式钢绗架的安装方法 | |
| CN206279855U (zh) | 可调撑杆式钢柱校正结构 | |
| CN201896289U (zh) | 具有双向倾斜度的锚杆定位装置 |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| C06 | Publication | ||
| PB01 | Publication | ||
| C10 | Entry into substantive examination | ||
| SE01 | Entry into force of request for substantive examination | ||
| RJ01 | Rejection of invention patent application after publication | ||
| RJ01 | Rejection of invention patent application after publication |
Application publication date: 20160511 |