CN105569351A CN201510953157.0A CN201510953157A CN105569351A CN 105569351 A CN105569351 A CN 105569351A CN 201510953157 A CN201510953157 A CN 201510953157A CN 105569351 A CN105569351 A CN 105569351A
Authority
CN
China
Prior art keywords
steel column
steel
column
bolt
absolute altitude
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201510953157.0A
Other languages
English (en)
Inventor
曹雁冰
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
ANHUI WEIHONG STEEL STRUCTURE GROUP Co Ltd
Original Assignee
ANHUI WEIHONG STEEL STRUCTURE GROUP Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by ANHUI WEIHONG STEEL STRUCTURE GROUP Co Ltd filed Critical ANHUI WEIHONG STEEL STRUCTURE GROUP Co Ltd
Priority to CN201510953157.0A priority Critical patent/CN105569351A/zh
Publication of CN105569351A publication Critical patent/CN105569351A/zh
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G21/00Preparing, conveying, or working-up building materials or building elements in situ; Other devices or measures for constructional work
    • E04G21/14Conveying or assembling building elements

Abstract

本发明公开一种钢结构钢柱的安装施工工艺,包括以下步骤:测量钢柱牛腿面的标高,确定柱脚和基础支撑面标高,调整支撑面;安装地脚螺栓预埋;汽车吊将钢柱的顶端吊住,钢柱顶端上升和回转直至钢柱呈竖直状态,停止提升,汽车吊向下运动,钢柱的底部对准地脚螺栓;钢柱用汽车吊吊装到位后,将钢柱底板穿入地脚螺栓,放置在螺帽上,调整柱脚,将钢柱的四面中心线对准基础十字线,用仪器测量钢柱柱身的垂直度,钢柱校正后拧紧螺栓焊接固定。本发明钢结构钢柱的安装施工工艺步骤合理,操作简单,安装速度快,安装精度高,工程质量安全可靠。

Description

一种钢结构钢柱的安装施工工艺
[0001]
技术领域
[0002]本发明涉及钢结构安装领域,具体是一种钢结构钢柱的安装施工工艺。
背景技术
[0003]钢材的特点是强度高、自重轻、整体刚性好、变形能力强,故用于建造大跨度和超高、超重型的建筑物特别适宜;材料匀质性和各向同性好,属理想弹性体,最符合一般工程力学的基本假定;材料塑性、韧性好,可有较大变形,能很好地承受动力荷载;建筑工期短;其工业化程度高,可进行机械化程度高的专业化生产。钢结构应研究高强度钢材,大大提高其屈服点强度;此外要乳制新品种的型钢,例如H型钢和T形钢以及压型钢板等以适应大跨度结构和超高层建筑的需要。钢结构安装中,钢柱的安装是安装的重点。
发明内容
[0004]本发明的目的在于提供一种钢结构钢柱的安装施工工艺。
[0005]本发明的目的可以通过以下技术方案实现:
一种钢结构钢柱的安装施工工艺,其特征在于,包括以下步骤:
(1)测量钢柱牛腿面的标高,确定柱脚和基础支撑面标高,调整支撑面;
(2)安装地脚螺栓预埋,找准预埋地脚螺栓上边四根固定角钢的纵横向中心线,与测量定位的基准线吻合,用水准仪测出预埋地脚螺栓顶面标高,完成地脚螺栓的预埋;
(3)汽车吊将钢柱的顶端吊住,钢柱顶端上升和回转直至钢柱呈竖直状态,停止提升,汽车吊向下运动,钢柱的底部对准地脚螺栓;
(4)钢柱用汽车吊吊装到位后,将钢柱底板插入地脚螺栓且距离支撑面40-100mm,调整柱底与基础十字线达到准确位置,汽车吊下降就位,用仪器测量钢柱柱身的垂直度,钢柱校正后拧紧螺栓焊接固定。
[0006]作为进一步地优选,本发明所述步骤(3)钢柱校正后的误差为±lmm。
[0007]作为进一步地优选,本发明所述步骤(3)钢柱校正为:先校正标高、再校正钢柱柱脚中心线,最后校正垂直度。
[0008]本发明的有益效果:本发明钢结构钢柱的安装施工工艺步骤合理,操作简单,安装速度快,安装精度高,工程质量安全可靠。
具体实施方式
[0009] 实施例1
一种钢结构钢柱的安装施工工艺,包括以下步骤:
1、测量钢柱牛腿面的标高,确定柱脚和基础支撑面标高,调整支撑面,保证混凝土表面在同一标高上,误差不超过2mm。
[0010] 2、安装地脚螺栓预埋,找准预埋地脚螺栓上边四根固定角钢的纵横向中心线,与测量定位的基准线吻合,用水准仪测出预埋地脚螺栓顶面标高,完成地脚螺栓的预埋。
[0011] 3、汽车吊将钢柱的顶端吊住,钢柱顶端上升和回转直至钢柱呈竖直状态,停止提升,汽车吊向下运动,钢柱的底部对准地脚螺栓。
[0012]吊装前将所需的钢结构构件运至现场,放在垫木上,尽量不要叠放避免钢构件被压坏或构件变形。
[0013]钢柱吊装前,地脚螺栓用锥形保护套进行保护,防止螺纹损伤。
[0014] 4、钢柱用汽车吊吊装到位后,将钢柱底板插入地脚螺栓且距离支撑面40-100mm,调整柱底与基础十字线达到准确位置,汽车吊下降就位,用仪器测量钢柱柱身的垂直度,钢柱校正后拧紧螺栓焊接固定,钢柱校正后的误差为±lmm。
[0015] 钢柱校正为:先校正标高、再校正钢柱柱脚中心线,最后校正垂直度。
[0016]钢柱吊装吊入地脚螺栓就位后,钢柱校正工作主要是对垂直度和平面位置进行校正:它的校正方法可采用缆风绳、千斤顶、正反螺纹撑杆、大型撬杠,对钢柱施加拉、顶、撑或撬的垂直力和侧向力的同时松紧柱底板螺母或钢垫板,使钢柱垂直度误差在规范允许范围以内;垂直度调整与钢柱平面位置同时进行。钢柱垂直度调整所用仪器要求:用经玮仪二台从相互垂直方向同时进行测量,测量基准可选用钢柱的一侧面进行测量,要求尽量从柱顶往柱底进行通长测量。在柱底板与基础调整校正后用双螺母固定,最后按图纸要求将上垫板与钢柱底板电焊围焊。
[0017]在钢柱安装完成后,进行柱底灌浆。
[0018]以上内容仅仅是对本发明结构所作的举例和说明,所属本技术领域的技术人员对所描述的具体实施例做各种各样的修改或补充或采用类似的方式替代,只要不偏离发明的结构或者超越本权利要求书所定义的范围,均应属于本发明的保护范围。

Claims (3)

1.一种钢结构钢柱的安装施工工艺,其特征在于,包括以下步骤: (1)测量钢柱牛腿面的标高,确定柱脚和基础支撑面标高,调整支撑面; (2)安装地脚螺栓预埋,找准预埋地脚螺栓上边四根固定角钢的纵横向中心线,与测量定位的基准线吻合,用水准仪测出预埋地脚螺栓顶面标高,完成地脚螺栓的预埋; (3)汽车吊将钢柱的顶端吊住,钢柱顶端上升和回转直至钢柱呈竖直状态,停止提升,汽车吊向下运动,钢柱的底部对准地脚螺栓; (4)钢柱用汽车吊吊装到位后,将钢柱底板插入地脚螺栓且距离支撑面40-100mm,调整柱底与基础十字线达到准确位置,汽车吊下降就位,用仪器测量钢柱柱身的垂直度,钢柱校正后拧紧螺栓焊接固定。
2.根据权利要求1所述的一种钢结构钢柱的安装施工工艺,其特征在于,所述步骤(3)钢柱校正后的误差为± 1mm。
3.根据权利要求1所述的一种钢结构钢柱的安装施工工艺,其特征在于,所述步骤(3)钢柱校正为:先校正标高、再校正钢柱柱脚中心线,最后校正垂直度。
CN201510953157.0A 2015-12-20 2015-12-20 一种钢结构钢柱的安装施工工艺 Pending CN105569351A (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201510953157.0A CN105569351A (zh) 2015-12-20 2015-12-20 一种钢结构钢柱的安装施工工艺

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201510953157.0A CN105569351A (zh) 2015-12-20 2015-12-20 一种钢结构钢柱的安装施工工艺

Publications (1)

Publication Number Publication Date
CN105569351A true CN105569351A (zh) 2016-05-11

Family

ID=55879921

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201510953157.0A Pending CN105569351A (zh) 2015-12-20 2015-12-20 一种钢结构钢柱的安装施工工艺

Country Status (1)

Country Link
CN (1) CN105569351A (zh)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107060068A (zh) * 2017-05-10 2017-08-18 五冶集团上海有限公司 一种单层钢结构及其安装方法
CN107190990A (zh) * 2017-06-02 2017-09-22 北京首钢建设集团有限公司 一种局限空间下厂房钢柱安装方法

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH0742369A (ja) * 1993-07-29 1995-02-10 Shimizu Corp 鉄骨柱の建て込み方法
CN101691815A (zh) * 2009-09-03 2010-04-07 中国建筑第四工程局有限公司 一种大型钢架快速吊装对正方法及钢架底座结构
CN102400558A (zh) * 2010-09-13 2012-04-04 五冶集团上海有限公司 苯加氢钢结构安装工程中工艺钢平台钢柱安装方法
CN103774854A (zh) * 2014-01-15 2014-05-07 浙江东驰钢结构有限公司 一种重型超高钢构件的吊装施工方法
CN103806669A (zh) * 2013-12-24 2014-05-21 大立建设集团有限公司 十字形断面h型钢劲性柱施工方法
CN103806660A (zh) * 2014-01-17 2014-05-21 永升建设集团有限公司 劲性混凝土结构梁-柱节点施工方法

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH0742369A (ja) * 1993-07-29 1995-02-10 Shimizu Corp 鉄骨柱の建て込み方法
CN101691815A (zh) * 2009-09-03 2010-04-07 中国建筑第四工程局有限公司 一种大型钢架快速吊装对正方法及钢架底座结构
CN102400558A (zh) * 2010-09-13 2012-04-04 五冶集团上海有限公司 苯加氢钢结构安装工程中工艺钢平台钢柱安装方法
CN103806669A (zh) * 2013-12-24 2014-05-21 大立建设集团有限公司 十字形断面h型钢劲性柱施工方法
CN103774854A (zh) * 2014-01-15 2014-05-07 浙江东驰钢结构有限公司 一种重型超高钢构件的吊装施工方法
CN103806660A (zh) * 2014-01-17 2014-05-21 永升建设集团有限公司 劲性混凝土结构梁-柱节点施工方法

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
李金声等: "污泥干燥车间钢结构柱的安装要点", 《市政技术》 *

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107060068A (zh) * 2017-05-10 2017-08-18 五冶集团上海有限公司 一种单层钢结构及其安装方法
CN107190990A (zh) * 2017-06-02 2017-09-22 北京首钢建设集团有限公司 一种局限空间下厂房钢柱安装方法

Similar Documents

Publication Publication Date Title
CN102561712B (zh) 大型钢柱、设备基础固定螺栓精确定位架及其施工方法
CN102434003B (zh) 一种重型双肢钢柱施工工艺
CN111851565B (zh) 一种带杯口型基础钢结构立柱找正结构及其施工方法
CN106120559B (zh) 一种桥梁少支架施工方法以及桥梁
CN105525625A (zh) 一种固定型钢柱脚预埋螺杆的施工方法及装置
CN107178091B (zh) 罐式煅烧炉钢结构支柱地脚螺栓预埋精确定位的方法
CN203625921U (zh) 地脚螺栓预埋安装精度控制装置
CN105569351A (zh) 一种钢结构钢柱的安装施工工艺
CN103061249A (zh) 一种桥梁钢管立柱快速定位施工装置及施工方法
CN104032969A (zh) 一种隔震支座预埋板精确定位及过程调控装置
CN207392771U (zh) 一种导向式钢柱定位器
CN111502120A (zh) 站台钢立柱吊装的施工方法
CN203404564U (zh) 一种用于设备安装找正、找平的校准装置
CN213234338U (zh) 一种预埋螺杆预埋位置辅助控制器
CN103669957A (zh) V形构架吊装施工方法
CN109138456A (zh) 一种用于调节厂房钢柱标高的调整装置
CN102155097B (zh) 混凝土墙体大型埋设件安装定位装置及其安装方法
CN203879026U (zh) 超高层钢结构箱形钢柱空中校正调整器
CN205743048U (zh) 一种幕墙较大尺寸立柱安装校正定位装置
CN103982048A (zh) 超高层钢结构箱形钢柱空中校正调整器
CN102528418B (zh) 高精度、大直径法兰钢管隔段、变轨安装方法
CN202716046U (zh) 一种可调节的设备安装中心找正装置
CN212742614U (zh) 一种基础内立柱定位安装结构
CN201896289U (zh) 具有双向倾斜度的锚杆定位装置
CN103741710B (zh) 无垫铁安装设备的施工方法

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20160511