CN201933834U - 输电线铁塔倾斜修正装置 - Google Patents

输电线铁塔倾斜修正装置 Download PDF

Info

Publication number
CN201933834U
CN201933834U CN2010206797166U CN201020679716U CN201933834U CN 201933834 U CN201933834 U CN 201933834U CN 2010206797166 U CN2010206797166 U CN 2010206797166U CN 201020679716 U CN201020679716 U CN 201020679716U CN 201933834 U CN201933834 U CN 201933834U
Authority
CN
China
Prior art keywords
clamping plate
iron tower
power transmission
transmission line
shaped clamping
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN2010206797166U
Other languages
English (en)
Inventor
李定平
王世宏
毛吉贵
王波
马学荣
杨兴林
方俊杰
徐天山
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
NINGXIA POWER Co WUZONG POWER SUPPLY BUREAU
Original Assignee
NINGXIA POWER Co WUZONG POWER SUPPLY BUREAU
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by NINGXIA POWER Co WUZONG POWER SUPPLY BUREAU filed Critical NINGXIA POWER Co WUZONG POWER SUPPLY BUREAU
Priority to CN2010206797166U priority Critical patent/CN201933834U/zh
Application granted granted Critical
Publication of CN201933834U publication Critical patent/CN201933834U/zh
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Landscapes

  • Suspension Of Electric Lines Or Cables (AREA)

Abstract

本实用新型涉及一种电力设备维修装置,特别是一种输电线铁塔倾斜修正装置。该装置是在两相配的“L”形夹紧板上开有沿“L”形夹紧板长度方向均布的螺栓孔,在其中一个“L”形夹紧板的外侧面固定有与“L”形夹紧板外侧面垂直的抬升臂Ⅰ,在另一个“L”形夹紧板的内侧面固定有与“L”形夹紧板内侧面垂直的抬升臂Ⅱ。当输电线铁塔出现倾斜时,将本装置安装在输电线铁塔主支撑角钢上,通过两相配的“L”形夹紧板将主支撑角钢夹紧,利用两千斤顶从两侧将输电线铁塔主支撑角钢抬起,将合适厚度的垫铁安装在固定输电线铁塔的地脚螺栓周围,就可完成输电线铁塔倾斜的修正。本装置具有结构简单、使用方便,在不停电的情况下,就可迅速修复铁塔的倾斜。

Description

输电线铁塔倾斜修正装置
技术领域
本实用新型涉及一种电力设备维修装置,特别是一种输电线铁塔倾斜修正装置。
背景技术
输电线铁塔是输电线路中的重要组成部分,它主要是由角钢组焊成的四棱锥形的塔状结构。由于地质条件和铁塔地基的变化,会造成输电线铁塔的倾斜,给输电线路的安全带来了很大的安全隐患。由于输电线铁塔的重量较大,且塔上连接有高压输电线,这就给输电线铁塔的倾斜修正工作带来了极大的难度,如何能够及时、快速的对输电线铁塔的倾斜进行修正,成为消除输电线路安全的难点之一。
发明内容
本实用新型的目的是提供一种可快速、方便的对输电线铁塔倾斜进行修正的装置。
为实现上述目的的技术方案是:一种输电线铁塔倾斜修正装置,其特征在于在两相配的“L”形夹紧板上开有沿“L”形夹紧板长度方向均布的螺栓孔,在其中一个“L”形夹紧板的外侧面固定有与“L”形夹紧板外侧面垂直的抬升臂Ⅰ,在另一个“L”形夹紧板的内侧面固定有与“L”形夹紧板内侧面垂直的抬升臂Ⅱ。
在上述抬升臂的下端面上固定有与千斤顶顶端相配的定位环。
上述“L”形夹紧板的宽度大于输电线铁塔主支撑角钢的宽度。
上述螺栓孔的中心线与相邻“L”形夹紧板内侧面之间的距离大于输电线铁塔主支撑角钢的宽度。
当输电线铁塔出现倾斜时,将本装置安装在需要抬起的垂直的输电线铁塔主支撑角钢上,通过两相配的“L”形夹紧板将主支撑角钢夹紧,利用两千斤顶从两侧将输电线铁塔主支撑角钢抬起,将合适厚度的垫铁安装在固定输电线铁塔的地脚螺栓周围,进行输电线铁塔倾斜的修正。本装置具有结构简单、使用方便,可以在不停电的情况下,迅速修复输电线铁塔的倾斜。
附图说明
附图1为本实用新型的结构示意图;
附图2为本实用新型附图1的俯视图;
附图3为本实用新型部件Ⅰ的结构示意图;
附图4为本实用新型部件Ⅱ的结构示意图;
附图5为本实用新型附图3的俯视图;
附图6为本实用新型附图4的俯视图。
具体实施方式
附图3、5为本装置的部件Ⅰ,附图4、6为本装置的部件Ⅱ。附图1、2为本装置部件Ⅰ、Ⅱ的组装图。部件Ⅰ是由开口向右的“L”形夹紧板Ⅰ3和固定在“L”形夹紧板Ⅰ的左侧面上即外侧面的与“L”形夹紧板Ⅰ左侧面垂直的抬升臂Ⅰ2组成,在“L”形夹紧板Ⅰ的两个侧板上开有垂直分布的螺栓孔9,为使千斤顶与部件Ⅰ的定位准确和牢固,在抬升臂Ⅰ下端面上固定有与千斤顶顶端相配的定位环1。部件Ⅱ是由开口向右的“L”形夹紧板Ⅱ6和固定在“L”形夹紧板Ⅱ的右侧面即内侧面上的与“L”形夹紧板Ⅱ右侧面垂直的抬升臂Ⅱ7组成,在“L”形夹紧板Ⅱ的两个侧板上开有垂直分布的螺栓孔9,为使千斤顶与部件Ⅱ的定位准确和牢固,在抬升臂Ⅱ下端面上固定有与千斤顶顶端相配的定位环8。

Claims (4)

1.一种输电线铁塔倾斜修正装置,其特征在于在两相配的“L”形夹紧板上开有沿“L”形夹紧板长度方向均布的螺栓孔(9),在其中一个“L”形夹紧板的外侧面固定有与“L”形夹紧板外侧面垂直的抬升臂Ⅰ(2),在另一个“L”形夹紧板的内侧面固定有与“L”形夹紧板内侧面垂直的抬升臂Ⅱ(7)。
2.根据权利要求1所述的输电线铁塔倾斜修正装置,其特征在于在上述抬升臂的下端面上固定有与千斤顶顶端相配的定位环。
3.根据权利要求2所述的输电线铁塔倾斜修正装置,其特征在于上述“L”形夹紧板的宽度大于输电线铁塔主支撑角钢的宽度。
4.根据权利要求3所述的输电线铁塔倾斜修正装置,其特征在于上述螺栓孔(9)的中心线与相邻“L”形夹紧板内侧面之间的距离大于输电线铁塔主支撑角钢的宽度。
CN2010206797166U 2010-12-26 2010-12-26 输电线铁塔倾斜修正装置 Expired - Fee Related CN201933834U (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2010206797166U CN201933834U (zh) 2010-12-26 2010-12-26 输电线铁塔倾斜修正装置

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2010206797166U CN201933834U (zh) 2010-12-26 2010-12-26 输电线铁塔倾斜修正装置

Publications (1)

Publication Number Publication Date
CN201933834U true CN201933834U (zh) 2011-08-17

Family

ID=44445358

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2010206797166U Expired - Fee Related CN201933834U (zh) 2010-12-26 2010-12-26 输电线铁塔倾斜修正装置

Country Status (1)

Country Link
CN (1) CN201933834U (zh)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102535875A (zh) * 2010-12-26 2012-07-04 宁夏电力公司吴忠供电局 输电线铁塔倾斜修正装置及修正方法
CN106759556A (zh) * 2016-12-26 2017-05-31 中国化学工程第三建设有限公司 一种矫正塔体倾斜的方法

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102535875A (zh) * 2010-12-26 2012-07-04 宁夏电力公司吴忠供电局 输电线铁塔倾斜修正装置及修正方法
CN106759556A (zh) * 2016-12-26 2017-05-31 中国化学工程第三建设有限公司 一种矫正塔体倾斜的方法

Similar Documents

Publication Publication Date Title
CN204266224U (zh) 一种自升式平台桩腿装置
CN204876779U (zh) 倾斜杆塔矫正装置
CN103485539B (zh) 大型直埋式钢锚爪预埋件的施工控制方法
CN203604918U (zh) 大型设备的水平位置校正装置
CN207847228U (zh) 一种防倾倒水泥电线杆
CN110900082A (zh) 一种大型工字梁焊接平台及焊接方法
CN204024092U (zh) 一种新型型钢柱定位组件
CN203569552U (zh) 用于齿轮齿条爬升式垂直升船机齿条高效安装的辅助调节装置
CN102927409A (zh) 用于固定汽车生产线设备的可调式地脚装置
CN202899731U (zh) 输电线路铁塔倾斜调整提升装置
CN203404564U (zh) 一种用于设备安装找正、找平的校准装置
CN103669431B (zh) 一种煤矿采动区输电铁塔倾斜调整装置
CN201933834U (zh) 输电线铁塔倾斜修正装置
CN204858400U (zh) 倾斜杆塔矫正器
CN106744567B (zh) 一种检修隧道电缆的抬升装置
CN102619377B (zh) 改进的辅助抱杆固定底座
CN104852324A (zh) 一种辅助替换瓷横担的导线支撑装置
CN102535875A (zh) 输电线铁塔倾斜修正装置及修正方法
CN203960920U (zh) 煤矿采动区输电铁塔倾斜调整装置
CN105401780A (zh) 通用型人字抱杆底座
CN105080976A (zh) 立式轧机垫板安装方法及其装置
CN203728491U (zh) 汽车加工的重型零件顶升装置
CN113738156A (zh) 一种有限空间内的临时支撑结构及其拆除方法
CN208397434U (zh) 梁外延千斤顶支撑工装
CN110747914A (zh) 大型塔设备倾斜度校正方法

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
C17 Cessation of patent right
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20110817

Termination date: 20121226